Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “terminal operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

NASA Space Network Project Operations Management: Past, Present and Future for the Tracking and Data Relay Satellite Constellation

The NASA Space Network (SN) Operations began with the launch of the first Tracking and Data Relay Satellite (TDRS-1) on April 4, 1983 with on-orbit operations conducted from the White Sands Ground Terminal (WSGT) in Las Cruces, New Mexico. Over the past 35 years, the SN has evolved to its current configuration comprised of four strategically located satellite ground stations and a constellation of ten geosynchronous Tracking and Data Relay Satellites that provide customer support 24 hours a day, 365 days per year, at an unprecedented 99.9% proficiency. The Space Network provides total global Communications, Data Relay, and Tracking services for Low Earth Orbiting (LEO) satellites, Human Space Flight, Expendable Launch Vehicles (ELV) and Scientific missions. This paper will address the Operations Management of the NASA Space Network and the complexities associated with this responsibility, as well as significant mission support highlights.

Sobchak, Ted↗

System Oriented Runway Management: A Research Update

The runway configuration used by an airport has significant implications with respect to its capacity and ability to effectively manage surface and airborne traffic. Aircraft operators rely on runway configuration information because it can significantly affect an airline's operations and planning of their resources. Current practices in runway management are limited by a relatively short time horizon for reliable weather information and little assistance from automation. Wind velocity is the primary consideration when selecting a runway configuration; however when winds are below a defined threshold, discretion may be used to determine the configuration. Other considerations relevant to runway configuration selection include airport operator constraints, weather conditions (other than winds) traffic demand, user preferences, surface congestion, and navigational system outages. The future offers an increasingly complex landscape for the runway management process. Concepts and technologies that hold the potential for capacity and efficiency increases for both operations on the airport surface and in terminal and enroute airspace are currently under investigation. Complementary advances in runway management are required if capacity and efficiency increases in those areas are to be realized. The System Oriented Runway Management (SORM) concept has been developed to address this critical part of the traffic flow process. The SORM concept was developed to address all aspects of runway management for airports of varying sizes and to accommodate a myriad of traffic mixes. SORM, to date, addresses the single airport environment; however, the longer term vision is to incorporate capabilities for multiple airport (Metroplex) operations as well as to accommodate advances in capabilities resulting from ongoing research. This paper provides an update of research supporting the SORM concept including the following: a concept of overview, results of a TRCM simulation, single airport and Metroplex modeling effort and a benefits assessment.

Lohr, Gary W.↗

Surface Movement Incidents Reported to the NASA Aviation Safety Reporting System

Increasing numbers of aircraft are operating on the surface of airports throughout the world. Airport operations are forecast to grow by more that 50%, by the year 2005. Airport surface movement traffic would therefore be expected to become increasingly congested. Safety of these surface operations will become a focus as airport capacity planning efforts proceed toward the future. Several past events highlight the prevailing risks experienced while moving aircraft during ground operations on runways, taxiways, and other areas at terminal, gates, and ramps. The 1994 St. Louis accident between a taxiing Cessna crossing an active runway and colliding with a landing MD-80 emphasizes the importance of a fail-safe system for airport operations. The following study explores reports of incidents occurring on an airport surface that did not escalate to an accident event. The Aviation Safety Reporting System has collected data on surface movement incidents since 1976. This study sampled the reporting data from June, 1993 through June, 1994. The coding of the data was accomplished in several categories. The categories include location of airport, phase of ground operation, weather /lighting conditions, ground conflicts, flight crew characteristics, human factor considerations, and airport environment. These comparisons and distributions of variables contributing to surface movement incidents can be invaluable to future airport planning, accident prevention efforts, and system-wide improvements.

Connell, Linda J.↗

Trajectory Specification for Terminal Air Traffic: Pairwise Conflict Detection and Resolution

Trajectory Specification is the explicit bounding and control of aircraft trajectories such that the position at any point in time is constrained to a precisely defined volume of space. The bounding space is defined by cross-track, along-track, and vertical tolerances relative to a reference trajectory that specifies position as a function of time. The tolerances are dynamic and will be based on the aircraft navigation capabilities and the current traffic situation. Assuming conformance, Trajectory Specification can guarantee safe separation for an arbitrary period of time even in the event of an air traffic control (ATC) system or datalink failure; hence it can help to achieve the high level of safety and reliability needed for ATC automation. It can also reduce the reliance on tactical backup systems during normal operation. This paper applies it to the terminal area around a major airport and presents algorithms and software for detecting and resolving conflicts. A representative set of pairwise conflicts was generated, and a fast-time simulation was run on them. All conflicts were successfully resolved in real time, demonstrating the computational feasibility of the concept.

terminal area↗

Interoperability and Concepts of Operation Assessment for Space Relay Services and Partnerships

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.

Eric J Knoblock↗

EMC test plan for shipboard in-harbor and at-sea measurements for L-band terminal

This test plan is to provide a procedure for the measurement of on-board radio frequency interference resulting from the operation of on-board radars (S-Band and X-Band). Field intensity measurements in the range of 1 to 10 GHz will be made using calibrated test instrumentation to determine possible adverse effects to the operation of the future installation of a Maritime L-Band Shipboard Satellite Communications Terminal, for use with the ATS-F and MARISAT Communications Satellites. A measurement will be made of power line conducted interference to determine the degree of power line isolation that may be required. There is also consideration of interference to the radars by the proposed L-Band terminals and observations will be made of the radar displays while L-Band transmitter operation is simulated. These tests will be made aboard the American Alliance container ship, United States Lines.

Source record↗

Improvements in Near-Terminator and Nocturnal Cloud Masks using Satellite Image Data over the Atmospheric Radiation Measurement Sites

Cloud detection using satellite measurements presents a big challenge near the terminator where the visible (VIS; 0.65 (micro)m) channel becomes less reliable and the reflected solar component of the solar infrared 3.9-(micro)m channel reaches very low signal-to-noise ratio levels. As a result, clouds are underestimated near the terminator and at night over land and ocean in previous Atmospheric Radiation Measurement (ARM) Program cloud retrievals using Geostationary Operational Environmental Satellite (GOES) imager data. Cloud detection near the terminator has always been a challenge. For example, comparisons between the CLAVR-x (Clouds from Advanced Very High Resolution Radiometer (AVHRR)) cloud coverage and Geoscience Laser Altimeter System (GLAS) measurements north of 60 degrees N indicate significant amounts of missing clouds from AVHRR because this part of the world was near the day/night terminator viewed by AVHRR. Comparisons between MODIS cloud products and GLAS at the same regions also shows the same difficulty in the MODIS cloud retrieval (Pavolonis and Heidinger 2005). Consistent detection of clouds at all times of day is needed to provide reliable cloud and radiation products for ARM and other research efforts involving the modeling of clouds and their interaction with the radiation budget. To minimize inconsistencies between daytime and nighttime retrievals, this paper develops an improved twilight and nighttime cloud mask using GOES-9, 10, and 12 imager data over the ARM sites and the continental United States (CONUS).

Detection↗

Control of nonlinear systems using terminal sliding modes

The development of an approach to control synthesis for robust robot operations in unstructured environments is discussed. To enhance control performance with full model information, the authors introduce the notion of terminal convergence and develop control laws based on a class of sliding modes, denoted as terminal sliders. They demonstrate that terminal sliders provide robustness to parametric uncertainty without having to resort to high-frequency control switching, as in the case of conventional sliders. It is shown that the proposed method leads to greater guaranteed precision in all control cases discussed.

Venkataraman, S. T.↗

The Use of LANDSAT DCS and Imagery in Reservoir Management and Operation

The author has identified the following significant results. The demonstration, local user terminal, has proven the hypothesis that a relatively inexpensive, automatic, and easily maintained ground receiving station for satellite relayed data is practical for an operational use.

Cooper, S.↗

Teamwork in the Terminal Area: Organizational Issues and Solutions

Dynamic growth and technology advances in commercial aviation have turned the terminal area into a complex, multi-organization workplace which requires the smooth coordination of many operational teams. In addition to pilots, cabin crew, air traffic controllers, and dispatch (who nominally work together throughout a flight), surface operations additionally involve local, ground and ramp controllers, ramp agents, maintenance, dozens of service contractors, and any number of teams who are responsible for airport operations. Under abnormal or emergency conditions, even more teams become actively involved. In order to accommodate growth and to meet productivity and safety challenges, numerous changes are being made in surface operations. Unfortunately, it is often the case that changes in technologies, organizational roles, procedures, and training are developed and implemented in isolated and piecemeal fashion without regard to cross organizational impact. Thus, there is a need for evaluation methodologies which assure integrated system safety for all organizations. Such methodologies should aid the understanding of how organizations work together and how changes in one domain affects the next. In this study, we develop one approach toward addressing these organizational issues. Examples of surface operations in abnormal situations are examined in regard to their impact on personnel in the terminal area. Timelines are given for the responses to incidents, along with the necessary communication links, the specific roles that members of terminal teams have, and any overlapping responsibilities. Suggestions to improve cross-operational teamwork are given. Methods of graphic representation are explored, both in regards to human links and access to information. The outcome of such an approach should enhance the understanding which is critical for resolving organizational conflicts and maximizing system effectiveness.

Parke, Bonny K.↗

Computational Model of Human and System Dynamics in Free Flight: Studies in Distributed Control Technologies

This paper presents a set of studies in full mission simulation and the development of a predictive computational model of human performance in control of complex airspace operations. NASA and the FAA have initiated programs of research and development to provide flight crew, airline operations and air traffic managers with automation aids to increase capacity in en route and terminal area to support the goals of safe, flexible, predictable and efficient operations. In support of these developments, we present a computational model to aid design that includes representation of multiple cognitive agents (both human operators and intelligent aiding systems). The demands of air traffic management require representation of many intelligent agents sharing world-models, coordinating action/intention, and scheduling goals and actions in a potentially unpredictable world of operations. The operator-model structure includes attention functions, action priority, and situation assessment. The cognitive model has been expanded to include working memory operations including retrieval from long-term store, and interference. The operator's activity structures have been developed to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. System stability and operator actions can be predicted by using the model. The model's predictive accuracy was verified using the full-mission simulation data of commercial flight deck operations with advanced air traffic management techniques.

Corker, Kevin M.↗

The Airfloat HL project

A design study is described for a large low-cost rigid airship intended primarily for the movement of large indivisible loads (cargo) between industrial sites. A survey of the ship and its overall performance is followed by accounts of the operational procedures for the above function and for an alternative application to unit module transfer between fixed terminals. A final section indicates the estimated costs of construction and operation. Safety factors are also considered. Lifting devices such as winches, hoists are shown and described, and airship configurations are also shown.

Mowforth, E.↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 micrometers in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 micrometers or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in April 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This presentation presents relevant results of the post-test inspection for both discharge and neutralizer cathodes.

Lifetime↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 h of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Ion engine↗

Evaluating the Use of High-Fidelity Simulator Research Methods to Study Airline Flight Crew Resilience

As it evolves, aviation will continue to require integration of a wide range of safety systems and practices, some of which are already in place and others that are yet to be developed. New concepts in system safety thinking have emerged to consider not only what may go wrong, but also what can be learned when things go right during commercial flight operations. Taken together, these complementary perspectives form a more comprehensive approach to systemsafety thinking that can help to recognize and preserve the resilient performance capabilities currently provided by humans. A need exists, however, for research methods to enable better understanding of the human contributions to aviation safety. NASA’s System-Wide Safety Project supports research on using flight simulation methods to study operator resilience and safety-producing behaviors. Building on prior NASA efforts investigating procedural non-adherences during area navigation standard terminal route arrivals, a high-fidelity commercial aviation line operational simulation (LOS) experiment has been designed to study how flight crews anticipate, monitor for, respond to, and learn from expected and unexpected disturbances during these operations. A diverse set of LOS scenarios were developed to simulate highly realistic, complex, but routinely encountered operational situations. Each scenario provided multiple opportunities to collect data on how flight crews manage threats and errors, as well as novel opportunities to observe resilient and safety-producing behaviors. The experimental design, implications for the study of safety-producing behaviors using simulation, and considerations for airline pilot training will be discussed.

Chad L Stephens↗

Laser-optical blade tip clearance measurement system

A laser-optical measurement system was developed to measure single blade tip clearances and average blade tip clearances between a rotor and its gas path seal in rotating component rigs and complete engines. The system is applicable to fan, compressor and turbine blade tip clearance measurements. The engine mounted probe is particularly suitable for operation in the extreme turbine environment. The measurement system consists of an optical subsystem, an electronic subsystem and a computing and graphic terminal. Bench tests and environmental tests were conducted to confirm operation at temperatures, pressures, and vibration levels typically encountered in an operating gas turbine engine.

Barranger, J. P.↗