Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “progress”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

R&D Adoption and Progress in Full Simulation of the CMS experiment

In this work we report on evolution of usage of Geant4 within CMSSW and adaptation of the newest Geant4 11.2.1, which is expected to be used for CMS simulation production in 2025. Physics validation results and results on CPU performance are reported. For the Phase-2 simulation several R&D are carried out. A significant update for CMS geometry description is performed. Different aspects of geometry description and physics simulation for the new detectors will be discussed. Progress on R&D efforts for the Phase-2 simulation will be presented, which includes reports on experience of application of G4HepEm external library.

Srimanobhas, Norraphat [Chulalongkorn U.]↗

Recent progress in global optimizations of covariant energy density functionals

The recent progress on global optimizations of covariant energy den­sity functionals (CEDFs) and global calculations of binding energies within the covariant density functional theory (CDFT) has been analyzed and reviewed. Recently developed anchor-based optimization approach of Ref. [1] allows global optimizations of CEDFs at a reasonable numerical cost. Moreover, it permits such optimizations in a very large fermionic basis with a proper extrap­olation to an infinite one. This allows to accurately estimate global calculation errors due to use of truncated fermionic basis and neglect of some contributions to binding energies (such as total electron binding energy).

Afanasjev, A. V. [Mississippi State University, MS↗

The MCNP ® 6 code: A decade of progress

After several years of effort involved in merging the Los Alamos National Laboratory MCNP5 and MCNPX codes, in 2013 the first production release of version 6 of the Monte Carlo N-Particle ® , or MCNP ® , code MCNP6.1 was distributed publicly. Since then, three significant releases have been issued: MCNP6.1.1beta in 2014, MCNP6.2 in 2018, and MCNP6.3 in 2023. While each release always contains new features, code enhancements, and bug fixes, each version has had a different primary focus, ranging from improved calculational efficiency to new powerful utilities and tools, to software modernization of the code base. With all that has been learned over the first decade of the MCNP6 code, continuous progress is being made toward a modernized, general-purpose Monte Carlo radiation transport code that remains a trusted resource for the global community of practitioners. This paper describes these first 10+ years of the MCNP6 code and its continually improving data libraries, and gives some insight into how the next decade is expected to unfold.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Progress Report on Computing Excited-State Hadron Masses in Lattice QCD

Our progress in computing the spectrum of excited baryons and mesons in lattice QCD is described. Sets of spatially-extended hadron operators with a variety of different momenta are used. A new method of stochastically estimating the low-lying effects of quark propagation is utilized which allows reliable determinations of temporal correlations of both single-hadron and multi-hadron operators. The method is tested on the isoscalar mesons in the scalar, pseudoscalar, and vector channels, and on the two-pion system of total isospin I = 0,1,2.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Progress in the MITICA beam source design

In the framework of the development of the ITER neutral beam (NB) system, a test facility is planned to be built in Padova. A full size prototype of the ITER heating NB injector (MITICA) shall be built and tested at full beam power (17 MW) as per ITER requirements. The design of the MITICA beam source has further progressed following updated optimization and overall integration criteria. In the paper, the major design choices and revisions are presented, together with some results of numerical analyses carried out in order to assess the electrostatic and thermo-mechanical behaviour of the source.

43 PARTICLE ACCELERATORS↗

Progress towards a practical multicell positron trap

Described here is progress in an experimental program to develop a 21 cell multicell trap for the accumulation and storage of {approx} 10{sup 12} positrons. The basic architecture is an arrangement of multiple Penning-Malmberg (PM) trapped plasmas (i.e., cells) arranged in parallel in a common vacuum system and magnetic field. Experiments are described that are intended to address several key issues, including the effects of large space charge potentials and high plasma densities on: plasma heating, deterioration of confinement, and decreased efficiency of rotating electric fields in producing plasma compression. The confinement of PM plasmas displaced both radially and toward the ends of the uniform magnetic field region will also be investigated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recent progress in tailoring trap-based positron beams

Recent progress is described to implement two approaches to specially tailor trap-based positron beams. Experiments and simulations are presented to understand the limits on the energy spread and pulse duration of positron beams extracted from a Penning-Malmberg (PM) trap after the particles have been buffer-gas cooled (or heated) in the range of temperatures 1000 {>=} T {>=} 300 K. These simulations are also used to predict beam performance for cryogenically cooled positrons. Experiments and simulations are also presented to understand the properties of beams formed when plasmas are tailored in a PM trap in a 5 tesla magnetic field, then non-adiabatically extracted from the field using a specially designed high-permeability grid to create a new class of electrostatically guided beams.

43 PARTICLE ACCELERATORS↗

Progress report for the CCT-WG5 high temperature fixed point research plan

An overview of the progress in High Temperature Fixed Point (HTFP) research conducted under the auspices of the CCT-WG5 research plan is reported. In brief highlights are: Provisional long term stability of HTFPs has been demonstrated. Optimum construction methods for HTFPs have been established and high quality HTFPs of Co-C, Pt-C and Re-C have been constructed for thermodynamic temperature assignment. The major sources of uncertainty in the assignment of thermodynamic temperature have been identified and quantified. The status of absolute radiometric temperature measurement has been quantified through the circulation of a set of HTFPs. The measurement campaign to assign low uncertainty thermodynamic temperatures to a selected set of HTFPs will begin in mid-2012. It is envisaged that this will be complete by 2015 leading to HTFPs becoming routine reference standards for radiometry and high temperature metrology.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Recent progress in III-V based ferromagnetic semiconductors: Band structure, Fermi level, and tunneling transport

Spin-based electronics or spintronics is an emerging field, in which we try to utilize spin degrees of freedom as well as charge transport in materials and devices. While metal-based spin-devices, such as magnetic-field sensors and magnetoresistive random access memory using giant magnetoresistance and tunneling magnetoresistance, are already put to practical use, semiconductor-based spintronics has greater potential for expansion because of good compatibility with existing semiconductor technology. Many semiconductor-based spintronics devices with useful functionalities have been proposed and explored so far. To realize those devices and functionalities, we definitely need appropriate materials which have both the properties of semiconductors and ferromagnets. Ferromagnetic semiconductors (FMSs), which are alloy semiconductors containing magnetic atoms such as Mn and Fe, are one of the most promising classes of materials for this purpose and thus have been intensively studied for the past two decades. Here, we review the recent progress in the studies of the most prototypical III-V based FMS, p-type (GaMn)As and its heterostructures with focus on tunneling transport, Fermi level, and bandstructure. Furthermore, we cover the properties of a new n-type FMS, (In,Fe)As, which shows electron-induced ferromagnetism. These FMS materials having zinc-blende crystal structure show excellent compatibility with well-developed III-V heterostructures and devices.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Progress update on cryogenic system for ARIEL E-linac at TRIUMF

TRIUMF is involved in a major upgrade. The Advanced Rare IsotopeE Laboratory (ARIEL) has become a fully funded project in July 2010. A 10 mA 50 MeV SRF electron linac (e-linac) operating CW at 1.3 GHz is the key component of this initiative. This machine will serve as a second independent photo-fission driver for Rare Isotope Beams (RIB) production at TRIUMF's Isotope Separator and Accelerator (ISAC) facility. The cryogens delivery system requirements are driven by the electron accelerator cryomodule design [1, 2]. Since commencement of the project in 2010 the cryogenic system of e-linac has moved from the conceptual design phase into engineering design and procurement stage. The present document summarizes the progress in cryogenic system development and construction. Current status of e-linac cryogenic system including details of LN{sub 2} storage and delivery systems, and helium subatmospheric (SA) system is presented. The first phase of e-linac consisting of two cryomodules, cryogens storage, delivery, and distribution systems, and a 600 W class liquid helium cryoplant is scheduled for installation and commissioning by year 2014.

43 PARTICLE ACCELERATORS↗

Progress and present status of ITER cryoline system

The cryoline system at ITER forms a very complex network localized inside the Tokamak building, on a dedicated plant bridge and in cryoplant areas. The cooling power produced in the cryoplant is distributed via these lines with a total length of about 3.7 km and interconnecting all the cold boxes of the cryogenic system as well as the cold boxes of various clients (magnets, cryopumps and thermal shield). Distinct layouts and polygonal geometry, nuclear safety and confinement requirements, difficult installation and in-service inspection/repair demand very high reliability and availability for the cryolines. The finalization of the building-embedded plates for supporting the lines, before the detailed design, has made this project technologically more challenging. The conceptual design phase has been completed and procurement arrangements have been signed with India, responsible for providing the system of cryolines and warm lines to ITER, as in kind contribution. The prototype test for the design and performance validation has been planned on a representative cryoline section. After describing the basic features and general layout of the ITER cryolines, the paper presents key design requirements, conceptual design approach, progress and status of the cryolines project as well as challenges to build such a complex cryoline system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design progress of cryogenic hydrogen system for China Spallation Neutron Source

China Spallation Neutron Source (CSNS) is a large proton accelerator research facility with 100 kW beam power. Construction started in October 2011 and is expected to last 6.5 years. The cryogenic hydrogen circulation is cooled by a helium refrigerator with cooling capacity of 2200 W at 20 K and provides supercritical hydrogen to neutron moderating system. Important progresses of CSNS cryogenic system were concluded as follows. Firstly, process design of cryogenic system has been completed including helium refrigerator, hydrogen loop, gas distribution, and safety interlock. Secondly, an accumulator prototype was designed to mitigate pressure fluctuation caused by dynamic heat load from neutron moderation. Performance test of the accumulator has been carried out at room and liquid nitrogen temperature. Results show the accumulator with welding bellows regulates hydrogen pressure well. Parameters of key equipment have been identified. The contract for the helium refrigerator has been signed. Mechanical design of the hydrogen cold box has been completed, and the hydrogen pump, ortho-para hydrogen convertor, helium-hydrogen heat exchanger, hydrogen heater, and cryogenic valves are in procurement. Finally, Hydrogen safety interlock has been finished as well, including the logic of gas distribution, vacuum, hydrogen leakage and ventilation. Generally, design and construction of CSNS cryogenic system is conducted as expected.

43 PARTICLE ACCELERATORS↗

The {sup 30}P(p, γ){sup 31}S reaction in classical novae: progress and prospects

The unknown thermonuclear rate of the {sup 30}P(p, γ){sup 31}S reaction at classical-nova temperatures currently prohibits the accurate modeling of nova nucleosynthesis in the A ⩾ 30 region. This is hindering the calibration of nova thermometers based on observed O/S, S/Al, O/P, and P/Al abundance ratios in nova ejecta, the calibration of a meter to probe mixing at the core-envelope interface in novae based on the observed Si/H abundance ratio, and the identification of candidate pre-solar nova grains found in primitive meteorites based on laboratory measurements of their {sup 30}Si/{sup 28}Si isotopic ratios. Each of these diagnostics could address key questions in our understanding of classical novae if the {sup 30}P(p, γ){sup 31}S rate were known. We review progress on the determination of the {sup 30}P(p, γ){sup 31}S rate leading to a critical assessment of current interpretations of published data and prospects for future work.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Review of recent experimental and modeling progress in the lower hybrid range of frequencies at ITER relevant parameters

Progress in experiment and simulation capability in the lower hybrid range of frequencies (LHRF) at ITER relevant parameters is reviewed. Use of LH power in reactor devices is motivated in terms of its potential for efficient off-axis current profile control. Recent improvements in simulation capability including the development of full-wave field solvers, inclusion of the scrape off layer (SOL) in wave propagation codes, the use of coupled ray tracing / full-wave / 3D (r v{sub ⊥}, v{sub ∥}) Fokker Planck models, and the inclusion of nonlinear broadening effects in ray tracing / Fokker Planck codes are discussed. Experimental and modeling results are reviewed which are aimed at understanding the spectral gap problem in LH current drive (LHCD) and the density limit that has been observed in LHCD experiments. Physics mechanisms that could be operative in these experiments are discussed, including toroidally induced variations in the parallel wavenumber, nonlinear broadening of the pump wave, scattering of LH waves from density fluctuations in the SOL, and spectral broadening at the plasma edge via full-wave effects.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Progress in the RAMI analysis of a conceptual LHCD system for DEMO

Reliability, Availability, Maintainability and Inspectability (RAMI) concepts and techniques, that acquired great importance during the first manned space missions, have been progressively extended to industrial, scientific and consumer equipments to assure them satisfactory performances and lifetimes. In the design of experimental facilities, like tokamaks, mainly aimed at demonstrating validity and feasibility of scientific theories, RAMI analysis has been often left aside. DEMO, the future prototype fusion reactors, will be instead designed for steadily delivering electrical energy to commercial grids, so that the RAMI aspects will assume an absolute relevance since their initial design phases. A preliminary RAMI analysis of the LHCD system for the conceptual EU DEMO reactor is given in the paper.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

40 years of progress in NDT - History as a guide to the future

The paper is focussed on the progress which has been made over 40 years in the science, technology and application of NDT/NDE both during manufacture and in-service, from the perspective of the author and his background in the energy industries in the UK. New techniques not dreamt of 40 years ago and new technology such as personal computers, lasers and robotics which are now common-place in everyday life have transformed some aspects of NDT. But other aspects have remained unchanged, including the continued use of the more basic NDT methods and the challenges of recruitment, training, certification and motivation of personnel. There have been major changes in the world scene over 40 years including the globalization of trade, the emergence of new countries as industrial powers, and the ageing of safety critical infrastructure. These have impacted on NDT business and on the activities of the international NDT community (including ICNDT, the International Committee for NDT). The paper concludes by introducing the activities championed by ICNDT to promote the understanding of the importance of NDT, to support the development of NDT Societies around the world, to educate users on the correct use of personnel certification and to pursue the objective of global harmonisation and recognition of third party certification.

61 RADIATION PROTECTION AND DOSIMETRY↗

Progress in quantitative GPR development at CNDE

Ground penetrating radar (GPR) uses electromagnetic (EM) radiation pulses to locate and map embedded objects. Commercial GPR instruments are generally geared toward producing images showing the location and extent of buried objects, and often do not make full use of available absolute amplitude information. At the Center for Nondestructive Evaluation (CNDE) at Iowa State University efforts are underway to develop a more quantitative approach to GPR inspections in which absolute amplitudes and spectra of measured signals play a key role. Guided by analogous work in ultrasonic inspection, there are three main thrusts to the effort. These focus, respectively, on the development of tools for: (1) analyzing raw GPR data; (2) measuring the EM properties of soils and other embedding media; and (3) simulating GPR inspections. This paper reviews progress in each category. The ultimate goal of the work is to develop model-based simulation tools that can be used assess the usefulness of GPR for a given inspection scenario, to optimize inspection choices, and to determine inspection reliability.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Review on recent progress of three-dimensional optical photonic crystal

Over the past two decades, the field of photonic-crystals has become one of the most influential realms of contemporary optics. In this paper, we will review two recent experimental progresses in three-dimensional photonic-crystal operating in optical wavelengths. The first is the observation of anomalous light-refraction, an acutely negative refraction, in a 3D photonic-crystal for light trapping, guiding and near-unity absorption. The second is the observation of quasi-coherent thermal emission from an all-metallic 3D photonic-crystal at elevated temperatures.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗