Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

The NASA Space Launch System Program Systems Engineering Approach for Affordability

The National Aeronautics and Space Administration is currently developing the Space Launch System to provide the United States with a capability to launch large Payloads into Low Earth orbit and deep space. One of the development tenets of the SLS Program is affordability. One initiative to enhance affordability is the SLS approach to requirements definition, verification and system certification. The key aspects of this initiative include: 1) Minimizing the number of requirements, 2) Elimination of explicit verification requirements, 3) Use of certified models of subsystem capability in lieu of requirements when appropriate and 4) Certification of capability beyond minimum required capability. Implementation of each aspect is described and compared to a "typical" systems engineering implementation, including a discussion of relative risk. Examples of each implementation within the SLS Program are provided.

Hutt, John J.↗

Transonic flow over wing/fuselage configurations

Wing Body Code (WIBCO) program simulates flow-field configurations for reduction of design cost and improvement of aircraft performance. Inputs to WIBCO consist of ambient flow conditions and geometric configuration data; grid control and relaxation parameters are internally set. Outputs include input data echo, grid system verification, relaxation-solution convergence history, and computed velocities, pressures, forces, moments, reference lengths, and areas. Program is written in FORTRAN IV for batch execution.

Boppe, C. W.↗

Adaption of space station technology for lunar operations

Space Station Freedom technology will have the potential for numerous applications in an early lunar base program. The benefits of utilizing station technology in such a fashion include reduced development and facility costs for lunar base systems, shorter schedules, and verification of such technology through space station experience. This paper presents an assessment of opportunities for using station technology in a lunar base program, particularly in the lander/ascent vehicles and surface modules.

Garvey, J. M.↗

Sustainable, Reliable Mission-Systems Architecture

A mission-systems architecture, based on a highly modular infrastructure utilizing: open-standards hardware and software interfaces as the enabling technology is essential for affordable and sustainable space exploration programs. This mission-systems architecture requires (a) robust communication between heterogeneous system, (b) high reliability, (c) minimal mission-to-mission reconfiguration, (d) affordable development, system integration, and verification of systems, and (e) minimal sustaining engineering. This paper proposes such an architecture. Lessons learned from the Space Shuttle program and Earthbound complex engineered system are applied to define the model. Technology projections reaching out 5 years are mde to refine model details.

O'Neil, Graham↗

Sustainable, Reliable Mission-Systems Architecture

A mission-systems architecture, based on a highly modular infrastructure utilizing open-standards hardware and software interfaces as the enabling technology is essential for affordable md sustainable space exploration programs. This mission-systems architecture requires (8) robust communication between heterogeneous systems, (b) high reliability, (c) minimal mission-to-mission reconfiguration, (d) affordable development, system integration, end verification of systems, and (e) minimal sustaining engineering. This paper proposes such an architecture. Lessons learned from the Space Shuttle program and Earthbound complex engineered systems are applied to define the model. Technology projections reaching out 5 years are made to refine model details.

O'Neil, Graham↗

Integrated design of the CSI evolutionary structure: A verification of the design methodology

One of the main objectives of the Controls-Structures Interaction (CSI) program is to develop and evaluate integrated controls-structures design methodology for flexible space structures. Thus far, integrated design methodologies for a class of flexible spacecraft, which require fine attitude pointing and vibration suppression with no payload articulation, have been extensively investigated. Various integrated design optimization approaches, such as single-objective optimization, and multi-objective optimization, have been implemented with an array of different objectives and constraints involving performance and cost measures such as total mass, actuator mass, steady-state pointing performance, transient performance, control power, and many more. These studies have been performed using an integrated design software tool (CSI-DESIGN CODE) which is under development by the CSI-ADM team at the NASA Langley Research Center. To date, all of these studies, irrespective of the type of integrated optimization posed or objectives and constraints used, have indicated that integrated controls-structures design results in an overall spacecraft design which is considerably superior to designs obtained through a conventional sequential approach. Consequently, it is believed that validation of some of these results through fabrication and testing of a structure which is designed through an integrated design approach is warranted. The objective of this paper is to present and discuss the efforts that have been taken thus far for the validation of the integrated design methodology.

Maghami, Peiman G.↗

A methodology for evaluation of an interactive multispectral image processing system

Because of the considerable cost of an interactive multispectral image processing system, an evaluation of a prospective system should be performed to ascertain if it will be acceptable to the anticipated users. Evaluation of a developmental system indicated that the important system elements include documentation, user friendliness, image processing capabilities, and system services. The criteria and evaluation procedures for these elements are described herein. The following factors contributed to the success of the evaluation of the developmental system: (1) careful review of documentation prior to program development, (2) construction and testing of macromodules representing typical processing scenarios, (3) availability of other image processing systems for referral and verification, and (4) use of testing personnel with an applications perspective and experience with other systems. This evaluation was done in addition to and independently of program testing by the software developers of the system.

Kovalick, William M.↗

Space Station Freedom - Technical and management challenges

The development of the Space Station is reviewed, focusing on the technical and managerial aspects of the program. The optimization of the Space Station configuration, utilization impacts on design, technical aspects of the distribution systems, and the problems of designing for a lifetime of 30 years or more are discussed. In addition, cost reduction studies, testing and verification, determining the assembly sequence, and operational communications and support systems are examined. Managerial aspects of the program include organization, program control, management tools and processes, and the integration of elements from the international partners.

Moser, Thomas L.↗

Analysis and testing of two-dimensional slot nozzle ejectors with variable area mixing sections

Finite difference computer techniques have been used to calculate the detailed performance of air to air two-dimensional ejectors with symmetric variable area mixing sections and coaxial coverging primary nozzles. The analysis of the primary nozzle assumed correct expansion of the flow and is suitable for subsonic and slightly supersonic velocity levels. The variation of the mixing section channel walls is assumed to be gradual so that the static pressure can be assumed uniform on planes perpendicular to the axis. A test program was run to provide two-dimensional ejector test data for verification of the computer analysis. A primary converging nozzle with a discharge geometry of 0.125 inch x 8.0 inch was supplied with 600 SCFM of air at about 35 psia and 180 F. This nozzle was combined with two mixing section geometries with throat sizes of 1.25 inch x 8.0 inch and 1.875 inch x 8.0 inch and was tested at a total of 11 operating points.

Gilbert, G. B.↗

Urine sampling and collection system optimization and testing

A Urine Sampling and Collection System (USCS) engineering model was developed to provide for the automatic collection, volume sensing and sampling of urine from each micturition. The purpose of the engineering model was to demonstrate verification of the system concept. The objective of the optimization and testing program was to update the engineering model, to provide additional performance features and to conduct system testing to determine operational problems. Optimization tasks were defined as modifications to minimize system fluid residual and addition of thermoelectric cooling.

Fogal, G. L.↗

Large Space Telescope - Orbital crew EV maintenance operations

The paper shows that orbital EV maintenance by the crew has a tremendous impact on several areas of the program, including operations, Shuttle interfaces, support equipment rendezvous and berthing, checkout and verification, levels of servicing achievable, logistics and spares and scientific instruments in order to permit changeout and possible future refurbishment. To achieve on-orbit EV maintenance, such challenges as designing for suited-astronaut access to all subsystem equipment elements, minimization for contamination, handling of extremely sensitive instruments, development of translation techniques, and use of existing GFE and hardware must be faced early in the preliminary design and operations analysis phases. All studies to date indicate that on-orbit EV manned maintenance of the LST (Large Space Telescope) is not only feasible but can be designed to be readily within the capability of the EV functioning astronaut. Both 1-g and neutral buoyancy man-in-the-loop simulations further support this point.

Fisher, H. T.↗

Analysis and testing of two-dimensional slot nozzle ejectors with variable area mixing sections

Finite difference computer techniques have been used to calculate the detailed performance of air-to-air two-dimensional ejectors with symmetric variable area mixing sections and coaxial converging primary nozzles. The analysis of the primary nozzle assumed correct expansion of the flow and is suitable for subsonic and slightly supersonic velocity levels. The variation of the mixing section channel walls is assumed to be gradual so that the static pressure can be assumed uniform on planes perpendicular to the axis. A test program was run to provide two-dimensional ejector test data for verification of the computer analysis. A primary converging nozzle with a discharge geometry of 3.18 mm x 203 mm was supplied with 0.340 kg/sec of air at about 2.43 bar and 356 K. This nozzle was combined with two mixing section geometries with throat sizes of 31.8 mm x 203 mm and 47.6 mm x 203 mm and was tested at a total of 11 operating points.

Gilbert, G. B.↗

THERMTRAJ: A FORTRAN program to compute the trajectory and gas film temperatures of zero pressure balloons

A FORTRAN computer program called THERMTRAJ is presented which can be used to compute the trajectory of high altitude scientific zero pressure balloons from launch through all subsequent phases of the balloon flight. In addition, balloon gas and film temperatures can be computed at every point of the flight. The program has the ability to account for ballasting, changes in cloud cover, variable atmospheric temperature profiles, and both unconditional valving and scheduled valving of the balloon gas. The program was verified for an extensive range of balloon sizes (from 0.5 to 41.47 million cubic feet). Instructions on program usage, listing of the program source deck, input data and printed and plotted output for a verification case are included.

Horn, W. J.↗

Stability of interfaces with mesh refinement

A study is conducted of the stability of mesh refinement in space and time for several different interface equations and finite-difference approximations. First, a root condition which implies stability for the initial-boundary value problem for this type of interface is derived. From the root condition, the stability of several interface equations is proved, using the maximum principle. In some cases, the final verification steps can be done analytically; in other cases, a simple computer program has been written to check the condition for values of a parameter along the boundary of the unit circle. Using this method, stability for Lax-Wendroff with all the interface conditions considered, and for Leapfrog with interpolation interface conditions when the fine and coarse grids overlap is proved.

Berger, M. J.↗

Space station WP-04 power system preliminary analysis and design document, volume 3

Rocketdyne plans to generate a system level specification for the Space Station Electric Power System (EPS) in order to facilitate the usage, accountability, and tracking of overall system level requirements. The origins and status of the verification planning effort are traced and an overview of the Space Station program interactions are provided. The work package level interfaces between the EPS and the other Space Station work packages are outlined. A trade study was performed to determine the peaking split between PV and SD, and specifically to compare the inherent total peaking capability with proportionally shared peaking. In order to determine EPS cost drivers for the previous submittal of DRO2, the life cycle cost (LCC) model was run to identify the more significant costs and the factors contributing to them.

Source record↗

Space Station launch site processing

Planning which is underway at NASA-Kennedy toward launch site processing of Space Station elements is described. The goal is to develop cost-effective processing for each of the Program elements. Launch site receiving is discussed as well as post delivery verification, prelaunch assembly, prelaunch testing, experiment integration, and testing and servicing.

Oertel, John G.↗

Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

Niewoehner, Kevin R.↗

NASA Scientific Data Purchase Project: From Collection to User

NASA's Scientific Data Purchase (SDP) project is currently a $70 million operation managed by the Earth Science Applications Directorate at Stennis Space Center. The SDP project was developed in 1997 to purchase scientific data from commercial sources for distribution to NASA Earth science researchers. Our current data holdings include 8TB of remote sensing imagery consisting of 18 products from 4 companies. Our anticipated data volume is 60 TB by 2004, and we will be receiving new data products from several additional companies. Our current system capacity is 24 TB, expandable to 89 TB. Operations include tasking of new data collections, archive ordering, shipment verification, data validation, distribution, metrics, finances, customer feedback, and technical support. The program has been included in the Stennis Space Center Commercial Remote Sensing ISO 9001 registration since its inception. Our operational system includes automatic quality control checks on data received (with MatLab analysis); internally developed, custom Web-based interfaces that tie into commercial-off-the-shelf software; and an integrated relational database that links and tracks all data through operations. We've distributed nearly 1500 datasets, and almost 18,000 data files have been downloaded from our public web site; on a 10-point scale, our customer satisfaction index is 8.32 at a 23% response level. More information about the SDP is available on our Web site.

Nicholson, Lamar↗