Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technology Demonstration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

NextGen Technologies on the FAA's Standard Terminal Automation Replacement System

This paper describes the integration, evaluation, and results from a high-fidelity human-in-the-loop (HITL) simulation of key NASA Air Traffic Management Technology Demonstration - 1 (ATD- 1) technologies implemented in an enhanced version of the FAA's Standard Terminal Automation Replacement System (STARS) platform. These ATD-1 technologies include: (1) a NASA enhanced version of the FAA's Time-Based Flow Management, (2) a NASA ground-based automation technology known as controller-managed spacing (CMS), and (3) a NASA advanced avionics airborne technology known as flight-deck interval management (FIM). These ATD-1 technologies have been extensively tested in large-scale HITL simulations using general-purpose workstations to study air transportation technologies. These general purpose workstations perform multiple functions and are collectively referred to as the Multi-Aircraft Control System (MACS). Researchers at NASA Ames Research Center and Raytheon collaborated to augment the STARS platform by including CMS and FIM advisory tools to validate the feasibility of integrating these automation enhancements into the current FAA automation infrastructure. NASA Ames acquired three STARS terminal controller workstations, and then integrated the ATD-1 technologies. HITL simulations were conducted to evaluate the ATD-1 technologies when using the STARS platform. These results were compared with the results obtained when the ATD-1 technologies were tested in the MACS environment. Results collected from the numerical data show acceptably minor differences, and, together with the subjective controller questionnaires showing a trend towards preferring STARS, validate the ATD-1/STARS integration.

air traffic management↗

Identifying Key Issues and Potential Solutions for Integrated Arrival, Departure, Surface Operations by Surveying Stakeholder Preferences

NASA's Aeronautics Research Mission Directorate (ARMD) collaborates with the FAA and industry to provide concepts and technologies that enhance the transition to the next-generation air-traffic management system (NextGen). To facilitate this collaboration, ARMD has a series of Airspace Technology Demonstration (ATD) sub-projects that develop, demonstrate, and transitions NASA technologies and concepts for implementation in the National Airspace System (NAS). The second of these sub-projects, ATD-2, is focused on the potential benefits to NAS stakeholders of integrated arrival, departure, surface (IADS) operations. To determine the project objectives and assess the benefits of a potential solution, NASA surveyed NAS stakeholders to understand the existing issues in arrival, departure, and surface operations, and the perceived benefits of better integrating these operations. NASA surveyed a broad cross-section of stakeholders representing the airlines, airports, air-navigation service providers, and industry providers of NAS tools. The survey indicated that improving the predictability of flight times (schedules) could improve efficiency in arrival, departure, and surface operations. Stakeholders also mentioned the need for better strategic and tactical information on traffic constraints as well as better information sharing and a coupled collaborative planning process that allows stakeholders to coordinate IADS operations. To assess the impact of a potential solution, NASA sketched an initial departure scheduling concept and assessed its viability by surveying a select group of stakeholders for a second time. The objective of the departure scheduler was to enable flights to move continuously from gate to cruise with minimal interruption in a busy metroplex airspace environment using strategic and tactical scheduling enhanced by collaborative planning between airlines and service providers. The stakeholders agreed that this departure concept could improve schedule predictability and suggested several key attributes that were necessary to make the concept successful. The goals and objectives of the planned ATD-2 sub-project will incorporate the results of this stakeholder feedback.

integrated arrival/departure/surface operations↗

Evaluation of Approval Request 47; Call for Release Procedures for Charlotte Douglas International Airport

NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.

Stevens, Lindsay↗

Evaluation of APREQCFR Coordination Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goal of The IADS capabilities in the ATD-2 project is to increase predictability and increase throughput via improving TMI compliance. The IADS capabilities that will impact TMI compliance are built upon previous NASA research, the Precision Departure Release Capability (PDRC). The proposed paper will evaluate the APREQCFR process between ATC Tower and Center and information sharing between ATC Tower and the airline Ramp tower. Subjective measures collected from the HITL surveys (e.g., workload, situational awareness, acceptability, usability) and performance metrics such as TMI, TMAT, and pushback advisory compliance from APREQCFR flights and will be reported.

APREQ scheduling↗

Evaluation of Approval Request/Call for Release Coordination Procedures for Charlotte Douglas International Airport

NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.

APREQ↗

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.

surface metering↗

International Challenges of GRACE Follow-On

The Gravity Recovery and Climate Experiment - Follow-On (GRACE-FO) Mission is a NASA directed mission to continue the goals of the original GRACE mission and provide continuity for the GRACE data set. The GRACE-FO mission is the result of an international cooperation to develop a concept and approach that minimizes cost and risk and maximizes the probability of success through limited changes to the original GRACE system design. The result is a system architecture in which maintenance of heritage is paramount, including heritage derived through the partnership with the German Research Centre for Geosciences (GFZ) in Germany. As a secondary goal, GRACE-FO will carry a Laser Ranging Interferometer (LRI) as a technology demonstration, which will provide laser interferometry measurements of inter-satellite range, complementary to the K/Ka-Band microwave link to demonstrate laser-ranging technology in support of future GRACE-like missions. Another secondary objective is the continuation of GRACE radio occultation measurements.

Kayali, Sammy↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Technology plan for the Terrestrial Planet Finder coronagraph

This document details the technology plan for the first of the TPF missions, the Terrestrial Planet Finder Coronagraph (TPF-C). TPF-C is currently in the first (or pre-Phase A) stage of the NASA project life cycle, and is undertaking a suite of technology development projects to demonstrate technological readiness leading to its Mission Concept Review, currently planned for late FY2006. Contained in these pages is an overview of planned pre-Phase A technology development activities, as well as activities planned through Phase C/D.

Lawson, Peter R.↗

NASA Small Spacecraft Technology Program

This presentation provides an overview of current and recent past technology demonstration missions, University SmallSat Technology Partnership projects, and technology interests for future years.

Roger C. Hunter↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

Real Time Technology Application Demonstration Project Final Report

Each of the 20 1-kg sample bags of Paducah soil will be sampled using a multi-increment (MI) strategy. These MI samples will be analyzed for total PCBs by the Abraxis PCB-HC kit. Processed soil samples will also be pooled to create sufficient volume for analysis for PAHs and PCB Aroclors by the ERT-Edison laboratory. Methanol extracts from Abraxis extractions will be analyzed by the ERT-Edison lab, the Abraxis lab, and the XDS laboratory for TEQ analytes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗