Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Layer-by-Layer-Processed Organic Solar Cells with 18.02% Efficiency Enabled by Regulating the Aggregation of Bottom Polymers

The fabrication of organic solar cells (OSCs) by a layer-by-layer (LBL) method has attracted growing attention in recent years. As already known, the pre-aggregates of conjugated polymers in solution have a profound impact on their microstructure morphology in films. Herein, by simply controlling the solution temperature and annealing processes, the pre-aggregation behavior of D18 polymer in solution can be fine-tuned and the microstructure of D18 bottom layer is well manipulated. The optimized D18 bottom layer can effectively regulate L8-BO upper-layer-forming suitable networks for efficient charge transportation. In addition, a vertical phase separation with a special D/D:A/A structure (P-i-N-type component distribution) is also formed. As a result, compared to the 16.43% power conversion efficiency (PCE) of the bulk heterojunction devices, such control enables bilayer OSC devices based on the polymer D18 and L8-BO to deliver an enhanced PCE of 18.02% with simultaneously improved short-circuit current density, open-circuit voltage, and fill factor. Importantly, it is also demonstrated in these results that the LBL deposition process utilizing the pre-aggregation of polymer and its fiber-network-forming ability is a very promising approach to improve charge dynamics, suppress carrier recombination, and fabricate highly efficient OSCs.

14 SOLAR ENERGY↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of an Additively Manufactured Recuperator With 800 °C Inlet Temperature for sCO2 Power Cycle Application

Abstract Recuperators with design temperatures at and above 800 °C can further increase the thermal efficiency of supercritical CO2 power cycles by enabling higher turbine exhaust temperatures. Mar-M247 is a well-suited nickel-based superalloy for high temperature service due to its high creep strength that prevents excessive material thickness being required for pressure containment. Additive manufacturing using a high-speed laser-directed energy deposition (L-DED) process presents a promising solution, with build trials demonstrating the ability to produce nonconventional flow channels for enhanced heat transfer. A design process is presented that includes aerothermal and mechanical evaluation to maximize performance within the constraints of the manufacturing process. A 2-D heat transfer network and pressure drop code allows prediction of flow distribution and its effect on overall thermal performance. Established literature correlations, along with CFD simulation, inform the prediction of heat transfer coefficients and friction factors for the flowpaths and enhancement features in the heat exchanger core. Mechanical evaluation using finite element analysis (FEA) modeling with the intent of the ASME Boiler & Pressure Vessel Code (BPVC) Section VIII, Div. 2 assesses the operational safety of the design. The detailed design features annular finned passages that take advantage of helical flow paths to distribute the flow from separated headers to shared heat transfer surfaces. Performance predictions for the recuperator at a 50 kW scale provide insights into the feasibility of the additively manufactured (AM) process to produce recuperators on a commercial scale that extend existing operating envelopes.

Engineering↗

Options for the Removal of Cesium and Strontium from Acidic Uranyl Sulfate Solutions from Molybdenum-99 Production: Part II The Effect of Sodium Carbonate Adjustment to pH 9 on Strontium Removal

A small laboratory-scale column process aimed at removing fission products from prototypical acidic sulfate solution wastes from a prototypical Mo-99 recovery process has been operated in a radioactive materials hood at Savannah River National Laboratory. This equipment has been operated with realistic concentrations of uranium (0.4 wt % 235 U), plutonium ( 239 Pu), neptunium ( 237 Np), non-radioactive surrogates of common fission products (including Cs and Sr) and two promising absorbents – AMP-PAN and CST R9120-B. The goal of this work was to demonstrate the removal and concentration of high specific activity isotopes which are expected to dominate the classification of the low-level waste from the production of 99 Mo. Both AMP-PAN and CST R9120-B are attractive absorbents for the removal of 137 Cs from an acidic sulfate waste stream. They do not provide a solution for the removal of 90 Sr from the acidic solutions. CST was shown to be useful at removing both Cs and Sr after adjustment of the acidic sulfate solution with sodium carbonate to pH 9. Limited removal of transuranic species and almost no removal of uranium was observed for CST R9120B absorbent. This could be important due to the relatively large amount of uranium expected to be present in such waste streams. The capacity of these absorbents for 137 Cs will likely be dependent on the Cs concentration in the solutions processed but loading in excess of 0.7 mg Cs per gram of CST absorbent while loading 0.14 mg Sr per gram of CST absorbent appears to be achievable from pH 9 carbonate solution.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computationally efficient and error aware surrogate construction for numerical solutions of subsurface flow through porous media

Limiting the injection rate to restrict the pressure below a threshold at a critical location can be an important goal of simulations that model the subsurface pressure between injection and extraction wells. The pressure is approximated by the solution of Darcy’s partial differential equation for a given permeability field. The subsurface permeability is modeled as a random field since it is known only up to statistical properties. This induces uncertainty in the computed pressure. Solving the partial differential equation for an ensemble of random permeability simulations enables estimating a probability distribution for the pressure at the critical location. These simulations are computationally expensive, and practitioners often need rapid online guidance for real-time pressure management. An ensemble of numerical partial differential equation solutions is used to construct a Gaussian process regression model that can quickly predict the pressure at the critical location as a function of the extraction rate and permeability realization. The Gaussian process surrogate analyzes the ensemble of numerical pressure solutions at the critical location as noisy observations of the true pressure solution, enabling robust inference using the conditional Gaussian process distribution. Our first novel contribution is to identify a sampling methodology for the random environment and matching kernel technology for which fitting the Gaussian process regression model scales as O ( n log n ) instead of the typical O ( n 3 ) rate in the number of samples n used to fit the surrogate. The surrogate model allows almost instantaneous predictions for the pressure at the critical location as a function of the extraction rate and permeability realization. Our second contribution is a novel algorithm to calibrate the uncertainty in the surrogate model to the discrepancy between the true pressure solution of Darcy’s equation and the numerical solution. Finally, although our method is derived for building a surrogate for the solution of Darcy’s equation with a random permeability field, the framework broadly applies to solutions of other partial differential equations with random coefficients.

54 ENVIRONMENTAL SCIENCES↗

FY 23 Filtration of Hanford Tank 241-SY-101 Supernatant at 16 °C

Approximately 9 liters of supernatant from Hanford waste tank 241-SY-101 was delivered by Washington River Protection Solutions to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory. The thirty-six SY-101 sample bottles were comprised of six sets of six samples, with each set pulled from a unique tank sampling level. Prior to testing, samples from each level were composited to provide nominally level-independent feed for dead end filtration and ion exchange testing. The composited 241-SY-101 supernatant was chilled to 16 °C for 1 week prior to testing. Filtration testing was then conducted using a backpulse dead-end filter (BDEF) system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the RPL. This was done to provide waste processing benchmarks for 200 West Area wastes in the West Area Risk Management project. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 . During filtration of the differential pressure required to effect filtration at 0.065 gpm/ft 2 increased little over the filtration campaign and never reached 2 psid (the Tank Side Cesium Removal system action limit). This indicates that the Media Grade 5 filter should perform well when processing SY-101 supernatant. After completing filtration of the SY-101 feed, the filter was cleaned. Solids concentrated from the backpulse solutions displayed calcium phosphate, aluminum oxides, aluminum-chromium nanoparticle agglomerates. Electron diffraction was used to determine the types of phases that were present in the solids. Most of the phases found were only weakly crystalline, possibly owing to their rapid precipitation during the process water treatment. The identifications of the phases therefore are tentative.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Potential for Precipitation of Solids during Storage of Non-Aluminum SNF Solutions

Non-aluminum clad spent nuclear fuels (NASNF) stored in the L-Area basin will be dissolved in H-Canyon using the 6.3D electrolytic dissolver. The solutions will be stored in either the hot or warm canyon until the preparation of a sludge batch for the Defense Waste Processing Facility. Spent nuclear fuel solutions could be stored for 1-2 years before transfer to the H-Area Tank Farm depending on the interval between sludge batches. The solution level in the storage tanks will be maintained; therefore, precipitation of solids due to evaporation is not an issue. However, the precipitation of solids from completely dissolved SNF due to solution instabilities has been observed during intermediate storage of solutions generating hydrated oxides.The presence of fissile material in these solids is generally associated with zirconium molybdate, which is known to act as a host lattice for Pu and can carry the actinides upon precipitation. The formation of zirconium molybdate solids which carry fissile material is a potential concern for the storage of NASNF solutions. To address this concern, the Savannah River National Laboratory performed a literature review to identify knowledge gaps which may require experimental work to determine if the formation of solids is a concern during storage of these solutions. Based on the literature review, the precipitation of zirconium molybdate solids from the Campaign 1 NASNF solutions during intermediatestorage is expected. This conclusion is supported by the identification of zirconium molybdate solids found on the H-Canyon 6.1D Dissolver MK-12 insert spacer. The formation of the zirconium molybdate solids is attributed to hydrolysis and radiolytic processes in the nitric acid solution. As the molybdate solids form, U and Pu can substitute for Zr in the crystal lattice resulting in co-precipitation. Generally, the Pu substitutes directly into the crystal lattice during precipitation while the U associated with the molybdate solids more likely absorbs from the solution. The U in the NASNF solutions is present as uranyl nitrate, a 2+ cation which will not substitute as easily into the molybdate crystal lattice for the Zr 4+ ion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A simple and practical process modeling methodology for pressure swing adsorption

Although many dynamic models exist for the design and simulation of pressure swing adsorption (PSA) processes, these models involve the solution of a complex system of coupled partial differential equations. Process engineers need a simple, practical, and yet robust short-cut model that helps decide whether to implement a PSA system in a process flowsheet. This work presents a “virtual” moving bed modeling methodology that considers only mass and energy balances and adsorption isotherms to describe the cyclic steady state behavior of PSA systems. Similar to tray efficiencies in distillation calculations, adsorption efficiencies are further introduced to account for system “non-ideality.” Finally, a lab-scale air separation system is used to illustrate the application of this modeling methodology.

42 ENGINEERING↗

Construction of a Code Verification Matrix for Heat Conduction With Finite Element Code Applications

When establishing the pedigree of a simulation tool, code verification is used to ensure that the implemented numerical algorithm is a faithful representation of its underlying mathematical model. During this process, numerical results on various meshes are systematically compared to a reference analytic solution. The selection of analytic solutions can be a laborious process, as it is difficult to establish adequate code confidence without performing redundant work. In this report we address this issue by applying a physics-based process that establishes a set of reference problems. In this process, code simulation options are categorized and systematically tested, which ensures that gaps in testing are easily identified and addressed. The resulting problems are primarily intended for code verification analysis but may also be useful for comparison to other simulation codes, troubleshooting activities, or training exercises. The process is used to select fifteen code verification problems relevant for the one-dimensional steady-state heat conduction equation. These problems are applicable to a wide variety of simulation tools, but, in this work, a demonstration is performed using the finite element-based nuclear fuel performance code BISON. Convergence to the analytic solution at the theoretical rate is quantified for a selection of the problems, which establishes a baseline pedigree for the code. Not only can this standard set of conduction solutions be used for verification of other codes, but also the physics-based process for selecting problems can be utilized to quantify and expand testing for any simulation tool.

42 ENGINEERING↗

Filtration of Hanford Tank 241-AN-107 Supernatant at 16 °C

Approximately 9 liters of supernatant from Hanford waste tank 241-AN-107 was delivered by Washington River Protection Solutions to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory. The thirty-six AN-107 sample bottles consisted of six sets of six samples, with each set pulled from a unique tank sampling level. Prior to testing, samples from each level were composited to provide nominally level-independent feed for dead end filtration and ion exchange testing. The composited 241-AN-107 supernatant was chilled to 16 °C for 1 week prior to testing. Filtration testing was then conducted using a backpulse dead-end filter (BDEF) system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the RPL. The purpose of this testing is to a) demonstrate dead-end filtration (DEF) of AN-107 feed at reduced temperature to obtain prototypic tank side cesium removal (TSCR) flux rates and identify issues that may impact filtration after dilution to 5.5M Na, and b) provide feed for a follow on ion exchange unit operation. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 . During filtration the differential pressure required to effect filtration at 0.065 gpm/ft 2 was slow to increase for most of the filtration campaign. After all the feed bottles had been pumped into the slurry reservoir, the bottoms of the bottles were added to the reservoir and transmembrane pressure (TMP) reached 2.0 psid (the TSCR action limit). The prototypic filter cleaning process was unable to effectively restore filter performance, and cleaning with oxalic acid was required before flow through the filter could be restored. This indicates that the Media Grade 5 filter may require an alternative cleaning protocol when processing AN-107 supernatant. After completing filtration of the AN-107 feed, the filter was cleaned. Solids concentrated from the backpulse solutions were composed of natrophosphate, Mn-Fe phases, and fluoro-natrophosphate that occurred as particle agglomerates. The individual particles were in some cases 100s of micrometers across which is consistent with prior observations from AN-107 supernate waste characterizations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Photonic curing of solution-deposited ZrO 2 dielectric on PEN: a path towards high-throughput processing of oxide electronics

High-throughput manufacturing of oxide electronics will enable new applications ranging from large-area displays to flexible medical devices and low-cost solar panels. However, high quality oxide films from solution-based precursors typically require 20 minutes or more of thermal annealing at high temperature (> 250 °C) for each layer, severely limiting both the throughput and substrate choice. Here, we report high speed photonic curing of ZrO 2 dielectric thin films on flexible plastic substrates. The curing and patterning processes can be achieved simultaneously by using shadow mask patterning or adjusting conditions to convert oxide only on top of underlying metal contacts, i.e. self-aligned patterning. Metal-insulator-metal capacitors using two layers of ZrO 2 films photonically cured in just 100 seconds per layer show non-dispersive capacitance-frequency behavior from 10 2 to 10 6 Hz, high areal capacitance of 200 nF/cm 2 and low dissipation factor of 0.03 at 10 5 Hz, leakage current density of ~ 10 -7 A/cm 2 at an applied field of 2 MV/cm, and a breakdown field of nearly 8 MV/cm. Using an upgraded tool, similar dielectric properties are achieved in as short as 100 milliseconds using a single pulse of light, revealing a pathway to oxide film processing beyond 30 m/min.

14 SOLAR ENERGY↗

Abstract for CRADA between National Energy Technology Laboratory and Giner Inc.

The National Energy Technology Laboratory (NETL) and Giner Inc. will collaborate in the development and scaling of an electrochemical system to capture and regenerate CO 2 from air with high efficiency and low energy input under an awarded project from the Department of Energy’s Direct Air Capture Pre Commercialization Technology Prize. Giner’s prototype design utilizes a hydroxide-based sorbent to capture the CO 2 from ambient air and convert it to carbonate in solution. The carbonate is then regenerated electrochemically back into CO 2 , releasing a purified, concentrated CO 2 stream ideal for downstream utilization. This process recycles the capture solution and all generated byproducts, including water and hydrogen, making it an extremely resource- and energy-efficient system. This collaboration will facilitate the deployment of this cost-effective solution for direct air capture of CO 2 to enable reduction in global greenhouse gases and advance NETL’s ongoing CO 2 conversion efforts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Innovation in Radiological Security, Part 2 of 2 – Insights into Developing a Cloud-hosted Security Technology

A Sentry Remote Monitoring System (Sentry-RMS) is a stand-alone security system that provides detection, assessment, and communication of priority alarms as an additional means of thwarting internal and external threats to sites that maintain radiological material. The SEntry-RMS CommUnications and REsponse (Sentry-SECURE) platform is an optional feature of the Sentry-RMS that relays priority alarm information to the identified response stakeholders. Sentry-SECURE is hosted in a cloud environment that abstracts the data owner’s and data consumer’s platforms to allow for greater information sharing. This promotes situational awareness amongst authorized users and enables future innovation among modern response platforms. When securely architecting a cloud solution such as this, the use of design paradigms can be an effective tool to increase the accuracy and reliability of cyber- and information-security-related decisions made throughout the development process. This approach also supports the categorization of design considerations into three levels: industry concepts, project approaches, and data protections for digital processes. Industry concepts consist of the notional underpinnings that guide or motivate a security process, system, or design but often lack any tangible attributes. Project approaches represent decisions made during the design and development process to prioritize a solution, method, or practice above another that may provide a comparable functional output but lacks a desired security benefit. Data protections for digital processes represent the selection, integration, and implementation of specific controls for a given asset. This paper will explore specific examples of how Sentry-SECURE has been designed to account for considerations at each of these three levels, while balancing the operational intent of the platform with the security enhancements necessary to maintain data integrity, availability, and confidentiality.

assessment, RMS, security, physical, cloud, Cyber ↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Iodide manipulation using zinc additives for efficient perovskite solar minimodules

Abstract Interstitial iodides are the most critical type of defects in perovskite solar cells that limits efficiency and stability. They can be generated during solution, film, and device processing, further accelerating degradation. Herein, we find that introducing a small amount of a zinc salt- zinc trifluoromethane sulfonate (Zn(OOSCF 3 ) 2 ) in the perovskite solution can control the iodide defects in resultant perovskites ink and films. CF 3 SOO ̶ vigorously suppresses molecular iodine formation in the perovskites by reducing it to iodide. At the same time, zinc cations can precipitate excess iodide by forming a Zn-Amine complex so that the iodide interstitials in the resultant perovskite films can be suppressed. The perovskite films using these additives show improved photoluminescence quantum efficiency and reduce deep trap density, despite zinc cations reducing the perovskite grain size and iodide interstitials. The zinc additives facilitate the formation of more uniform perovskite films on large-area substrates (78-108 cm 2 ) in the blade-coating process. Fabricated minimodules show power conversion efficiencies of 19.60% and 19.21% with aperture areas of 84 and 108 cm 2 , respectively, as certified by National Renewable Energy Laboratory (NREL), the highest efficiency certified for minimodules of these sizes.

14 SOLAR ENERGY↗

Automatically adaptive stabilized finite elements and continuation analysis for compaction banding in geomaterials

Under compressive creep, viscoplastic solids experiencing internal mass transfer processes can accommodate singular cnoidal wave solutions as material instabilities at the stationary wave limit. These instabilities appear when the loading rate is significantly faster than the material's capacity to diffusive internal perturbations, leading to localized failure features (e.g., cracks and compaction bands). These cnoidal waves, generally found in fluids, have strong nonlinearities that produce periodic patterns. Due to the singular nature of the solutions, the applicability of the theory is currently limited. Additionally, practical simulation tools require proper regularization to overcome the challenges that singularity induces. We focus on the numerical treatment of the governing equation using a nonlinear approach building on a recent adaptive stabilized finite element method. This automatic refinement method provides an error estimate that drives mesh adaptivity, a crucial feature for the problem at hand. We compare the performance of this adaptive strategy against analytical and standard finite element solutions. We then investigate the sensitivity of the diffusivity ratio, the parameter controlling the process, and identify multiple possible solutions with several stress peaks. We also show the evolution of the spacing between peaks for all solutions as a function of that parameter.