Technical Assistance for Mount Desert Island, Maine

Mount Desert Island, Maine, worked with researchers in the Energy Technology Innovation Partnership Project (ETIPP) to evaluate microgrid siting and sizing to assess how this technology could measurably improve critical service reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Defense Resilience Technical Assistance Options - Initial Overview

The Defense Resilience Technical Assistance (TA) project, a collaboration between the DOE Grid Deployment Office and the DoD, aims to enhance energy infrastructure at military installations and utilities and the surrounding community. It focuses on improving energy system performance, addressing power infrastructure inadequacies, enhancing power quality, reducing cyber sabotage impacts, and strengthening digital supply chains. Defense Resilience Technical Assistance Options - Initial Overview. Intend to tailor to the pilot installation.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Modeling of Microgrid for Critical Data Center Applications

As part of continuing efforts to develop support, understanding, and infrastructure of data center integration onto the electric grid, our work aims to model and analyze the behavior of data center loads in a microgrid power system. Our model consists of renewable energy sources, batteries, and a nuclear reactor-steam Rankine cycle to power data center loads. The simulation studies investigate the electrical behavior of the microgrid system to assess its ability in supporting large data center electrical demands.

14 - SOLAR ENERGY↗

Large Load Integration - Task List and Overview

Large Load Integration Tasks: Task 1 – Workshops Support stakeholder engagement across industry to promote collaboration and identify solutions to challenges that will guide other work Task 2 – Ancillary Services Characterize different types of large loads to assess under what conditions they may be utilized to provide grid stability services Task 3 – Communications Explore the cybersecurity and communications infrastructure required to enable large loads to interface with grid operations to provide ancillary services Task 4 – Nuclear Integration Explore risks and methods for supporting large load energy needs with SMRs and incorporating them into the wider power system Task 5 – Decision Support and TA Provide support to stakeholders through the creation of planning tools and direct technical assistance.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Fuel Cell Stack Model for Real-Time Simulation of Grid-Connected Applications

Fuel cell stacks coupled with electrolyzers and hydrogen storage sites can be a promising category of distributed energy resources for both grid-connected and stand-alone power systems. However, because of high costs, at-scale hardware testing of fuel cell stacks for grid-connected applications is not economically viable at present. A model-based system that can accurately captures the steady-state and dynamic response of fuel cell stacks over long time periods (hours), is needed. This paper demonstrate a real-time electromagnetic transient model of a megawatt-scale, grid-connected proton exchange membrane fuel cell stack, coupled with a mass-based hydrogen storage system. This model can emulate the electrical steady-state and dynamic response of grid-connected fuel cell stacks. We validate the model using the response of commercial hardware fuel cell stacks and analytical models in the literature - using a digital real-time simulator (RSCAD). The proposed real-time model is then used to simulate cases spanning different time horizons and to design controller-hardware-in-the-loop experiments to evaluate controllers for hydrogen stations.

activation potential↗

Power Quality and Stability in a Cluster of Microgrids with Coordinated Power and Energy Management

Distributed Energy Resources (DER) such as photovoltaic (PV) systems and battery energy storage systems (BESS) can be operated collectively as microgrids. Microgrids can be effective in meeting local load requirements as well as in improving the power quality and stability in a modern power distribution system. Multiple microgrids can also be operated in a coordinated manner as a cluster, to improve the resiliency of the power distribution system. In the event of an outage caused by a transmission system failure, the microgrids in a cluster can use their distributed generation capacity and energy storage resources to recover and extend power availability to the critical loads in the system. In this paper, an illustrative cluster of two microgrids based on the IEEE 13-bus model with DERs has been used, to demonstrate the operation of the concept using real-time simulations. Using real-time simulations, capabilities such as switching reconfiguration following faults, identification of optimal DER placement for effective power quality management, and power electronic controller validation have been demonstrated. For the two-microgrid cluster, this paper also presents improvements in load voltage quality and

Chowdhury, Prithwiraj Roy↗

Grid Value Investigation of Medium-Voltage Back-to-Back Converters

This paper presents the results of an investigation into the value that medium voltage back-to-back (MVB2B) converters can be realized through two potential applications: voltage regulation via the provision of reactive power supply or absorption, and distributed energy resource (DER) hosting capacity improvement via the controlled transfer of real power within the distribution system. Two groups of distribution systems have been prepared for the value investigation: the IEEE 123-bus system for the voltage regulation study and two utility-provided, realistic distribution systems for the DER hosting capacity improvement study. The results demonstrate that the MVB2B converter can realize significant value for the grid through these two applications. In particular, with the MVB2B converter transferring power between two feeders, DER-based power can be routed to nearby loads instead of feed through the distribution substation. Additionally, the size of energy storage elements used to enable higher levels of DERs can be significantly reduced.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

Annual Technology Baseline: The 2022 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' renewable energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, coal, and natural gas. EIA data for nuclear and conventional biopower are included for reference. This webinar presentation introduces the 2022 update to the ATB Electricity data and documentation.

capacity factor↗

Annual Technology Baseline: The 2023 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' renewable energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, coal, and natural gas. EIA data for nuclear and conventional biopower are included for reference. This webinar presentation introduces the 2023 update to the ATB Electricity data and documentation.

capacity factor↗

Annual Technology Baseline: The 2024 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, nuclear, coal, and natural gas. EIA data for conventional biopower are included for reference. This webinar presentation introduces the 2024 update to the ATB Electricity data and documentation.

battery storage↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

VDiSC: An Open Source Framework for Distributed Smart City Vision and Biometric Surveillance Networks

Recent global growth in the interest of smart cities has led to trillions of dollars of investment toward research and development. These connected cities have the potential to create a symbiosis of technology and society and revolutionize the cost of living, safety, ecological sustainability, and quality of life of societies on a world-wide scale. Some key components of the smart city construct are connected smart grids, self-driving cars, federated learning systems, smart utilities, large-scale public transit, and proactive surveillance systems. While exciting in prospect, these technologies and their subsequent integration cannot be attempted without addressing the potential societal impacts of such a high degree of automation and data sharing. Additionally, the feasibility of coordinating so many disparate tasks will require a fast, extensible, unifying framework. To that end, we propose the Distributed Smart City framework for Vision, or VDiSC. VDiSC serves as a unified biometric API harness that allows for seamless evaluation, deployment, and simple pipeline creation for heterogeneous biometric software. VDiSC additionally provides a fully declarative capability for defining and coordinating custom machine learning and sensor pipelines, allowing the distribution of processes across otherwise incompatible hardware and networks. VDiSC ultimately provides a way to quickly configure, hot-swap, and expand large coordinated or federated systems online without interruptions for maintenance. Because much of the data collected in a smart city contains Personally Identifying Information (PII), VDiSC also provides built-in tools and layers to ensure secure and encrypted streaming, storage, and access of PII data across distributed systems.

Brogan, Joel↗

Measurement of the muon anomalous precession frequency in runs 4, 5, and 6 of the muon ${g}-2$ Experiment at Fermilab

The Fermilab E989 Muon $g-2$ experiment measures the muon's anomalous magnetic moment to a precision of 127 parts per billion, as reported in June 2025. The value is proportional to the difference between the muon's cyclotron frequency and the spin precession frequency in the presence of a uniform magnetic field, for muons contained within the $g-2$ storage ring. Spin precession frequency is extracted from the time distribution of the muon's decay positrons recorded by 24 electromagnetic calorimeters positioned around the inner circumference of the storage ring. The anomalous precession frequency is one of the primary experimental inputs necessary to estimate the anomalous magnetic moment, the other being the measurement of the magnetic field. This dissertation details the anomalous precession frequency extraction, including reconstruction, time-distribution fitting, and treatment of systematic uncertainties for the final three data-collection runs: Run-4, Run-5, and Run-6. This data represents a fourfold increase in statistics over the previous analysis release, halving the statistical uncertainty. The residual slow term from previous analyses is now well understood and documented in a systematic treatment. As of the writing of this dissertation, the theoretical prediction for the SM estimate of the muon's anomalous magnetic moment is under debate, with two competing prediction methods, so a definitive comparison with theory is not available. The results submitted for experimental release use the kernel-ratio asymmetry method, contributing 115 parts per billion to the statistical uncertainty and 34 parts per billion to the systematic uncertainty. When combined with the previous analyses in earlier data runs, this thereby improves the measurement beyond the experimental goal and sets the world's most precise measurement of the muon's anomalous magnetic moment.

Israel, Scott Nathan [Boston U.]↗

Measurement of the muon anomalous precession frequency in runs 4, 5, and 6 of the muon ${g}-2$ Experiment at Fermilab

The Fermilab E989 Muon $g-2$ experiment measures the muon's anomalous magnetic moment to a precision of 127 parts per billion, as reported in June 2025. The value is proportional to the difference between the muon's cyclotron frequency and the spin precession frequency in the presence of a uniform magnetic field, for muons contained within the $g-2$ storage ring. Spin precession frequency is extracted from the time distribution of the muon's decay positrons recorded by 24 electromagnetic calorimeters positioned around the inner circumference of the storage ring. The anomalous precession frequency is one of the primary experimental inputs necessary to estimate the anomalous magnetic moment, the other being the measurement of the magnetic field. This dissertation details the anomalous precession frequency extraction, including reconstruction, time-distribution fitting, and treatment of systematic uncertainties for the final three data-collection runs: Run-4, Run-5, and Run-6. This data represents a fourfold increase in statistics over the previous analysis release, halving the statistical uncertainty. The residual slow term from previous analyses is now well understood and documented in a systematic treatment. As of the writing of this dissertation, the theoretical prediction for the SM estimate of the muon's anomalous magnetic moment is under debate, with two competing prediction methods, so a definitive comparison with theory is not available. The results submitted for experimental release use the kernel-ratio asymmetry method, contributing 115 parts per billion to the statistical uncertainty and 34 parts per billion to the systematic uncertainty. When combined with the previous analyses in earlier data runs, this thereby improves the measurement beyond the experimental goal and sets the world's most precise measurement of the muon's anomalous magnetic moment.

Israel, Scott Nathan [Boston U.]↗

Measurement of the muon anomalous precession frequency in Runs 4, 5, and 6 of the Muon g-2 experiment at Fermilab

The Fermilab E989 Muon g − 2 experiment measures the muon’s anomalous magnetic moment to a precision of 127 parts per billion, as reported in June 2025. The value is proportional to the difference between the muon’s cyclotron frequency and the spin precession frequency in the presence of a uniform magnetic field, for muons contained within the g − 2 storage ring. Spin precession frequency is extracted from the time distribution of the muon’s decay positrons recorded by 24 electromagnetic calorimeters positioned around the inner circumference of the storage ring. The anomalous precession frequency is one of the primary experimental inputs necessary to estimate the anomalous magnetic moment, the other being the measurement of the magnetic field. This dissertation details the anomalous precession frequency extraction, including reconstruction, time-distribution fitting, and treatment of systematic uncertainties for the final three data-collection runs: Run-4, Run-5, and Run-6. This data represents a fourfold increase in statistics over the previous analysis release, halving the statistical uncertainty. The residual slow term from previous analyses is now well understood and documented in a systematic treatment. As of the writing of this dissertation, the theoretical prediction for the SM estimate of the muon’s anomalous magnetic moment is under debate, with two competing prediction methods, so a definitive comparison with theory is not available. The results submitted for experimental release use the kernel-ratio asymmetry method, contributing 115 parts per billion to the statistical uncertainty and 34 parts per billion to the systematic uncertainty. When combined with the previous analyses in earlier data runs, this thereby improves the measurement beyond the experimental goal and sets the world’s most precise measurement of the muon’s anomalous magnetic moment.

Israel, Scott Nathan [Boston U.]↗

CO 2 storage site characterization using ensemble-based approaches with deep generative models

Estimating spatially distributed properties such as permeability from available sparse measurements is a great challenge in efficient subsurface CO 2 storage operations. In this paper, a deep generative model that can accurately capture complex subsurface structure is tested with an ensemble-based inversion method for accurate and accelerated characterization of CO 2 storage sites. We chose Wasserstein Generative Adversarial Network with Gradient Penalty (WGAN-GP) for its realistic reservoir property representation and Ensemble Smoother with Multiple Data Assimilation (ES-MDA) for its robust data fitting and uncertainty quantification capability. WGAN-GP are trained to generate high-dimensional permeability fields from a low-dimensional latent space and ES-MDA then updates the latent variables by assimilating available measurements. Several subsurface site characterization examples including Gaussian, channelized, and fractured reservoirs are used to evaluate the accuracy and computational efficiency of the proposed method and the main features of the unknown permeability fields are characterized accurately with reliable uncertainty quantification. Furthermore, the estimation performance is compared with a widely-used variational, i.e., optimization-based, inversion approach, and the proposed approach outperforms the variational inversion method in several benchmark cases. We explain such superior performance by visualizing the objective function in the latent space: because of nonlinear and aggressive dimension reduction via generative modeling, the objective function surface becomes extremely complex while the ensemble approximation can smooth out the multi-modal surface during the minimization. This suggests that the ensemble-based approach works well over the variational approach when combined with deep generative models at the cost of forward model runs unless convergence-ensuring modifications are implemented in the variational inversion.

42 ENGINEERING↗

Sequential Precipitation Input Tagging (SPIT) to Estimate Water Transit Times and Hydrologic Tracer Dynamics Within Water‐Tagging Enabled Hydrologic Models

Determining the age distribution of water exiting a catchment is important for understanding groundwater storage and mixing. New water-tagging capabilities within models track precipitation events as they move through simulated storages, yet forward modeling of individual events may not systematically capture the full transit time distribution (TTD). Here, we present a “sequential precipitation input tagging” (SPIT) framework to tag all input precipitation at regular intervals during extended model simulations. Monthly tags over 7 years were applied at six National Ecological Observatory Network sites to calculate TTDs and derive mean virtual tracer age, $\overline{T_{V}}$, fractions of young water, F yw , and hydrologic tracer concentrations (water isotopes δ 18 O and δ 2 H) within a tagging enabled version of the Weather Research and Forecast hydrologic model (WRF-Hydro). Throughout seven simulation years, the fraction of simulated discharge derived from tagged events, F tag , increased each year, with the final year's F tag ranging from 66% to 100% and highlights the need to apply SPIT over many years to understand TTDs. When the F tag was >75%, simulated $\overline{T_{V}}$ ranged 179–923 days and F yw 0.6%–23.9%, with daily values exhibiting a power-law relationship with precipitation, discharge, and groundwater. Through implementation of SPIT, we find this hydrologic model configuration performs poorly in estimation of $\overline{T_{V}}$ and F yw (root mean squared error of 469 days and 14.4% respectively), suggesting it misrepresents subsurface mixing. Thus, the SPIT framework provides a reproducible approach to calculate watershed transit times within tagging enabled models and thereby assess and improve representation of hydrologic processes.

fraction of young water↗