Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical cables”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

High-Speed Ring Bus

The high-speed ring bus at the Jet Propulsion Laboratory (JPL) allows for future growth trends in spacecraft seen with future scientific missions. This innovation constitutes an enhancement of the 1393 bus as documented in the Institute of Electrical and Electronics Engineers (IEEE) 1393-1999 standard for a spaceborne fiber-optic data bus. It allows for high-bandwidth and time synchronization of all nodes on the ring. The JPL ring bus allows for interconnection of active units with autonomous operation and increased fault handling at high bandwidths. It minimizes the flight software interface with an intelligent physical layer design that has few states to manage as well as simplified testability. The design will soon be documented in the AS-1393 standard (Serial Hi-Rel Ring Network for Aerospace Applications). The framework is designed for "Class A" spacecraft operation and provides redundant data paths. It is based on "fault containment regions" and "redundant functional regions (RFR)" and has a method for allocating cables that completely supports the redundancy in spacecraft design, allowing for a complete RFR to fail. This design reduces the mass of the bus by incorporating both the Control Unit and the Data Unit in the same hardware. The standard uses ATM (asynchronous transfer mode) packets, standardized by ITU-T, ANSI, ETSI, and the ATM Forum. The IEEE-1393 standard uses the UNI form of the packet and provides no protection for the data portion of the cell. The JPL design adds optional formatting to this data portion. This design extends fault protection beyond that of the interconnect. This includes adding protection to the data portion that is contained within the Bus Interface Units (BIUs) and by adding to the signal interface between the Data Host and the JPL 1393 Ring Bus. Data transfer on the ring bus does not involve a master or initiator. Following bus protocol, any BIU may transmit data on the ring whenever it has data received from its host. There is no centralized arbitration or bus granting. The JPL design provides for autonomous synchronization of the nodes on the ring bus. An address-synchronous latency adjust buffer (LAB) has been designed that cannot get out of synchronization and needs no external input. Also, a priority-driven cable selection behavior has been programmed into each unit on the ring bus. This makes the bus able to connect itself up, according to a maximum redundancy priority system, without the need for computer intervention at startup. Switching around a failed or switched-off unit is also autonomous. The JPL bus provides a map of all the active units for the host computer to read and use for fault management. With regard to timing, this enhanced bus recognizes coordinated timing on a spacecraft as critical and addresses this with a single source of absolute and relative time, which is broadcast to all units on the bus with synchronization maintained to the tens of nanoseconds. Each BIU consists of up to five programmable triggers, which may be programmed for synchronization of events within the spacecraft of instrument. All JPL-formatted data transmitted on the ring bus are automatically time-stamped.

Wysocky, Terry↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Fast cycling HTS based superconducting accelerator magnets: Feasibility study and readiness demonstration program driven by neutrino physics and muon collider needs

Development of energy-efficient fast cycling accelerator magnets is critical for the next generation of proton rapid cycling synchrotrons (RCS) for neutrino research and booster accelerators of future muon colliders. We see a unique opportunity for having such magnets to be built on base of High Temperature Superconductors (HTS). Besides being superconducting at relatively high temperatures, rare-earth HTS tapes have shown very small AC losses compared to low-temperature NbTi superconductor cables. Recent tests of the HTS-based 0.5 m long two-bore superconducting accelerator magnet have shown record high dB/dt ramping rates of about 300 T/s at 10 Hz repetition rate and 0.5 T B-field span. No temperature rise in 6 K cooling He was observed within the 0.003 K error setting the upper limit on the cryogenic power loss in the magnet conductor coil to be less than 0.2 W/m. Based on this result we outline a possible upgrade of this test magnet design to 2 T B-field in the 10 mm beam gap with the dB/dt ramping rates up to 1000 T/s. The power test results of this short sample magnet will be used to project both cryogenic and electrical power losses as a function of the magnet B-field and the dB/dt ramping rates. Then these projections will be scaled to the range of expected accelerator magnet beam gaps and B-fields for the proton and muon RCS accelerators. We invite collaborators to join these studies and call for support of the R&D program aimed at comprehensive demonstration of this approach that includes design, construction, and power tests of a long prototype of the HTS-based fast-cycling accelerator magnet by 2028.

43 PARTICLE ACCELERATORS↗

Arrays of Miniature Microphones for Aeroacoustic Testing

A phased-array system comprised of custom-made and commercially available microelectromechanical system (MEMS) silicon microphones and custom ancillary hardware has been developed for use in aeroacoustic testing in hard-walled and acoustically treated wind tunnels. Recent advances in the areas of multi-channel signal processing and beam forming have driven the construction of phased arrays containing ever-greater numbers of microphones. Traditional obstacles to this trend have been posed by (1) the high costs of conventional condenser microphones, associated cabling, and support electronics and (2) the difficulty of mounting conventional microphones in the precise locations required for high-density arrays. The present development overcomes these obstacles. One of the hallmarks of the new system is a series of fabricated platforms on which multiple microphones can be mounted. These mounting platforms, consisting of flexible polyimide circuit-board material (see left side of figure), include all the necessary microphone power and signal interconnects. A single bus line connects all microphones to a common power supply, while the signal lines terminate in one or more data buses on the sides of the circuit board. To minimize cross talk between array channels, ground lines are interposed as shields between all the data bus signal lines. The MEMS microphones are electrically connected to the boards via solder pads that are built into the printed wiring. These flexible circuit boards share many characteristics with their traditional rigid counterparts, but can be manufactured much thinner, as small as 0.1 millimeter, and much lighter with boards weighing as much as 75 percent less than traditional rigid ones. For a typical hard-walled wind-tunnel installation, the flexible printed-circuit board is bonded to the tunnel wall and covered with a face sheet that contains precise cutouts for the microphones. Once the face sheet is mounted, a smooth surface is established over the entire array due to the flush mounting of all microphones (see right side of figure). The face sheet is made from a continuous glass-woven-fabric base impregnated with an epoxy resin binder. This material offers a combination of high mechanical strength and low dielectric loss, making it suitable for withstanding the harsh test section environment present in many wind tunnels, while at the same time protecting the underlying polyimide board. Customized signal-conditioning hardware consisting of line drivers and antialiasing filters are coupled with the array. The line drivers are constructed using low-supply-current, high-gain-bandwidth operational amplifiers designed to transmit the microphone signals several dozen feet from the array to external acquisition hardware. The anti-alias filters consist of individual Chebyshev low-pass filters (one for each microphone channel) housed on small printed-circuit boards mounted on one or more motherboards. The mother/daughter board design results in a modular system, which is easy to debug and service and which enables the filter characteristics to be changed by swapping daughter boards with ones containing different filter parameters. The filter outputs are passed to commercially- available acquisition hardware to digitize and store the conditioned microphone signals. Wind-tunnel testing of the new MEMS microphone polyimide mounting system shows that the array performance is comparable to that of traditional arrays, but with significantly less cost of construction.

Shams, Qamar A.↗

Regenerative Performance of the NASA Symmetrical Solid Oxide Fuel Cell Design

The NASA Glenn Research Center is developing both a novel cell design (BSC) and a novel ceramic fabrication technique to produce fuel cells predicted to exceed a specific power density of 1.0 kW/kg. The NASA Glenn cell design has taken a completely different approach among planar designs by removing the metal interconnect and returning to the use of a thin, doped LaCrO3 interconnect. The cell is structurally symmetrical. Both electrodes support the thin electrolyte and contain micro-channels for gas flow-- a geometry referred to as a bi-electrode supported cell or BSC. The cell characteristics have been demonstrated under both SOFC and SOE conditions. Electrolysis tests verify that this cell design operates at very high electrochemical voltage efficiencies (EVE) and high H2O conversion percentages, even at the low flow rates predicted for closed loop systems encountered in unmanned aerial vehicle (UAV) applications. For UAVs the volume, weight and the efficiency are critical as they determine the size of the water tank, the solar panel size, and other system requirements. For UAVs, regenerative solid oxide fuel cell stacks (RSOFC) use solar panels during daylight to generate power for electrolysis and then operate in fuel cell mode during the night to power the UAV and electronics. Recent studies, performed by NASA for a more electric commercial aircraft, evaluated SOFCs for auxiliary power units (APUs). System studies were also conducted for regenerative RSOFC systems. One common requirement for aerospace SOFCs and RSOFCs, determined independently in each application study, was the need for high specific power density and volume density, on the order of 1.0 kW/kg and greater than 1.0 kW/L. Until recently the best reported performance for SOFCs was 0.2 kW/kg or less for stacks. NASA Glenn is working to prototype the light weight, low volume BSC design for such high specific power aerospace applications.

Cable, Thomas L.↗

Vanadium oxide coatings to self-regulate current sharing in high-temperature superconducting cables and magnets

High-temperature superconductors such as REBa 2 Cu 3 O 7-δ (REBCO, RE = rare earth) enable high-current cables and high-field magnets. By removing the turn-to-turn insulation in a magnet application, recent experiments demonstrated that REBCO magnets can self-protect against catastrophic damage during a superconducting-to-normal transition (quench), i.e., when the stored magnetic energy rapidly converts to heat. The current can bypass the hot spot during a quench, thereby reducing the localized heat dissipation. The removal of the insulation between turns, however, leads to excessive eddy currents during current ramping, thereby forcing a much-prolonged magnet charging time. To address this issue, we investigate vanadium oxide (VO x ) coatings as a temperature-dependent self-switching medium that automatically manages current sharing. VO x coatings (with 1.70 ≤ × ≤ to 2.07) were deposited by reactive cathodic arc deposition, initially on insulating glass to determine the electrical properties, and later on commercial REBCO tapes. The coatings are x-ray amorphous but with a short-range crystalline ordering according to Raman spectrometry. The resistivity of VO x decreased by at least three orders of magnitude when the temperature increased from 80 to 300 K. The coating process is compatible with commercial REBCO tapes as evidenced by the negligible change in the critical current caused by the coating process. Here, the results from current sharing experiments and circuit analysis suggest that the VO x coating can effectively self-regulate current sharing in REBCO magnets, suppress excessive eddy currents, and enable self-protection during quenches.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Preliminary Design of Ironless Linear Induction Motors for ITER MSE Shutter Actuators

In this article, the shutters need to be closed or opened during the operation and calibration period time for the fusion diagnostic systems, such as the International Thermonuclear Experimental Reactor (ITER) motional stark effect (MSE). Standard electric motors and actuators will not work in a strong magnetic field environment due to the presence of the magnetic field of fusion reactors. The innovative linear induction motor (LIM) with an ironless feature overcomes this kind of challenge and can be used for any application that requires controlled motion with a large stroke in the magnetic field environment. It consists of a high-electrical conductivity plate like copper and three-phase motor windings with nonferrous or stainless-steel stators. The conductor plate attached with the shutter is simply driven by the underneath three-phase linear windings to achieve linear motion. The motor drive can be controlled remotely by a controller using the electrical connection, so no sensitive electronic components are located in the harsh environment where the motor itself is located. The design requirements and test facility have been described. Several 3-D transient Maxwell electromagnetic (EM) models with different locations of three-phase linear motor windings and shutter stators have been analyzed and evolved to meet any applications allowed in the harsh environment inside the vacuum vessel of fusion reactors. The preliminary design results are presented in this article.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Technology That's Ready and Able to Inspect Those Cables

Attempting to locate a malfunctioning wire in a complex bundle of wires or in a cable that is concealed behind a wall is as difficult as trying to find a needle in a haystack. The result of such an effort can also be costly, time-consuming, and frustrating, whether it is the tedious process of examining cable connections for the Space Shuttle or troubleshooting a cable television hookup. Furthermore, other maintenance restrictions can compound the effort required to locate and repair a particular wiring problem. For example, on the Space Shuttle, once a repair is completed, all systems that have a wire passing through any of the connectors that were disconnected during troubleshooting are affected and, therefore, must undergo retesting, an arduous task that is completely unrelated to the original problem. In an effort to streamline wire inspection and maintenance, two contractors supporting NASA's Kennedy Space Center invented the Standing Wave Reflectometer (SWR) in 1999. In doing so, they leveraged technology that was first developed to detect problems that could lead to aircraft accidents, such as the one that resulted in the catastrophic failure of TWA flight 800 in 1996. The SWR performs a non-intrusive inspection that verifies the condition of electrical power and signal-distribution systems inside the Space Shuttle orbiters. Such testing reduces processing delays and ensures safe operation of these systems.

Source record↗

Electro-Thermo-Mechanical (ETM) Study on Submarine Dynamic Power Cables (SDPC) for Offshore Wind Transmission

Understanding the failure mechanisms of submarine dynamic power cables (SDPC) is critical for innovative design to meet the 2035 cost reduction target of U.S. DOE Floating Offshore Wind Shot. This is important because the current design suffers a significant failure rate in the field. This project conducted a systematic electro-thermo-mechanical (ETM) experimental study on the power cores extracted from a 15kV power cable with three cores of copper conductor, ethylene propylene rubber (EPR) insulation, and continuously corrugated welded aluminum armor (CCWA). An ETM testing system was developed by integrating a high voltage (HV) amplifier, two ceramic heaters, and a rod-plate transverse compression setup into a mechanical testing machine. Increasing temperature from room temperature (RT, 22 degree C) to 90 degree C resulted in the 67% decrease in the failure mechanical load as defined by the dielectric breakdown. Under creep mechanical loading, the dielectric breakdown time was decreased by 70% for a given mechanical load when the specimen temperature increased from RT to 90oC. The failure strain in both monotonic and creep mechanical loading modes was related to the maximum mechanical load applied. Although the dielectric breakdown occurred in the ETM test, the post-test measurement revealed an impressive recovery of electric resistance. The failure analysis on cross section of tested specimens indicated a sizable gap across insulation layer near the area between copper conductor and loading rod, which apparently resulted from online dielectric failure and offline elastic recovery of components including conductor and insulation layer.

17 WIND ENERGY↗

Development of Quantum Computing Interconnect Based on Aerosol Jet Printing and Electrochemical Deposition of Rhenium

The electrodeposition of rhenium on to a metal seed layer on flexible substrates is presented as a means to creating superconducting flexible cable connectors in an enabling plug-and-play approach for quantum computing. Cryogenic quantum electronics are currently connected using masses of stainless-steel coaxial cables that are bulky, rigid - both in form and design - and lead to significant joule heating, thermal noise, and cross talk. Here, we present an unprecedented approach to integrate an aerosol jet printed (AJP) metal seed layer with rhenium electrodeposition on a flexible substrate in the advancement of superconducting interconnect technologies. Silver and gold were printed using the ‘Nanojet’ aerosol jet printer on Kapton films. Adhesion of gold was found to be far superior to that of silver and adhesion on roughened Kapton surpassed that of its smooth counterpart. Electrodeposition of rhenium was successful on both silver and gold and an amorphous Re film was confirmed by XRD. Results for both materials are presented however due to the poor adhesion of silver to Kapton it was ruled out as a viable candidate. Composite materials were characterized by profilometry, EDS, XRD and FIBSEM. Electrical measurements of the composite at ambient temperature showed a critical temperature (T c ), where the resistance drops to 0, of 5.8 K, well above 4.2 K, the temperature of liquid helium. Stress-strain tests of the Ag-Re and Au-Re composites on roughened and smooth Kapton were completed. Cyclic flexure testing (200 cycles) to 1.25% strain showed smooth Kapton samples reach a stress of ~16 MPa, while Kapton roughened with sandpaper, reaches ~20MPa of stress for the same 1.25% strain.

36 MATERIALS SCIENCE↗

Deep Charging Evaluation of Satellite Power and Communication System Components

Deep charging, in contrast to surface charging, focuses on electron penetration deep into insulating materials applied over conductors. A classic example of this scenario is an insulated wire. Deep charging can pose a threat to material integrity, and to sensitive electronics, when it gives rise to an electrostatic discharge or arc. With the advent of Electric Orbit Raising, which requires spiraling through Earth's radiation belts, satellites are subjected to high energy electron environments which they normally would not encounter. Beyond Earth orbit, missions to Jupiter and Saturn face deep charging concerns due to the high energy radiation environments. While predictions can be made about charging in insulating materials, it is difficult to extend those predictions to complicated geometries, such as the case of an insulating coating around a small wire, or a non-uniform silicone grouting on a bus bar. Therefore, to conclusively determine the susceptibility of a system to arcs from deep charging, experimental investigations must be carried out. This paper will describe the evaluation carried out by NASA's Marshall Space Flight Center on subscale flight-like samples developed by Space Systems/Loral, LLC. Specifically, deep charging evaluations of solar array wire coupons, a photovoltaic cell coupon, and a coaxial microwave transmission cable, will be discussed. The results of each evaluation will be benchmarked against control sample tests, as well as typical power system levels, to show no significant deep charging threat existed for this set of samples under the conditions tested.

Schneider, T. A.↗

PCB-Based Break-Out Box

Break-out boxes (BOBs) are necessary for all electrical integration/cable checkouts and troubleshooting. Because the price of a BOB is high, and no work can be done without one, often the procedure stops, simply waiting for a BOB. A less expensive BOB would take less time in the integration, testing, and troubleshooting process. The PCB-based BOB works and looks the same as a standard JPL BOB, called Gold Boxes. The only differences between the old BOB and the new PCB-based BOB is that the new one has 80 percent of its circuitry in a printed circuit board. This process reduces the time for fabrication, thus making the BOBs less expensive. Moreover, because of its unique design, the new BOBs can be easily assembled and fixed. About 80 percent of the new PCB-based BOB is in a $22 (at the time of this reporting) custom-designed, yet commercially available PCB. This device has been used successfully to verify that BOB cables were properly made. Also, upon completion, the BOB was beeped out via a multimeter to ensure that all sockets on the connectors were properly connected to the respective banana jack. When compared to the Gold Box BOBs, the new BOB has many advantages. It is much more cost efficient, it delivers equal usability at substantially lower cost of the BOB, and the Gold Box is much heavier when compared to the new BOB. The new BOB is also a bit longer and much more versatile in that connectors are easily changeable and if a banana jack is broken, it can be replaced instead of throwing away an entire BOB.

Lee, Jason H.↗

Foldable Instrumented Bits for Ultrasonic/Sonic Penetrators

Long tool bits are undergoing development that can be stowed compactly until used as rock- or ground-penetrating probes actuated by ultrasonic/sonic mechanisms. These bits are designed to be folded or rolled into compact form for transport to exploration sites, where they are to be connected to their ultrasonic/ sonic actuation mechanisms and unfolded or unrolled to their full lengths for penetrating ground or rock to relatively large depths. These bits can be designed to acquire rock or soil samples and/or to be equipped with sensors for measuring properties of rock or soil in situ. These bits can also be designed to be withdrawn from the ground, restowed, and transported for reuse at different exploration sites. Apparatuses based on the concept of a probe actuated by an ultrasonic/sonic mechanism have been described in numerous prior NASA Tech Briefs articles, the most recent and relevant being "Ultrasonic/ Sonic Impacting Penetrators" (NPO-41666) NASA Tech Briefs, Vol. 32, No. 4 (April 2008), page 58. All of those apparatuses are variations on the basic theme of the earliest ones, denoted ultrasonic/sonic drill corers (USDCs). To recapitulate: An apparatus of this type includes a lightweight, low-power, piezoelectrically driven actuator in which ultrasonic and sonic vibrations are generated and coupled to a tool bit. The combination of ultrasonic and sonic vibrations gives rise to a hammering action (and a resulting chiseling action at the tip of the tool bit) that is more effective for drilling than is the microhammering action of ultrasonic vibrations alone. The hammering and chiseling actions are so effective that the size of the axial force needed to make the tool bit advance into soil, rock, or another material of interest is much smaller than in ordinary twist drilling, ordinary hammering, or ordinary steady pushing. Examples of properties that could be measured by use of an instrumented tool bit include electrical conductivity, permittivity, magnetic field, magnetic permeability, temperature, and any other properties that can be measured by fiber-optic sensors. The problem of instrumenting a probe of this type is simplified, relative to the problem of attaching electrodes in a rotating drill bit, in two ways: (1) Unlike a rotating drill bit, a bit of this type does not have flutes, which would compound the problem of ensuring contact between sensors and the side wall of a hole; and (2) there is no need for slip rings for electrical contact between sensor electronic circuitry and external circuitry because, unlike a rotating drill, a tool bit of this type is not rotated continuously during operation. One design for a tool bit of the present type is a segmented bit with a segmented, hinged support structure (see figure). The bit and its ultrasonic/sonic actuator are supported by a slider/guiding fixture, and its displacement and preload are controlled by a motor. For deployment from the folded configuration, a spring-loaded mechanism rotates the lower segment about the hinges, causing the lower segment to become axially aligned with the upper segment. A latching mechanism then locks the segments of the bit and the corresponding segments of the slider/guiding fixture. Then the entire resulting assembly is maneuvered into position for drilling into the ground. Another design provides for a bit comprising multiple tubular segments with an inner alignment string, similar to a foldable tent pole comprising multiple tubular segments with an inner elastic cable connecting the two ends. At the beginning of deployment, all segments except the first (lowermost) one remain folded, and the ultrasonic/sonic actuator is clamped to the top of the lowermost segment and used to drive this segment into the ground. When the first segment has penetrated to a specified depth, the second segment is connected to the upper end of the first segment to form a longer rigid tubular bit and the actuator is moved to the upper end of the second segnt. The process as described thus far is repeated, adding segments until the desired depth of penetration has been attained. Yet other designs provide for bits in the form of bistable circular- or rectangular- cross-section tubes that can be stowed compactly like rolls of flat tape and become rigidified upon extension to full length, in a manner partly similar to that of a common steel tape measure. Albeit not marketed for use in tool bits, a bistable reeled composite product that transforms itself from a flat coil to a rigid tube of circular cross section when unrolled, is commercially available under the trade name RolaTube(TradeMark) and serves as a model for the further development of tool bits of this subtype.

Bar-Cohen, Yoseph↗

New Developments and Capabilities Within WEC-Sim

WEC-Sim is an open-source software for simulating wave energy converters and has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory and Sandia National Laboratories within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with the latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1, which spans a 2-year period from June 2020 to September 2022. New features described here include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

Atlantic Offshore Wind Transmission Study

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Atlantic Offshore Wind Transmission Study: Executive Summary

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Electrokinetic In Situ Treatment of Metal-Contaminated Soil

An electrokinetic technique has been developed as a means of in situ remediation of soils, sludges, and sediments that are contaminated with heavy metals. Examples of common metal contaminants that can be removed by this technique include cadmium, chromium, zinc, lead, mercury, and radionuclides. Some organic contaminants can also be removed by this technique. In the electrokinetic technique, a low-intensity direct current is applied between electrodes that have been implanted in the ground on each side of a contaminated soil mass. The electric current causes electro-osmosis and migration of ions, thereby moving aqueous-phase subsurface contaminants from one electrode to the other. The half reaction at the anode yields H+, thereby generating an acid front that travels from the anode toward the cathode. As this acid front passes through a given location, the local increase in acidity increases the solubility of cations that were previously adsorbed on soil particles. Ions are transported towards one electrode or the other which one depending on their respective electric charges. Upon arrival at the electrodes, the ionic contaminants can be allowed to become deposited on the electrodes or can be extracted to a recovery system. Surfactants and other reagents can be introduced at the electrodes to enhance rates of removal of contaminants. Placements of electrodes and concentrations and rates of pumping of reagents can be adjusted to maximize efficiency. The basic concept of electrokinetic treatment of soil is not new. What is new here are some of the details of application and the utilization of this technique as an alternative to other techniques (e.g., flushing or bioremediation) that are not suitable for treating soils of low hydraulic conductivity. Another novel aspect is the use of this technique as a less expensive alternative to excavation: The cost advantage over excavation is especially large in settings in which contaminated soil lies near and/or under industrial buildings and therefore excavation would be made even more expensive by the need to prevent damage to numerous underground pipes and cables.

Quinn, Jacqueline↗