Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Fiberoptic characteristics for extreme operating environments

Fiberoptics could offer several major benefits for cryogenic liquid-fueled rocket engines, including lightning immunity, weight reduction, and the possibility of implementing a number of new measurements for engine condition monitoring. The technical feasibility of using fiberoptics in the severe environments posed by cryogenic liquid-fueled rocket engines was determined. The issues of importance and subsequent requirements for this use of fiberoptics were compiled. These included temperature ranges, moisture embrittlement succeptability, and the ability to withstand extreme shock and vibration levels. Different types of optical fibers were evaluated and several types of optical fibers' ability to withstand use in cryogenic liquid-fueled rocket engines was demonstrated through environmental testing of samples. This testing included: cold-bend testing, moisture embrittlement testing, temperature cycling, temperature extremes testing, vibration testing, and shock testing. Three of five fiber samples withstood the tests to a level proving feasibility, and two of these remained intact in all six of the tests. A fiberoptic bundle was also tested, and completed testing without breakage. Preliminary cabling and harnessing for fiber protection was also demonstrated. According to cable manufacturers, the successful -300 F cold bend, vibration, and shock tests are the first instance of any major fiberoptic cable testing below roughly -55 F. This program has demonstrated the basic technical feasibility of implementing optical fibers on cryogenic liquid-fueled rocket engines, and a development plan is included highlighting requirements and issues for such an implementation.

Delcher, R. C.↗

A comparative evaluation plan for the Maintenance, Inventory, and Logistics Planning (MILP) System Human-Computer Interface (HCI)

The primary goal of this project was to develop a tailored and effective approach to the design and evaluation of the human-computer interface (HCI) to the Maintenance, Inventory and Logistics Planning (MILP) System in support of the Mission Operations Directorate (MOD). An additional task that was undertaken was to assist in the review of Ground Displays for Space Station Freedom (SSF) by attending the Ground Displays Interface Group (GDIG), and commenting on the preliminary design for these displays. Based upon data gathered over the 10 week period, this project has hypothesized that the proper HCI concept for navigating through maintenance databases for large space vehicles is one based upon a spatial, direct manipulation approach. This dialogue style can be then coupled with a traditional text-based DBMS, after the user has determined the general nature and location of the information needed. This conclusion is in contrast with the currently planned HCI for MILP which uses a traditional form-fill-in dialogue style for all data access and retrieval. In order to resolve this difference in HCI and dialogue styles, it is recommended that comparative evaluation be performed which combines the use of both subjective and objective metrics to determine the optimal (performance-wise) and preferred approach for end users. The proposed plan has been outlined in the previous paragraphs and is available in its entirety in the Technical Report associated with this project. Further, it is suggested that several of the more useful features of the Maintenance Operations Management System (MOMS), especially those developed by the end-users, be incorporated into MILP to save development time and money.

Overmyer, Scott P.↗

The Beamed Energy Technology Working Group, Programs and Goals

A brief description of the Beamed Energy Technology Program will be given. Its relationship to the overall Advanced Technology Program at Marshall Space Flight Center will be discussed. A summary description of the known potential benefits and technical issues remaining in the development of a viable system will be presented along with program plans for a NASA Research Announcement in FY03 to begin development of relevant technologies and systems concepts. The results of workshop activity by the Beamed Energy Technology Working Group will be provided.

Montgomery, Edward E., IV↗

Research and Technology 1997

NASA Lewis Research Center is responsible for developing and transferring critical technologies that address national priorities in aeropropulsion and space applications in partnership with U.S. industries, universities, and Government institutions. As NASA s designated Lead Center for Aeropropulsion, our role is to develop, verify, and transfer aeropropulsion technologies to U.S. industry. As NASA s designated Center of Excellence in Turbomachinery, our role is to develop new and innovative turbomachinery technology to improve the reliability, performance, efficiency and affordability, capacity, and environmental compatibility of future aerospace vehicles. We also maintain a science and technology development role in aeropropulsion, communications, space power and onboard propulsion, and microgravity fluid physics and combustion. We are committed to enabling non-aerospace U.S. industries to benefit directly from the technologies developed through our programs to maximize the benefit to the Nation and the return on each taxpayer s investment. In addition, we are aggressively pursuing continuous improvement in our management and business practices and striving for diversity in our workforce as together we push the edge of technology in space and aeronautics. The Lewis Research Center is a unique facility located in an important geographical area, the southwest corner of Cleveland, Ohio. Situated on 350 acres of land adjacent to the Cleveland Hopkins International Airport, Lewis comprises more than 140 buildings that include 24 major facilities and over 500 specialized research and test facilities. Additional facilities are located at Plum Brook Station, which is about 50 miles west of Cleveland. Over 3700 people staff Lewis, including civil service employees and support service contractors. Over half of them are scientists and engineers, who plan, conduct or oversee, and report on our research tasks and projects. They are assisted by technical specialists, skilled workers, and an administrative staff. Our end product is knowledge. This report is designed to help us make this knowledge fully available to potential users the aircraft engine industry, the energy industry, the automotive industry, the aerospace industry, and others. It is organized so that a broad cross section of the community can readily use it. Each article begins with a short introductory paragraph that should prove to be a valuable tool for the layperson. These articles summarize the progress made during the year in various technical areas and portray the technical and administrative support associated with Lewis technology programs. We hope that the information is useful to all. If additional information is desired, readers are encouraged to contact the researchers identified in the articles and to visit Lewis on the World Wide Web (http://www.lerc.nasa.gov/). This document is available on the World Wide Web (http://www.lerc.nasa.gov/WWW/RT).

Source record↗

Quantum Gravity Gradiometer Development for Space

Funded by the Advanced Technology Component Program, we have completed the development of a laboratory-based quantum gravity gradiometer based on atom interferometer technology. This is our first step towards a new spaceborne gradiometer instrument, which can significantly contribute to global gravity mapping and monitoring important in the understanding of the solid earth, ice and oceans, and dynamic processes. In this paper, we will briefly review the principles and technical benefits of atom-wave interferometer-based inertial sensors in space. We will then describe the technical implementation of the laboratory setup and report its status. We will also discuss our implementation plan for the next generation instrument.

gravity gradiometry↗

EOS Aura Mission Status

This PowerPoint presentation will discuss EOS Aura mission and spacecraft subsystem summary, recent and planned activities, inclination adjust maneuvers, propellant usage lifetime estimate. Eric Moyer, ESMO Deputy Project Manager-Technical (code 428) has reviewed and approved the slides on April 30, 2015.

propellant usage↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Integrated Systems Health Management for Sustainable Habitats (Using Sustainability Base as a Testbed)

Habitation systems provide a safe place for astronauts to live and work in space and on planetary surfaces. They enable crews to live and work safely in deep space, and include integrated life support systems, radiation protection, fire safety, and systems to reduce logistics and the need for resupply missions. Innovative health management technologies are needed in order to increase the safety and mission-effectiveness for future space habitats on other planets, asteroids, or lunar surfaces. For example, off-nominal or failure conditions occurring in safety-critical life support systems may need to be addressed quickly by the habitat crew without extensive technical support from Earth due to communication delays. If the crew in the habitat must manage, plan and operate much of the mission themselves, operations support must be migrated from Earth to the habitat. Enabling monitoring, tracking, and management capabilities on-board the habitat and related EVA platforms for a small crew to use will require significant automation and decision support software.Traditional caution and warning systems are typically triggered by out-of-bounds sensor values, but can be enhanced by including machine learning and data mining techniques. These methods aim to reveal latent, unknown conditions while still retaining and improving the ability to provide highly accurate alerts for known issues. A few of these techniques will briefly described, along with performance targets for known faults and failures. Specific system health management capabilities required for habitat system elements (environmental control and life support systems, etc.) may include relevant subsystems such as water recycling systems, photovoltaic systems, electrical power systems, and environmental monitoring systems. Sustainability Base, the agency's flagship LEED-platinum certified green building acts as a living laboratory for testing advanced information and sustainable technologies that provides an opportunity to test novel machine learning and controls capabilities. In this talk, key features of Sustainability Base that make it relevant to deep space habitat technology and its use of these kinds of subsystems previously listed will be presented. The fact that all such systems require less power to support human occupancy can be used as a focal point to serve as a testbed for deep space habitats that will need to operate within finite energy budgets.

Systems Health Management↗

Acoustics Technical Working Group History

A brief history of NASA's Acoustics Technical Working Group (TWG) is given. The TWG dates back to 1992 and was formed to plan the Advanced Subsonic Technology (AST) Noise Reduction Program. It has endured several program, project and organizational changes. Today a new work area called "Urban Air Mobility" is being proposed and the TWG will have an opportunity to discuss its roles in continuing to coordinate NASA's acoustics research.

Acoustics↗

ISyCL technical report

The Air Force Integrated Information Systems Evolution Environment (IISEE) is a program focused on the development of technology for enabling the planning definition development and maintenance of evolutionary integrated information systems. This program has studied the representational needs of this knowledge base from the point of view of the needs of engineering, manufacturing, and logistics Evolutionary Information Systems (EIS). The definition of the concepts for a suite of automated tools and environments to support the pursuit of such engineering, manufacturing, and logistics EIS's has also required examination of languages and representation schemes for the knowledge base of these integrated systems. To accomplish this purpose, the language must be very rich, and must support object orientation, relational orientation, persistent storage, process transaction specification, and first order logic. The task of designing a unified language which supports these paradigms is a challenge. The Information Systems Constraint Language (ISyCL) is described. It was designed to meet the definitional and knowledge representation needs of three perspectives. It supports users from the area expert to the data base designer.

Decker, Louis P.↗

Research Plans for Improving Understanding of Effects of Very Low-Frequency Noise of Heavy Lift Rotorcraft

This report reviews the English-language technical literature on infrasonic and low-frequency noise effects; identifies the most salient effects of noise produced by a future large civil tiltrotor aircraft on crew, passengers, and communities near landing areas; and recommends research needed to improve understanding of the effects of such noise on passengers, crew, and residents of areas near landing pads.

Fidell, Sanford↗

Guidance and Control Software Project Data - Volume 1: Planning Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

Hayhurst, Kelly J.↗

GCS plan for software aspects of certification

As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

Shagnea, Anita M.↗

From Here to There - Bird's Eye Perspective on Grant Lifecycle and Administration

“What gets measured gets done ”or “measure it to manage it”. The statements have become matter of fact. However, measurement (and even metrics) alone cannot fully communicate an organization’s story without the point of accountability. As a dynamic org, we must measure what is necessary, using the appropriate lenses to analyze the most relevant information that allows robust decision-making. A key function of Program Planning and Control (PP&C) is to assist HRP in the development of such strategy that ensures the proper execution of program research goals. With introspection of the Technical Officer role as defined by 2 CFR(i.e., Part 200, Part 1800)and subsequent governance under the NASA Grant and Cooperative Agreement Manual (GCAM), we’ve realized an obvious disconnect among Principal Investigator’s (PI),technical communication with the elements and some of the administrative/fiduciary requirements that should run parallel to the science work. This find has introduced new program risks as evidenced through incomplete deliverables or other less-than-successful requirements through the lifecycle for work we fund. One solution the Grants Technical Officer proposes is for PP&C to share in the communication with stakeholders of grants administration much earlier in the award process in attempt to reduce programmatic risks; particularly in data, reporting and performance management. As such, the planned IWS 2022 session will focus on(plenary) topics that include (1) definition of the grant lifecycle, (2) anatomy of a grant(NF1687 the award document), and (3)performance measurement/post-award monitoring. As HH&P pursues its strategic objectives to evolve the directorate into a data rich and knowledge rich organization, it has become increasingly important to develop the multiple levels of insight across the program to ensure data and other reporting(qualitative/quantitative), alongside proper administration. And the desired outcome is to make certain HRP meets/exceeds the accountability standard that our research information is received, maintained and accessible in posterity.

Lucy D Barnes-Moten↗

Risk Reduction on X-33/RLV Engines

Risk management has received considerable attention in the X-33 and Reusable Launch Vehicle (RLV) program due to aggressive schedules, limited funding. and planned private investment to develop the commercial VentureStar vehicle. As an X-33 and RLV team member and main propulsion supplier, Boeing Rocketdyn Propulsion and Power has addressed risk through a methodical application of systems engineering in identifying, assessing, and mitigating risks. The methods employed involve rigorous risk mitigation planning early in development, continuous risk monitoring and assessment during the course of development, and the systematic verification of compliance with technical requirements prior to delivery. In addition, an engine system reliability analysis was conducted to reduce risk. In July 1996, NASA selected Lockheed Martin's "Skunk Works" (LMSW) as the lead contractor for the X-33 and RLV program. The X-33 vehicle is a half-scale pathfinder for the full-scale RLV. The LMSW RLV design is a lifting body shaped vehicle employing linear aerospike engine provided propulsion. The initial X-33 flight is planned for the summer of 2000, and the initial VentureStar flight is planned for between 2005 and 2007.

Crowley, Tim↗

Concepts, requirements, and design approaches for building successful planning and scheduling systems

Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

Hornstein, Rhoda Shaller↗

Bubble Experiments on the Hydrodynamic Focusing Bioreactor-Space (HFB-S)

The Hydrodynamic Focusing Bioreactor-Space (HFB-S) is being developed as a drop-in replacement for the Rotating Wall Perfused Vessel (RWPV) bioreactor currently planned for use on the International Space Station (ISS). Only the vessel itself is proposed for change, the supporting hardware will remain the same. These bioreactors are used for the growth of three-dimensional tissue culture that cannot be done in normal gravity labs. The bioreactors provide a continual supply of oxygen for cell growth, as well as periodic replacement of cell culture media with nutrients. The RWPV has had many successful flights on the space shuttle, but longer duration missions onboard the Mir Space Station resulted in bubbles inside the vessel that were detrimental to the science. It is believed that procedural changes can prevent bubble formation, but the HFB-S must not only provide a mechanism of bubble removal, but must also meet strict requirements for a low-shear environment and uniform oxygen concentration distribution for optimum cell tissue growth. A detailed technical objective (DTO) flight on the space shuttle to fully evaluate the HFB-S is currently in the planning stages. Ground-based activities are also underway to quanitify the characteristics of the HFB-S. Computational studies are being used to predict the internal fluid flow and cell trajectories. These computations will be compared to ground-based flow visualization experiments. Comparative studies of ground-based cell growth between the RWPV and the HFB-S are also in progress. These studies have shown that the HFB-S functions well as a bioreactor in normal gravity. Bubble motion and bubble removal are being studied using computational predictions as well as experimental validation.

Charles Niederhaus↗