Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

SiC cladding R&D execution plan

To advance the development of accident-tolerant fuel cladding for light-water reactors, the Advanced Fuels Campaign actively addresses the R&D gap between the specialized technological progress in SiC-based composite materials, led by industrial partners, and the fundamental scientific understanding of material behavior under reactor operating conditions. The laboratory activities are systematically organized based on the Development Strategy document, which outlines critical barriers to the use of SiC composites in nuclear energy applications for the coming decade and beyond. To complement the strategy, this execution plan specifies a detailed year-by-year work package and establishes key milestones for assessing progress in technological advancement. This plan has been formulated in collaboration with principal investigators at national laboratories, stakeholders, and industry partners with the goal of closing technology gaps and readying SiC-based cladding technologies for full-scale commercial testing. The research conducted at the national laboratories is categorized into three primary subjects: (1) addressing challenges associated with the performance of SiC cladding under normal operating environments, (2) identifying the failure limits of SiC cladding under accident conditions, and (3) modeling fuel performance for SiC cladding systems. Comprehensive laboratory activities integrate the development of advanced modeling tools for SiC-based cladding systems with experimental validation via integrated testing of multiphysics phenomena. This document lays out the laboratory plan to support the development of SiC-based technologies, which have the potential for significant operational and safety benefits for the U.S. nuclear industry. This plan aligns with industry developer needs, relevant Nuclear Energy University Programs, and Nuclear Energy Advanced Modeling and Simulation Programs to ensure SiC cladding technologies are matured as efficiently as possible and will be maintained and updated to accommodate the dynamically evolving progress of development, capability needs, and resource availability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

Hurricane Preparedness and Control Plan

This plan establishes policy and sets forth guidance, responsibilities and procedures utilized by Federal Electric Corp., communications department in support of the KSC Emergency Preparedness Plan, Annex A, Hurricane Control Plan (GP-355) dated 27 May 1971. This plan covers all FEC communications department personnel, facilities, and equipment situated at the Kennedy Space Center that are the responsibility of FEC contract NAS 10-4967.

Source record↗

Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

Dunbar, J. C.↗

First look analyses of five cycles of ERTS-1 imagery over County of Los Angeles: Assessment of data utility for urban development and regional planning

Significant results have been obtained from the analyses of ERTS-1 imagery from five cycles over Test Site SR 124 by classical photointerpretation and by an interactive hybrid multispectral information extraction system (GEMS). The synopticity, periodicity and multispectrality of ERTS coverage, available for the first time to LA County planners, have opened up both a new dimensionality in data and offer new capability in preparation of planning inputs. Photointerpretation of ERTS images has produced over 25 overlays at 1:1,000,000 scale depicting regional relations and urban structure in terms of several hundred linear and areal features. To mention only one such result, a possible new fault lineament has been discovered on the northern slope of the Santa Monica mountains in the scene 1144-18015, composited of MSS bands 4, 5, 6,. GEMS analysis of the ERTS products has provided new or improved information in the following planning data categories: urban vegetation; land cover segregation; man-made and natural impact monitoring; urban design; and suitability. ERTS data analysis has allowed planners to establish trends that directly impact planning policies. This new source of information will not only assist current methods to be more efficient, but permits entirely new planning methodologies to be employed.

Raje, S.↗

Apollo experience report: Evolution of the rendezvous-maneuver plan for the lunar-landing missions

The evolution of the nominal rendezvous-maneuver plan for the lunar landing missions is presented along with a summary of the significant development for the lunar module abort and rescue plan. A general discussion of the rendezvous dispersion analysis that was conducted in support of both the nominal and contingency rendezvous planning is included. Emphasis is placed on the technical developments from the early 1960's through the Apollo 15 mission (July to August 1971), but pertinent organizational factors also are discussed briefly. Recommendations for rendezvous planning for future programs relative to Apollo experience also are included.

Alexander, J. D.↗

WINDOW: A computer program for planning astronomical observations

A FORTRAN computer program called WINDOW was written to simplify the planning of astronomical observations of a number of objects in a limited time. The program lists the azimuths at 15 minute intervals of up to 20 objects while they are in a given range of elevation angles - the window - and gives the elevation angle of each object at its time of transit. This work was motivated by the need to use observing time efficiently on flights of NASA-Ames' Lear Jet and C-141 observatories; WINDOW permits the investigator to prepare preliminary flight plans. However, the program is suited to planning ground-based observations as well. The program and a sample flight plan are described.

Erickson, E. F.↗

The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

Bronstein, L.↗

AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule

The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

Yao, S. S.↗

Airline flight planning - The weather connection

The history of airline flight planning is briefly reviewed. Over half a century ago, when scheduled airline services began, weather data were almost nonexistent. By the early 1950's a reliable synoptic network provided upper air reports. The next 15 years saw a rapid growth in commercial aviation, and airlines introduced computer techniques to flight planning. The 1970's saw the development of weather satellites. The current state of flight planning activities is analyzed. It is found that accurate flight planning will require meteorological information on a finer scale than can be provided by a synoptic forecast. Opportunities for a new approach are examined, giving attention to the available options, a mesoscale numerical weather prediction model, limited area fine mesh models, man-computer interactive display systems, the use of interactive techniques with the present upper air data base, and the implementation of interactive techniques.

Steinberg, R.↗

Planning for rotorcraft and commuter air transportationn

Community planning needs, criteria, and other considerations such as intermodal coordination and regulatory requirements, for rotorcraft and fixed wing commuter air transportation were identified. A broad range of community planning guidelines, issues, and information which can be used to: (1) direct anticipated aircraft technological improvements; (2) assist planners in identifying and evaluating the opportunities and tradeoffs presented by rotorcraft and commuter aircraft options relative to other modes; and (3) increase communication between aircraft technologists and planners for the purpose of on going support in capitalizing on rotorcraft and commuter air opportunities are provided. The primary tool for identifying and analyzing planning requirements was a detailed questionnaire administered to a selected sample of 55 community planners and other involved in planning for helicopters and commuter aviation.

Stockwell, W. L.↗

Spacecraft servicing demonstration plan

A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.

Bergonz, F. H.↗

Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning, volume 1

The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This volume of the report discusses the results of Task 1 of the four major tasks included in the study. Task 1 compares flight plans based on forecasts with plans based on the verifying analysis from 33 days during the summer and fall of 1979. The comparisons show that: (1) potential fuel savings conservatively estimated to be between 1.2 and 2.5 percent could result from using more timely and accurate weather data in flight planning and route selection; (2) the Suitland forecast generally underestimates wind speeds; and (3) the track selection methodology of many airlines operating on the North Atlantic may not be optimum resulting in their selecting other than the optimum North Atlantic Organized Track about 50 percent of the time.

Keitz, J. F.↗

Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning, volume 4

The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This volume of the report discusses the results of Task 4 of the four major tasks included in the study. Task 4 uses flight plan segment wind and temperature differences as indicators of dates and geographic areas for which significant forecast errors may have occurred. An in-depth analysis is then conducted for the days identified. The analysis show that significant errors occur in the operational forecast on 15 of the 33 arbitrarily selected days included in the study. Wind speeds in an area of maximum winds are underestimated by at least 20 to 25 kts. on 14 of these days. The analysis also show that there is a tendency to repeat the same forecast errors from prog to prog. Also, some perceived forecast errors from the flight plan comparisons could not be verified by visual inspection of the corresponding National Meteorological Center forecast and analyses charts, and it is likely that they are the result of weather data interpolation techniques or some other data processing procedure in the airlines' flight planning systems.

Keitz, J. F.↗

The flight planning - flight management connection

Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

Sorensen, J. A.↗

Planning for Space Station utilization

User requirements for the planned Space Station, and utilization planning to meet those needs, are discussed. The continual involvement of the customer in all aspects of the Space Station Program is to be achieved by identifying customers and by defining, refining, and integrating their requirements so as to stimulate the best possible design, development, and operations. Planning guidelines to be used in the Space Station definition process are shown and discussed, as is the Space Station Planning Schedule.

Raney, W.↗

Space Station thermal management system development status and plans

The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.

Rankin, J. G.↗