Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Environmental Permitting and Compliance Cost Reduction Strategies for the MHK Industry: Lessons Learned from Other Industries

The marine and hydrokinetic (MHK) industry plays a vital role in the U.S. clean energy strategy by providing a renewable, domestic energy source that may offset the need for traditional energy sources. The first MHK deployments in the U.S. have incurred very high permitting costs and long timelines for deploying projects, which increases project risk and discourages investment. A key challenge to advancing an economically competitive U.S. MHK industry is reducing the time and cost required for environmental permitting and compliance with government regulations. Other industries such as offshore oil and gas, offshore wind energy, subsea power and data cables, onshore wind energy, and solar energy facilities have all developed more robust permitting and compliance pathways that provide lessons for the MHK industry in the U.S. and may help inform the global consenting process. Based on in-depth review and research into each of the other industries, we describe the environmental permitting pathways, the main environmental concerns and types of monitoring typically associated with them, and factors that appear to have eased environmental permitting and compliance issues.

other industries↗

Concept definition for space station technology development experiments. Experiment definition, task 2

The second task of a study with the overall objective of providing a conceptual definition of the Technology Development Mission Experiments proposed by LaRC on space station is discussed. During this task, the information (goals, objectives, and experiment functional description) assembled on a previous task was translated into the actual experiment definition. Although still of a preliminary nature, aspects such as: environment, sensors, data acquisition, communications, handling, control telemetry requirements, crew activities, etc., were addressed. Sketches, diagrams, block diagrams, and timeline analyses of crew activities are included where appropriate.

Source record↗

An Evaluation of Detect and Avoid (DAA) Displays for Unmanned Aircraft Systems: The Effect of Information Level and Display Location on Pilot Performance

A consortium of government, industry and academia is currently working to establish minimum operational performance standards for Detect and Avoid (DAA) and Control and Communications (C2) systems in order to enable broader integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). One subset of these performance standards will need to address the DAA display requirements that support an acceptable level of pilot performance. From a pilot's perspective, the DAA task is the maintenance of self separation and collision avoidance from other aircraft, utilizing the available information and controls within the Ground Control Station (GCS), including the DAA display. The pilot-in-the-loop DAA task requires the pilot to carry out three major functions: 1) detect a potential threat, 2) determine an appropriate resolution maneuver, and 3) execute that resolution maneuver via the GCS control and navigation interface(s). The purpose of the present study was to examine two main questions with respect to DAA display considerations that could impact pilots' ability to maintain well clear from other aircraft. First, what is the effect of a minimum (or basic) information display compared to an advanced information display on pilot performance? Second, what is the effect of display location on UAS pilot performance? Two levels of information level (basic, advanced) were compared across two levels of display location (standalone, integrated), for a total of four displays. The authors propose an eight-stage pilot-DAA interaction timeline from which several pilot response time metrics can be extracted. These metrics were compared across the four display conditions. The results indicate that the advanced displays had faster overall response times compared to the basic displays, however, there were no significant differences between the standalone and integrated displays. Implications of the findings on understanding pilot performance on the DAA task, the development of DAA display performance standards, as well as the need for future research are discussed.

detect and avoid↗

Online Measurement of the Energy Spread of Multi-Turn Beam in the Fermilab Booster at Injection

We have developed a computer program interfaced with the ACNET environment of Fermilab accelerators to measure energy spread of the proton beam from the LINAC at an injection into the Booster. It uses a digitizing oscilloscope and provides users an ability to configure the scope settings for optimal data acquisition from a resistive wall current monitor. When the program is launched, a) a one shot timeline is generated to initiate beam injection into the Booster, b) a gap of about 40 ns is produced in the injected beam using a set of fast kickers, c) collects line charge distribution data from the wall current monitor for the first 200 μs from the injection and d) performs complete data analysis to extract full beam energy spread of the beam. The program also gives the option to store the data for offline analyses. We illustrate a case with an example. We also present results on beam energy spread as a function of beam intensity from recent measurements.

43 PARTICLE ACCELERATORS↗

LWR Aging Management for Life Beyond 80

While several decades of materials degradation research enabled the current US fleet of Light Water Reactors (LWR) to plan to produce electrical power through extended operations up to 80 years of plant life, it now seems appropriate to evaluate what issues, methods, and timelines need to be considered to meet the expected electric power demands for life beyond eighty (LBE) years. To address these questions, it will be necessary to review the electrical capacity and the projected LWR fleet capacity including new builds and advanced reactors. This effort should begin with a materials degradation assessment focused on known and possible unknown issues using a reduced Expanded Materials Degradation Assessment [1], which was employed to identify knowledge gaps for a second license renewal (60-80 yrs.). The focus of the LBE assessment should include: Establishing a timeline to initiate assessments of possible materials aging issues and to ensure sufficient time to evaluate materials degradation research gaps; assessing components and materials to be evaluated, e.g., metals (reactor pressure vessels and alloys within and outside the pressure boundary), concrete, cables, as well as mitigation methods, advanced monitoring, and validation with ex-service materials; initiating a LBE research plan focused on developing an expanded mechanistic understanding of materials degradation and refined models through Codes and Standards evaluation for use by the nuclear industry; and maintaining and strengthening the nuclear materials human knowledge base to address new and as yet unknown degradation modes.

Chen, Xiang↗

Study of selected tether applications in space, phase 3, volume 2

The results of a Phase 3 study of two Selected Tether Applications in Space (STAIS); deorbit of a Shuttle and launch of an Orbital Transfer Vehicle (OTV), both from the space station using a tether were examined. The study objectives were to: perform a preliminary engineering design, define operational scenarios, develop a common cost model, perform cost benefits analyses, and develop a Work Breakdown Structure (WBS). Key features of the performance analysis were to identify the net increases in effective Shuttle cargo capability if tethers are used to assist in the deorbit of Shuttles and the launching of the OTVs from the space station and to define deployer system designs required to accomplish these tasks. Deployer concepts were designed and discussed. Operational scenarios, including timelines, for both tethered and nontethered Shuttle and OTV operations at the space station were evaluated. A summary discussion of the Selected Tether Applications Cost Model (STACOM) and the results of the cost benefits analysis are presented. Several critical technologies needed to implement tether assisted deployment of payloads are also discussed. Conclusions and recommendations are presented.

Source record↗

Lunar Water ISRU Measurement Study (LWIMS): Establishing a Measurement Plan for Identification and Characterization of a Water Reserve

NASA’s Artemis program aims to achieve a sustainable lunar presence by 2028. To carry out sustained crewed surface operations, In-Situ Resource Utilization (ISRU), which would use lunar resources (e.g., water) to produce mission consumables, will be critical. Water-bearing materials have been identified at both lunar poles, butthe nature and extent of this resource is not well understood. Identification of the presence of water alone is not adequate for ISRU architecture planning and engineering design. The Lunar Water ISRU Measurement Study (LWIMS) assessed and defined the type, amount, and fidelity of the information and measurements needed to select mining locations for lunar water ISRU and to define requirements for ISRU hardware and architecture development. Current ISRU requirements were used to define a water ‘reserve’ in this context. A measurement plan to achieve these goals includes three key elements; a predictive ‘water favorability’ model to identify and map potential deposits, continued assessment of orbital data, and three types of landed missions to make direct ground measurements. Corresponding mission scenarios and instrument suites will depend on risk posture and timelines for ISRU implementation.

In situ resource utilization↗

Wind Energy High-Fidelity Model Verification and Validation Roadmap

The development of a next generation high-fidelity modeling code for wind plant applications is one of the central focus areas of the U.S. Department of Energy Atmosphere to Electrons (A2e) initiative. The code is based on a highly scalable framework, currently called Nalu-Wind. One key aspect of the model development is a coordinated formal validation program undertaken specifically to establish the predictive capability of Nalu-Wind for wind plant applications. The purpose of this document is to define the verification and validation (V&V) plan for the A2e high-fidelity modeling capability. It summarizes the V&V framework, identifies code capability users and use cases, describes model validation needs, and presents a timeline to meet those needs.

17 WIND ENERGY↗

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture↗

Thermal Sensitivity Study of Lunar Terrain Vehicle Wheels

Since the early development of lunar vehicles for the Apollo program, designing a wheel capable of functioning in the harsh equatorial lunar environment was identified as a uniquely difficult engineering challenge. The Lunar Terrain Vehicle (LTV) must contend with many of the same challenges encountered during the Apollo missions, but with the addition of colder, more complex thermal environments at the lunar south pole and longer Artemis mission timelines. A full thermal assessment of LTV wheels should capture these and other details to assess heat leak through the wheels and extreme hot and cold temperatures. The goals of this study are to provide bounding lunar south pole thermal environments; to define sensitivity to interactions between the wheel and the lunar surface in different operation modes, such as parked and traversing; and to identify thermal performance concerns related to the use of shape memory alloys.

Lunar Terrain Vehicle↗

The Feasibility of Direct CO2 Conversion Technologies on Impacting Mid-Century Climate Goals

Recent IPCC modeling suggests that to limit global warming below 2 degrees C, "unprecedented" reductions in CO2 emissions will be required during the 2030-2050 time frame. The direct conversion of CO2 to fuels and chemicals using renewable electricity has garnered interest as one route to draw down emissions with the ability to synthesize products at a significantly lower carbon footprint than conventional methods. However, most direct CO2 conversion pathways are only in the early stages of development and face technical and market hurdles prior to scale-up, bringing into question what role they may play in influencing global CO2 emissions within this critical two-decade window. In this perspective, we highlight low-temperature electrolysis as a promising technology for direct CO2 conversion, including discussion on the products that could most impact global emission levels, and importantly, offer insight into the timeline, required advancements, and specific technical targets needed to successfully scale and deploy these technologies at the commercial level.

chemicals↗

ZIKA virus infection causes persistent chorioretinal lesions

Zika-infected patients can have eye involvement ranging from mild conjunctivitis to severe chorioretinal lesions, however the possible long-term sequelae of infection and timeline to recovery remain unknown. Here we describe the partial recovery of chorioretinal lesions in an immunocompetent patient diagnosed with bilateral posterior uveitis associated with Zika infection and show that some lesions resolved with focal atrophy evident as pigmentary changes on funduscopy. To better understand the progression of the lesions and correlate the changes in fundus imaging with local viral load, immune responses, and retinal damage, we developed a symptomatic mouse model of ocular Zika virus infection. Imaging of the fundus revealed multiple hypopigmentary patches indicative of chorioretinal degeneration as well as thinning of the retina that mirror the lesions in patients. Microscopically, the virus primarily infected the optic nerve, retinal ganglion cells, and inner nuclear layer cells, showing thinning of the outer plexiform layer. During acute infection, the eyes showed retinal layer disorganization, retinitis, vitritis, and focal choroiditis, with mild cellular infiltration and increased expression of tumor necrosis factor, interferon-γ, granzyme B, and perforin. Focal areas of gliosis and retinal degeneration persisted 60 dpi. The model recapitulates features of ZIKA infections in patients and should help elucidate the mechanisms underlying the damage to the eyes and aid in the development of effective therapeutics.

59 BASIC BIOLOGICAL SCIENCES↗

Maximally Expressive Modeling

Planning and scheduling systems organize tasks into a timeline or schedule. Tasks are logically grouped into containers called models. Models are a collection of related tasks, along with their dependencies and requirements, that when met will produce the desired result. One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed; the information sought is at the cutting edge of scientific endeavor; and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a maximally expressive modeling schema.

Jaap, John↗

The NEEMO Project: A Report on how NASA Utilizes the "Aquarius" Undersea Habitat as an Analog for Long-Duration Space Flight

NEEMO is the NASA Extreme Environment Mission Operations, a cooperative project between NASA and the National Oceanic and Atmospheric Administration (NOAA). NEEMO was created and is managed by the Mission Operations Directorate at the Johnson Space Center in Houston, Texas. On the NOAA side, the National Undersea Research Center (NURC) in Key Largo, FL, with the help of the University of North Carolina at Wilmington, manages and operates the Aquarius Program. NEEMO was developed by astronaut training specialists to utilize an undersea research habitat as a multi-objective mission analog for long-duration space flight. Each mission was designed to expose astronauts to extreme environments for training purposes and to research crew behavior, habitability, and space analog life sciences. All of this was done much in the model of a space mission utilizing specific crew procedures, mission rules and timelines. Objectives of the missions were very diverse and contained many of the typical space mission type activities such as EV As (also known as extra vehicular activities), in-habitat science and research, and educational, public outreach, and media events. Five missions, dubbed NEEMO 1-5, were conducted between October 2001 and July 2003, the longest of which (NEEMO 5) lasted 14 days.

Reagan, Marc↗

2015 Space Radiation Standing Review Panel

The 2015 Space Radiation Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on December 8 - 9, 2015. The SRP met with representatives from the Space Radiation Element and members of the Human Research Program (HRP) to review the updated research plan for the Risk of Radiation Carcinogenesis Cancer Risk. The SRP also reviewed the newly revised Evidence Reports for the Risk of Acute Radiation Syndromes Due to Solar Particle Events (SPEs) (Acute Risk), the Risk of Acute (In-flight) and Late Central Nervous System Effects from Radiation Exposure (CNS Risk), and the Risk of Cardiovascular Disease and Other Degenerative Tissue Effects from Radiation (Degen Risk), as well as a status update on these Risks. The SRP would like to commend Dr. Simonsen, Dr. Huff, Dr. Nelson, and Dr. Patel for their detailed presentations. The Space Radiation Element did a great job presenting a very large volume of material. The SRP considers it to be a strong program that is well-organized, well-coordinated and generates valuable data. The SRP commended the tissue sharing protocols, working groups, systems biology analysis, and standardization of models. In several of the discussed areas the SRP suggested improvements of the research plans in the future. These include the following: It is important that the team has expanded efforts examining immunology and inflammation as important components of the space radiation biological response. This is an overarching and important focus that is likely to apply to all aspects of the program including acute, CVD, CNS, cancer and others. Given that the area of immunology/inflammation is highly complex (and especially so as it relates to radiation), it warrants the expansion of investigators expertise in immunology and inflammation to work with the individual research projects and also the NASA Specialized Center of Research (NSCORs). Historical data on radiation injury to be entered into the Watson “big data” study must be used with caution. The general scientific issues of reproducibility, details of experimental methods and data analysis from preclinical and basic research laboratories have been raised broadly over the last few years (not specific to this work) and indicate that caution must be applied in the ways these data are used. This pertains to preclinical data and also to phase 3 clinical trials in radiation oncology and medical oncology. Of course, appropriate use and analysis of these “big-data” sets also offer the potential of pinpointing limitations and extracting remaining useful information. Emphasis should be placed on the latter possibility. A key target is risk reduction from radiation exposure. Progress of the entire space program, now moving towards the Mars mission, requires timely answers to key components of human risk, which are known to be complex. Periodic review of progress should be conducted with additional resources directed into achieving critical milestones. Turning the long red bars to yellow and green (or for some risks such as CNS possibly to grey) must be high priority. That such progress will require new science and not engineering means that it should be viewed in a knowledge-based light. The technology-based aspects of engineering issues are certainly as important, however, science and knowledge-based problems are solved in a different way than engineering. Timelines for engineering are more predictable, while for science, progress can be methodical with occasional major incremental findings that can rapidly change the rate of progress. As opportunities for rapid incremental changes arise, periodic enhancement of investment is strongly recommended to enable such new knowledge to be quickly and efficiently exploited. Collaborations and linkages with National Institute of Allergy and Infectious Diseases (NIAID), the Biomedical Advanced Research and Development Authority (BARDA) and the Department of Defense (DoD) are in place and more are encouraged, where possible, with the radiation injury and medical countermeasure studies. This could include utilizing some of their animal model testing contracts to facilitate obtaining results using common platforms. Such approach will facilitate the comparison of results among laboratories, and will facilitate and accelerate the development of medical countermeasures. It is particularly noteworthy that the NASA Space Radiation Element is reaching out to the Multidisciplinary European Low Dose Initiative (MELODI) platform coordinating low dose radiation risk research, and to other international agencies that are studying low dose radiation effects in an effort to fill the void generated by the cancelation of the Department of Energy (DOE) low dose radiation program. While NASA is working actively with NIAID and BARDA to integrate their relevant findings of radiation mitigator investigations to NASA programs, the committee notes its disappointment that the United States currently lacks a dedicated low dose radiation program with clear mechanistic orientation and aimed at the quantification and mitigation of human radiation risk on Earth. This void gives to the NASA Space Radiation Program Element special societal value, but also makes its overall design more challenging.

Steinberg, Susan↗

Radiation Accidents and Malicious Events – Scenarios and Scope of the Work of ICRP Task Group 120

The International Commission on Radiological Protection (ICRP) Task Group 120 (TG120) is developing ICRP recommendations for radiological protection for a wide range of radiation accidents and malicious events, complementing those given in ICRP Publication 146 (2020) for large nuclear accidents. The scope includes accidents involving criticalities, operating faults, and fires and explosions in nuclear facilities, inadvertent damage to sealed radiation sources, as well as malicious events, such as sabotage of nuclear facilities or materials, use of radiological dispersal devices, the contamination of food and drinking water supplies, and the deployment of nuclear weapons. A template has been designed to collate relevant information on a wide range of case studies and hypothetical malicious scenarios to ensure that the recommendations developed are broadly applicable and comprehensive. For all scenarios, a graded approach to protection is being taken, accepting that specific guidance may be required for some distinctive aspects, for example, protection during times of armed conflict. This paper provides an overview of the scenarios and scope of the work of TG120, including some of the radiological and non-radiological impacts of radiation emergencies, along the response and recovery timeline.

ICRP↗

Honeywell Enhancing Airplane State Awareness (EASA) Project: Final Report on Refinement and Evaluation of Candidate Solutions for Airplane System State Awareness

The loss of pilot airplane state awareness (ASA) has been implicated as a factor in several aviation accidents identified by the Commercial Aviation Safety Team (CAST). These accidents were investigated to identify precursors to the loss of ASA and develop technologies to address the loss of ASA. Based on a gap analysis, two technologies were prototyped and assessed with a formative pilot-in-the-loop evaluation in NASA Langley’s full-motion Research Flight Deck. The technologies address: 1) data source anomaly detection in real-time, and 2) intelligent monitoring aids to provide nominal and predictive awareness of situations to be monitored and a mission timeline to visualize events of interest. The evaluation results indicated favorable impressions of both technologies for mitigating the loss of ASA in terms of operational utility, workload, acceptability, complexity, and usability. The team concludes that there is a feasible retrofit solution for improving ASA that would minimize certification risk, integration costs, and training impact.

Whitlow, Stephen D.↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗