Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Modeling and Simulation Plans in Support of Low Cost, Size, Weight, and Power Surveillance Systems for Detecting and Tracking Non-Cooperative Aircraft

RTCA Special Committee (SC) 228 has initiated a second phase for the development of minimum operational performance standards (MOPS) for UAS detect and avoid (DAA) systems. Technologies to enable UAS with less available Size, Weight, and Power (SWaP) will be considered. RTCA SC-228 has established sub-working groups and one of the sub-working groups is focused on aligning modeling and simulations activities across all participating committee members. This briefing will describe NASAs modeling and simulation plans for the development of performance standards for low cost, size, weight, and power (C-SWaP) surveillance systems that detect and track non-cooperative aircraft. The briefing will also describe the simulation platform NASA intends to use to support end-to-end verification and validation for these DAA systems. Lastly, the briefing will highlight the experiment plan for our first simulation study, and provide a high-level description of our future flight test plans. This briefing does not contain any results or data.

surveillance↗

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

Thermal↗

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

Thermal↗

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

TVAC↗

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data include, but are not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data include, but are not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrated sequence display device

Device integrates a planned test sequence with real-time changes indicated on a visual display which includes a record of both planned and unplanned events related to a time base. Motor driven paper chart can be advanced or reversed to display the time span of interest.

Rosine, D. R.↗

JT9D engine diagnostics. Task 2: Feasibility study of measuring in-service flight loads

The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.

Kafka, P. G.↗

Support to NASA's Advanced Space Technology Program

During the period of May through September 2000, Lee & Associates, LLC completed the following tasks as specified in the purchase order SOW: Assessment of current processes and structure and recommended improvements; Reviewed and commented on restructure options; Participated in closure of the Fastrac Delta Critical Design Review actions; Participated in the Fastrac Test readiness review (TRR) process for test planned at SSC and Rocketdyne; and Participated in the investigation of any anomalies identified during the Fastrac engine test data reviews.

Goetz, Otto↗

System Accommodation of Propylene Loop Heat Pipes For The Geoscience Laser Altimeter System (GLAS) Instrument

Loop Heat Pipes (LHP) are used for precise temperature control for NASA Goddard Space Flight Center's Geoscience Laser Altimeter System (GLAS) Instrument in a widely varying LEO thermal environment. Two propylene LHPs are utilized to provide separate thermal control for the Nd:YAG Lasers and the remaining avionics/detector components suite. Despite a rigorous engineering development and test plan to demonstrate the performance in the restrictive GLAS design, the flight units failed initial thermal vacuum acceptance testing at GSFC. Subsequent investigation revealed that compromises in the mechanical packaging of these systems resulted in inadequate charge levels for a concentric wick LHP. The redesign effort included larger compensation chambers that provide more fluid to the wick for start-up scenarios and highlighted the need to fully understand the limitations and accommodation requirements of new technologies in a system design application. Once again, seemingly minor departures from heritage configurations and limited resources led to performance and operational issues. This paper provides details into the GLAS LHP engineering development program and acceptance testing of the flight units, including the redesign effort.

Grob, Eric W.↗

The Hyper-X Flight Systems Validation Program

For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.

Redifer, Matthew↗

The Intelligent Flight Control Program (IFCS)

Institute for Scientific Research, Inc. (ISR) is pleased to submit this closeout report for the Research Cooperative Agreement NCC4-00128 of accomplishments for the Intelligent Flight Control System (IFCS) Project. It has been a pleasure working with NASA and NASA partners as we strive to meet the goals of this research initiative. ISR was engaged in this Research Cooperative Agreement beginning March 3, 2001 and ending March 31, 2003. During this time, a great deal has been accomplished and plans have been solidified for the continued success of this program. Our primary areas of involvement include the following: 1) ARTS II Master Test Plan; 2) ARTS II Hardware Design and Development; 3) ARTS II Software Design and Development; 4) IFCS PID/BLNN/OLNN Development; 5) Performed Preliminary and Formal Testing; 6) Documentation and Reporting.

Source record↗

Launch Abort System Flight Test Overview

This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.

Williams-Hayes, Peggy↗

Charpy Impact Characterization of Surveillance Specimens Harvested from Palisades High Fluence A-60 Capsule

Located on the shores of Lake Michigan, the Palisades Nuclear Generating Station (PNGS) was a nuclear power plant that operated in Covert Township, Michigan. The plant had a single pressurized water reactor that produced electricity for the region. The PNGS was shut down in 2022 after more than four decades of service. The PNGS included in its surveillance program a surveillance capsule, designated A-60, containing specimens of a weld metal with nickel content of about 1.36 wt% and copper content of about 0.25 wt%. The capsule was removed from its surveillance position in early 1995 and has been resident in the spent fuel pool since that time. This capsule was irradiated to a fluence of 1.96×10 20 n/cm 2 (E>1MeV) that is equivalent for more than 150 effective full power years (EFPYs) for the US reactor pressure vessel (RPV) fleet. The material is also of special interest because of its very high nickel content and potential for development of NiMnSi (nickel-manganese-silicon) precipitates. Combination of very high fluence and very high Ni and Cu content makes the material in this capsule of great interest as benchmark for currently developing embrittlement trend curves (ETC) aiming to predict embrittlement at high fluences. Multi-year efforts by the Light Water Reactor Sustainability (LWRS) Program personnel from the Materials Research Pathway (MRP) to harvest this capsule finally succeeded in 2023. As a result, the Westinghouse Electric Company (WEC) through contract with Oak Ridge National Laboratory (ORNL) came to PNGS site, retrieved the A-60 capsule, brought it to WEC Churchill hot cell facility, opened the capsule and sent all surveillance specimens in the capsule to ORNL for future characterization by July 2023. Total of 9 tensile and 48 Charpy specimens were inventoried in the ORNL hot cells. Testing plan has been developed based on available specimens. It includes hardness, tensile, Charpy impact, Mini-CT fracture toughness testing, in-situ thermal annealing, and microstructural characterization, including Atom Probe Tomography (APT). Charpy impact testing has been completed and results are presented in this report. Moreover, negotiations with Pressurized Water Reactors Owners Group (PWROG) and Westinghouse resulted in Westinghouse donating to ORNL a piece of archive weld and base metal such that unirradiated characterization of these materials can be performed as part of this project. Comparison of measured hardening and embrittlement has been performed and data are compared to available large database.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance testing of the Galileo attitude control system

Performance testing plans, procedures, and initial results for the Galileo Attitude and Articulation Control Subsystem are described. The objectives of performance testing include test bed comparisons, examining the interactions between spacecraft dynamics and controllers, and verifying the ability to tune control algorithms in flight to meet specific performance requirements. Two primary test beds are described. One, the Integration Test Laboratory, drives actual flight hardware components and support equipment with a real time computer simulation of spacecraft dynamics. The other, the Functional Simulator, is a nonreal time computer simulation with high fidelity spacecraft dynamics, including flexible appendages, fuel slosh, and simulated hardware components. Initial Functional Simulator results are presented which illustrate spacecraft response to open loop spin-up and turn commands. A closed loop sun acquisition turn is also demonstrated. Future tests for verifying performance of attitude determination, spacecraft control, and scan platform pointing functions are outlined.

Bell, C. E.↗

AMSD Cryo Actuator Testing

The actuator technology required for AMSD and subsequently NGST are critical in the successful development for future cryogenic systems. Kodak has undertaken an extensive test plan to determine the performance of the force actuators developed under the AMSD program. These actuators are currently in testing at MSFC and are expected to finish this test cycle in early June 2002.

Mullette, Mark↗

Experimental Assessment of the Reciprocating Feed System

The primary goal of this project was to design, construct, and test a full scale, high pressure simulated propellant feed system test bed that could evaluate the ability of the Reciprocating Feed System (RFS) to provide essentially constant flow rates and pressures to a rocket engine. The two key issues addressed were the effects of the transition of the drain cycle from tank to tank and the benefits of other hardware such as accumulators to provide a constant pressure flow rate out of the RFS. The test bed provided 500 psi flow at rates of the order of those required for engines in the 20,000 lbf thrust class (e.g., 20 to 40 lb/sec). A control system was developed in conjunction with the test article and automated system operation was achieved. Pre-test planning and acceptance activities such as a documented procedure and hazard analysis were conducted and the operation of the test article was approved by, and conducted in coordination with, appropriate NASA Marshall Space Flight Center personnel under a Space Act Agreement. Tests demonstrated successful control of flow rates and pressures.

Eddleman, David E.↗

Developmental and Cryogenic Thermal Vacuum (TVAC) Testing Lessons Learned

Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.

Mackenzie Byrnes↗