Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Plan for Scaling Up Hydrogen Production with Nuclear Power Plants

The United States (U.S.) Department of Energy’s (DOE’s) Light Water Reactor Sustainability (LWRS) Program Flexible Plant Operations and Generation (FPOG) Pathway is developing options to help U.S. nuclear power plants (NPPs) better integrate with intermittent wind and solar capacity and the recent surge of natural gas power generation. Research is focusing on improving NPP flexibility through hybrid production of electricity and other products, such as hydrogen (H 2 ) and energy storage for the purpose of shifting power production to a later time. In the case of H 2 production, the clean electrical and thermal power from an NPP can be used to split water using electrolysis. This report outlines the opportunity for NPPs to participate in a first-of-akind (FOAK) commercial nuclear H 2 project intended to bring industry partners together to create regional clean H 2 hubs. The Bipartisan Infrastructure Law (BIL) will fund at least one hub up to $1.25 billion as federal cost share totally no less than 50% to execute a nuclear H 2 project. The report discusses the set of activities that are now underway or that are planned for completion by the FPOG Pathway to reduce the economic, technical, regulatory, and safety risks of these projects. DOE cross-program activities are being coordinated to ensure success in the timeframe allowed by the BIL. Figure ES-1 shows the approximate schedule of coordinated research and development (R&D) and pilot demonstration projects leading up to the first commercial nuclear H 2 production project. Execution of this plan requires DOE and industry collaboration. DOE research accomplishments are being provided to the electric utilities or industries looking to participate in the H 2 hub proposal and project execution process.

08 HYDROGEN↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Ares I-X Launch Vehicle Modal Test Overview

The first test flight of NASA's Ares I crew launch vehicle, called Ares I-X, is scheduled for launch in 2009. Ares IX will use a 4-segment reusable solid rocket booster from the Space Shuttle heritage with mass simulators for the 5th segment, upper stage, crew module and launch abort system. Flight test data will provide important information on ascent loads, vehicle control, separation, and first stage reentry dynamics. As part of hardware verification, a series of modal tests were designed to verify the dynamic finite element model (FEM) used in loads assessments and flight control evaluations. Based on flight control system studies, the critical modes were the first three free-free bending mode pairs. Since a test of the free-free vehicle is not practical within project constraints, modal tests for several configurations in the nominal integration flow were defined to calibrate the FEM. A traceability study by Aerospace Corporation was used to identify the critical modes for the tested configurations. Test configurations included two partial stacks and the full Ares I-X launch vehicle on the Mobile Launcher Platform. This paper provides an overview for companion papers in the Ares I-X Modal Test Session. The requirements flow down, pre-test analysis, constraints and overall test planning are described.

Buehrle, Ralph D.↗

Developing Reliable Life Support for Mars

A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and less certain expected reliability. A plan to develop reliable life support is needed to achieve the best possible reliability.

life support↗

Ethernet for Space Flight Applications

NASA's Goddard Space Flight Center (GSFC) is adapting current data networking technologies to fly on future spaceflight missions. The benefits of using commercially based networking standards and protocols have been widely discussed and are expected to include reduction in overall mission cost, shortened integration and test (I&T) schedules, increased operations flexibility, and hardware and software upgradeability/scalability with developments ongoing in the commercial world. The networking effort is a comprehensive one encompassing missions ranging from small University Explorer (UNEX) class spacecraft to large observatories such as the Next Generation Space Telescope (NGST). Mission aspects such as flight hardware and software, ground station hardware and software, operations, RF communications, and security (physical and electronic) are all being addressed to ensure a complete end-to-end system solution. One of the current networking development efforts at GSFC is the SpaceLAN (Spacecraft Local Area Network) project, development of a space-qualifiable Ethernet network. To this end we have purchased an IEEE 802.3-compatible 10/100/1000 Media Access Control (MAC) layer Intellectual Property (IP) core and are designing a network node interface (NNI) and associated network components such as a switch. These systems will ultimately allow the replacement of the typical MIL-STD-1553/1773 and custom interfaces that inhabit most spacecraft. In this paper we will describe our current Ethernet NNI development along with a novel new space qualified physical layer that will be used in place of the standard interfaces. We will outline our plans for development of space qualified network components that will allow future spacecraft to operate in significant radiation environments while using a single onboard network for reliable commanding and data transfer. There will be a brief discussion of some issues surrounding system implications of a flight Ethernet. Finally, we will show an onboard network architecture for a proposed new mission using Ethernet for science data transport.

Webb, Evan↗

Analyzing Launch Operations using the Spaceport Throughput Analysis Resource (STAR)

NASA’s Kennedy Space Center (KSC) and Cape CanaveralSpace Force Station (CCSFS) are the world’s preeminent multi-user spaceport, providing facilities and launch capabilities to the agency, NASA’s commercial partners, and other government agencies. KSC works to ensure an environment in which NASA’s programs and other users can safely and effectively carry out their operations. Approximately 100 launches are expected to take place in 2024. KSC needs to meet the needs of customers who request launches based on their own schedules, but who may not be aware of KSC-wide resource limitations and external constraints on launch operations. KSC-wide resources include telecommunications, range tracking, commodities such as Helium and Nitrogen, and special equipment needed to support launches. External constraints include seasonal launch operations. Since space vehicles are complex and launch operations are uncertain, unexpected events can also cause delays in operations. The Spaceport Throughput AnalysisResource (STAR) assesses whether a specific set of pro-posed launches and associated activities can be performed given the resources KSC currently has available, and external constraints imposed on KSC operations. STAR integrates short-horizon scheduling and simulation of launches using a monte-carlo approach driven by configurable probabilities of different classes of event outcomes, including de-lays and worst-case use of resources. The resulting analyses inform stakeholders of key constraints preventing customers from being able to perform their missions as desired, and give insight into how to improve spaceport throughput. The rest of the paper is organized as follows. In 2 we de-scribe the problem STAR is intended to solve. In Section3 we formally describe the scheduling problem ingredients. In Section 4 we describe how manifests are simulated. InSection 5 we describe the constraints problem that is solved when rescheduling. In Section 6 we describe what information is recorded during manifest simulation in order to evaluate delays. In Section 7 we describe the specific problem solved for KSC. In Section 8 we describe the challenges of knowledge engineering for STAR.

Planning Scheduling Analysis↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

Design, Construction, and Field Validation of a Blown-In Fiberglass Wall System in a Cold, Wet, and Windy Climate

In the Native Village of Tununak, located on Nelson Island in Southwest Alaska,buildings are exposed to wind-driven rain and snow throughout the year. The Cold Climate Housing Research Center (CCHRC) and Knauf Insulation partnered with the community in 2018 to design a residence for a public safety officer. Construction began in fall 2021 and is scheduled to conclude in summer 2022. The house will use integrated trusses with floor, attic, and wall cavities filled with blown-in fiberglass insulation. Hygrothermal models of the building envelope system demonstrate that the high ambient moisture load will wet the outer edges of the insulation annually regardless of the extent and integrity of exterior weather sealing measures; blown-in fiberglass is expected to be more resilient to this wetting than blown-in cellulose. To verify this, researchers will embed temperature, relative humidity, and moisture sensors in the two windward walls of the house to monitor the ability of the blown-in fiberglass insulation to dry out after wetting events that may have occurred during the transport of the insulation to the building site, storage of the insulation on site, construction process, or after installation in the wall. Sensors will remain in place for two years,documenting the wall's performance over time and verifying the design's potential for use in buildings located in climates where the chance for moisture damage is high. Here, we describe the wall system , design criteria, and the results from the hygrothermal modeling. We share details on the monitoring system's components and the planned management and analysis of data. Finally, we explain how the experiences and data from this project will inform future builds in similar locations.

building design↗

Cruise-Efficient Short Takeoff and Landing (CESTOL): Potential Impact on Air Traffic Operations

The National Aeronautics and Space Administration (NASA) is investigating technological and operational concepts for introducing Cruise-Efficient Short Takeoff and Landing (CESTOL) aircraft into a future US National Airspace System (NAS) civil aviation environment. CESTOL is an aircraft design concept for future use to increase capacity and reduce emissions. CESTOL provides very flexible takeoff, climb, descent and landing performance capabilities and a high-speed cruise capability. In support of NASA, this study is a preliminary examination of the potential operational impact of CESTOL on airport and airspace capacity and delay. The study examines operational impacts at a subject site, Newark Liberty Intemational Airport (KEWR), New Jersey. The study extends these KEWR results to estimate potential impacts on NAS-wide network traffic operations due to the introduction of CESTOL at selected major airports. These are the 34 domestic airports identified in the Federal Aviation Administration's Operational Evolution Plan (OEP). The analysis process uses two fast-time simulation tools to separately model local and NAS-wide air traffic operations using predicted flight schedules for a 24-hour study period in 2016. These tools are the Sen sis AvTerminal model and NASA's Airspace Concept Evaluation System (ACES). We use both to simulate conventional-aircraft-only and CESTOL-mixed-with-conventional-aircraft operations. Both tools apply 4-dimension trajectory modeling to simulate individual flight movement. The study applies AvTerminal to model traffic operations and procedures for en route and terminal arrival and departures to and from KEWR. These AvTerminal applications model existing arrival and departure routes and profiles and runway use configurations, with the assumption jet-powered, large-sized civil CESTOL aircraft use a short runway and standard turboprop arrival and departure procedures. With these rules, the conventional jet and CESTOL aircraft are procedurally separated from each other geographically and in altitude during tenninal airspace approach and departure operations, and each use a different arrival runway. AvTeminal implements its unique Focal-point Scheduling Process to sequence, space and delay aircraft to resolve spacing and overtake conflicts among flights in the airspace and airport system serving KEWR. This Process effectively models integrated arrival and departure operations. AvTerminal assesses acceptance rates and delay magnitude and causality at selected locations, including en route outer boundary fixes, tenninal airspace arrival and departure boundary fixes, terminal airspace arrival merge and departure diverge fixes, and runway landing and takeoff runways. The analysis compares the resulting capacity impacts, flight delays and delay sources between CESTOL and conventional KEWR operations. AvTerminal quantitative results showed that CESTOL has significant capability to increase airport arrival acceptance rates (35-40% at KEWR) by taking advantage of otherwise underused airspace and runways where available. The study extrapolates the AvTerminal-derived KEWR peak arrival and departure acceptance rates to estimate capacity parameter values for each of the OEP airports in the ACES modeling of traffic through the entire NAS network. The extrapolations of acceptance rates allow full, partial or no achievement of CESTOL capacity gains at an OEP airport as determined by assessments of the degree to which local procedures allow leveraging of CESTOL capabilities. These assessments consider each OEP airport's runway geometries, runway system configurations, airport and airspace operations, and potential CESTOL traffic loadings. The ACES modeling, simulates airport and airspace spacing constraints imposed by airport runway system, terminal and en route air traffic control and traffic flow management operations using airport acceptance rates representing conventional-aircraft-only and CESTOL-mixed operations. CEOL aircraft are assumed to have Mach 0.8, and alternatively Mach 0.7, cruise speeds to examine compatibility with conventional aircraft operations in common airspace. The ACES results provides estimates of CESTOL delay impact NAS-wide and at OEP airports due to changes in OEP airport acceptance rates and changes in en route airspace potential conflict rates. Preliminary results show meaningful nationwide delay reductions (20%) due to CESTOL operations at 34 major domestic airports.

Couluris, G. J.↗

Integrated Test and Evaluation Flight Test 3 Flight Test Plan

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

Unmanned↗

Leverage Points for System Health Management of Autonomous Systems

Systems Health Management (SHM) is one of three basic functionalities that constitute an autonomous capability of a system. The other two functionalities are Planning & Scheduling, and Task Execution. In an autonomous system, variable autonomy is often distinct from variable authority to sense, decide, and act. There are quantifiable Levels of Autonomy that can be achieved by tuning different portions of the Observe-Orient-Decide-Act loop to provide flexibility and control. This approach is tabulated for multiple domains such as spacecraft and aerial vehicles. Examining SHM through a Systems Thinking lens helps us understand its stocks and flows, loops, and delays. Systems thinking, and modeling, is a useful way to understand change and complexity of systems of many types. There are certain archetypes that underlie well-known autonomy architectures. And there often are leverage points - best places to intervene in a system - that can resolve or mitigate some fundamental challenges in the design and deployment of autonomous systems. I identify these levers and present the ones that have been successfully used in NASA missions.

Systems Thinking↗

Overview of the Life Sciences Glovebox (LSG) Facility

The Life Sciences Glovebox (LSG) is a rack-level payload facility designed to house biological investigations in a "workbench" type environment aboard the International Space Station (ISS). The facility is scheduled to be launched in September 2018 and will be installed in the Japanese Experiment Module (JEM) of the ISS. LSG is comprised of an extendable work volume, an airlock, an avionics package, a laptop, and supporting structure. The 450L work volume provides two levels of containment for investigations via the physical barrier of its structure and an internal, filtered airflow that results in a negative pressure relative to ISS cabin pressure. The facility provides many other resources for investigation use including 28 VDC power, 120 VAC power, heat rejection, data connections, and video. Portions of the interior surfaces of the work volume are ferrous, allowing investigations and supporting hardware to be magnetically affixed to these surfaces. A UV decontamination system and a variety of ancillary hardware are available for investigations to use while occupying LSG. An engineering unit on the ground is used for payload development and integrated verification testing. Once the facility is installed and commissioned, it will be managed by the same team that manages the Microgravity Science Glovebox (MSG), another rack-level payload facility that has been operating aboard the ISS since 2002. Experienced Investigation Payload Integration Managers (IPIMs), who also support MSG payloads, will be available to assist payload developers through the integration process. This presentation will provide an overview of the LSG facility and the planned investigation flow for the near future.

Jordan, Lee↗

Southern Bhutan Ecological Forecasting Tech Paper: Modeling Asian Elephant (Elephas maximus) Habitat Suitability along the Southern Bhutan Border with NASA Earth Observations

Asian elephants (Elephas maximus) are a flagship species essential for the functioning of forest ecosystems, and they also have cultural significance in Bhutan. Elephants receive the highest legal protection as listed under Schedule I of the Bhutan Forests and Nature Conservation Act, 1995. Yet, they face threats of extinction due to poaching for ivory as well as the loss and fragmentation of their habitat. Due to the recent clearing of forests and the growing populations in these areas, there has been an increase in incidents of human-elephant conflict. These conflicts have been detrimental to farmer’s annual harvests and livelihoods and have led to retaliatory killing and injury of elephants in southern Bhutan. The DEVELOP Southern Bhutan Ecological Forecasting team partnered with the Bhutan Foundation and Bhutan Tiger Center to help address this problem. The team integrated NASA Earth observations, including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and the Shuttle Radar Topography Mission (SRTM) to acquire information on land cover change and elephant habitat suitability along the southern border of Bhutan. The team utilized Esri ArcGIS Pro and Software for Assisted Habitat Modeling (SAHM) for data analysis, modeling, and visualization. The team used elephant occurrence data and environmental variables to model current habitat suitability for migrating elephant populations. This analysis provided partners with maps to inform decisions about the placement and conservation of elephant corridors and helped build their capacity to use satellite data for future studies and project planning.

Palchen Wangchuk↗

Southern Bhutan Ecological Forecasting Project Summary - Modeling Asian Elephant (Elephas Maximus) Habitat Suitability along the Southern Bhutan Border with NASA Earth Observations

Asian elephants (Elephas maximus) are a flagship species essential for the functioning of forest ecosystems, and they also have cultural significance in Bhutan. Elephants receive the highest legal protection as listed under Schedule I of the Bhutan Forests and Nature Conservation Act, 1995. Yet, they face threats of extinction due to poaching for ivory as well as the loss and fragmentation of their habitat. Due to the recent clearing of forests and the growing populations in these areas, there has been an increase in incidents of human-elephant conflict. These conflicts have been detrimental to farmer’s annual harvests and livelihoods and have led to retaliatory killing and injury of elephants in southern Bhutan. The DEVELOP Southern Bhutan Ecological Forecasting team partnered with the Bhutan Foundation and Bhutan Tiger Center to help address this problem. The team integrated NASA Earth observations, including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and the Shuttle Radar Topography Mission (SRTM) to acquire information on land cover change and elephant habitat suitability along the southern border of Bhutan. The team utilized Esri ArcGIS Pro and Software for Assisted Habitat Modeling (SAHM) for data analysis, modeling, and visualization. The team used elephant occurrence data and environmental variables to model current habitat suitability for migrating elephant populations. This analysis provided partners with maps to inform decisions about the placement and conservation of elephant corridors and helped build their capacity to use satellite data for future studies and project planning.

DEVELOP Project Summary↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗

BRAINSTACK – A Platform for Artificial Intelligence & Machine Learning Collaborative Experiments on a Nano-Satellite

As the space economy continues to expand through increasingly easy access to advanced and inexpensive technology, space missions themselves have become more ambitious with exploration targets growing ever distant while simultaneously requiring larger guidance and communication budgets. These conflicting desires of distance and control drive the need for advanced on-board intelligent decision making to reduce communication and control limitations by automating as many mission functions as possible in-situ. While the amount of research on such Artificial Intelligence and Machine Learning (AI/ML) software modules has grown exponentially, the capacity to experimentally validate such software modules in space in a rapid and inexpensive format has not. To this end, the Nano Orbital Workshop (NOW) group at NASA Ames Research Center has been at the forefront of performing initial flight evaluation tests of ‘commercially’ available bleeding-edge computational platforms via what is programmatically referred to as the BrainStack on the TechEdSat (TES-n) flight series. This on-orbit computational platform provides an evaluation laboratory where advanced software experiments are pre-loaded into memory prior to launch, then executed as payloads during mission operations with results reported back and program tweaks or new training sets uploaded as needed. Processors selected as part of the BrainStack are of ideal size, packaging, and power consumption for easy integration into a cube satellite structure. These experiments have included the evaluation of small, high-performance GPUs and, more recently, neuromorphic processors, in LEO operations. Neuromorphic processors are of particular interest due to their superior power efficiency over GPUs in intelligent automation applications. The first TES-n flight test of an Intel first-generation Loihi neuromorphic processor launched on TES-13, January 13, 2022, and continues to operate in orbit despite no significant modifications to harden the processor against the space environment. The Intel Loihi Gen-1 on TES-13 is characterized by a 14nm 128-core Spiking Neural Network (SNN) able to support on-chip training. The processor is packaged in the Kapoho Bay USB module, providing a relatively straight-forward interface to the bus avionics system. The Kapoho Bay was in turn managed by an Intel Pentium single-board computer to handle scheduling of the software application payloads and communications with the satellite’s primary computer. The recently released Intel Loihi Gen-2, able to support integer-valued spike payloads and produced using 7nm process, will form part of the continually evolving BrainStack in the upcoming three TES-n/NOW flights. The Kapoho Point unit will incorporate eight Loihi-2 processors, enabling neural networks of up to one million neurons and one billion synapsis. Additionally, it is planned to measure the radiation environment these processors experience to understand any degradation or computational artifacts caused by long term space radiation exposure on these novel architectures. This evolving flexible and collaborative environment involving various research teams across NASA and other organizations is intended to be a convenient orbital test platform from which many anticipated future space automation applications may be initially tested.

Artificial Intelligence↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗

Recommended Methods for Monitoring Skeletal Health in Astronauts to Distinguish Specific Effects of Prolonged Spaceflight

NASA uses areal bone mineral density (aBMD) by dual-energy X-ray absorptiometry (DXA) to monitor skeletal health in astronauts after typical 180-day spaceflights. The osteoporosis field and NASA, however, recognize the insufficiency of DXA aBMD as a sole surrogate for fracture risk. This is an even greater concern for NASA as it attempts to expand fracture risk assessment in astronauts, given the complicated nature of spaceflight-induced bone changes and the fact that multiple 1-year missions are planned. In the past decade, emerging analyses for additional surrogates have been tested in clinical trials; the potential use of these technologies to monitor the biomechanical integrity of the astronaut skeleton will be presented. OVERVIEW: An advisory panel of osteoporosis policy-makers provided NASA with an evidence-based assessment of astronaut biomedical and research data. The panel concluded that spaceflight and terrestrial bone loss have significant differences and certain factors may predispose astronauts to premature fractures. Based on these concerns, a proposed surveillance program is presented which a) uses Quantitative Computed Tomography (QCT) scans of the hip to monitor the recovery of spaceflight-induced deficits in trabecular BMD by 2 years after return, b) develops Finite Element Models [FEM] of QCT data to evaluate spaceflight effect on calculated hip bone strength and c) generates Trabecular Bone Score [TBS] from serial DXA scans of the lumbar spine to evaluate the effect of age, spaceflight and countermeasures on this novel index of bone microarchitecture. SIGNIFICANCE: DXA aBMD is a widely-applied, evidence-based predictor for fractures but not applicable as a fracture surrogate for premenopausal females and males <50 years. Its inability to detect structural parameters is a limitation for assessing changes in bone integrity with and without countermeasures. Collective use of aBMD, TBS, QCT, and FEM analysis for astronaut surveillance could accommodate NASA's aggressive schedule for risk definition and inform a NASA-developed model which assesses the probability of overloading bones during mechanically-loaded mission tasks and possibly for physical activities after return to Earth.

Vasadi, Lukas J.↗