Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

X-33/RLV System Health Management/ Vehicle Health Management

To reduce operations cost, the RLV must include the following elements: highly reliable, robust subsystems designed for simple repair access with a simplified servicing infrastructure and incorporating expedited decision making about faults and anomalies. A key component for the Single Stage to Orbit (SSTO) RLV System used to meet these objectives is System Health Management (SHM). SHM deals with the vehicle component- Vehicle Health Management (VHM), the ground processing associated with the fleet (GVHM) and the Ground Infrastructure Health Management (GIHM). The objective is to provide an automated collection and paperless health decision, maintenance and logistics system. Many critical technologies are necessary to make the SHM (and more specifically VHM) practical, reliable and cost effective. Sanders is leading the design, development and integration of the SHM system for RLV and X-33 SHM (a sub-scale, sub-orbit Advanced Technology Demonstrator). This paper will present the X-33 SHM design which forms the baseline for RLV SHM. This paper will also discuss other applications of these technologies.

Garbos, Raymond J.↗

Characterizing GEO Titan IIIC Transtage Fragmentations Using Ground-Based and Telescopic Measurements

In a continued effort to better characterize the Geosynchronous Orbit (GEO) environment, NASA's Orbital Debris Program Office (ODPO) utilizes various ground-based optical assets to acquire photometric and spectral data of known debris associated with fragmentations in or near GEO. The Titan IIIC Transtage upper stage is known to have fragmented four times. Two of the four fragmentations were in GEO while a third Transtage fragmented in GEO transfer orbit. The forth fragmentation occurred in Low Earth Orbit. In order to better assess and characterize these fragmentations, the NASA ODPO acquired a Titan Transtage test and display article previously in the custody of the 309th Aerospace Maintenance and Regeneration Group (AMARG) in Tucson, Arizona. After initial inspections at AMARG demonstrated that the test article was of sufficient fidelity to be of interest, the test article was brought to JSC to continue material analysis and historical documentation of the Titan Transtage. The Transtage has been subject to two separate spectral measurement campaigns to characterize the reflectance spectroscopy of historical aerospace materials. These data have been incorporated into the NASA Spectral Database, the goal being to enable comparison with telescopic data and potential material identification. A LIDAR scan has been completed and a scale model has been created for use in the Optical Measurement Center for photometric analysis of an intact Transtage, including a BRDF. An historical overview of the Titan IIIC Transtage, the current analysis that has been done to date, and the future work to be completed in support of characterizing the GEO and near GEO orbital debris environment will be discussed in the subsequent presentation.

Cowardin, H.↗

Preliminary Analysis and Design of a Rocket Based Combined Cycle for Efficient Access to Space

Access to space is presently limited by cost. The cost of delivering a payload to low earth orbit (LEO) is on average $10,000 per pound of payload, in the United States. Much of this cost is incurred from the operation of vehicles developed with 30-40 year old technology. The old technology and design practices have resulted in expensive hardware and intensive maintenance requirements for current launch vehicles. In order to alleviate the cost factor, the technological advances throughout the next millennium must bring affordable development and a new invigorating desire to space exploration. National Aeronautical and Space Administration (NASA), Department of Defense (DOD), and private industry are addressing this issue by focusing on incremental improvements in the Earth- to Orbit (ETO) costs. These improvements have investigated two different approaches: 1) make space vehicles as inexpensive as possible (i.e. Evolved Expendable Launch Vehicle (EELV) and Delta IV) 2) make space vehicles as reusable as airplanes so that the initial cost of investment can be recaptured (i.e. Reusable Launch Vehicle (RLV), X-33, X-34, and X-37) These programs have made notable progress in new material, propulsion, structures, and avionics technologies, during the last 3-5 years. So far, these programs are targeted to reduce present costs by, as much as, five times the current cost. The year 2025 goal for continued space advancement is to have ETO costs reduced by a factor of ten (i.e., tenfold), as low as $100 - $200/lb payload. For the RLV, this goal translates into very low maintenance costs and higher expected reliability per flight must be obtained. Therefore, making higher launch rates possible. For the expendable vehicle, the cost of maintenance cost is minimal, but a greater reliability must exist to insure the payload; since, there would be no way to recover the payload if the mission was to an abort or failure. Overall the cost of vehicle, payload and operations of an expendable may be too high compared to those of the RLV.

Harris, Lawanna↗

Monitoring of crustal movements in the San Andreas fault zone by a satellite-borne ranging system

The Close Grid Geodynamic Measurement System is conceived as an orbiting ranging device with a ground base grid of reflectors or transponders (spacing 1.0 to 30 km), which are projected to be of low cost (maintenance free and unattended), and which will permit the saturation of a local area to obtain data useful to monitor crustal movements in the San Andreas fault zone. The system includes a station network of 75 stations covering an area between 36 deg N and 38 deg N latitudes, and 237 deg E and 239 deg E longitudes, with roughly half of the stations on either side of the faults. In addition, the simulation of crustal movements through the introduction of changes in the relative positions between grid stations, weather effect for intervisibility between satellite and station and loss of observations thereof, and comparative evaluation of various observational scheme-patterns have been critically studied.

Kumar, M.↗

Food system galley for Space Shuttle

The Galley, a 42 man-day meal preparation facility (with flexibility to accomodate 210 man-days) is described. The facility is designed for minimum meal preparation and clean-up time in zero g and ease of servicing, maintenance, and removal in one gravity. The Galley provides a centralized location for performing all of the food-related functions (except dining) within the orbiter. Consideration is given to the oven-water heater, personal hygiene station, water dispensers, and water supply subsystem. The Galley is positioned in the orbiting mid deck, interfacing with rehydratable food packages and the waste collector subsystem.

Murray, R. W.↗

Analysis of experimental observations of electron temperatures in the near wake of a model in a laboratory-simulated solar wind plasma

In the present paper, the results are presented of the first laboratory experiments in a high-energy plasma which investigate the electron temperature Te in the body wake. A large number of Te samples in the very near- and near-wake regions downstream from a conducting body are employed. The obtained results are compared with the experimental findings of Oran et al. (1975), Stone (1981), and others. The findings are discussed in the more general context of theoretical studies and of other relevant considerations. Attention is also given to the possible relevance of the results to the maintenance of the nightside ionosphere of Venus, and suggestions are made regarding some specific spacecraft observations which should be carried out using the Pioneer Venus orbiter.

Intriligator, D. S.↗

Development of a System to Assess Biofilm Formation in the International Space Station

The design requirements for the water treatment systems aboard the International Space Station (ISS) include and require recycling as much water as possible and to treat the water for intentional contamination (hygiene, urine distillate, condensate, etc.) and unintentional contamination in the form of biofilm and microorganisms. As part of an effort to address the latter issue, a biofilm system was developed by Marshall Space Flight Center (MSFC) to simulate the conditions aboard ISS with respect to materials, flow rates, water conditions, water content, and handling. The tubing, connectors, sensors, and fabricated parts included in the system were chosen for specific attributes as applicable to emulate an orbital water treatment system. This paper addresses the design and development process of the system, as well as the configuration, operation, and system procedures for maintenance to assure that the simulation is valid for the representative data as it applies to water degradation and biofilm/microbial growth. Preliminary biofilm/microbial results are also presented.

Charles E Martin↗

STS-100 Photo-op/Shut-up/Depart O&C/Launch Endeavour On Orbit/Landing/Crew Egress

This video shows an overview of crew activities from STS-100. The crew of Space Shuttle Shuttle Endeavour includes: Commander Kent Rominger; Pilot Jeffrey Ashby; and Mission Specialists Chris Hadfield, John Phillips, Scott Parazynski, Umberto Guidoni, and Yuri Lonchakov. Sections of the video include: Photo-op; Suit-up; Depart O&C; Ingress; Launch with Playbacks; On-orbit; Landing with Playbacks; Crew Egress & Departure. Voiceover narration introduces the astronauts at their pre-flight meal, and continues during the video, except for the launch and landing sequences. Launch playback views include: NEXT; Beach Tracker; VAB; PAD-A; Tower-1; UCS-15; Grandstand; OTV-60; OTV-70; OTV-71; DOAMS; UCS-10 Tracker; UCS-23 Tracker; On-board Ascent Camera. The On-orbit section of the video shows preparations for an extravehicular activity (EVA) to install Canadarm 2 on the International Space Station (ISS). Preparation for docking with the ISS, and the docking of the orbiter and ISS are shown. The attachment of Canadarm 2 and the Raffaello Logistics Module, a resupply vehicle, are shown. The crew also undertakes some maintenance of the ISS. Landing playback views include: TV-1; TV-2; LRO-1; LRO-2; PPOV.

Source record↗

Managing NASA's International Space Station Logistics and Maintenance Program

The International Space Station's Logistics and Maintenance program has had to develop new technologies and a management approach for both space and ground operations. The ISS will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines - it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally completed in 2006. It has over 6,000 orbital replaceable units (ORU), and spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors. From conception to operation, the ISS requires a unique approach in all aspects of development and operations. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station for both space and ground operations. It started with the basic support concept developed for Department of Defense systems, and then it was tailored for the unique requirements of a manned space vehicle. Space logistics is a new concept that has wide reaching consequences for both space travel and life on Earth. This paper discusses what type of organization has been put into place to support both space and ground operations and discusses each element of that organization. In addition, some of the unique operations approaches this organization has had to develop is discussed.

Butina, Anthony↗

NASA Exploration Systems Maintainability Standards for Artemis and Beyond

This assessment was requested by the NASA Engineering and Safety Center (NESC), which, based on findings from the NESC study “Safe Human Expeditions Beyond Low Earth Orbit (LEO)” (Valinia et al., 2022), determined its topic to be an underrecognized critical and urgent Agency need, due to impending Artemis vehicle procurements. The principal objective of this assessment was to review and update current Agency-level maintainability requirements for space systems to support crew on expeditions beyond LEO in both preventive and corrective maintenance. This report contains the results of the NESC assessment.

Orbital Replacement Units↗

Solar maximum repair mission

The Solar Maximum Repair Mission is scheduled for launch in April, 1984. The mission was made possible through a spacecraft designed for on-orbit repair, the availability of spacecraft repair hardware and the availability of the Shuttle System. Repair is expected to result in the availability of significant new science data and a demonstration of the capability for on-orbit repair of spacecraft. Considerations of the capability to maintain and repair spacecraft on-orbit for the future are also discussed.

Space transportation system↗

Soldering in a Reduced Gravity Environment (SoRGE)

Future long-duration human exploration missions will be challenged by constraints on mass and volume allocations available for spare parts. Addressing this challenge will be critical to the success of these missions. As a result, it is necessary to consider new approaches to spacecraft maintenance and repair that reduce the need for large replacement components. Currently, crew members on the International Space Station (ISS) recover from faults by removing and replacing, using backup systems, or living without the function of Orbital Replacement Units (ORUs). These ORUs are returned to a depot where the root cause of the failure is determined and the ORU is repaired. The crew has some limited repair capability with the Modulation/DeModulation (MDM) ORU, where circuit cards are removed and replace in faulty units. The next step to reducing the size of the items being replaced would be to implement component-level repair. This mode of repair has been implemented by the U.S. Navy in an operational environment and is now part of their standard approach for maintenance. It is appropriate to consider whether this approach can be adapted for future spaceflight operations. To this end, the Soldering in a Reduced Gravity Environment (SoRGE) experiment studied the effect of gravity on the formation of solder joints on electronic circuit boards. This document describes the SoRGE experiment, the analysis methods, and results to date. This document will also contain comments from the crew regarding their experience conducting the SoRGE experiment as well as recommendations for future improvements. Finally, this document will discuss the plans for the SoRGE samples which remain on ISS.

Easton, John W.↗

Shuttle operations, maintenance, and safety.

Review of a systematic search for practical solutions in the areas of space shuttle cryogenics, flight operations, ground operations, and safety. The insulation of the main-propulsion hydrogen tanks for both booster and orbiter to prevent water condensation is considered, as well as the insulation of the orbiter's orbital cryogen tanks for ground storage. Two approaches to the feeding of cryogens are outlined - namely, an approach depending on a periodic axial force to settle propellants and refill the basket, and a method of continuous feed through a capillary network adjacent to the walls throughout the tank, the latter method being independent of vehicle thrust. The development of reliable cryogen components is discussed, and the results of studies of launch-abort problems, shuttle approach and landing techniques, and the tolerance of ?deconditioned' crew and passengers to shuttle reentry g-loads are cited.

Beddingfield, S. T.↗

Space-based solar power conversion and delivery systems study. Volume 5: Economic analysis

Space-based solar power conversion and delivery systems are studied along with a variety of economic and programmatic issues relevant to their development and deployment. The costs, uncertainties and risks associated with the current photovoltaic Satellite Solar Power System (SSPS) configuration, and issues affecting the development of an economically viable SSPS development program are addressed. In particular, the desirability of low earth orbit (LEO) and geosynchronous (GEO) test satellites is examined and critical technology areas are identified. The development of SSPS unit production (nth item), and operation and maintenance cost models suitable for incorporation into a risk assessment (Monte Carlo) model (RAM) are reported. The RAM was then used to evaluate the current SSPS configuration expected costs and cost-risk associated with this configuration. By examining differential costs and cost-risk as a function of postulated technology developments, the critical technologies, that is, those which drive costs and/or cost-risk, are identified. It is shown that the key technology area deals with productivity in space, that is, the ability to fabricate and assemble large structures in space, not, as might be expected, with some hardware component technology.

Source record↗

Space Shuttle redesign status

NASA has conducted an extensive redesign effort for the Space Shutle in the aftermath of the STS 51-L Challenger accident, encompassing not only Shuttle vehicle and booster design but also such system-wide factors as organizational structure, management procedures, flight safety, flight operations, sustainable flight rate, and maintenance safeguards. Attention is presently given to Solid Rocket Booster redesign features, the Shuttle Main Engine's redesigned high pressure fuel and oxidizer turbopumps, the Shuttle Orbiter's braking and rollout (landing gear) system, the entry control mode of the flight control system, a 'split-S' abort maneuver for the Orbiter, and crew escape capsule proposals.

Brand, Vance D.↗

Medical evaluations on the KC-135 1991 flight report summary

The medical investigations completed on the KC-135 during FY 1991 in support of the development of the Health Maintenance Facility and Medical Operations are presented. The experiments consisted of medical and engineering evaluations of medical hardware and procedures and were conducted by medical and engineering personnel. The hardware evaluated included prototypes of a crew medical restraint system and advanced life support pack, a shuttle orbiter medical system, an airway medical accessory kit, a supplementary extended duration orbiter medical kit, and a surgical overhead canopy. The evaluations will be used to design flight hardware and identify hardware-specific training requirements. The following procedures were evaluated: transport of an ill or injured crewmember at man-tended capability, surgical technique in microgravity, transfer of liquids in microgravity, advanced cardiac life support using man-tended capability Health Maintenance Facility hardware, medical transport using a model of the assured crew return vehicle, and evaluation of delivery mechanisms for aerosolized medications in microgravity. The results of these evaluation flights allow for a better understanding of the types of procedures that can be performed in a microgravity environment.

Lloyd, Charles W.↗

Characterizing GEO Titan Transtage Fragmentations using Ground-based Measurements

In a continued effort to better characterize the Geosynchronous Orbit (GEO) environment, NASA's Orbital Debris Program Office (ODPO) utilizes various ground-based optical assets to acquire photometric and spectral data of known debris associated with fragmentations in or near GEO. The Titan IIIC Transtage upper stage is known to have fragmented four times. Two of the four fragmentations were in GEO while a third Transtage fragmented in GEO transfer orbit. The forth fragmentation occurred in Low Earth Orbit. In order to better assess what may be causing these fragmentations, the NASA ODPO recently acquired a Titan Transtage test and display article that was previously in the custody of the 309th Aerospace Maintenance and Regeneration Group (AMARG) in Tucson, Arizona. After initial inspections at AMARG demonstrated that the test article was of sufficient fidelity to be of interest, the test article was brought to JSC to continue material analysis and historical documentation of the Titan Transtage. The Transtage will be a subject of forensic analysis using spectral measurements to compare with telescopic data; as well, a scale model will be created to use in the Optical Measurement Center for photometric analysis of an intact Transtage, including a BRDF. The following presentation will provide a review of the Titan Transtage, the current analysis that has been done to date, and the future work to be completed in support of characterizing the GEO and near GEO orbital debris environment.

Cowardin, H.↗

A Non-Linear Approach to Spacecraft Formation Control in the Vicinity of a Collinear Libration Point

An expanding interest in mission design strategies that exploit libration point regions, demands the continued development of enhanced, efficient, control algorithms for station-keeping and formation maintenance. Linear control strategies have been developed for station-keeping. However, their region of stability is bounded by the assumptions required for linearizing the governing equations of motion. For example, reference [I] discusses the development of a linear control design for maintaining a halo orbit about the Earth-Moon L2 libration point. Trial runs indicated the trajectory was unstable for starting points exceeding 45,000 km from the L2 point. Also, there was significant growth in the control effort required to maintain the orbit as the nominal radius increased. This result is a consequence of the increased influence of the system non-linearities, as the trajectory deviated from the linearization point, L2. As an alternative, this paper presents the development of a non-linear control strategy, based on a Hamiltonian formulation of the equations of motion. The control strategy is applied to the problem of formation maintenance, rather than simple station

Luquette, Richard J.↗