Cost Impacts of Risk-Based Methods for Defining AoR and PISC Duration of a CO 2 Storage Project Using NRAP Tools and FE/NETL CO 2 Saline Storage Cost Model

The purpose of this analysis is to assess the fiscal impact of using risk-based methods to define the area of review (AoR) and post-injection site care (PISC) duration for a geologic carbon dioxide (CO 2 ) storage project. The Office of Fossil Energy (FE)/National Energy Technology Laboratory (NETL) CO 2 Saline Storage Cost Model (“cost model”) was utilized to evaluate CO 2 storage economics in this study. The cost model is a widely used tool for evaluating CO 2 storage costs in geologic settings. It estimates costs for storage operations conducted under compliance to the United States Environmental Protection Agency (EPA) Underground Injection Control (UIC) Class VI regulations. This analysis evaluates and compares the costs of storage (on a first-year break-even dollar per tonne [2018$] basis) at the proposed FutureGen 2.0 site as a case study storage location by implementing different approaches to determine AoR and PISC given the prevailing geologic conditions and injection volume and duration considerations. The approaches include the use of 1) risk-based methods to define AoR and PISC duration, 2) an EPA-approved AoR and PISC documented in the FutureGen 2.0 UIC Class VI permit applications, and 3) cost model default settings that utilize uncertainty multipliers to estimate CO 2 plume and pressure front extent as part of AoR determination, as well as a 50-year PISC default. From all three sources, the AoR and PISC specified in the Class VI permit applications for FutureGen 2.0 were the largest and longest relative to the other two sources.

54 ENVIRONMENTAL SCIENCES↗

A 30 MW, 200 MHz Inductive Output Tube for RF Accelerators

This program investigated development of a multiple beam inductive output tube (IOT) to produce 30 MW pulses at 200 MHz. The program was successful in demonstrating feasibility of developing the source to achieve the desired power in microsecond pulses with 70% efficiency. The predicted gain of the device is 24 dB. Consequently, a 200 kW driver would be required for the RF input. Estimated cost of this driver is approximately $1.25 M. Given the estimated development cost of the IOT of approximately $750K and the requirements for a test set that would significantly increase the cost, it was determined that development could not be achieved within the funding constraints of a Phase II program.

43 PARTICLE ACCELERATORS↗

Solar Living House Final Technical Report

The Solar Living House is a high-performance solar-powered dwelling designed by a team of faculty and students from the University of Florida, in collaboration with Santa Fe College, the National University of Singapore, and Alachua Habitat for Humanity. The project was designed in accordance with the Solar Decathlon 2015, a research, design, education, and outreach program developed by the U.S. Department of Energy (DOE). The Solar Living House is fundamentally a house for living, centered on people and the activities of daily life while quietly introducing advanced design, construction, and engineering technologies. The 993 square-foot two-bedroom one-bath home was designed to embrace and frame an exterior courtyard space. This courtyard acts as an extension of the interior living spaces, maximizing the spatial potentials of a modest building footprint and introducing natural light into the primary living spaces of the house. Research Outcomes: The Solar Living House advances work on high-performance buildings through three principal technological innovations: wet/dry modular construction, a building automation system, and solar dehumidification systems. Wet / Dry Modular Construction: The house is designed as a series of five modules, including one that is designated as the “wet core.” The wet core consolidates the mechanical systems and bathroom into a single module to reduce plumbing runs, efficiency losses, and on-site construction time. The other four modules are designed to eliminate interior load bearing walls to allow for maximum flexibility in the reconfiguring of the space over time. The modules are designed to meet the structural challenges of both Florida’s hurricanes and California’s earthquakes. Building Automation System: The house is equipped with an integrated building automation system, allowing the houses environmental systems, lights, security systems, and smoke detectors to be programmed, monitored, and controlled through any mobile or computing device. These systems allow for more precise calibrations of temperature/humidity/lighting to correspond with user needs and preferences, minimizing energy losses with economical night- or day-time setbacks. Solar Dehumidification System: The most significant technological innovation in the Solar Living House is the solar thermal dehumidification system. This system generates hot water through two rooftop-mounted evacuated tube solar thermal collectors. The hot water is used to continually dry a regenerative solid desiccant material, typically white silica gel. The solid desiccant is used to adsorb moisture and humidity from the air without additional mechanical cooling. This strategy allows humidity to be modulated independently of air temperature, providing greater thermal comfort and reducing the opportunity for the growth of mold spores within the house while also reducing the overall energy consumption of the HVAC system. Economic Feasibility: The team set aggressive goals for affordability, targeting a construction cost of $138,710. An independent professional cost estimator determined the overall project costs, as designed, would be $333,799, or $336.15 per square foot of finished floor area. This is more than 2.4 times the target construction cost. By comparison, the average construction cost for a home in the United States in 2015 was $289,415, or $103.29 per square foot of finished floor area. Following work on the Solar Living House, team leaders incorporated many of its objectives into a net-zero energy home on a site in Gainesville, Florida. This site-built home avoided many of the constraints and complications of modular construction necessitated by the Solar Decathlon, allowing it to be built for a much more modest budget. This two-bedroom two bath 1,800 square foot home was constructed for $135.39 per square foot, including active photovoltaic solar systems, careful attention to continuous air barriers, increased insulation levels, and permanent site constructions. This project suggest that high-performance buildings can be realized for more modest budgets. Public Benefits: Work on the Solar Living House and Solar Decathlon 2015 offered our student team unparalleled learning opportunities. Because of the duration of the project, a number of students participated at different points in their education, from first year undergraduates all the way through to advanced graduate students. The opportunity for collaboration with students and faculty from the National University of Singapore was also extraordinary, allowing for a sharing of technical knowledge and cultural exchange. The wider public has benefited from this work as its findings have been shared through public presentations and publications. It serves as a useful stepping stone along the path towards affordable, high-performance buildings.

14 SOLAR ENERGY↗

Techno-economic Analysis of Advanced Zeolite Membranes for the Concentration of Tritiated Water

This report describes the techno-economic analysis of advanced molecular sieve zeolite membranes to separate and concentrate tritiated water (HTO) from dilute HTO-bearing aqueous streams. In the first phase of this effort, several monovalent and divalent cation-exchanged silicoalumino phosphate (SAPO- 34) molecular sieve zeolite membranes were synthesized on disk supports and characterized with gas and vapor permeation measurements. In the second phase, Linde Type A (LTA) zeolite membranes were synthesized on disk and tubular supports. The pervaporation process performance was evaluated for the separation and concentration of tritiated water. Techno-economic analysis (TEA) on SAPO-34 and LTA membrane based technologies was completed. However, compared to the SAPO-34 membranes, LTA zeolite membrane performance both with respect to separation factor and permeance was superior and encouraging. LTA zeolite membranes were selected as the preferred option for comparison with the Combined Electrolysis and Catalyst Exchange (CECE) process for the concentration of tritiated water from dilute HTO-bearing aqueous solutions. It is estimated that the total energy cost to process 10 L/min of tritiated water for the membrane cascade system is substantially lower compared to the CECE process. A preliminary capital cost estimate for the membrane based system and the CECE process is also reported.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comprehensive Analysis of Coal and Biomass Conversion to Jet Fuel: Oxygen Blown, Transport Reactor Integrated Gasifier (TRIG) and Fischer-Tropsch (F-T) Catalyst Configurations Modeled and Validated Scenarios

This study evaluates the technological/process, life cycle environmental, and economic perspective of 20 discreet F-T jet fuel production scenarios. The technological/process model provides a process level evaluation of the 10 alternate CBTL facility scenarios considered in this study. Aspen Plus simulation models for the CBTL facility scenarios were developed to determine the composition and flows of all of the major streams in the plants. These were used to develop conceptual level cost estimates for capital and operating costs for the major process units. NETL completed this study for the Connecticut Center for Advanced Technology (CCAT) to provide techno-economic and life cycle analysis modeling support for CBTL alternative jet fuel production, which forms key references to their report to the Defense Logistics Agency (their project sponsor/funder).

01 COAL, LIGNITE, AND PEAT↗

Comprehensive Analysis of Coal and Biomass Conversion to Jet Fuel: Oxygen Blown, Entrained-Flow Gasifier (EFG) and Fischer-Tropsch (F-T) Catalyst Configurations Modeled and Validated Scenarios

This study evaluates the technological/process, life cycle environmental, and economic perspective of 10 discreet F-T jet fuel production scenarios. The technological/process model provides a process level evaluation of the 10 alternate CBTL facility scenarios considered in this study. Aspen Plus simulation models for the CBTL facility scenarios were developed to determine the composition and flows of all of the major streams in the plants. These were used to develop conceptual level cost estimates for capital and operating costs for the major process units. NETL completed this study for the Connecticut Center for Advanced Technology (CCAT) to provide techno-economic and life cycle analysis modeling support for CBTL alternative jet fuel production, which forms key references to their report to the Defense Logistics Agency (their project sponsor/funder).

01 COAL, LIGNITE, AND PEAT↗

Catalytic Bio-crude Production in a Novel, Short-Contact Time Reactor

RTI has developed a catalytic fast pyrolysis (CFP) process to produce biomass-based hydrocarbon replacement fuels. From a technology perspective, this advanced biofuels process produces liquid transportation fuels that can leverage capital expenditures in the existing petroleum distribution infrastructure. From a business perspective, this technology does not face potential market limitations caused by oxygenate blend limitations for light duty vehicle applications. A promising catalyst has been developed with excellent potential for deoxygenation to produce a hydrocarbon-rich biocrude that is more suitable for upgrading with traditional hydroprocessing technology. The role of the catalyst is to control the chemistry during biomass pyrolysis to produce a biocrude in a single step that has lower oxygen content and is more thermally stable than conventional biomass fast pyrolysis oil. Catalyst properties are optimized to minimize gas and coke production and improve catalytic deoxygenation and biocrude yields. Results from this project have demonstrated that biocrudes from catalytic fast pyrolysis contain <20 wt% oxygen, with the organic fraction as low as 12% oxygen. These oxygen numbers are > 50% lower compared to traditional fast pyrolysis oils. The biocrude produced from our CFP process can be upgraded to gasoline range hydrocarbons. A very conservative approach for upgrading included a preliminary stabilization step followed by a hydroprocessing step. The oxygen content in the upgraded product was decreased by 97% (to less than 3wt %) from the oxygen content of the biocrude sample. Additionally, the acid content was reduced by 99% from the acid content of the biocrude sample. In an optimized integrated process, the CFP step and the hydroprocessing (upgrading) step need to be carefully balanced to maximize the input biomass energy that is recovered in the finished biofuels. Hydrogen utilization and carbon recovery during both catalytic biomass pyrolysis and biocrude upgrading need to be optimized to maximize energy recovery in the finished biofuel. A nominal 1 ton per day (TPD) catalytic biomass pyrolysis system was designed based on the laboratory experimental data. The system was designed to achieve the short residence times (0.5–2 sec) and high heat transfer rates required for maximum liquid biocrude yields while optimizing process integration to maintain catalyst activity by continuous regeneration. The catalytic biomass pyrolysis reactor is a continuously circulating single-loop transport reactor design that is flexible enough to allow sensitivity studies around temperature, residence time, biomass feed rate, and catalyst-to-biomass ratio (i.e., catalyst circulation rate) for process optimization. For a nominal 100 lb/hr feed rate of dry biomass, the products include ~25 lb/hr char and coke, ~20 lb/hr permanent gases, and ~55 lb/hr condensable vapors. Pyrolysis temperatures are 350–600°C, and the system is operated close to ambient pressure. Production of the catalyst developed within the project was scaled up to provide enough material (200kg) for bench-scale testing. The 1TPD bench-scale unit was fabricated, installed and commissioned with this project. Biocrude samples from wood were produced in this unit with the CFP catalyst with material balance > 90%. The intermediate biocrude yields and chemical composition compare well with previous laboratory results and a hydroprocessing strategy for upgrading the resulting biocrude was developed. The experimental results obtained within this project were used to develop a process model for a 2000 TPD commercial facility. Detailed flow sheets were developed for all major unit operations in the process and provided a basis for an economic analysis to develop capital and operating costs. Estimates of the biofuel production costs were used to develop internal rates of return for the yields and compositions measured for the current state of technology at the end of this project and for the yields anticipated for an optimized (nth plant) scenario as additional process improvements are made.

09 BIOMASS FUELS↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FECM/NETL Hydrogen Pipeline Cost Model (2024): Description and User’s Manual

The FECM/NETL Hydrogen Pipeline Cost Model (H2_P_COM) estimates costs for transporting gaseous hydrogen in a pipeline from a source, such as a hydrogen production facility, to a final destination which may be a user of the hydrogen or a distribution center where hydrogen in the pipeline is diverted to multiple end users. This document provides two main functions. First, the document describes the equations and algorithms that are used by the model to calculate technical quantities (such as the minimum inner pipe diameter needed to transport a user-specified H 2 mass flow rate a specified distance) and engineering-economic quantities (such as capital costs, operating costs, and cash flows). Second, the document is a user’s manual for the model that describes the procedures the user must follow to run the model. The model can be accessed at this URL: https://www.netl.doe.gov/energy-analysis/details?id=db897190-8e26-40b1-9535-ee78ac934193

08 HYDROGEN↗

Global Assessment of Hydrogen Technologies - Executive Summary

This project was a collaborative effort involving researchers from the University of Alabama at Birmingham (UAB) and Argonne National Laboratory (ANL), drawing on the experience and expertise of both research organizations. The goal of this study was to assess selected hydrogen technologies for potential application to transportation and power generation. Specifically, this study evaluated scenarios for deploying hydrogen technologies and infrastructure in the Southeast. One study objective was to identify the most promising near-term and long-term hydrogen vehicle technologies based on performance, efficiency, and emissions profiles and compare them to traditional vehicle technologies. Hydrogen vehicle propulsion may take many forms, ranging from hydrogen or hythane fueled internal combustion engines (ICEs) to fuel cells and fuel cell hybrid systems. This study attempted to developed performance and emissions profiles for each type (assuming a light duty truck platform) so that effective deployment strategies can be developed. A second study objective was to perform similar cost, efficiency, and emissions analysis related to hydrogen infrastructure deployment in the Southeast. There will be many alternative approaches for the deployment of hydrogen fueling infrastructure, ranging from distributed hydrogen production to centralized production, with a similar range of delivery options. This study attempted to assess the costs and potential emissions associated with each scenario. A third objective was to assess the feasibility of using hydrogen fuel cell technologies for stationary power generation and to identify the advantages and limits of different technologies. Specific attention was given to evaluating different fuel cell membrane types. A final objective was to promote the use and deployment of hydrogen technologies in the Southeast. This effort was to include establishing partnerships with industry as well promoting educational and outreach efforts to public service providers. To accomplish these goals and objectives a work plan was developed comprising 6 primary tasks: • Task 1 - Technology Evaluation of Hydrogen Light-Duty Vehicles – The PSAT powertrain simulation software was used to evaluate candidate hydrogen-fueled vehicle technologies for near-term and long-term deployment in the Southeastern U.S. • Task 2 - Comparison of Performance and Emissions from Near-Term Hydrogen Fueled Light Duty Vehicles - An investigation was conducted into the emissions and efficiency of light-duty internal combustion engines fueled with hydrogen and compressed natural gas (CNG) blends. The different fuel blends used in this investigation were 0%, 15%, 30%, 50%, 80%, 95%, and ~100% hydrogen, the remainder being compressed natural gas. • Task 3 - Economic and Energy Analysis of Hydrogen Production and Delivery Options - Expertise in engineering cost estimation, hydrogen production and delivery analysis, and transportation infrastructure systems was used to develop regional estimates of resource requirements and costs for the infrastructure needed to deliver hydrogen fuels to advanced-technology vehicles. • Task 4 –Emissions Analysis for Hydrogen Production and Delivery Options - The hydrogen production and delivery scenarios developed in Task 3 were expanded to include analysis of energy and greenhouse gas emissions associated with each specific case studies. • Task 5 – Use of Fuel Cell Technology in Power Generation - The purpose of this task was to assess the performance of different fuel cell types (specifically low-temperature and high temperature membranes) for use in stationary power generation. • Task 6 – Establishment of a Southeastern Hydrogen Consortium - The goal of this task was to establish a Southeastern Hydrogen Technology Consortium (SHTC) whose purpose would be to promote the deployment of hydrogen technologies and infrastructure in the Southeast.

08 HYDROGEN↗

Establishing a Cost Basis for Converting the High Flux Isotope Reactor from High Enriched to Low Enriched Uranium Fuel

Under the auspices of the Global Threat Reduction Initiative Reduced Enrichment for Research and Test Reactors Program, the National Nuclear Security Administration /Department of Energy (NNSA/DOE) has, as a goal, to convert research reactors worldwide from weapons grade to non-weapons grade uranium. The High Flux Isotope Reactor (HFIR) at Oak Ridge National Lab (ORNL) is one of the candidates for conversion of fuel from high enriched uranium (HEU) to low enriched uranium (LEU). A well documented business model, including tasks, costs, and schedules was developed to plan the conversion of HFIR. Using Microsoft Project, a detailed outline of the conversion program was established and consists of LEU fuel design activities, a fresh fuel shipping cask, improvements to the HFIR reactor building, and spent fuel operations. Current-value costs total $76 million dollars, include over 100 subtasks, and will take over 10 years to complete. The model and schedule follows the path of the fuel from receipt from fuel fabricator to delivery to spent fuel storage and illustrates the duration, start, and completion dates of each subtask to be completed. Assumptions that form the basis of the cost estimate have significant impact on cost and schedule.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Feasibility Study 30 Watts per Pound Rollup Solar Array

Principal efforts in this reporting period were applied to preparation of the detail design of the array structure and mechanisms and to manufacturing drawings for a demonstration model of the selected design concept. Analytical support focused on substantiation of the detail design. Additional studies were performed of dynamic criteron effects on components of the wrap drum. Thermal studies were extended to evaluate another thin film (preferred) material for the substrate and its influence on solar cell temperatures. Electrical design considerations included feasibility studies and ramifications of using a new, larger size, solar cell and a new coverglass application concept. Preliminary evaluations suggest improvement in the array power to weight characteristic and net savings in the estimated cost of cell installation. Weight estimates have been up-dated in keeping with refinements in detail design. Performance of this contractor's rollout solar array design is now projected as capable of producing 31.6 watts per pound of weight; excludes estimated improvements from use of new solar cell design.

Source record↗

Analysis of space tug operating techniques (study 2.4). Volume 1: Executive summary

The costs of tug refurbishment were studied, using existing cost estimating relationships, to establish the cost of maintaining the reusable third stage of the space transportation system. Refurbishment operations sheets which describe the actual tasks that are necessary to keep the equipment functioning properly were used along with refurbishment operations sheets which contain all of the pertinent descriptive information for each of the major vehicle areas. Tug refurbishment costs per mission are tabulated.

Source record↗

Pricing of NASA Space Shuttle transportation system cargo

A two-part pricing policy is investigated as the most feasible method of pricing the transportation services to be provided by NASA's SSTS. Engineering cost estimates and a deterministic operating cost model generate a data base and develop a procedure for pricing the services of the SSTS. It is expected that the SSTS will have a monopoly on space material processing in areas of crystal growth, glass processing, metallurgical space applications, and biomedical processes using electrophoresis which will require efficient pricing. Pricing problems, the SSTS operating costs based on orbit elevation, number of launch sites, and number of flights, capital costs of the SSTS, research and development costs, allocation of joint transportation costs of the SSTS to a particular space processing activity, and rates for the SSTS are discussed. It is concluded that joint costs for commercial cargoes carried in the SSTS can be most usefully handled by making cost allocations based on proportionate capacity utilization.

Hale, C. W.↗

An all-plated, low cost contact system for silicon solar cells

The plating sequences Pd-Cr-Cu and Pd-Ni-Cu are demonstrated. The surface was sensitized with a 50 A-thick Pd layer obtained from an immersion bath. After 15 min heating at 400 C in N2, a thin barrier layer of either Cr or Ni was deposited from electroless baths operated at temperatures around 90 C. The sintering process was repeated, and a thin copper layer of 500 A was deposited by electroless means. An electrolytic copper bath was used to build the copper layer to 3-4 micron thicknesses. Cells with good I-V curves were obtained, and the all-plated contacts had good adhesion. Preliminary cost estimates show that the process costs approximately 12 cents per watt excluding the cost of the masking procedure.

Tanner, D. P.↗

Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

Source record↗

Contingencies in Decommissioning Cost Evaluations - Panel Session 24

Contingency costs apply to unforeseen, uncertain and unpredictable conditions, typically encountered during the decommissioning activities (known unknowns). Outside spent fuel management, the dismantling activities in the controlled area constitute the largest contributor to project risk and decommissioning cost. Using data from previous proven experience on site help minimize the contingencies and provide more accurate cost estimates. Technology improvement leads to cost and contingency reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗