Learning Team Breach of a Posted Barricade to Connect an Instrument to Power
On February 15, 2017, a DESHF-STO HPFC (health physics field coordinator) was asked by an NEN-1 employee if they could move an instrument, a radiation dosimetry system, from A166A to another lab at TA-35 Building 2. The HPFC walked the job down and discovered the instrument was connected to power. The instrument had not been connected to power previously. See photo 1. The instrument is located within an RCA (radiological control area). Entry to connect the instrument to power the instrument requires contacting RP. RP personnel had not been contacted as required as stated in the RCA posting.