Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TANKS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Temperature and flow measurements on near-freezing aviation fuels in a wing-tank model

Freezing behavior, pumpability, and temperature profiles for aviation turbine fuels were measured in a 190-liter tank, to simulate internal temperature gradients encountered in commercial airplane wing tanks. Two low-temperature situations were observed. Where the bulk of the fuel is above the specification freezing point, pumpout of the fuel removes all fuel except a layer adhering to the bottom chilled surfaces, and the unpumpable fraction depends on the fuel temperature near these surfaces. Where the bulk of the fuel is at or below the freezing point, pumpout ceases when solids block the pump inlet, and the unpumpable fraction depends on the overall average temperature.

Friedman, R.↗

Drive mechanism for the shuttle orbiter/external tank propellant disconnect

The Space Shuttle design required development of a large, 0.43-m (17-in.) nominal diameter separable disconnect for the liquid hydrogen and liquid oxygen propellant lines at the orbiter-to-external-tank interface. The disconnect must provide for shutoff of the propellant flow area by simultaneous action of two rotary flapper valves (orbiter and external tank) prior to disconnect separation. In the case of pneumatic system failure, the rotary flapper valves are closed automatically through mechanical interlocking linkage during disconnect separation. The mechanism must meet requirements while accommodating changes in bearing clearances and linkage geometry over a wide temperature range from ambient to 20.37 K (-423°F). The mechanical design of the separable disconnect, kinematics of the drive mechanism, and the analysis and test methods used to verify proper operation and qualification for the Space Shuttle dynamic environments are presented.

E. Thomas↗

Space Shuttle External Tank Gaseous Oxygen Vent System

Two problems had to be solved to assure successful elimination of ice on the External Tank (ET). First, an access/support structure was provided from the Launch Complex 39A Fixed Service Structure to the vicinity of the nose cone on the ET approximately 82.3 meters (270 feet) above the surface of the pad and 22.9 meters (75 feet) from the face of the FSS. Second, an umbilical was designed and tested that would seal around the ET gaseous oxygen (GOX) vent louvers and not allow ice to form on the tank or the umbilical. A modified Apollo service arm was chosen. An inflatable vent seal subsystem was chosen, providing a cloth seal around each vent louver with an internal annulus to provide a path for the gaseous oxygen from the ET to a hard duct on the swing arm.

Franklin, W. G.↗

High-speed machining of space shuttle External Tank (ET) panels

The applicability to and advantages of the high-speed machining process for the production of Space Shuttle external tank panels by physically machining selected sample portions of an external tank panel were investigated. The panel sample configuration was selected, and potential high speed milling procedures identified. An 8 foot long panel was machined and the milling demonstration is described in detail.

Miller, J. A.↗

Test program to demonstrate the stability of hydrazine in propellant tanks

A 24-month coupon test program to evaluate the decomposition of propellant tanks is reported. The propellant fuel evaluated was monopropellant-grade hydrazine (N2H4), which is normally a colorless, fuming, corrosive, strongly reducing liquid. The degree of hydrazine decomposition was determined by means of chemical analyses of the liquid and evolved gases at the end of the test program. The experimental rates of hydrazine decomposition were determined to be within acceptable limits. The propellant tank materials and material combinations were not degraded by a 2-year exposure to hydrazine propellant. This was verified using change-of-weight determinations and microscopic examination of the specimen surface before and after exposure, and by posttest chemical analyses of hydrazine liquid for residual metal content.

Moran, C. M.↗

Evaluation of propellant tank insulation concepts for low-thrust chemical propulsion systems

An analytical evaluation of cryogenic propellant tank insulations for liquid oxygen/liquid hydrogen low-thrust 2224N (500 lbf) propulsion systems (LTPS) was conducted. The insulation studied consisted of combinations of N2-purged foam and multilayer insulation (MLI) as well as He-purged MLI-only. Heat leak and payload performance predictions were made for three Shuttle-launched LTPS designed for Shuttle bay packaged payload densities of 56 kg/cu m, 40 kg/cu m and 24 kg/cu m. Foam/MLI insulations were found to increase LTPS payload delivery capability when compared with He-purged MLI-only. An additional benefit of foam/MLI was reduced operational complexity because Orbiter cargo bay N2 purge gas could be used for MLI purging. Maximum payload mass benefit occurred when an enhanced convection, rather than natural convection, heat transfer was specified for the insulation purge enclosure. The enhanced convection environment allowed minimum insulation thickness to be used for the foam/MLI interface temperature selected to correspond to the moisture dew point in the N2 purge gas. Experimental verification of foam/MLI benefits was recommended. A conservative program cost estimate for testing a MLI-foam insulated tank was 2.1 million dollars. It was noted this cost could be reduced significantly without increasing program risk.

Kramer, T.↗

Evaluation of propellent tank insulation concepts for low-thrust chemical propulsion systems: Executive summary

Cryogenic propellant tank insulations or liquid oxygen/liquid hydrogen low-thrust 2224N (500 lbf) propulsion systems (LTPS) were assessed. The insulation studied consisted of combinations of N2-purged foam and multilayer insulation (MLI) as well as He-purged MLI-only. Heat leak and payload performance predictions were made for three shuttle-launched LTPS designed for shuttle bay packaged payload densities of 56 kg cu/m (3.5 lbm/cu ft), 40 kg/cu m (2.5 lbm/cu ft) and 24 kg/cu m (1.5 lbm/cu ft). Foam/MLI insulations were found to increase LTPS payload delivery capability when compared with He-purged MLI-only. An additional benefit of foam/MLI was reduced operational complexity because orbiter cargo bay N2 purge gas could be used for MLI purging. Maximum payload mass benefit occurred when an enhanced convection, rather than natural convection, heat transfer was specified for the insulation purge enclosure. The enhanced convection environment allowed minimum insulation thickness to be used for the foam/MLI interface temperature selected to correspond to the moisture dew point in the N2 purge gas. Experimental verification of foam/MLI benefits was recommended. A conservative program cost estimate for testing a MLI-foam insulated tank was 2.1 million dollars. This cost could be reduced significantly without increasing program risk.

Kramer, T.↗

Numerical analysis of flow and heat transfer in the VAFB LOX storage Dewar tank

The present report describes numerical simulation of three-dimensional transient distributions of velocity and temperature of liquid oxygen (LOX) in the LOX Dewar tank of Vendenberg Air Force Base (VAFB). The present analyses cover the replenish time period only. Four test cases have been considered. For all four cases, the input boundary conditions are comprised of LOX facility heat loads, drain flow rates, recirculation flow rates and dewar heating. All the quantities are prescribed as functions of time. The first two test cases considered sensitivity of results to the computational grid. In Case 3, system heat load was changed, while in Case 4, a lower LOX level was specified. Cases 1 and 2 showed that the temperatures were not sensitive to the grid refinement. This provided a basic check on the numerical model. Cases 3 and 4 showed that the thermal boundary layer motion near the tank surface becomes more significant at the late time, e.g., 5 1/2 hours from replenish start. Comparison between results of Cases 3 and 4 showed, as expected, that the smaller initial LOX volume given in Case 4, results in higher temperature level. All calculated velocity and temperature distributions were found to be plausible.

Tam, L. T.↗

External Tank GH2 Vent Arm

Because the venting of free hydrogen gas to the atmosphere presents an extremely hazardous situation, it was necessary to devise a means for safe, controlled venting of the shuttle external tank gaseous hydrogen during and after liquid hydrogen tank loading. Several design concepts that were considered initially were discarded as unfeasible because of vehicle weight restrictions, high cost, and because the proposed structure was itself deemed a hazard due to the vehicle's nonvertical launch trajectory. These design concepts are discussed. A design employing a support structure/access arm attached to the fixed service structure was finally selected. The various design problems resolved included vent arm disconnect/drop interference, minimizing refurbishment due to launch damage, disconnect reliability, vehicle movement tracking, minimizing vent line pressure drop, and the presence of other vehicle services at the same centralized supply area. Six launches have proven the system to be reliable, efficient, and of nearly zero refurbishment cost.

Reichle, G. E.↗

Thermal design of the space shuttle external tank

The shuttle external tank thermal design presents many challenges in meeting the stringent requirements established by the structures, main propulsion systems, and Orbiter elements. The selected thermal protection design had to meet these requirements, and ease of application, suitability for mass production considering low weight, cost, and high reliability. This development led to a spray-on-foam (SOFI) which covers the entire tank. The need and design for a SOFI material with a dual role of cryogenic insulation and ablator, and the development of the SOFI over SLA concept for high heating areas are discussed. Further issuses of minimum surface ice/frost, no debris, and the development of the TPS spray process considering the required quality and process control are examined.

Bachrtel, F. D.↗

Filling an Unvented Cryogenic Tank

Slow-cooling technique enables tank lacking top vent to be filled with cryogenic liquid. New technique: pressure buildup prevented through condensation of accumulating gas resulting in condensate being added to bulk liquid. Filling method developed for vibration test on vacuum-insulated spherical tank containing liquid hydrogen.

Beck, Phillip↗

Tank tread assemblies with track-linking mechanism

The proposed tank tread assembly has adjacent tank tread segments joined by a link bearing tapered pins retained by clips inserted through the tread shells perpendicular to the axes of the pin. It also has highway pads attached by a release rod bearing tapered, grooved cams which interlockingly engage tabs inserted into the tread shells.

Collins, Earl R., Jr.↗

Environmental projects. Volume 2: Underground storage tanks compliance program

Six large parabolic dish antennas are located at the Goldstone Deep Space Communications Complex north of Barstow, California. As a large-scale facility located in a remote, isolated desert region, the GDSCC operations require numerous on-site storage facilities for gasoline, diesel and hydraulic oil. These essential fluids are stored in underground storage tanks (USTs). Because USTs may develop leaks with the resultant seepage of their hazardous contents into the surrounding soil, local, State and Federal authorities have adopted stringent regulations for the testing and maintenance of USTs. Under the supervision of JPL's Office of Telecommunications and Data Acquisition, a year-long program has brought 27 USTs at the Goldstone Complex into compliance with Federal, State of California and County of San Bernadino regulations. Of these 27 USTs, 15 are operating today, 11 have been temporary closed down, and 1 abandoned in place. In 1989, the 15 USTs now operating at the Goldstone DSCC will be replaced either by modern, double-walled USTs equipped with automatic sensors for leak detection, or by above ground storage tanks. The 11 inactivated USTs are to be excavated, removed and disposed of according to regulation.

Kushner, L.↗

The water towing tank as an experimental facility

Wind tunnels and flumes have become standard laboratory tools for modeling a variety of aerodynamic and hydrodynamic flow problems. Less available, although by no means less useful, are facilities in which a model can be towed (or propelled) through air or water. This article emphasizes the use of the water towing tank as an experimental tool for aerodynamic and hydrodynamic studies. Its advantages and disadvantages over other flow rigs are discussed, and its usefulness is illustrated through many examples of research results obtained over the past few years in a typical towing tank facility.

Gad-El-hak, M.↗

Measurement of suspension and ride characteristics of the M1 main battle tank

Means were developed to measure the effect of vibration on human beings in a tank vehicle so as to determine the limits to which they might be taken in terms of operating effectiveness and also in terms of well being. Improved hardware for making these measurements, a method for relating tank hull input forces to ride quality, and installation and calibration of instrumentation to measure the hull forces are discussed.

Reed, Bobby E.↗

Use of water towing tanks for aerodynamics and hydrodynamics

Wind tunnels and flumes have become standard laboratory tools for modeling a variety of aerodynamic and hydrodynamic flow problems. Less available, although by no means less useful, are facilities in which a model can be towed (or propelled) through air or water. This article emphasizes the use of the water towing tank as an experimental tool for aerodynamic and hydrodynamic studies. Its advantages and disadvantages over other flow rigs are discussed, and its usefullness is illustrated through many examples of research results obtained over the past few years in a typical towing tank facility.

Gadelhak, Mohamed↗

Simulation tests of the optimization method of Hopfield and Tank using neural networks

The method proposed by Hopfield and Tank for using the Hopfield neural network with continuous valued neurons to solve the traveling salesman problem is tested by simulation. Several researchers have apparently been unable to successfully repeat the numerical simulation documented by Hopfield and Tank. However, as suggested to the author by Adams, it appears that the reason for those difficulties is that a key parameter value is reported erroneously (by four orders of magnitude) in the original paper. When a reasonable value is used for that parameter, the network performs generally as claimed. Additionally, a new method of using feedback to control the input bias currents to the amplifiers is proposed and successfully tested. This eliminates the need to set the input currents by trial and error.

Paielli, Russell A.↗

Insulation For Cryogenic-Liquid Tanks

Rigid foam and radiation shields prevent excessive heating in variety of environments. Report discusses design, development, and test of thermal-protection system for liquid-oxygen and liquid-hydrogen tanks of now discontinued Shuttle/Centaur G' project. System protects tank from excessive heat before and during launches, while in orbit around Earth, and during premature landings from aborted launches. Designed to withstand stresses of launch and emergency landing, acoustical loads, rapid changes in pressure, and impingement of rapidly flowing gas near vents of cargo bay in Space Shuttle. Primary requirements in design, system presents no hazard to Space Shuttle or its crew.

Knoll, Richard H.↗