Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Operating Reserves and Wind Power Integration: An International Comparison

The determination of additional operating reserves in power systems with high wind penetration is attracting a significant amount of attention and research. Wind integration analysis over the past several years has shown that the level of operating reserve that is induced by wind is not a constant function of the installed capacity. Observations and analysis of actual wind plant operating data has shown that wind does not change its output fast enough to be considered as a contingency event. However, the variability that wind adds to the system does require the activation or deactivation of additional operating reserves. This paper provides a high-level international comparison of methods and key results from both operating practice and integration analysis, based on the work in International Energy Agency IEA WIND Task 25 on Large-scale Wind Integration. The paper concludes with an assessment of the common themes and important differences, along with recent emerging trends.

17 WIND ENERGY↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Flight Deck Robustness/Conformance Testing with a Surface Management System: An Integrated Pilot-Controller Human-in-the-Loop Surface Operations Simulation

An integrated flight deck and controller human-in-the-loopsimulation was conducted with a total of 120 Dallas-Ft.Worth (DFW) taxi-out operations. In this first integratedPilot-Controller Spot and Runway Departure Advisor(SARDA) simulation, ATC Ground and Local Controllersused the SARDA decision support tool to plan and issuespot release clearances and departure clearances. TheAirport and Terminal Area Simulator (ATAS), a simulatedB737NG piloted, in turn, by 10 commercial transportparticipant pilots, was integrated into the realisticsimulation traffic environment. In the simulation,controllers used SARDA advisories to issue spot release,taxi route, and runway/departure radio voice clearances toall aircraft on the airport surface. Simulation resultsindicated that under a variety of observed pilot/aircraftperformance variations, SARDA yielded controlleradvisories that were: Supportive of current-day time-basedoperations; Compatible with controllers’ expectations;Predictive of actual take-off times; and, Adaptable to offnominalevents. An Information Sharing Display, thatpresented SARDA sequence and timing information on theflight deck, was considered useful for both NextGenoperations and current-day time-based Traffic ManagementInitiative (TMI) operations.

Foyle, David C.↗

The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

Fatig, Curtis↗

Digital Twin for Optimizing Real-time Economy of the Integrated Energy Systems

Economic and safe operation of integrated energy systems (IES) requires real-time optimization (RTO) of the control and actions conducted on each system component. In this regard, digital twins (DTs), which consist of a physical system, a virtual system, and the data communication that occurs between the two, are essential for effective RTO. Through the data warehouse, the virtual system is constantly updated with real-time data from the physical system, and functions as the model in the optimization framework. The reduced-order model of the dynamic process model in the virtual system is used in the optimization framework. The optimization results are then returned, via the data warehouse, as control actions to the physical system. This work demonstrates the software capabilities of DT assets for an IES in the context of preparing a DT for an experimental system comprised of Idaho National Laboratory (INL)’s Thermal Energy Delivery System and battery system. For the virtual demonstration, the DTs encompass (1) a physical system, including the Modelica models of the Thermal Energy Delivery System and the battery system; (2) virtual optimization via the Optimization of Real-Time Capacity Allocation (ORCA) platform; and (3) the open-source data warehouse software DeepLynx. This work assesses the performance of ORCA, which utilizes a reduced-order model built using the Risk Analysis Virtual Environment (RAVEN) and trained on the Modelica models and real-time data pipeline through the graph database hosted in DeepLynx. The proposed optimization workflow will be an RTO model based on DTs and the data they generate.

25 ENERGY STORAGE↗

Optimizing Integrated Arrival, Departure and Surface Operations Under Uncertainty

In airports and surrounding terminal airspaces, the integration of arrival, departure and surface scheduling and routing have the potential to improve the operations efficiency. Recent research had developed mixed-integer-linear programming algorithm-based scheduler for integrated arrival and departure operations in the presence of uncertainty. This paper extends to the surface previous research performed by the authors to integrate taxiway and runway operations. The developed algorithm is capable of computing optimal aircraft schedules and routings that reflects the integration of air and ground operations. A preliminary study case is conducted for a set of thirteen aircraft evolving in a model of the Los Angeles International airport and surrounding terminal areas. Using historical data, a representative traffic scenario is constructed and probabilistic distributions of pushback delay and arrival gate delay are obtained. To assess the benefits of optimization, a First- Come-First-Serve algorithm approach comparison is realized. Evaluation results demonstrate that the optimization can help identifying runway sequencing and schedule that reduce gate waiting time without increasing average taxi times.

Bosson, Christabelle↗

Managing fatigue in operational settings 2: An integrated approach

The six domains that must be addressed in managing fatigue in operational settings are identified, and examples of how the aviation industry is dealing with the problems in each domain are given. Challenges facing healthcare providers in managing fatigue are also discussed.

Non-programmatic↗

ISS Remote User Payload Operations Training and Support

For more than ten years hundreds of payloads have been, and are currently being, successfully operated onboard the ISS. These payloads are operated by a diverse set of users all over the world. Due to the current international economic environment payload operations are being streamlined, in more and more cases, by using the payload investigators and scientists to also fill the role of operators. Taking this into consideration, increasingly, we have payload operators that are new to space operations and practices, therefore ground systems training and support have become a more critical aspect in ensuring a successful payload mission. The ISS ground systems payload interface is the Payload Operations and Integration Center (POIC), located at Marshall Space Flight Center. ISS ground systems training for all remote ISS payload operators, as well as the ISS POIC CADRE, are centralized at this facility. The POIC is the starting point for a remote payload operator to learn how to integrate, and operate their payload, successfully onboard the ISS. Additionally, the CADRE that supports the payload user community are trained and operate from this facility. This paper will give an overview of the ISS ground systems at the POIC, as it relates to the payload user/operator and CADRE community. The entire training process from initial contact with the POIC to in-flight operations will be reviewed and improvements to this process will be presented. More importantly we will present current training methods and proposed methodology whereby the user community will be trained more efficiently and thoroughly. Also, we will discuss how we can more effectively support users in their operations concept to programmatically conduct certain aspects of payload operations to reduce costs.

Roth, Karl↗

Dynamic Weather Routes: A Weather Avoidance Concept for Trajectory-Based Operations

The integration of convective weather modeling with trajectory automation for conflict detection, trial planning, direct routing, and auto resolution has uncovered a concept that could help controllers, dispatchers, and pilots identify improved weather routes that result in significant savings in flying time and fuel burn. Trajectory automation continuously and automatically monitors aircraft in flight to find those that could potentially benefit from improved weather reroutes. Controllers, dispatchers, and pilots then evaluate reroute options to assess their suitability given current weather and traffic. In today's operations aircraft fly convective weather avoidance routes that were implemented often hours before aircraft approach the weather and automation does not exist to automatically monitor traffic to find improved weather routes that open up due to changing weather conditions. The automation concept runs in real-time and employs two keysteps. First, a direct routing algorithm automatically identifies flights with large dog legs in their routes and therefore potentially large savings in flying time. These are common - and usually necessary - during convective weather operations and analysis of Fort Worth Center traffic shows many aircraft with short cuts that indicate savings on the order of 10 flying minutes. The second and most critical step is to apply trajectory automation with weather modeling to determine what savings could be achieved by modifying the direct route such that it avoids weather and traffic and is acceptable to controllers and flight crews. Initial analysis of Fort Worth Center traffic suggests a savings of roughly 50% of the direct route savings could be achievable.The core concept is to apply trajectory automation with convective weather modeling in real time to identify a reroute that is free of weather and traffic conflicts and indicates enough time and fuel savings to be considered. The concept is interoperable with today's integrated FMS/datalink. Auxiliary(lat/long) waypoints define a minimum delay reroute between current position and a downstream capture fix beyond the weather. These auxiliary waypoints can be uplinked to equipped aircraft and auto-loaded into the FMS. Alternatively, for unequipped aircraft, auxiliary waypoints can be replaced by nearby named fixes, but this could reduce potential savings. The presentation includes an overview of the automation approach and focuses on several cases in terms of potential savings, reroute complexity, best auxiliary waypoint solution vs. named fix solution, and other metrics.

McNally, B. David↗

Spacelab operations planning

The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

Lee, T. J.↗

Primary System Test Facility Review

Idaho National Laboratory (INL) is designing a Dynamic Energy Transport and Integration Laboratory (DETAIL) to demonstrate the operation of an integrated energy system as part of supporting research and development needs for the DOE Office of Nuclear Energy Integrated Energy Systems (IES) Program. DETAIL will demonstrate real-time integration with the electrical grid, renewable energy inputs, thermal and electrical energy storage, and energy delivery to an end user. A Thermal Energy Distribution System (TEDS) is being constructed within the DETAIL facility to demonstrate the operation of integrated energy system heat transfer components, thermal energy storage, distribution systems, and instrumentation and control (I&C), which will allow the facility to emulate the distribution of thermal energy to the generation of electrical power, and/or producing non-electrical commodities (e.g., hydrogen). As is the case for other subsystems within DETAIL, TEDS is designed to operate either independently or as a part of an integrated system to demonstrate the operation of integrated components, develop and validate thermal energy transport models and control systems, and study thermal energy inertia and energy storage. In an effort to completely understand how TEDS will integrate with operational plants, data from tests previously run at existing integral system test facilities (IST) will be used to drive the TEDS heater. Alternatively, a real-time data connection would allow steam conditions at the IST to drive the TEDS heater at the same time as having TEDS conditions provide feedback to the IST in terms of steam demand and/or pressure. This integrated testing approach will assess the ability of TEDS to operate during all plant conditions. Three existing integral system test facilities have been reviewed to determine their suitability for demonstrating TEDS capabilities when integrated within the DETAIL. This report summarizes the capabilities of each IST facility and any challenges that must be overcome to meet the operational needs of TEDS and DETAIL.

25 ENERGY STORAGE↗

Advanced Command Destruct System (ACDS) Enhanced Flight Termination System (EFTS)

This presentation provides information on the development, integration, and operational usage of the Enhanced Flight Termination System (EFTS) at NASA Dryden Flight Research Center and Air Force Flight Test Center. The presentation will describe the efforts completed to certify the system and acquire approval for operational usage, the efforts to integrate the system into the NASA Dryden existing flight termination infrastructure, and the operational support of aircraft with EFTS at Edwards AFB.

Tow, David K.↗

Unmanned Aircraft Systems Detect and Avoid System: End-to-End Verification and Validation Simulation Study of Minimum Operations Performance Standards for Integrating Unmanned Aircraft into the National Airspace System

As Unmanned Aircraft Systems (UAS) make their way to mainstream aviation operations within the National Airspace System (NAS), research efforts are underway to develop a safe and effective environment for their integration into the NAS. Detect and Avoid (DAA) systems are required to account for the lack of "eyes in the sky" due to having no human on-board the aircraft. The technique, results, and lessons learned from a detailed End-to-End Verification and Validation (E2-V2) simulation study of a DAA system representative of RTCA SC-228's proposed Phase I DAA Minimum Operational Performance Standards (MOPS), based on specific test vectors and encounter cases, will be presented in this paper.

Ghatas, Rania W.↗

Remote Support of ISS Payload Operations During the COVID19 Pandemic

As part of the Human Health and Performance Contract (HHPC) with the NASA Johnson Space Center, the Human Research Program’s (HRP) Research Operations and Integration (ROI) element conducts the planning, implementation, and closing of human research operations on-board the International Space Station (ISS). These operations are supported out of the Telescience Support Center (TSC) located in the Mission Control Center at Houston’s Johnson Space Center (MCC-H). HRP ROI has an Emergency Response Plan in place to allow for remote operations to be completed in the case of inclement weather or other natural disaster; however, nominally, the remote support is only expected to last one to two weeks. In response to the COVID-19 global pandemic, HRP ROI was challenged to complete a quick transition to supporting on-orbit operations remotely and distanced for an indefinite amount of time. This shift in ground support required close collaboration with various external groups as well as the implementation or adaptation of various technologies and tools to ensure no loss of science data. Operational adjustments were put into place for ground commanding, telemetry monitoring, personnel staffing and private and public audio and video with the ISS. Adjustments were also put in place for communication and collaboration with MCC-H, the Payload Operation and Integration Center (POIC) at Marshall Space Flight Center (MSFC), as well as between the various HRP ROI console team members spread across Houston, TX. The ability to successfully support a variety of on-orbit operations from any remote location is more in demand as the commercialization of low Earth orbit is expanding.

Operations↗

Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗