Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “colliders”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

582 records · Page 33

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Presentation accompanying the technical report with the same name. The abstract for the report and the full study is repeated below. Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.

conjunction assessment↗

COLUTA: Custom 8-Channel 15-bit 40-MSPS ADC for the ATLAS Liquid Argon Calorimeter Readout

The stringent radiation-tolerance, quantization requirements, and the need for seamless integration of the on-detector readout electronics chain require the design of a full-custom analog-to-digital converter (ADC) for the 182,468 channels in the ATLAS Liquid Argon (LAr) calorimeter at the Large Hadron Collider (LHC) at CERN, as part of the High-Luminosity LHC (HL-LHC) upgrade. Each of the 8 channels in the prototype 65 nm CMOS ADC with 15-bit resolution and >68 dB signal-to-noise-and-distortion ratio (SNDR), or equivalently >11 effective number of bits (ENOB), consists of a Multiplying-DAC (MDAC) and a successive-approximation (SAR) ADC. A digital data processing unit (DDPU) calibrates and serially transmits the quantized data. Initial lab characterization of 18 chips shows a minimum SNDR of 69.5 dB at full-scale at about 5 MHz and a maximum power consumption of 1.17 W; differential non-linearity (DNL) measurements show no missing codes. Additional validation of the ADC is ongoing before approximately 70k chips can be mass-produced for the upgrade.

Rui Xu↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.

conjunction assessment↗

A Cost and Benefit Analysis of Orbital Debris Remediation, Mitigation,Tracking, and Characterization

Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work(Colvin, Karcz, and Wusk. 2023), referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current paper summarizes the work of Locke and Colvin (2024), which contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Orbital Debris↗

Autonomous Stabilization and Orientation Control of Hoisted Payloads

An orientation control system prototype has been developed for hoisted payloads. This system will allow payloads to be lifted off inclined surfaces while maintaining orientation control, allowing removal of tightly packed payloads without colliding with adjacent objects. For this concept, the payload is hoisted with a crane using a rigging system composed of a cable routed through two capstans and three or four attachment points on the payload. Motors rotate the capstans to adjust the cable lengths to the payload, and thereby control the orientation of the payload. Initial testing of the prototype was completed using manual control, however the algorithms necessary to fully automate the system are presented in this paper.

control↗