A conceptual study of the SSV/GN&C system data bus
Development of time shared data bus concept for use with space shuttle guidance, navigation, and control system
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Development of time shared data bus concept for use with space shuttle guidance, navigation, and control system
The functional paths of the Orbital Maneuver Subsystem (OMS) is defined. The operational flight instrumentation required for performance monitoring, fault detection, and annunciation is described. The OMS is a pressure fed rocket engine propulsion subsystem. One complete OMS shares each of the two auxiliary propulsion subsystem pods with a reaction control subsystem. Each OMS is composed of a pressurization system, a propellant tanking system, and a gimbaled rocket engine. The design, development, and operation of the system are explained. Diagrams of the system are provided.
The design and implementation of hardware and software systems involved in using a 40,000 bit/second communication line as the connecting link between an IMLAC PDS 1-D display computer and a Univac 1108 computer system were described. The IMLAC consists of two independent processors sharing a common memory. The display processor generates the deflection and beam control currents as it interprets a program contained in the memory; the minicomputer has a general instruction set and is responsible for starting and stopping the display processor and for communicating with the outside world through the keyboard, teletype, light pen, and communication line. The processing time associated with each data byte was minimized by designing the input and output processes as finite state machines which automatically sequence from each state to the next. Several tests of the communication link and the IMLAC software were made using a special low capacity computer grade cable between the IMLAC and the Univac.
The implementation of a partitioned numerical algorithm for determining the dynamic response of coupled structure/controller/estimator finite-dimensional systems is reviewed. The partitioned approach leads to a set of coupled first and second-order linear differential equations which are numerically integrated with extrapolation and implicit step methods. The present software implementation, ACSIS, utilizes parallel processing techniques at various levels to optimize performance on a shared-memory concurrent/vector processing system. A general procedure for the design of controller and filter gains is also implemented, which utilizes the vibration characteristics of the structure to be solved. Also presented are: example problems; a user's guide to the software; the procedures and algorithm scripts; a stability analysis for the algorithm; and the source code for the parallel implementation.
On this first day of the STS-78 mission, the flight crew, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Ph.D. and Robert B. Thirsk, M.D., can be seen preforming pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Henricks shares a unique view of Columbia's climb to orbit with flight controllers from a small camera that was mounted on the flight deck. The video follows Columbia's flight from just before main engine start through main engine cutoff, showing the force of main engine and solid booster ignition as experienced by the astronauts.
On this seventh day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, Shannon Lucid, Jay Apt, and Carl E. Walz, share a brief video tour of the Mir Space Station with flight controllers, taking a break from the transfer activities that has occupied the astronauts' time during three days of docked operations. Readdy and Apt floated through several of Mir's modules and back into Atlantis' double Spacehab module during the tour pointing out the numerous transfer items stowed on both spacecraft. Readdy, Wilcutt, Lucid and Blaha are seen discussing their mission in an interview with CNN's John Holliman.
Unique power control technology has been incorporated into an electrical power control unit (EPCU) for the Fluids and Combustion Facility (FCF). The objective is to maximize science throughput by providing a flexible power system that is easily reconfigured by the science payload. Electrical power is at a premium on the International Space Station (ISS). The EPCU utilizes advanced power management techniques to maximize the power available to the FCF experiments. The EPCU architecture enables dynamic allocation of power from two ISS power channels for experiments. Because of the unique flexible remote power controller (FRPC) design, power channels can be paralleled while maintaining balanced load sharing between the channels. With an integrated and redundant architecture, the EPCU can tolerate multiple faults and still maintain FCF operation. It is important to take full advantage of the EPCU functionality. The EPCU acts as a buffer between the experimenter and the ISS power system with all its complex requirements. However, FCF science payload developers will still need to follow guidelines when designing the FCF payload power system. This is necessary to ensure power system stability, fault coordination, electromagnetic compatibility, and maximum use of available power for gathering scientific data.
In order to handle the expected increase in air traffic volume, the next generation air transportation system is moving towards a distributed control architecture, in which groundbased service providers such as controllers and traffic managers and air-based users such as pilots share responsibility for aircraft trajectory generation and management. This paper presents preliminary research investigating a distributed trajectory-oriented approach to manage traffic complexity, based on preserving trajectory flexibility. The underlying hypotheses are that preserving trajectory flexibility autonomously by aircraft naturally achieves the aggregate objective of avoiding excessive traffic complexity, and that trajectory flexibility is increased by collaboratively minimizing trajectory constraints without jeopardizing the intended air traffic management objectives. This paper presents an analytical framework in which flexibility is defined in terms of robustness and adaptability to disturbances and preliminary metrics are proposed that can be used to preserve trajectory flexibility. The hypothesized impacts are illustrated through analyzing a trajectory solution space in a simple scenario with only speed as a degree of freedom, and in constraint situations involving meeting multiple times of arrival and resolving conflicts.
Mars Express (MEX), the first planetary mission of the European Space Agency (ESA), reached Mars on December 25th 2003. Since then it is performing routine operations. Its operational phase had to cover one Martian year, with the possibility of an extension for a second Martian year (i.e. until November 2007). The end of the mission extension is approaching but, given the good health of the payload instruments and the high science return of the mission, there is a strong will to achieve further extensions. Mars Express is also seen as an important asset, capable to provide relay functions for future Martian missions. The ESA Science Program Committee has recently approved a second extension of the MEX mission until May 2009 and even further extensions are possible. Mars Express has an eccentric quasi-polar orbit with a period of approximately 6.72 hours and a pericentre height of about 300 km. Science observations are mainly performed at pericentre (but not only). In addition the orbit has a resonance of 11 revolutions per 3 Martian days. This means that ground tracks corresponding to orbits separated by 11 revolutions are adjacent, such that a given area can be covered by the on-board camera without leaving gaps. The J2 effect of Mars causes a drift of both ascending node and argument of pericentre. The drift of argument of pericentre makes it possible to observe periodically all Mars latitudes from close distance. Illumination conditions at pericentre are influenced by both the drift of the argument of pericentre and the drift of ascending node, as well as by the rotation of Mars around the Sun. The original MEX routine orbit was optimized for the duration of the nominal mission and extension, such that it produced a balanced share of day-side observations (for the optical instruments) and night-side observations (for the radar). The orbit was thus not optimized for the time beyond the assumed extension. Indeed, the evolution of the ascending node and argument of pericentre would cause in the following years a drift of the pericentre towards night-side observation conditions, hence uninteresting for the optical instruments. In order to prevent this an optimisation process for the future routine orbit has taken place. The share between day-side and night-side observations can be controlled by adjusting the drift of argument of pericentre and ascending node. This can in particular be achieved by changing the semimajor axis, eccentricity and/or inclination. A change of inclination is inefficient compared to a change in semimajor axis and eccentricity, and has therefore been discarded. An in-plane maneuvre can be performed to change both semi-major axis and eccentricity, and thus the period of the orbit. Although an apocentre manoeuvre is cheaper in terms of deltaV, it would result in raising the pericentre height, which is unfavourable for close observations. Hence a pericentre manoeuvre is proposed, which will increase the apocentre height. A repeat cycle is still required to allow mapping areas with adjacent ground tracks, so the change of semimajor axis must result in a new resonance. Resonances 18:5, 25:7 and 7:2 have been considered as potential candidates. The resulting long term evolution of the observation conditions has been analysed. Finally it has been decided to perform a change of orbit to reach the 18:5. Another aspect of the optimisation process is the control of the ground track. The previous MEX reference trajectory included regular maneuvres at every apocentre in order to adjust the orbital period, such that the separation of the ground tracks would be optimal, regardless of the latitude of pericentre. The implementation of the actual delatVs on-board was done partly by optimizing the attitude of reaction-wheel desaturation activities. Despite of it, this strategy has a significant propellant cost, because it prevents to optimize reaction wheel de-saturation activities to minimize propellant consumption. Therore, with the aim at preserving propellant resources for a long time extension it has been agreed to stop the ground-track control. This requires now a more accurate science operation planning, with improved attitude pointing control. Finally, the approach to phase Mars Express to provide back-up relay functions for NASA Phoenix landing is explained. In the context of the routine trajectory optimisation a new requirement for close fly-bys at Phobos, with different observation geometries, has been specified. The approach to fulfill this requirement is explained.
There are over 70,000 flights managed per day in the National Airspace System, with approximately 7,000 aircraft in the air over the United States at any given time. Operators of each of these flights would prefer to fly a user-defined “4D” trajectory (4DT), which includes arrival and departure times; preferred gates and runways at the airport; efficient, wind-optimal routes for departure, cruise and arrival phase of flight; and fuel efficient altitude profiles. To demonstrate the magnitude of this achievement a single flight from Los Angeles to Baltimore, accesses over 35 shared or “constrained” resources that are managed by roughly 30 air traffic controllers (at towers, approach control and en route sectors); along with traffic managers at 12 facilities, using over 22 different, independent automation system (including TBFM, ERAM, STARS, ASDE-X, FSM, TSD, GPWS, TCAS, etc.). In addition, dispatchers, ramp controllers and others utilize even more systems to manage each flight’s access to operator-managed resources. Flying an ideal 4DT requires successful coordination of all flight constraints among all flights, facilities, operators, pilots and controllers. Additionally, when conditions in the NAS change, the trajectories of one or more aircraft may need to be revised to avoid loss of flight efficiency, predictability, separation or system throughput. The Aviation Safety Network has released the 2016 airliner accident statistics showing a very low total of 19 fatal airliner accidents, resulting in 325 fatalities1. Despite several high profile accidents, the year 2016 turned out to be a very safe year for commercial aviation, Aviation Safety Network data show. Over the year 2016 the Aviation Safety Network recorded a total of 19 fatal airliner accidents [1], resulting in 325 fatalities. This makes 2016 the second safest year ever, both by number of fatal accidents as well as in terms of fatalities. In 2015 ASN recorded 16 accidents while in 2013 a total of 265 lives were lost. How can we keep it that way and not upset the apple cart by premature insertion of innovative technologies, functions, and procedures? In aviation, safety nets function as the last system defense against incidents and accidents. Current ground-based and airborne safety nets are well established and development to make them more efficient and reliable continues. Additionally, future air traffic control safety nets may emerge from new operational concepts.
Cooperative practices will likely be foundational to future digitally enabled airspace operations characterized by decentralized and asynchronous decision-making. This paper explores the implementation of cooperative practices in high-altitude airspace. The digitally enabled operations framework, under exploratory investigation by NASA as a potential new operating mode, which is enabled and dependent on digital technologies and information sharing, may create new operational possibilities for a wide range of vehicle types and missions. An essential element of the operating mode framework under investigation, cooperative practices, could empower operators to manage critical functions such as deconfliction, equitable airspace usage, and demand-capacity balancing. The use of cooperative practices would involve asynchronous flight information sharing and decentralized conflict management by operators, representing a major change from traditional air traffic services that use synchronous surveillance information to support centralized decision-making by air traffic controllers. This paper details three key components for implementing cooperative practices for decentralized, digitally enabled operations: (a) intent modeling and sharing, (b) conflict detection, and (c) cooperative deconfliction.
In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)
Virtual power plants (VPPs) can provide grid services by aggregating and controlling many distributed energy resources. However, their design, operation, level of participation, and outcomes depend on the regulatory and market environments they operate in, DER owner preferences, grid service value, and technical capabilities (e.g., communications, forecasting, controls, user interfaces). Although VPPs are inherently complex, they could enable high shares of behind-the-meter solar plus storage and reduce the cost of electrifying, e.g., personal vehicles and space heating.
Over the past decade, academic research on advanced controls has slowly transitioned into new software platforms, giving rise to various companies developing and deploying these innovative products, including solutions for light commercial HVAC systems. However, the current workforce remains widely unprepared to install, maintain and operate these systems, particularly complex software-based control platforms, as most workforce training programs still focus on traditional building automation for large commercial buildings. This paper presents the development and piloting of curriculum for three key types of professionals: ● Technicians (trade-level): installing and maintaining modern high-performance HVAC systems and controls ● Programmers (undergrad-level): developing and implementing advanced controls ● Engineers and energy professionals (undergrad/grad-level): managing and evaluating system performance We share details of the material developed including training videos, open-source software, instruction manuals. We also present the results of a pilot implementation of the training materials with real students.
The input data and execution control statements for the ATLAS integrated structural analysis and design system are described. It is operational on the Control Data Corporation (CDC) 6600/CYBER computers in a batch mode or in a time-shared mode via interactive graphic or text terminals. ATLAS is a modular system of computer codes with common executive and data base management components. The system provides an extensive set of general-purpose technical programs with analytical capabilities including stiffness, stress, loads, mass, substructuring, strength design, unsteady aerodynamics, vibration, and flutter analyses. The sequence and mode of execution of selected program modules are controlled via a common user-oriented language.
A g cueing microcontroller is described which consists of a tandem pair of microprocessors, dedicated to the task of simulating pilot sensed cues caused by gravity effects. This task includes execution of a g cueing model which drives actuators that alter the configuration of the pilot's seat. The g cueing microcontroller receives acceleration commands from the aerodynamics model in the main computer and creates the stimuli that produce physical acceleration effects of the aircraft seat on the pilots anatomy. One of the two microprocessors is a fixed instruction processor that performs all control and interface functions. The other, a specially designed bipolar bit slice microprocessor, is a microprogrammable processor dedicated to all arithmetic operations. The two processors communicate with each other by a shared memory. The g cueing microcontroller contains its own dedicated I/O conversion modules for interface with the seat actuators and controls, and a DMA controller for interfacing with the simulation computer. Any application which can be microcoded within the available memory, the available real time and the available I/O channels, could be implemented in the same controller.
Room temperature deformation of a Ni{sub 46.7}Ti{sub 42.8}Nb{sub 10.5} alloy was studied by in-situ synchrotron X-ray diffraction. Compared to binary NiTi alloy, the Nb dissolved in the matrix significantly increased the onset stress for Stress-Induced Martensite Transformation (SIMT). The secondary phase, effectively a Nb-nanowire dispersion in a NiTi-Nb matrix, increased the elastic stiffness of the bulk material, reduced the strain anisotropy in austenite families by load sharing during SIMT, and increased the stress hysteresis by resisting reverse phase transformation during unloading. The stress hysteresis can be controlled over a wide range by heat treatment through its influences on the residual stress of the Nb-nanowire dispersion and the stability of the austenite.
Distribution networks are often unbalanced, causing oscillatory responses in inverter control designed for balanced conditions. Here, to address this problem, this paper proposes a novel time-domain transformation appropriate for inverter control and enables the decomposition of three-phase unbalanced signals into constant positive and negative components. Relations useful for calculating unbalanced active and reactive power are derived from first principle, providing insight into vector products of unbalanced three-phase signals. Furthermore, a grid-forming control effective under unbalanced conditions is developed, which delivers superior performance while meeting UNIFI1 specifications for grid-forming control under unbalanced conditions. specifications applicable to category 4 inverter-based resource, like setting and regulating frequency/voltage, providing voltage support, sharing active power, injecting negative sequence current, and riding through faults. A current limiter is proposed for safe fault ride-through and integrates with the grid-forming control featuring frequency/voltage droop controllers and current and voltage control loops. The transformation of interconnected inverters is formulated and stability of the proposed control analyzed to support robust parameter selections. The effectiveness of the proposed transformation and grid-forming control is demonstrated through analytical results and real-time simulation of a IEEE 123 distribution network on the Real-Time Digital Simulator. Comparison with existing methods shows that the proposed strategy satisfies the UNIFI specifications with a much better performance.