Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Towards Thermal Protection System Certification by Analysis: Identification and Implication of Features

The thermal protection systems (TPS) to be used for upcoming sample return missions (e.g., Mars Sample Return) and future crewed missions to the Moon and Mars are subject to stringent reliability criteria. The certification of TPS is conducted through extensive testing, which can include Arc Jet testing to understand ablative behavior and non-destructive evaluation (NDE) to identify features that could lead to sub-optimal performance during entry. Unexpected features observed during fabrication of large-scale articles often require additional testing to certify, which in the very worst cases can impact schedule and contribute to cost.

J. B. Haskins↗

Flight Crew Task Management in Non-Normal Situations

Task management (TM) is always performed on the flight deck, although not always explicitly, consistently, or rigorously. Nowhere is TM as important as it is in dealing with non-normal situations. The objective of this study was to analyze pilot TM behavior for non-normal situations. Specifically, the study observed pilots performance in a full workload environment in order to discern their TM strategies. This study identified four different TM prioritization and allocation strategies: Aviate-Navigate-Communicate-Manage Systems; Perceived Severity; Procedure Based; and Event/Interrupt Driven. Subjects used these strategies to manage their personal workload and to schedule monitoring and assessment of the situation. The Perceived Severity strategy for personal workload management combined with the Aviate-Navigate-Communicate-Manage Systems strategy for monitoring and assessing appeared to be the most effective (fewest errors and fastest response times) in responding to the novel system failure used in this study.

Schutte, Paul C.↗

Manned geosynchronous mission requirements and systems analysis study. Volume 1: Executive summary

The crew capsule of the MOTV was studied with emphasis on crew accommodations, crew capsule functional requirements, subsystem interface definition between crew module and propulsion module, and man rating requirements. Competing mission modes were studied covering a wide range of propulsion concepts. These included one stage, one and one half stage, and two stage concepts using either the standard STS or an augmented STS. Several deorbit concepts were considered, including all propulsive modes, direct re-entry, and aeromaneuvering skip in skip out in the upper reaches of Earth's atmosphere. A five year plan covering costs, schedules, and critical technology issues is discussed.

Boyland, R. E.↗

A comparison of hand grasp breakaway strengths and bare-handed grip strengths of the astronauts, SML 3 test subjects, and the subjects from the general population

Astronauts have the task of retrieving and deploying satellites and handling massive objects in a around the payload bay. Concerns were raised that manual handling of such massive objects might induce loads to the shuttle suits exceeding the design-certified loads. The Crew and Thermal Division of NASA JSC simulated the satellite handling tasks (Satellite Manload Tests 1 and 3) and determined the maximum possible load that a suited member could impart onto the suit. In addition, the tests revealed that the load to the suit by an astronaut could be calculated from the astronaut's maximum hand grasp breakaway strength. Thus, this study was conducted to document that hand grasp breakaway strengths of the astronauts who were scheduled to perform EVA during the upcoming missions. In addition, this study verified whether the SML 3 test results were sufficient for documenting the maximum possible load. An attempt was made to predict grasp strength from grip strength and hand anthropometry. Based on the results from this study, the SML 3 test results were deemed sufficient to document the maximum possible load on the suit. Finally, prediction of grasp strength from grip strength was not as accurate as expected. Hence, it was recommended that grasp strength be collected from the astronauts in order to obtain accurate load estimation.

Rajulu, Sudhakar L.↗

Computational Model of Human and System Dynamics in Free Flight: Studies in Distributed Control Technologies

This paper presents a set of studies in full mission simulation and the development of a predictive computational model of human performance in control of complex airspace operations. NASA and the FAA have initiated programs of research and development to provide flight crew, airline operations and air traffic managers with automation aids to increase capacity in en route and terminal area to support the goals of safe, flexible, predictable and efficient operations. In support of these developments, we present a computational model to aid design that includes representation of multiple cognitive agents (both human operators and intelligent aiding systems). The demands of air traffic management require representation of many intelligent agents sharing world-models, coordinating action/intention, and scheduling goals and actions in a potentially unpredictable world of operations. The operator-model structure includes attention functions, action priority, and situation assessment. The cognitive model has been expanded to include working memory operations including retrieval from long-term store, and interference. The operator's activity structures have been developed to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. System stability and operator actions can be predicted by using the model. The model's predictive accuracy was verified using the full-mission simulation data of commercial flight deck operations with advanced air traffic management techniques.

Corker, Kevin M.↗

Architecting the Human Space Flight Program with Systems Modeling Language (SysML)

The next generation of missions in NASA's Human Space Flight program focuses on the development and deployment of highly complex systems (e.g., Orion Multi-Purpose Crew Vehicle, Space Launch System, 21st Century Ground System) that will enable astronauts to venture beyond low Earth orbit and explore the moon, near-Earth asteroids, and beyond. Architecting these highly complex system-of-systems requires formal systems engineering techniques for managing the evolution of the technical features in the information exchange domain (e.g., data exchanges, communication networks, ground software) and also, formal correlation of the technical architecture to stakeholders' programmatic concerns (e.g., budget, schedule, risk) and design development (e.g., assumptions, constraints, trades, tracking of unknowns). This paper will describe how the authors have applied System Modeling Language (SysML) to implement model-based systems engineering for managing the description of the End-to-End Information System (EEIS) architecture and associated development activities and ultimately enables stakeholders to understand, reason, and answer questions about the EEIS under design for proposed lunar Exploration Missions 1 and 2 (EM-1 and EM-2).

scheduling↗

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

Human-in-the-Loop Assessment of Alternative Clearances in Interval Management Arrival Operations

Interval Management Alternative Clearances (IMAC) was a human-in-the-loop simulation experiment conducted to explore the Air Traffic Management (ATM) Technology Demonstration (ATD-1) Concept of Operations (ConOps), which combines advanced arrival scheduling, controller decision support tools, and aircraft avionics to enable multiple time deconflicted, efficient arrival streams into a high-density terminal airspace. Interval Management (IM) is designed to support the ATD-1 concept by having an "Ownship" (IM-capable) aircraft achieve or maintain a specific time or distance behind a "Target" (preceding) aircraft. The IM software uses IM clearance information and the Ownship data (route of flight, current location, and wind) entered by the flight crew, and the Target aircraft's Automatic Dependent Surveillance-Broadcast state data, to calculate the airspeed necessary for the IM-equipped aircraft to achieve or maintain the assigned spacing goal.

Baxley, Brian T.↗

STS-103 Crew Interviews: Scott Kelly

Live footage of a preflight interview with Pilot Scott J. Kelly is seen. The interview addresses many different questions including why Kelly became an astronaut, the events that led to his interest, any role models that he had, and his inspiration. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, replacement of the gyroscopes, transistors, and computers. Also discussed are the Chandra X Ray Astrophysics Facility, and a brief touch on Kelly's responsibility during any of the given four space walks scheduled for this mission.

Source record↗

STS-103 Crew Interviews: Claude Nicollier

Live footage of a preflight interview with Mission Specialist Claude Nicollier is seen. The interview addresses many different questions including why Nicollier became an astronaut, the events that led to his interest, any role models that he had, and his inspiration. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, replacement of the gyroscopes, transistors, and computers. Also discussed are the Chandra X-Ray Astrophysics Facility, and a brief touch on Nicollier's responsibility during any of the given four space walks scheduled for this mission.

Source record↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Wind Information Uplink to Aircraft Performing Interval Management Operations

Interval Management (IM) is an ADS-B-enabled suite of applications that use ground and flight deck capabilities and procedures designed to support the relative spacing of aircraft (Barmore et al., 2004, Murdoch et al. 2009, Barmore 2009, Swieringa et al. 2011; Weitz et al. 2012). Relative spacing refers to managing the position of one aircraft to a time or distance relative to another aircraft, as opposed to a static reference point such as a point over the ground or clock time. This results in improved inter-aircraft spacing precision and is expected to allow aircraft to be spaced closer to the applicable separation standard than current operations. Consequently, if the reduced spacing is used in scheduling, IM can reduce the time interval between the first and last aircraft in an overall arrival flow, resulting in increased throughput. Because IM relies on speed changes to achieve precise spacing, it can reduce costly, low-altitude, vectoring, which increases both efficiency and throughput in capacity-constrained airspace without negatively impacting controller workload and task complexity. This is expected to increase overall system efficiency. The Flight Deck Interval Management (FIM) equipment provides speeds to the flight crew that will deliver them to the achieve-by point at the controller-specified time, i.e., assigned spacing goal, after the target aircraft crosses the achieve-by point (Figure 1.1). Since the IM and target aircraft may not be on the same arrival procedure, the FIM equipment predicts the estimated times of arrival (ETA) for both the IM and target aircraft to the achieve-by point. This involves generating an approximate four-dimensional trajectory for each aircraft. The accuracy of the wind data used to generate those trajectories is critical to the success of the IM operation. There are two main forms of uncertainty in the wind information used by the FIM equipment. The first is the accuracy of the forecast modeling done by the weather provider. This is generally a global environmental prediction obtained from a weather model such as the Rapid Refresh (RAP) from the National Centers for Environmental Prediction (NCEP). The weather forecast data will have errors relative to the actual, or truth, winds that the aircraft will encounter. The second source of uncertainty is that only a small subset of the forecast data can be uplinked to the aircraft for use by the FIM equipment. This results in loss of additional information. The Federal Aviation Administration (FAA) and RTCA are currently developing standards for the communication of wind and atmospheric data to the aircraft for use in NextGen operations. This study examines the impact of various wind forecast sampling methods on IM performance metrics to inform the standards development.

Ahmad, Nashat N.↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

STS-103 Crew Interviews: Jean-Francois Clervoy

Live footage of a preflight interview with Mission Specialist Jean-Francois Clervoy is seen. The interview addresses many different questions including why Clervoy became an astronaut, what were the events that led to his interest. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, replacement of the gyroscopes, transistors and computers. Also discussed is an explanation of the ESA (European Space Agency) involvement in this mission, and a brief touch on Clervoy's responsibility during any of the given four space walks scheduled for this mission.

Source record↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

CEO Sites Mission Management System (SMMS)

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

Trenchard, Mike↗

Sleep Disruption Medical Intervention Forecasting (SDMIF) Module for the Integrated Medical Model

The NASA Integrated Medical Model (IMM) assesses the risk, including likelihood and impact of occurrence, of all credible in-flight medical conditions. Fatigue due to sleep disruption is a condition that could lead to operational errors, potentially resulting in loss of mission or crew. Pharmacological consumables are mitigation strategies used to manage the risks associated with sleep deficits. The likelihood of medical intervention due to sleep disruption was estimated with a well validated sleep model and a Monte Carlo computer simulation in an effort to optimize the quantity of consumables. METHODS: The key components of the model are the mission parameter program, the calculation of sleep intensity and the diagnosis and decision module. The mission parameter program was used to create simulated daily sleep/wake schedules for an ISS increment. The hypothetical schedules included critical events such as dockings and extravehicular activities and included actual sleep time and sleep quality. The schedules were used as inputs to the Sleep, Activity, Fatigue and Task Effectiveness (SAFTE) Model (IBR Inc., Baltimore MD), which calculated sleep intensity. Sleep data from an ISS study was used to relate calculated sleep intensity to the probability of sleep medication use, using a generalized linear model for binomial regression. A human yes/no decision process using a binomial random number was also factored into sleep medication use probability. RESULTS: These probability calculations were repeated 5000 times resulting in an estimate of the most likely amount of sleep aids used during an ISS mission and a 95% confidence interval. CONCLUSIONS: These results were transferred to the parent IMM for further weighting and integration with other medical conditions, to help inform operational decisions. This model is a potential planning tool for ensuring adequate sleep during sleep disrupted periods of a mission.

Lewandowski, Beth↗