Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

FFTF Acceptance and Startup Testing for GAIN

The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following the demise of the breeder reactor program in the United States, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. FFTF operations ceased in April 1992 after a determination by DOE that no combination of proposed missions was financially feasible over a ten-year period. The reactor is currently deactivated and in a long-term surveillance and maintenance (S&M) mode. This report provides information on the extensive and rigorous process that was used to conduct turnover from construction followed by acceptance and startup testing of the FFTF. This paper is in support of the Gateway for Accelerated Innovation in Nuclear (GAIN), which provides the nuclear energy community with access to the technical, regulatory, and financial support necessary to move new or advanced nuclear reactor designs toward commercialization while ensuring the continued safe, reliable, and economic operation of the existing nuclear fleet. The information obtained from the design, startup, and operation of the FFTF provides valuable insight for follow-on reactor projects, such as the Versatile Test Reactor (VTR), in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, reactor startup and operations, and reactor deactivation and decommissioning (D&D). The focus of this report is on the process used to startup the FFTF and to ensure that operations could be conducted efficiently and safely. A reference section is provided of documents detailing the successful turnover and testing process implemented for startup of the reactor and its supporting systems. The documents listed can be retrieved upon request and are believed useful for future reactor startup endeavors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Agency Agreements Process Champion Support Intern

This document will provide information on the 2018 Spring semester NIFS Intern who represented the Office of Chief Financial Officer (OCFO) as a Reimbursable Accountant at Kennedy Space Center (KSC). This intern supported the Agency Agreements Process Champions and Team Lead, Susan Kroskey, Sandy Massey and Mecca Murphy, with major initiatives to advance the KSC OCFO's vision of creating and innovating healthy financial management practices that maximize the value of resources entrusted to NASA. These initiatives include, but are not limited to: updating the Agency Guidance and NASA Procedural Guidance 9090.1 Agreements, implementing a new budget structure to be utilized across all centers, submitting a Call Request (CRQ) to enhance non-federal customer reporting, initiating a discussion to incorporate a 3-year funding program for NASA agreements, and undertaking the Office of Inspector General (OIG) Audit. In support of these initiatives, this intern identified technical methods to enhance and reduce the workload of financial processes for reimbursable and non-reimbursable agreements, prepared reports in support of accounting functions, and performed administrative work and miscellaneous technical tasks in support of the OCFO as requested. In conclusion of the internship, the intern will become knowledgeable on reimbursable accounting, reimbursable policy, types of reimbursable agreements, the agreements process, estimated pricing reports, and the roles and responsibilities of the Financial Accounting and Financial Services offices.

Process Champion↗

Renewable Energy Potential Model: Priority Geothermal Leasing Areas ReEDs Results

This dataset contains the results of a study conducted by the National Renewable Energy Laboratory (NREL) to identify potential future priority geothermal leasing areas on Bureau of Land Management (BLM) and United States Forest Service (USFS) lands. The analysis uses the Regional Energy Deployment System (ReEDS) model to evaluate geothermal resource potential under different scenarios of resource depth and technology combinations through the year 2050. The study considers geothermal resource potential, natural resource conflicts, and transmission access to categorize areas into near, mid, and far deployment priorities. The dataset includes outputs from the ReEDS model, such as geothermal capacity, generation, system costs, and emissions under various economic and technical scenarios. Favorability site data with geographic coordinates and site-specific attributes (e.g., resource favorability, land type) are also provided. Supporting resources include a technical report detailing methodologies and assumptions, along with a link to the ReEDS model GitHub repository, which requires GAMS and Python software for execution.

15 GEOTHERMAL ENERGY↗

Brief Overview of the NCSP [Slides]

The mission of the NCSP is to provide sustainable expert leadership, direction, and the technical infrastructure necessary to develop, maintain, and disseminate the essential technical tools, training, and data required to support safe, efficient fissionable material operations within the Department of Energy. The vision of the NCSP is a continually improving, adaptable, and transparent program that communicates and collaborates globally to incorporate technology, practices, and programs to be responsive to the essential technical needs of those responsible for developing, implementing, and maintaining nuclear criticality safety.

2021 NCSP TPR Best Paper Award↗

A New Process for Small-Batch Purification of the Medical Isotope Molybdenum-99: Non-Technical Overview

The U.S. medical community depends on a reliable supply of the radioisotope molybdenum-99 (Mo-99) for nuclear medical diagnostic procedures. Mo-99's decay product, technetium-99m (Tc-99m), is used in over 40,000 medical procedures in the United States each day to diagnose heart disease and cancer, to study organ structure and function, and to perform other important medical applications. For example, patients undergoing a common procedure—the cardiac “stress test”—likely have benefited from Tc-99m. Historically, Mo-99 was primarily produced through the fission of uranium-235, in the form of highly enriched uranium (HEU) targets irradiated in research and test reactors. HEU is a proliferation-sensitive material that, if diverted or stolen, could be used as a component of a nuclear weapon. NNSA’s Office of Material Management and Minimization (M3) manages the Molybdenum-99 (Mo-99) Program as part of its mission to minimize the use of HEU in civilian applications. The Mo-99 Program assists global Mo-99 production facilities in converting to non-HEU processes and supports the establishment of domestic supplies of Mo-99 without the use of proliferation-sensitive HEU. As part of this program, M3 funds U.S. national laboratories to provide non-proprietary technical support to U.S. companies working to establish non-HEU-based Mo-99 production capabilities. The results of this research are published on OSTI.gov for the benefit of the Mo-99 community and the public. However, it can be difficult for readers without a scientific background to understand and interpret these publications. In order to increase public understanding of the work being done in M3’s Mo-99 Program, this paper aims to provide an overview of a key, recent national laboratory technical publication in terms that can be understood by readers without a technical background. To accomplish this, the paper first explains key scientific concepts—primarily related to chemistry—that provide a foundation for understanding research in this area. This includes chromatography, absorption vs. adsorption, dissolution and precipitation, and liquid-liquid extraction. Drawing on these concepts, the paper then provides an explanation for non-technical audiences of the Argonne National Laboratory publication entitled Recovery of High Specific Activity Molybdenum-99 from Accelerator-Induced Fission on Low-Enriched Uranium for Technetium-99m Generators (Brown, M.A. et al., 2021) and related article Separation and Purification of Mo-99 Produced from Natural U3O8 Targets via Photo-Fission (Brown, M.A. et al., 2021).

Stamler, Bradley↗

Model-based reasoning in SSF ECLSS

The interacting processes and reconfigurable subsystems of the Space Station Freedom Environmental Control and Life Support System (ECLSS) present a tremendous technical challenge to Freedom's crew and ground support. ECLSS operation and problem analysis is time-consuming for crew members and difficult for current computerized control, monitoring, and diagnostic software. These challenges can be at least partially mitigated by the use of advanced techniques such as Model-Based Reasoning (MBR). This paper will provide an overview of MBR as it is being applied to Space Station Freedom ECLSS. It will report on work being done to produce intelligent systems to help design, control, monitor, and diagnose Freedom's ECLSS. Specifically, work on predictive monitoring, diagnosability, and diagnosis, with emphasis on the automated diagnosis of the regenerative water recovery and air revitalization processes will be discussed.

Miller, J. K.↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗

Overview of the NCSP Nuclear Data Program [Slides]

The mission of the NCSP is to provide sustainable expert leadership, direction and the technical infrastructure necessary to develop, maintain and disseminate the essential technical tools, training and data required to support safe, efficient fissionable material operations within the Department of Energy. The vision of the NCSP is to create a continually improving, adaptable and transparent program that communicates and collaborates globally to incorporate technology, practices and programs to be responsive to the essential technical needs of those responsible for developing, implementing and maintaining nuclear criticality safety.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Software metrics: The key to quality software on the NCC project

Network Control Center (NCC) Project metrics are captured during the implementation and testing phases of the NCCDS software development lifecycle. The metrics data collection and reporting function has interfaces with all elements of the NCC project. Close collaboration with all project elements has resulted in the development of a defined and repeatable set of metrics processes. The resulting data are used to plan and monitor release activities on a weekly basis. The use of graphical outputs facilitates the interpretation of progress and status. The successful application of metrics throughout the NCC project has been instrumental in the delivery of quality software. The use of metrics on the NCC Project supports the needs of the technical and managerial staff. This paper describes the project, the functions supported by metrics, the data that are collected and reported, how the data are used, and the improvements in the quality of deliverable software since the metrics processes and products have been in use.

Burns, Patricia J.↗

Clean Energy Transformation in Bangladesh

Since 2011, the United States Agency for International Development (USAID) and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) have partnered to support Bangladesh’s energy transition by enabling the deployment of advanced energy systems. The USAID-NREL Partnership launched the Reinforcing Advanced Energy Systems (RAES) program in May 2021 as a mechanism for providing a broader array of technical assistance to the Government of Bangladesh in support of their goal to promote renewable energy development to stimulate private sector investment, rural economic development, and to meet growing energy demand through domestic energy resources. This fact sheet reviews how USAID and NREL collaborate in Bangladesh to improve energy access and security and stimulate economic growth through the deployment of advanced energy systems.

Bangladesh↗

SXI prototype mirror mount

The purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule. A number of development hardware parts have been designed and fabricated jointly by MSFC and UAH for the engineering model of SXI. The major parts include a nickel electroformed mirror and a mirror mount, plating and coating of the ceramic spacers, and gold plating of the contact rings and fingers for the camera assembly. An aluminum model of the high accuracy sun sensor (HASS) was also designed and fabricated. A number of fiber optic tapers for the camera assembly were also coated with indium tin oxide and phosphor for testing and evaluation by MSFC. A large number of the SXI optical bench parts were also redesigned and simplified for a prototype telescope. These parts include the forward and rear support flanges, front aperture plate, the graphite epoxy optical bench and a test fixture for the prototype telescope. More than fifty (50) drawings were generated for various components of the prototype telescope. Some of these parts were subsequently fabricated at UAH machine shop or at MSFC or by the outside contractors. UAH also provide technical support to MSFC staff for a number of preliminary and critical design reviews. These design reviews included PDR and CDR for the mirror assembly by United Technologies Optical Systems (UTOS), and the program quarterly reviews, and SXI PDR and CDR. UAH staff also regularly attended the monthly status reviews, and made a significant number of suggestions to improve the design, assembly and alignment of the telescope. Finally, a high level assembly and alignment plan for the entire telescope was prepared by UAH. This plan addresses the sequence of assembly, the required assembly and alignment tolerances, and the methods to verify the alignment at each step during the assembly process. This assembly and alignment plan will be used to assemble and integrate the engineering model (EM) of the telescope. Later on, based on this plan more detailed assembly and alignment procedures will be developed for the lower-level assemblies of SXI.

Source record↗

International Space Station (ISS) Expedite the Process of Experiments to Space Station (EXPRESS) Racks Software Support

bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED 14), the MSFC EXPRESS Project Office (FD3 l), and the Huntsville Boeing Company. Work accomplishments included the support of SRB activities, ATB activities, ESCP activities, participating in technical meetings, coordinating issues between the Boeing Company and the MSFC Project Office, and performing special tasks as requested.

Source record↗

Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

Huebner, Lawrence D.↗

Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics

Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics

Huebner, Lawrence D.↗

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

This is a technical presentation that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ames Engineering Directorate

The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.

Small Satellites↗