Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “certification by analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Randomized Algorithms for Scientific Computing (RASC)

Randomized algorithms have propelled advances in artificial intelligence (AI) and represent a foundational research area in advancing AI for Science. Future advancements in DOE Office of Science priority areas such as climate science, astrophysics, fusion, advanced materials, combustion, and quantum computing all require randomized algorithms for surmounting challenges of complexity, robustness, and scalability. Advances in data collection and numerical simulation have changed the dynamics of scientific research and motivate the need for randomized algorithms. For instance, advances in imaging technologies such as X-ray ptychography, electron microscopy, electron energy loss spectroscopy, or adaptive optics lattice light-sheet microscopy collect hyperspectral imaging and scattering data in terabytes, at breakneck speed enabled by state-of-the-art detectors. The data collection is exceptionally fast compared with its analysis. Likewise, advances in high-performance architectures have made exascale computing a reality and changed the economies of scientific computing in the process. Floating-point operations that create data are essentially free in comparison with data movement. Thus far, most approaches have focused on creating faster hardware. Ironically, this faster hardware has exacerbated the problem by making data still easier to create. Under such an onslaught, scientists often resort to heuristic deterministic sampling schemes (e.g., low-precision arithmetic, sampling every nth element) and sacrifice potentially valuable accuracy. Dramatically better results can be achieved via randomized algorithms, reducing the data size as much as or more than naive deterministic subsampling can achieve, while retaining the high accuracy of computing on the full data set. By randomized algorithms we mean those algorithms that employ some form of randomness in internal algorithmic decisions to accelerate time to solution, increase scalability, or improve reliability. Examples include matrix sketching for solving large-scale least-squares problems (see Figure 1) and stochastic gradient descent for training machine learning models. We are not recommending heuristic methods but rather randomized algorithms that have certificates of correctness and probabilistic guarantees of optimality and near-optimality. Such approaches can be useful beyond acceleration, for example, in understanding how to avoid measure zero worst-case scenarios that plague methods such as QR matrix factorization.

97 MATHEMATICS AND COMPUTING↗

Renewable Energy at NASA's Johnson Space Center

NASA's Johnson Space Center has implemented a great number of renewable energy systems. Renewable energy systems are necessary to research and implement if we humans are expected to continue to grow and thrive on this planet. These systems generate energy using renewable sources - water, wind, sun - things that we will not run out of. Johnson Space Center is helping to pave the way by installing and studying various renewable energy systems. The objective of this report will be to examine the completed renewable energy projects at NASA's Johnson Space Center for a time span of ten years, beginning in 2003 and ending in early 2014. This report will analyze the success of each project based on actual vs. projected savings and actual vs. projected efficiency. Additionally, both positive and negative experiences are documented so that lessons may be learned from past experiences. NASA is incorporating renewable energy wherever it can, including into buildings. According to the 2012 JSC Annual Sustainability Report, there are 321,660 square feet of green building space on JSC's campus. The two projects discussed here are major contributors to that statistic. These buildings were designed to meet various Leadership in Energy and Environmental Design (LEED) Certification criteria. LEED Certified buildings use 30 to 50 percent less energy and water compared to non-LEED buildings. The objectives of this project were to examine data from the renewable energy systems in two of the green buildings onsite - Building 12 and Building 20. In Building 12, data was examined from the solar photovoltaic arrays. In Building 20, data was examined from the solar water heater system. By examining the data from the two buildings, it could be determined if the renewable energy systems are operating efficiently. Objectives In Building 12, the data from the solar photovoltaic arrays shows that the system is continuously collecting energy from the sun, as shown by the graph below. Building 12 has two solar inverters, located on the second floor, that collected the data from the solar photovoltaic arrays. The data displayed here is the total energy produced by the system. These are cumulative amounts, so the last point on the graph shows all of the energy collected from the system since the start of its operation. The data shown here was manually collected from the solar inverters. However, the data is also automatically recorded through EBI. Through analysis of both sets of data it was determined that the EBI data was faulty. For example, from the manually collected data it can be determined that a total of 73 kWh of energy was collected between the dates of 1/16/2014 – 1/22/2014. The EBI data reports that approximately 17800 kWh of energy was collected during the same time frame. Not only does this exceed the time frame examined, but it also exceeds the total energy collected from the start of collection as recorded from the inverters. This leads to the belief that there is a malfunction with the automatic recording of the energy. In Building 20, data was examined from the solar water heater dating back many months and found that the pump for the solar water heater system was not operating properly, as exhibited in the graph shown below. The pump operates on a solar energy system, meaning that it collects energy throughout the day from the sun. Because of this, the system would stop operating shortly after the sun set because of a lack of sunlight. At that point, the graph should show a zero flow rate, but as exhibited in the graph below, that is not the case. It is clearly shown that the pump is continuously operating, even during the night. It was also observed that the majority of the time the pump would not turn on at all, despite good weather conditions. This led to the conclusion that the pump is malfunctioning, and needs to be examined and fixed.

McDowall, Lindsay↗

Geospatial Education and Research Development: A Laboratory for Remote Sensing and Environmental Analysis (LaRSEA)

Old Dominion University has claimed the title "University of the 21st Century," with a bold emphasis on technology innovation and application. In keeping with this claim, the proposed work has implemented a new laboratory equipped for remote sensing as well as curriculum and research innovations afforded for present and future faculty and students. The developments summarized within this report would not have been possible without the support of the NASA grant and significant cost-sharing of several units within the University. The grant effectively spring-boarded the university into major improvements in its approach to remote sensing and geospatial information technologies. The university has now committed to licensing Erdas Imagine software for the laboratory, a campus-wide ESRI geographic information system (GIS) products license, and several smaller software and hardware utilities available to faculty and students through the laboratory. Campus beneficiaries of this grant have included faculty from departments including Ocean, Earth. and Atmospheric Sciences, Political Science and Geography, Ecological Sciences, Environmental Health, and Civil and Environmental Engineering. High student interest is evidenced in students in geology, geography, ecology, urban studies, and planning. Three new courses have been added to the catalog and offered this year. Cross-cutting curriculum changes are in place with growing enrollments in remote sensing, GIS, and a new co-taught seminar in applied coastal remote sensing. The enabling grant has also allowed project participants to attract external funding for research grants, thereby providing additional funds beyond the planned matching, maintenance and growth of software and hardware, and stipends for student assistants. Two undergraduate assistants and two graduate assistants have been employed by full-time assistantships as a result. A new certificate is offered to students completing an interdisciplinary course sequence in remote sensing and coastal environments. Subsequent phases of the project are under planning. including seminars for regional coastal managers and public dissemination of remote sensing science through the local media and university publications.

Allen, Thomas R., Jr.↗

Face Sheet/Core Disbond Growth in Honeycomb Sandwich Panels Subjected to Ground-Air-Ground Pressurization and In-Plane Loading

Typical damage modes in light honeycomb sandwich structures include face sheet/core disbonding and core fracture, both of which can pose a threat to the structural integrity of a component. These damage modes are of particular interest to aviation certification authorities since several in-service occurrences, such as rudder structural failure and other control surface malfunctions, have been attributed to face sheet/core disbonding. Extensive studies have shown that face sheet/core disbonding and core fracture can lead to damage propagation caused by internal pressure changes in the core. The increasing use of composite sandwich construction in aircraft applications makes it vitally important to understand the effect of ground-air-ground (GAG) cycles and conditions such as maneuver and gust loads on face sheet/core disbonding. The objective of the present study was to use a fracture mechanics based approach developed earlier to evaluate the loading at the disbond front caused by ground-air-ground pressurization and in-plane loading. A honeycomb sandwich panel containing a circular disbond at one face sheet/core interface was modeled with three-dimensional (3D) solid finite elements. The disbond was modeled as a discrete discontinuity and the strain energy release rate along the disbond front was computed using the Virtual Crack Closure Technique (VCCT). Special attention was paid to the pressure-deformation coupling which can decrease the pressure load within the disbonded sandwich section significantly when the structure is highly deformed. The commercial finite element analysis software, Abaqus/Standard, was used for the analyses. The recursive pressure-deformation coupling problem was solved by representing the entrapped air in the honeycomb cells as filled cavities in Abaqus/Standard. The results show that disbond size, face sheet thickness and core thickness are important parameters that determine crack tip loading at the disbond front. Further, the pressure-deformation coupling was found to have an important load decreasing effect [6]. In this paper, a detailed problem description is provided first. Second, the analysis methodology is presented. The fracture mechanics approach used is described and the specifics of the finite element model, including the fluid-filled cavities, are introduced. Third, the initial model verification and validation are discussed. Fourth, the findings from a closely related earlier study [6] are summarized. These findings provided the basis for the current investigation. Fifth, an aircraft ascent scenario from 0 to 12192 m (0 to 40000 ft) is considered and the resulting crack tip loading at the disbond front is determined. In-plane loading to simulate maneuvers and gust conditions are also considered. Sixth, the results are shown for a curved panel, which was used to simulate potential fuselage applications. Finally, a brief summary of observations is presented and recommendations for improvement are provided.

Chen, Zhi M.↗

The CCD/Transit Instrument (CTI) data-analysis system

The automated software system for archiving, analyzing, and interrogating data from the CCD/Transit Instrument (CTI) is described. The CTI collects up to 450 Mbytes of image-data each clear night in the form of a narrow strip of sky observed in two colors. The large data-volumes and the scientific aims of the project make it imperative that the data are analyzed within the 24-hour period following the observations. To this end a fully automatic and self evaluating software system has been developed. The data are collected from the telescope in real-time and then transported to Tucson for analysis. Verification is performed by visual inspection of random subsets of the data and obvious cosmic rays are detected and removed before permanent archival is made to the optical disc. The analysis phase is performed by a pair of linked algorithms, one operating on the absolute pixel-values and the other on the spatial derivative of the data. In this way both isolated and merged images are reliably detected in a single pass. In order to isolate the latter algorithm from the effects of noise spikes a 3x3 Hanning filter is applied to the raw data before the analysis is run. The algorithms reduce the input pixel-data to a database of measured parameters for each image which has been found. A contrast filter is applied in order to assign a detection-probability to each image and then x-y calibration and intensity calibration are performed using known reference stars in the strip. These are added to as necessary by secondary standards boot-strapped from the CTI data itself. The final stages involve merging the new data into the CTI Master-list and History-list and the automatic comparison of each new detection with a set of pre-defined templates in parameter-space to find interesting objects such as supernovae, quasars and variable stars. Each stage of the processing from verification to interesting image selection is performed under a data-logging system which both controls the pipe-lining of data through the system and records key performance monitor parameters which are built into the software. Furthermore, the data from each stage are stored in databases to facilitate evaluation, and all stages offer the facility to enter keyword-indexed free-format text into the data-logging system. In this way a large measure of certification is built into the system to provide the necessary confidence in the end results.

Cawson, M. G. M.↗

A Concept of Operations (ConOps) of an In-time Aviation Safety Management System (IASMS) for Advanced Air Mobility (AAM)

The growth of new emerging operations involving Advanced Air Mobility (AAM) necessitates developing a perspective for an In-time Aviation Safety Management System (IASMS). This perspective advances from the National Academies report on IASMS and its recommendation for developing a Concept of Operations (ConOps) for IASMS. A ConOps has been developed for In-time System-Wide Safety Assurance (ISSA) from which the IASMS ConOps pivots to provide a robust scope commensurate with the broad vision defined by the National Academies. The IASMS ConOps focuses on emerging operations and spans innovations in Unmanned Aircraft System (UAS) and an increasingly complex ecosystem comprised of a widening mix of vehicles and technologies, Urban Air Mobility (UAM) with industry-federated services, traditional operations, as well as new supersonic aircraft and space launch systems.The challenge for the IASMS ConOps is to be broad to encompass innovations in the coming years and decades while agile to ensure levels of safety compatible with operational and certification requirements of the National Airspace System (NAS). The IASMS ConOps interweaves increasing complexity of operational safety capabilities and unlocking UAS Maturity Levels (UMLs). The relationships between increased complexity of automation and automated systems, fewer operators who are not as traditionally higher skilled, more complex operational environments, and aviation operations management with mixed aircraft and equipage pose a multi-dimensional space for IASMS capabilities essential for safety assurance and risk management. Instantiating IASMS capabilities and how they would be integral to AAM operations and increasing maturity of UAM could be accomplished through a series of Safety Demonstrators. These Safety Demonstrators could provide increased understanding and insight into use of controls for risk mitigation, means of compliance for certification, and operational experience with safety services such as in relation to contingency management. The IASMS capabilities can be viewed as initially residing with the vehicle, airspace, and Supplemental Data Service Provider (SDSP). For example, vehicle capabilities include communications including the command and control link, Remote Identification (ID), conflict advisory/alerting, and UAS system monitoring. These capabilities monitor and assess data such as battery health, aircraft state, and human performance. Complexity of ISAMS capabilities depends on a number of factors. These factors are intendedonly as a notional categorization with the purpose being to reflect the complexity of the AAM ecosystem that would drive up the complexity of ISSA capabilities including systems, sensors, models, standards, and controls. Factors could include the Vehicle Flight Management, Environment, Airspace, and Contingency Management. Each of these factors can be comprised of multiple sub-factors that contribute to increasing complexity. For example, Airspace at a lower level of complexity could be dedicated to UTM operations that are unmonitored, and at a higher level of complexity could involve mixed UTM and ATM operations. The IASMS concept includes safety services that provide data and information to different participants in AAM. The roles and responsibilities of participants can be defined using the Responsible-Accountable-Consulted-Informed (RACI) analysis. For example, for the safety service involving the Remote ID, the Operator would be accountable for providing the data, the Vehicle would be responsible for transmitting it, and the USS, SDSP, Vertiports, FIMS (FAA), and Public Entities such as safety services would be informed by receiving the data. The IASMS ConOps identifies the capabilities needed for risk mitigation and safety assurance in the increasingly complex national airspace. The ConOps serves as a pathway for engaging with industry to gain operational experience including through the Safety Demonstrator series, the RACI analysis, and operational complexity factors. The ConOps serves to integrate these different perspectives to build a cohesive and cogent approach to an AAM safety management system.

In-Time Aviation Safety Management System↗

Forward Bay Cover Separation Modeling and Testing for the Orion Multi-Purpose Crew Vehicle

Spacecraft multi‐body separation events during atmospheric descent require complex testing and analysis to validate the flight separation dynamics model and to verify no recontact. NASA Orion Multi‐Purpose Crew Vehicle (MPCV) teams examined key model parameters and risk areas to develop a robust but affordable test campaign in order to validate and verify the Forward Bay Cover (FBC) separation event for Exploration Flight Test‐1 (EFT‐1). The FBC jettison simulation model is highly complex, consisting of dozens of parameters varied simultaneously, with numerous multi‐parameter interactions (coupling and feedback) among the various model elements, and encompassing distinct near‐field, mid‐field, and far‐field regimes. The test campaign was composed of component‐level testing (for example gas‐piston thrusters and parachute mortars), ground FBC jettison tests, and FBC jettison air‐drop tests that were accomplished by a highly multi‐disciplinary team. Three ground jettison tests isolated the testing of mechanisms and structures to anchor the simulation models excluding aerodynamic effects. Subsequently, two air‐drop tests added aerodynamic and parachute parameters, and served as integrated system demonstrations, which had been preliminarily explored during the Orion Pad Abort‐1 (PA‐1) flight test in May 2010. Both ground and drop tests provided extensive data to validate analytical models and to verify the FBC jettison event for EFT‐1, but more testing is required to support human certification, for which NASA and Lockheed Martin are applying knowledge from Apollo and EFT‐1 testing and modeling to develop a robust but affordable human spacecraft capability.

Ali, Yasmin↗

Selection and Assessment of Predictions of the Mars Pathfinder Landing Site

The successful landing of the Mars Pathfinder spacecraft on Mars allows the review of the process of selecting the landing site and assessing predictions made for the site based on Viking and Earth-based data. Selection of the landing site for Mars Pathfinder was a two-phase process. The first phase took place from October 1993 to June 1994 and involved: initial identification of engineering constraints, definition of environmental conditions at the site for spacecraft design, and evaluation of the scientific potential of different landing sites. This phase culminated with the first "Mars Pathfinder Landing Site Workshop", held at the Lunar and Planetary Institute in Houston, Texas on April 18-19, 1994, in which suggested approaches and landing sites were solicited from the entire scientific community. A preliminary site was selected by the project for design purposes in June 1994. The second phase took place from July 1994 to March 1996 and involved: developing criteria for evaluating site safety using images and remote sensing data, testing of the spacecraft and landing subsystems (with design improvements) to establish quantitative engineering constraints on landing site characteristics, evaluating all potential landing sites on Mars, and certification of the site by the project. This phase included a second open workshop, "Mars Pathfinder Landing Site Workshop II: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington" held in Spokane and Moses Lake September 24-30, 1995 and formal acceptance of the site by NASA Headquarters. Engineering constraints on Pathfinder landing sites were developed from the initial design of the spacecraft and the entry, descent and landing scenario. The site must be within 5 degrees of the subsolar latitude at the time of landing (15N for maximum solar power and flexible communications with Earth. It also must be below 0 km elevation to enable enough time for the parachute to bring the lander to the proper terminal velocity for landing. The entire landing ellipse, which is 70 km by 200 km due to navigational, ephemeris and atmospheric uncertainties, must be free of steep slopes, scarps and obvious hazards in Viking orbiter images, have acceptable radar reflectivity, moderate rock abundances and have little or no dust. Scientific considerations of the Mars Pathfinder payload and mission indicate that analyses of "grab bag" samples at the mouths of outflow channels can offer a first order assessment of a variety of rock types on Mars. Highland sites offer the advantage of in situ analysis of ancient rocks on Mars that record crustal differentiation and the nature of the early environment. Dark gray sites offer the potential of analyzing unweathered and unoxidized materials. Following a general assessment of the safety of different sites, a preliminary selection of a "grab bag" site was made. This site, Ares Vallis, is near the mouth of an outflow channel that may contain ancient Noachian terrain, Hesperian ridged plains, and reworked channel materials. All potential landing sites on Mars that met basic safety criteria were analyzed in detail. Sites (100 by 200 km target ellipses) were considered safe if they were below 0 km elevation, were free of obvious hazards (high relief surface features) in high-resolution (< 50 m/pixel) Viking orbiter images and had acceptable reflectivity and roughness at radar wavelengths, high thermal inertia, moderate rock abundance, low red to violet ratio, and low albedo. Only 4 sites on Mars met all the above criteria, which included 1995 opposition 3.5 cm delay-Doppler radar data. Complete data were evaluated for 7 sites and the Viking landing sites for comparison for all the above criteria as well as crater abundance, hill and mesa abundance, slopes over meter to kilometer scales, low altitude winds (from global circulation models and slopes), the size-frequency distribution of large rocks, as well as rover trafficability and science potential. Discussion of potential hazards at Ares Vallis using a variety of data sets (including radar) at a second open workshop, indicated this site cannot be shown to be any more hazardous than the Viking landing sites. Field trips to the Channeled Scabland and the Ephrata Fan, analogs for Ares Vallis and the landing site, respectively, provided valuable insight into possible geologic processes and potential surface characteristics. Three sites met all the data requirements and safety criteria for landing Pathfinder. Ares Vallis was selected by the project because it appeared acceptably safe (although it appeared to have greater rock abundances than other sites, its elevation was likely the best known) and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which would enable addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early martian environment and its subsequent evolution. The selection was reviewed by an external board at a number of meetings and accepted, and the site was approved by NASA Headquarters. Data gathered by the Pathfinder lander' and rover provides the opportunity to test the predictions made for the site in the selection process based on remote observations from Earth, orbit, and the surface. The discussion below is taken from Golombek et al. to which the reader is referred for a more complete discussion and a complete list of references, which are omitted here for brevity. Many characteristics of the landing site are consistent with its being shaped and deposited by the Ares and Tiu catastrophic floods. The rocky surface is consistent a depositional plain comprising semi-rounded pebbles, cobbles and tabular boulders (some of which appear imbricated and/or inclined in the direction of flow) that appear similar to depositional plains in terrestrial catastrophic floods. The Twin Peaks appear to be streamlined hills in lander images, which is consistent with interpretations of larger hills in Viking orbiter images of the region that suggest the lander is on the flank of a broad, gentle ridge trending northeast from Twin Peaks. This ridge, which is the rise to the north of the lander, is aligned in the downstream direction from the Ares and Tiu Valles floods, and may be a debris tail deposited in the wake of the Twin Peaks. Channels visible throughout the scene may be a result of late stage drainage. As predicted by delay-Doppler radar measurements and tracking results, the average elevation of the center of the site was about the same as Viking Lander I relative to the 6.1 mbar geoid. The Doppler tracking and two-way ranging estimate for the elevation of the spacecraft is only 45 in lower than the Viking I Lander and within 100 in of that expected, which is within the uncertainties of the measurements. After landing, surface pressures and winds (5-10 m/s) were found to be similar to expectations based on Viking data, although temperatures were about 10 K warmer. The temperature profile below 50 km was also roughly 20 K warmer. As a result, predicted densities were 5% higher near the surface and up to 40% lower at 50 km but within the entry, descent and landing design margins. The populations of craters and small hills and the slopes of the hills measured in high-resolution (38 m/pixel) Viking orbiter images and the radar derived slopes of the landing site are all consistent with observations of these properties in the lander images. A rocky surface was expected from Viking Infra-Red Thermal Mapper (IRTM) observations and comparisons with the Viking landing sites. The observed cumulative fraction of area covered by rocks with diameters greater than 3 cm and heights greater than 0.5 in (potentially hazardous to landing) at Ares is similar to that predicted by IRTM observations and models of Viking lander and Earth analog rock size-frequency distributions. The IRTM prediction postulated an effective thermal inertia of 30 (10(exp -3) cgs units - cal/cubic cm/s(exp 0.5)/K) for the rock population, but we obtain a slightly different effective thermal inertia for the actual rock population. The validity of interpretations of radar echoes prior to landing are supported by a simple radar echo model, an estimate of the reflectivity of the soil from its bulk density, and the fraction of area covered by rocks. In the calculations, the soil produces the quasi-specular echo and the rocks produce the diffuse echo. The derived quasispecular cross section is comparable to the cross-sections and reflectivities reported for 3.5-cm wavelength observations. The model yields a diffuse echo that is modestly larger than the polarized diffuse echo reported for 3.5-cm wavelength observations. At 12.5-cm wavelength, similar rock populations at Ares and the Viking I site were expected because the diffuse echoes are comparable, but the large normal reflectivities suggests that bulk densities of the soils at depth are greater than those at the surface. We also obtain a fine-component inertia near 8.4 which agrees with the fine-component inertia of 8.7 (in 10(exp -3) cgs units) estimated from thermal observations from orbit by the IRTM; for this estimate, we used a bulk thermal inertia of 10.4 for the landing site, an effective thermal inertia near 40 (10(exp -3) cgs units) for the rock population, and a graphical representation of Kieffer's model. Color and albedo data for Ares suggested surfaces of materials at Ares Vallis would be relatively dust free or unweathered prior to landing compared with the materials at the Viking landing sites. This suggestion is supported by the abundance of relatively dark-gray rocks at Ares and their relative rarity at the Viking landing sites, where rocks are commonly coated with bright red dust. Finally, the 40 km long Ephrata Fan of the Channeled Scabland in Washington state, which was deposited where c

Golombek, M. P.↗

Mars Sample Handling Protocol Workshop Series: Workshop 2

Numerous NASA reports and studies have identified Planetary Protection (PP) as an important part of any Mars sample return mission. The mission architecture, hardware, on-board experiments, and related activities must be designed in ways that prevent both forward- and back-contamination and also ensure maximal return of scientific information. A key element of any PP effort for sample return missions is the development of guidelines for containment and analysis of returned sample(s). As part of that effort, NASA and the Space Studies Board (SSB) of the National Research Council (NRC) have each assembled experts from a wide range of scientific fields to identify and discuss issues pertinent to sample return. In 1997, the SSB released its report on recommendations for handling and testing of returned Mars samples. In particular, the NRC recommended that: a) samples returned from Mars by spacecraft should be contained and treated as potentially hazardous until proven otherwise, and b) rigorous physical, chemical, and biological analyses [should] confirm that there is no indication of the presence of any exogenous biological entity. Also in 1997, a Mars Sample Quarantine Protocol workshop was convened at NASA Ames Research Center to deal with three specific aspects of the initial handling of a returned Mars sample: 1) biocontainment, to prevent 'uncontrolled release' of sample material into the terrestrial environment; 2) life detection, to examine the sample for evidence of organisms; and 3) biohazard testing, to determine if the sample poses any threat to terrestrial life forms and the Earth's biosphere. In 1999, a study by NASA's Mars Sample Handling and Requirements Panel (MSHARP) addressed three other specific areas in anticipation of returning samples from Mars: 1) sample collection and transport back to Earth; 2) certification of the samples as non-hazardous; and 3) sample receiving, curation, and distribution. To further refine the requirements for sample hazard testing and the criteria for subsequent release of sample materials from quarantine, the NASA Planetary Protection Officer convened an additional series of workshops beginning in March 2000. The overall objective of these workshops was to develop comprehensive protocols to assess whether the returned materials contain any biological hazards, and to safeguard the purity of the samples from possible terrestrial contamination. This document is the report of the second Workshop in the Series. The information herein will ultimately be integrated into a final document reporting the proceedings of the entire Workshop Series along with additional information and recommendations.

Rummel, John D.↗

Modeling Savings for ENERGY STAR Smart Home Energy Management Systems

The objective of this study was to develop a repeatable and defensible methodology to analyze the energy savings for Home Energy Management Systems (HEMS) that meets the minimum requirements for certification under ENERGY STAR ® Smart Home Energy Management System (SHEMS) Version 1. Mandatory connected loads include a smart thermostat, two smart lights, and one smart power strip or smart outlet. Control strategies must include feedback to occupants through an in-home display, user programming, occupancy sensor-based controls, and responsiveness to utility signals such as demand response programs. Several occupant behavior patterns were selected to quantify the range of energy savings potential for a HEMS with this basic functionality. A literature review was conducted to establish realistic room-by-room occupancy levels and usage patterns for connected devices. A series of event-driven hourly profiles were created, followed by adjustments based on application of HEMS control strategies to thermostats, interior lighting, and plug load schedules. EnergyPlus modeling was performed using these hourly schedules in three locations (Boston, Houston, and Phoenix) to examine climate dependence of energy savings. Total site energy savings ranged from 4.3 to 27.1 MBtu/year (7%-35%), and utility bill savings ranged from $\$$123 to $\$$670/year (6%-29%). The highest predicted savings was realized by occupants that were not energy conscious prior to HEMS installation, but highly engaged with the HEMS controls once the system was installed. The smart thermostat accounted for most of the savings, followed by the smart power strip. Smart lighting did not save a significant amount of energy in our analysis, based on an assumption that efficient LEDs with no standby power would normally be installed anyway.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Uncertainty Quantification of Inducer Natural Frequency using Conditional Assessment of Modeling and Modal Testing of Simpler Systems

The low pressure fuel pump inducer of the new Space Launch System RS25 core stage engine operates in a highly complex environment that substantially affects its modal characteristics. Some of the more important effects are fluid-added mass resulting from operation within a light liquid (Hydrogen), and the magnification of this effect due to tight tip clearance. Since higher order cavitation has been identified as a significant harmonic driver, knowledge of the natural frequency of potentially excitable modes is critical for safe operation, but this frequency cannot be measured during the severe operational environment. A comprehensive testing and analysis program has therefore been performed over the last four years to identify the nominal value and uncertainty of the frequency by modeling and testing four simpler structures which share some of the characteristics of the operational inducer. This testing was used to assess and adjust modeling techniques and excellent correlation was achieved. Identification of the uncertainty in the inducer frequency itself was still problematic, however. This difficulty led to an investigation of Bayesian uncertainty quantification techniques, and to the application of the relatively simple technique of Multi-Variate Normal conditional distributions to calculate the inducer natural frequency uncertainty. Assumptions on prior distributions of uncertainty of the fluid-added mass and tip clearance effect are initially applied to models of each of the simple structures and the inducer itself, and these uncertainties are propagated to generate natural frequencies using design of experiments. Simple response surfaces are then created from this data in order to calculate a Covariance Matrix relating all of these natural frequencies. Finally, the results from modal test of the simple structures are considered to be observations and used to calculate the conditional variance of the desired inducer frequencies. As this method is less rigorous than more complicated Bayesian methods reported in the literature, a conservative factor is applied to the result, but the resulting uncertainty is still significantly less than originally estimated and will greatly assist certification of the inducer for use in the engine.

Uncertainty Quantification↗

Uncertainty Quantification of Inducer Eigenvalues using Conditional Assessment of Models and Modal Test of Simpler Systems

The low pressure fuel pump inducer of the new Space Launch System RS25 core stage engine operates in a highly complex environment that substantially affects its modal characteristics. Some of the more important effects are fluid-added mass resulting from operation within a light liquid (Hydrogen), and the magnification of this effect due to tight tip clearance. Since higher order cavitation has been identified as a significant harmonic driver, knowledge of the natural frequency of potentially excitable modes is critical for safe operation, but this frequency cannot be measured during the severe operational environment. A comprehensive testing and analysis program has therefore been performed over the last four years to identify the nominal value and uncertainty of the frequency by modeling and testing four simpler structures which share some of the characteristics of the operational inducer. This testing was used to assess and adjust modeling techniques and excellent correlation was achieved. Identification of the uncertainty in the inducer frequency itself was still problematic, however. This difficulty led to an investigation of Bayesian uncertainty quantification techniques, and to the application of the relatively simple technique of Multi-Variate Normal conditional distributions to calculate the inducer natural frequency uncertainty. Assumptions on prior distributions of uncertainty of the fluid-added mass and tip clearance effect are initially applied to models of each of the simple structures and the inducer itself, and these uncertainties are propagated to generate natural frequencies using design of experiments. Simple response surfaces are then created from this data in order to calculate a Covariance Matrix relating all of these natural frequencies. Finally, the results from modal test of the simple structures are considered to be observations and used to calculate the conditional variance of the desired inducer frequencies. As this method is less rigorous than more complicated Bayesian methods reported in the literature, a conservative factor is applied to the result, but the resulting uncertainty is still significantly less than originally estimated and will greatly assist certification of the inducer for use in the engine.

Uncertainty Quantification↗

Building a QC Database of Meteorological Data from NASA KSC and the United States Air Force's Eastern Range

The National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) Natural Environments Branch (EV44) provides atmospheric databases and analysis in support of space vehicle design and day-of-launch operations for NASA and commercial launch vehicle programs launching from the NASA Kennedy Space Center (KSC), co-located on the United States Air Force's Eastern Range (ER) at the Cape Canaveral Air Force Station. The ER complex is one of the most heavily instrumented sites in the United States with over 31 towers measuring various atmospheric parameters on a continuous basis. An inherent challenge with large datasets consists of ensuring erroneous data are removed from databases, and thus excluded from launch vehicle design analyses. EV44 has put forth great effort in developing quality control (QC) procedures for individual meteorological instruments, however no standard QC procedures for all databases currently exists resulting in QC databases that have inconsistencies in variables, development methodologies, and periods of record. The goal of this activity is to use the previous efforts to develop a standardized set of QC procedures from which to build meteorological databases from KSC and the ER, while maintaining open communication with end users from the launch community to develop ways to improve, adapt and grow the QC database. Details of the QC procedures will be described. As the rate of launches increases with additional launch vehicle programs, It is becoming more important that weather databases are continually updated and checked for data quality before use in launch vehicle design and certification analyses.

Brenton, J. C.↗

Building a Quality Controlled Database of Meteorological Data from NASA Kennedy Space Center and the United States Air Force's Eastern Range

The National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) Natural Environments Branch (EV44) has provided atmospheric databases and analysis in support of space vehicle design and day-of-launch operations for NASA and commercial launch vehicle programs launching from the NASA Kennedy Space Center (KSC), co-located on the United States Air Force's Eastern Range (ER) at the Cape Canaveral Air Force Station. The ER complex is one of the most heavily instrumented sites in the United States with over 31 towers measuring various atmospheric parameters on a continuous basis. An inherent challenge with large sets of data consists of ensuring erroneous data is removed from databases, and thus excluded from launch vehicle design analyses. EV44 has put forth great effort in developing quality control (QC) procedures for individual meteorological instruments, however no standard QC procedures for all databases currently exists resulting in QC databases that have inconsistencies in variables, methodologies, and periods of record. The goal of this activity is to use the previous efforts by EV44 to develop a standardized set of QC procedures from which to build meteorological databases from KSC and the ER, while maintaining open communication with end users from the launch community to develop ways to improve, adapt and grow the QC database. Details of the QC procedures will be described. As the rate of launches increases with additional launch vehicle programs, it is becoming more important that weather databases are continually updated and checked for data quality before use in launch vehicle design and certification analyses.

Brenton, James C.↗

Vapor/Mist Used to Lubricate Gears After Loss of Primary Lubrication System

Loss of lubrication in rotorcraft drive systems is a demanding requirement placed on drive system manufacturers. The drive system must operate for at least 30 minutes once the primary lubrication system has failed. This test is a military requirement that must be passed prior to certification of the aircraft. As new aircraft engines, operating at higher speeds, are fielded, the requirements for the drive system become increasingly more difficult. Also, the drive system must be lightweight, which minimizes the opportunity to use the gear bodies to absorb the tremendous amount of heating that takes place. In many cases, the amount of heat generated because of the high speed and load requires an emergency lubrication system that negatively impacts the aircraft's weight, complexity, and cost. A single mesh spur gear test rig is being used at the NASA Glenn Research Center to investigate possible emergency lubrication system improvements that will minimize the impact of having these systems onboard rotorcraft. A technique currently being investigated uses a vapor/mist system to lubricate the contacting surfaces after the primary lubrication system has been shut down. A number of tests were conducted in which the vapor/mist used the same lubricant as the primary system, but at a greatly reduced flow rate. Each test was initiated with the primary lubrication system operational and at steady-state conditions for a given speed and load. Then the primary lubrication system was shut down, and the vapor/mist lubrication system was initiated. An example of the tests conducted is shown in the figures. These preliminary tests have uncovered a mechanism that provides a lubricious, carbonaceous solid on the surface that actually reduces the surface temperature of the meshing gear teeth during operation. Surface analysis of the carbonaceous solid revealed it was graphitic. This mechanism is the synthetic lubricant "coking" on the active profile of the gears, which reduces the friction between the contacting gear surfaces. The level of load affects the onset of this mechanism: the higher the load, the sooner coking takes place. Future work will investigate several other factors that could improve the already promising results that have been attained.

Handschuh, Robert F.↗

Supplemental Structural Analyses Used in Support of Certification of the Defense Programs Package 3

The Defense Programs Package (DPP)-3 is to be certified by the National Nuclear Security Administration (NNSA) Packaging and Transportation Division (PTD). Certification is based on successful physical testing of the package, and six certification test units (CTUs) have been subjected to the normal conditions of transport (NCT) and hypothetical accident conditions (HAC) outlined in Title 10 of the Code of Federal Regulations Part 71 (10 CFR 71). During regulatory testing of one of the CTUs, the drum lid closure bolt closest to the impact surface failed during the HAC 30-ft side drop. One of the testing goals for this CTU was to minimize the thermal pathway from the drum exterior shell to the containment vessel (CV) flange and O-rings, leading to the maximum damage scenario in preparation for thermal testing at 1475 °F. Therefore, the puncture bar impact proceeded as originally planned by striking the side wall of the package exterior closest to the location of the CV flange. This puncture bar impact did not attempt to exploit the region of the failed drum lid closure bolt to potentially cause more damage to the package. After the conclusion of regulatory testing, the DPP-3 package finite element model was used to numerically evaluate the effects of puncture bar impacts to the drum exterior in the vicinity of the failed drum lid closure bolt to further demonstrate the robustness of the DPP-3 design. Three alternate puncture bar impact locations and orientations were evaluated to demonstrate that these puncture bar impacts would not substantially reduce the effectiveness of the DPP-3 packaging. This paper describes the supplemental finite element models performed and structural analysis results that demonstrate the alternate HAC 40-in. puncture bar impact tests would have no deleterious effect on the performance of the DPP-3.

Sakalaukus Jr., Peter J.↗

Challenges in Qualification of Thermal Protection Systems in Extreme Entry Environments

Planetary entry vehicles employ ablative TPS materials to shield the aeroshell from entry aeroheating environments. To ensure mission success, it must be demonstrated that the heat shield system, including local features such as seams, does not fail at conditions that are suitably margined beyond those expected in flight. Furthermore, its thermal response must be predictable, with acceptable fidelity, by computational tools used in heat shield design. Mission assurance is accomplished through a combination of ground testing and material response modelling. A material's robustness to failure is verified through arcjet testing while its thermal response is predicted by analytical tools that are verified against experimental data. Due to limitations in flight-like ground testing capability and lack of validated high-fidelity computational models, qualification of heat shield materials is often achieved by piecing together evidence from multiple ground tests and analytical simulations, none of which fully bound the flight conditions and vehicle configuration. Extreme heating environments (>2000 W/sq. cm heat flux and >2 atm pressure), experienced during entries at Venus, Saturn and Ice Giants, further stretch the current testing and modelling capabilities for applicable TPS materials. Fully-dense Carbon Phenolic was the material of choice for these applications; however, since heritage raw materials are no longer available, future uses of re-created Carbon Phenolic will require re-qualification. To address this sustainability challenge, NASA is developing a new dual-layer material based on 3D weaving technology called Heat shield for Extreme Entry Environments (HEEET). Regardless of TPS material, extreme environments pose additional certification challenges beyond what has been typical in recent NASA missions. Scope of this presentation: This presentation will give an overview of challenges faced in verifying TPS performance at extreme heating conditions. Examples include: (1) Bounding aeroheating parameters (heat flux, pressure, shear and enthalpy) in ground facilities. How to certify TPS if environments can't be bounded or aeroheating parameters can't be simultaneously achieved. (2) Higher uncertainties in ground test environments (facility calibration and analytical predictions) at extreme conditions. (3) Testing in flows similar to planetary atmosphere composition (H2/He for Gas and Ice Giants). (4) Test sample size limitations for qualifying seam designs. (5) Lack of computational tools capable of simulating all significant aspects of TPS performance (including initiation and propagation of failures). This presentation will provide recommendations on how the EDL community can address these challenges and mitigate some of the risks involved in flying TPS materials at extreme conditions. Examples include: (1) Dedicated activity to understanding TPS failure modes. Develop computational tools capable of modelling fluid interaction with material's thermostructural response. Validate these tools through failure testing. A better understanding of failure mechanisms may eliminate the need to fully bound all aeroheating parameters in ground testing. (2) Enhancements to current testing facilities to simulate flight-like ablation mechanism (ex. testing in Nitrogen at Ames Interaction Heating Facility to limit oxidation in favor of more sublimation). (3) Improved characterization of test conditions with new diagnostic methods and determination of environment uncertainty through rigorous statistical analysis of available data. (4) Design margin policies that are directly tied to uncertainties in ground test environments and modelling fidelity

Mahzari, Milad↗

Development of an Inflatable Airlock for a Deep Space Gateway

Inflatable structures technology utilizes high-strength fabric materials and internal pressure to create a stiffened pressure vessel that can replace traditional metallic primary structure in a habitable spacecraft. The flexibility of fabric structures allows them to be compactly stowed for launch and expanded in space, providing significant launch volume savings. The unique construction and design flexibility of these structures can be customized for a variety of uses in space including landing bags, decelerators, long duration in-space and planetary surface habitats, and even airlocks. An airlock is often a required component of a crewed spacecraft to allow for maintenance and human exploration outside of the vehicle. Airlock designs in use today rely on complex hatches and seals connected by metallic walls. Recent developments towards the design of an inflatable airlock structure show feasibility and a significant launch volume savings over a traditional metallic design. This paper will provide a high-level summary of these projects and the current state-of-the-art in inflatable airlock development with additional references and detail about previous and on-going research, providing guidance for the design of a softgoods airlock system. The use of inflatables in space has been in development since the 1960’s for both habitats and airlocks. The first ever EVA was conducted by the USSR in 1965 using an inflatable airlock known as the Volga. This airlock was attached to the Voskhod 2 spacecraft and turned the vehicle into a dual chamber airlock. The airlock was successfully deployed, used and jettisoned after Alexey Leonov’s historic spacewalk. Additional work on human-rated inflatable structures was not continued until the late 1990’s when NASA-JSC led an effort to demonstrate these structures as feasible long-term pressurized elements with the TransHab project. The technology developed and pioneered during this project led to multiple patents and proven feasibility that inflatables could be used for large habitable structures. Following TransHab, Bigelow Aerospace continued the development of inflatable structures with technical support from NASA. This partnership eventually led to the successful flight certification, launch, attachment and deployment of the Bigelow Expandable Activities Module (BEAM) on the ISS in 2016. Inflatable and expandable airlock structures have undergone various detailed feasibility studies and testing for over 15 years, most notably with the Advanced Inflatable Airlock (AIA), Dual-Chamber Hybrid Inflatable Suitlock (DCIS), Minimalistic Advanced Soft Hatch (MASH), and Lightweight External Inflatable Airlock (LEIA). During this time, full-scale articles have been built and pressure-tested, and mock-ups and demonstrators have been constructed and evaluated. During the 2001-2003 timeframe, the AIA concept was matured through requirements development, conceptual design, subscale and full-scale engineering breadboards subjecting various test articles to deployment and pressure testing up to four times operating pressure. These tests proved the feasibility of successful deployment and structural integrity of an inflatable crewlock. Additional testing was performed in the ensuing years, as funding permitted, to further refine additional structural and deployment concepts and to understand the EVA crewmember interfaces, hatches and EVA support equipment interfaces that would be required for a fully functioning airlock. This work resulted in a refinement of the structural requirements and an accounting of the systems needed in an inflatable airlock. In 2014, the MASH project developed an ultra-lightweight airlock concept with a fabric hatch that utilized a unique pressure vessel shape to minimize structural loads around a linear seal. The concept uses an automated zipper-like seal that allows for crew egress/ingress. Most of the development work on the project thus far has focused on the design, analysis and testing of the primary structure and the zipper-like seal system is in the preliminary stages of development with a successful proof-of-concept test. As part of the 2017 LEIA effort, studies were conducted on EVA crewmember interfaces on the inside of an inflatable airlock. These efforts included the design of an internal secondary structure and placement of handholds and foot restraints to enable hatch opening, closing and translation through the airlock. Structural design, analysis and testing was completed on several secondary structure candidates. Crew interface testing was also completed using an inflatable crewlock mockup and the JSC Active Response Gravity Offload System (ARGOS) to simulate the movement of an EVA crewmember through an inflatable crewlock in microgravity. The results of these tests helped demonstrate the feasibility of utilizing an inflatable structure as an airlock and informed the required volume, hatch size, and configuration and location of translation aids for crewmembers in a microgravity crewlock. The ISS Quest airlock uses a dual-chamber design with isolated compartments known as the equipment-lock and the crewlock. The equipment-lock houses the Servicing, Performance and Checkout Equipment (SPCE) items (suit batteries, consumables, etc.) while the crewlock has limited internal hardware and is the nominally depressurized compartment during US EVAs. While inflatable dual chamber airlocks have been studied, the current state of the art emphasizes an inflatable crewlock-type structure attached to a rigid equipment-lock type or habitat structure. Since a large portion of the hardware in the equipment-lock are rigid components and connectors that are installed on the ground - and an inflatable structure does not achieve full structural capabilities until pressurized in space - a depressurized fabric structure cannot provide the capabilities of a full equipment-lock. The use of an inflatable as a crewlock, however, provides all the required capabilities for EVA operations in a small launch package that offers significant volume savings over a metallic crewlock. The functions of a traditional equipment lock, including the SPCE, could be provided by a spacecraft’s habitat module or node and not necessarily in a separate equipment lock. An inflatable crewlock would be attached to the vehicle and launched in a packed and compressed state, saving volume under the launch shroud and mass for the overall airlock element compared to a rigid crewlock. Work is currently underway to continue development of an inflatable airlock with a variety of focus areas including the consideration of crew-induced loads and interfaces, the design and development of an internal sub-structure to provide translation aids and restraints, the thermal considerations of a fabric shell depressurized during an EVA, the micrometeorite environment in deep space, and the packaging and deployment of an inflatable airlock.

Deep Space Exploration↗