Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

NASA aviation safety reporting system

The study deals with 165 inadvertent operations on or into inappropriate portions of the aircraft areas at controlled airports. Pilot-initiated and controller-initiated incursions are described and discussed. It was found that a majority of the pilot-initiated occurrences involved operation without a clearance; controller-initiated occurrences usually involved failure to maintain assured separation. The factors associated with these occurrences are analyzed. It appears that a major problem in these occurrences is inadequate coordination among the various system participants. Reasons for this, and some possible solutions to various aspects of the problem, are discussed. A sample of reports from pilots and controllers is presented. These relate to undesired occurrences in air transport, general aviation, and air traffic control operations; to ATC coordination problems; and to a recurrent problem in ASRS reports, parachuting operations. A sample of alert bulletins and responses to them is presented.

Source record↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Online task-space motion control for positioner-coordinated multi-robot manufacturing systems

Incorporating multiple robotic manipulators into large-scale manufacturing systems enhances production efficiency and expands manufacturing capabilities beyond those of single-robot systems. Workpiece positioners in robotic manufacturing have demonstrated significant benefits for process optimization, but coordination strategies for multi-robot systems with shared positioners have received limited attention. This work presents a task-space coordinated trajectory-tracking control framework for multi-robot manufacturing systems, in which robots coordinate their motions within a shared, dynamic workpiece positioning frame. A workpiece positioner actively adjusts the pose of the manufactured component to enable greater operational concurrency and improve overall production efficiency. The proposed motion-coordination scheme employs a distributed and scalable architecture, supporting coordination across heterogeneous multi-robot systems. Two optimization methodologies are introduced to manage kinematic redundancies and maintain continuous, near-optimal operation throughout the manufacturing process. The first strategy exploits a task-space dimensionality reduction to achieve locally optimal configurations by leveraging symmetry-axis rotations of the tool. The second strategy utilizes the workpiece positioner to drive the coordinated robots toward stable and kinematically favorable configurations. For both optimization strategies, multiple objectives are defined to improve key performance metrics, including manipulability, configuration consistency, proximity to mechanical limits, and motion efficiency. Addressing a key limitation of existing coordination approaches, the framework is designed around online setpoint modification, allowing coordinated robots to respond effectively to in-situ process feedback. The proposed control framework is validated using the Robot Operating System (ROS) middleware on a combination of physical and simulated multi-robot system hardware.

Arbogast, Alex [ORNL] (ORCID:0000000154740723)↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Mars Science Laboratory Frame Manager for Centralized Frame Tree Database and Target Pointing

The FM (Frame Manager) flight software module is responsible for maintaining the frame tree database containing coordinate transforms between frames. The frame tree is a proper tree structure of directed links, consisting of surface and rover subtrees. Actual frame transforms are updated by their owner. FM updates site and saved frames for the surface tree. As the rover drives to a new area, a new site frame with an incremented site index can be created. Several clients including ARM and RSM (Remote Sensing Mast) update their related rover frames that they own. Through the onboard centralized FM frame tree database, client modules can query transforms between any two frames. Important applications include target image pointing for RSM-mounted cameras and frame-referenced arm moves. The use of frame tree eliminates cumbersome, error-prone calculations of coordinate entries for commands and thus simplifies flight operations significantly.

quaternion↗

Real-Time Model-Adaptive Relaying Applied to Microgrid Protection

In microgrids, the short-circuit current magnitude is significantly limited by more than an order of magnitude due to the relatively small inverter-based resources. Commercially available protective devices for distribution cannot reliably protect a microgrid due to their dependence on the magnitude of the fault current. Moreover, overcurrent relays typically cannot function properly for a microgrid because they are incapable of detecting faults and/or performing the coordination between the relays in inverter-based microgrids operated in the islanded mode. This paper proposes a model-adaptive relay designed to adjust the relay curves based on the available generation and the network topology. The proposed method runs a real-time model of the microgrid, which gathers information from the network to calculate the available short-circuit current in the specified node. The fault current from the model is then used for the adaptive algorithm to calculate the relay settings, considering coordination with the downstream fuses and upstream reclosers. This work presents the validation of the proposed method in Hardware-in-the-Loop, in a hardware testbed as well as field deployed in a real microgrid in East-Tennessee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kibo Robot Programming Challenge 5/21/2020 Checkout Activity Report

This a report on JAXA’s Kibo Robot Programing Challenge (RPC) Checkout activity which took place on 2020-05-21. This activity is an on-orbit test for the upcoming competition organized by JAXA and to be ran by September 2020. It aimed to check the multiple aspects of the operation of Bumble in support of this competition. The activity had three primary objectives: a) verification of four different positions to be visited during the competition, namely Start Position, P1, P2, and P3, b) demonstration of Bumble autonomously moving from the Start Position to P3 without keep-in/keep-out zones and c) demonstration of Bumble autonomously moving from the Start Position to P3 with JAXA’s defined keep-in/keep-out zones. The report emphasizes the confirmation of JAXA’s previously calculated and commanded coordinates for each position and the Astrobee Facilities Team (AFT) estimation of new coordinates in case those coordinates did not match JAXA’s desired target positions per ground and crew procedures. Four estimated coordinates are proposed and various suggestions on operation procedures are given to improve the maneuverability of Bumble during the actual day of the competition.

Astrobee↗

Cyber Conservative Operations

In an era of increasingly sophisticated and pervasive cyber threats, robust cyber resilience strategies are more critical than ever. This paper introduces the concept of Cyber Conservative Operations, a proactive approach designed to assist critical infrastructure owners and operators in managing risk and maintaining resilience in the face of imminent, yet not occurring, cyber events. By leveraging the principles of Cyber-Informed Engineering (CIE) and the energy sector’s practice of conservative operations, Cyber Conservative Operations offer a framework for planning and executing coordinated active defense and resilience-oriented actions ahead of cyber events. This approach aims to minimize the consequences of digitally-enabled hazards and ensure swift recovery from anticipated cyber threats. Cyber Conservative Operations enhance the ability of owners and operators to execute pre-planned defense and resilience actions, thereby reducing the impact of digitally-enabled hazards. These operations are crucial for addressing impacts that cannot be precisely quantified or forecasted and for preparing organizations for rapid recovery from imminent digital threats. The paper begins with a discussion of conservative operations as applied to the bulk power system (BPS), a current mechanism allowing BPS entities to enact defensive operating plans to mitigate impending grid unreliability. Building on this model, we present a concept for implementing cyber conservative operations at asset owner facilities. The paper concludes with two case studies of cyber conservative operations drawn from high-profile cyber events, illustrating the practical application and benefits of this proactive approach.

42 - ENGINEERING↗

Global Power System Transformation Consortium

The Global Power System Transformation (G-PST) Consortium, an expert- and practitioner-driven initiative, engages key power system operators, research and educational institutes, governments, businesses, and stakeholders in all regions of the world to accelerate clean energy transitions at the ambitious scope and scale that is required. The G-PST Consortium provides coordinated, holistic support and knowledge infusion for system operators pursuing clean energy transitions, including performing cutting-edge research; providing implementation support for world-class engineering and operational solutions; supporting workforce development; building and disseminating open-access data and tools; and accelerating localized technology adoption, standards development, and testing programs.

consortium↗

NASA's Astronant Family Support Office

During the NASA‐Mir program of the 1990s and due to the challenges inherent in the International Space Station training schedule and operations tempo, it was clear that a special focus on supporting families was a key to overall mission success for the ISS crewmembers pre‐, in‐ and post‐flight. To that end, in January 2001 the first Family Services Coordinator was hired by the Behavioral Health and Performance group at NASA JSC and matrixed from Medical Operations into the Astronaut Office's organization. The initial roles and responsibilities were driven by critical needs, including facilitating family communication during training deployments, providing mission‐specific and other relevant trainings for spouses, serving as liaison for families with NASA organizations such as Medical Operations, NASA management and the Astronaut Office, and providing assistance to ensure success of an Astronaut Spouses Group. The role of the Family Support Office (FSO) has modified as the ISS Program matured and the needs of families changed. The FSO is currently an integral part of the Astronaut Office's ISS Operations Branch. It still serves the critical function of providing information to families, as well as being the primary contact for US and international partner families with resources at JSC. Since crews launch and return on Russian vehicles, the FSO has the added responsibility for coordinating with Flight Crew Operations, the families, and their guests for Soyuz launches, landings, and Direct Return to Houston post‐flight. This presentation will provide a summary of the family support services provided for astronauts, and how they have changed with the Program and families the FSO serves. Considerations for future FSO services will be discussed briefly as NASA proposes one year missions and beyond ISS missions. Learning Objective: 1) Obtain an understanding of the reasons a Family Support Office was important for NASA. 2) Become familiar with the services provided for astronauts and their families and how they changed with the Program and family needs.

Beven, Gary↗

Module 6: Exercise 1: Fresh Fuel Receipt for a Nuclear Facility: Nuclear Security Controls [Slides]

This module presents an operational scenario to illustrate the NMAC functions that are recommended for nuclear security. After completing this module, participants should be able to: 1) Describe the role NMAC plays in implementing recommended nuclear security practices. 2) Discuss the coordination between other departments during a primarily NMAC operation.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

A Petri-net coordination model for an intelligent mobile robot

The authors present a Petri net model of the coordination level of an intelligent mobile robot system (IMRS). The purpose of this model is to specify the integration of the individual efforts on path planning, supervisory motion control, and vision systems that are necessary for the autonomous operation of the mobile robot in a structured dynamic environment. This is achieved by analytically modeling the various units of the system as Petri net transducers and explicitly representing the task precedence and information dependence among them. The model can also be used to simulate the task processing and to evaluate the efficiency of operations and the responsibility of decisions in the coordination level of the IMRS. Some simulation results on the task processing and learning are presented.

Wang, F.-Y.↗

Robust and resilient coordination of feeders with uncertain distributed energy resources: from real-time control to long-term planning

To enable flexible demand and ensure reliable and economical operation of distribution systems, we present a novel hierarchical scheme that actively coordinates responsive behind-the-meter grid resources, including distributed energy resources (DERs), to reliably manage each unbalanced distribution feeder and exploits the available flexibility to economically optimize the entire network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

14 SOLAR ENERGY↗

Long plasma duration operation analyses with an international multi-machine (tokamaks and stellarators) database

Combined high-fusion performance and long-pulse operation is one of the key integration challenges for fusion energy development in magnetic devices. Addressing these challenges requires an integrated vision of physics and engineering aspects with the purpose of simultaneously increasing time duration and fusion performance. Significant progress has been made in tokamaks and stellarators, including very recent achievement in duration and/or performance. This progress is reviewed by analyzing the experimental data (109 plasma pulses with a total of 3200 data points, i.e. on average 29 data per pulse) provided by ten tokamaks (in alphabetical order: Axially Symmetric Divertor Experiment Upgrade, DIII-D, Experimental Advanced Superconducting Tokamak, Joint European Torus, JT-60 Upgrade, Korea Superconducting Tokamak Advanced Research, tokamak à configuration variable, Tokamak Fusion Test Reactor, Tore Supra, W Environment in Steady-State Tokamak) and two stellarators (Large Helical Device and Wendelstein 7-X) expanding the pioneering work of Kikuchi (Kikuchi M. and Azumi M. 2015 Frontiers in Fusion Research II: Introduction to Modern Tokamak Physics (Springer)). Data have been gathered up to January 2022 and coordination has been provided by the recently created International Energy Agency-International Atomic Energy Agency international Coordination on International Challenges on Long duration OPeration group. By exploiting the multi-machine international database, recent progress in terms of injected energies (e.g. 1730 MJ in L-mode, 425 MJ in H-mode), durations (1056 s in L-mode, 101 s in H-mode), injected powers, and sustained performance will be reviewed. Progress has been made to sustain long-pulse operation in tokamaks and stellarators with superconducting coils, actively cooled components, and/or with metallic walls. The graph of the fusion triple products as a function of duration shows a dramatic reduction of, at least two orders of magnitude when increasing the plasma duration from less than 1 s to 100 s. Indeed, long-pulse operation is usually reached in dominant electron-heating modes at reduced density (current drive optimization) but with low ion temperatures ranging from 1 to 3 keV for discharges above 100 s. Difficulties in extending the duration may arise from coupling high heating powers over long durations and the evolving plasma-wall interaction towards an unstable operational domain. Possible causes limiting the duration and critical issues to be addressed prior to ITER operation and DEMO design are reported and analyzed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons Learned From Ventilation and Glovebox Flooding Via Overfilling of the Wet Vacuum System in a Plutonium Facility

In the summer of 2021, operations personnel requested maintenance personnel to fill a wet vacuum (Wetvac) seal water tank in a plutonium facility at Los Alamos National Laboratory (LANL). After the filling was finished, the fill valve of the Wetvac seal water tank was left open and a ‘dead-man’ valve on an isolation line failed to close properly. After a series of other failures, the water exited the glovebox and contaminated three rooms of the first floor of the facility and an underlying area in the basement. A retrospective analysis of this event determined that there was no risk of a criticality due to the inherent design features of the ventilation system. This paper will explain the driving factors behind how this event was able to happen, as well as some of the major lessons learned that can be universally applied to other nuclear facilities. One of the main causes of the event was the delegation of work to maintenance personnel that were not qualified for the work being asked of them. Additionally, there was a lack of coordination between criticality safety engineers and facility operations equipment owners regarding equipment and connections present on the seal water tanks for the Wetvac, specifically the presence of overflow drain lines. The respective criticality safety evaluation credited an overflow drain line being present on the seal water tanks that was later found to have not been present. Lastly, there are lessons to be learned regarding equipment configuration and designing systems with safety in mind.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗

Stereo Combining NASA Technologies and Partnerships to Transform Current-Day Emergency Response Operations

STEReO brings together several technologies in Unmanned Aircraft Systems (UAS) Traffic Management (UTM), Autonomy, Communications, Human Factors, and Domain Expertise & Tools, aimed at providing scalability and flexibility, as well as operational resiliency to dynamic changes during a disaster event. Some of the concepts STEReO explores are: collaborative tools to ingest remote sensing information and distribute a common mission operating picture, apply ad-hoc communication networks to facilitate timely information sharing and communication of changes, vehicle-to-vehicle and onboard autonomy technologies ensure the safety and resiliency of operations, and apply NASA’s UAS traffic management system (UTM) as a public safety UAS Service Supplier (USS) to access and coordinate use of the airspace by both manned and unmanned operations. The potential benefits of STEReO include: standardized, cross-platform communication means increased interoperability and ease of cooperation/collaboration, increased situation awareness and common operating picture allow for earlier detection and decision making, and scalable to size and complexity of environment, operations, and mission objectives. This presentation gives an overview of the STEReO project and introduces a stakeholder workshop as a three-day activity to solicit input from the community of emergency response operators and related industry representatives.

Mercer, Joey S.↗

STEReO: Combining NASA Technologies and Partnerships to Transform Current-Day Emergency Response Operations

STEReO brings together several technologies in Unmanned Aircraft Systems (UAS) Traffic Management (UTM), Autonomy, Communications, Human Factors, and Domain Expertise & Tools, aimed at providing scalability and flexibility, as well as operational resiliency to dynamic changes during a disaster event. Some of the concepts STEReO explores are: collaborative tools to ingest remote sensing information and distribute a common mission operating picture, apply ad-hoc communication networks to facilitate timely information sharing and communication of changes, vehicle-to-vehicle and onboard autonomy technologies ensure the safety and resiliency of operations, and apply NASA?s UAS traffic management system (UTM) as a public safety UAS Service Supplier (USS) to access and coordinate use of the airspace by both manned and unmanned operations. The potential benefits of STEReO include: standardized, cross-platform communication means increased interoperability and ease of cooperation/collaboration, increased situation awareness and common operating picture allow for earlier detection and decision making, and scalable to size and complexity of environment, operations, and mission objectives. This presentation gives an informational overview of the STEReO project to attendees of the annual North American Aerial Fire Fighting conference (AFFNA 2020).

Mercer, Joey S.↗