Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Systems architecture for distributed applications

This paper describes the kernel of a distributed operating system called ADAPT. The system runs on top of existing single host operating systems that are networked together. It's purpose is to transform this network of individual systems into a single system that will be easier for application programmers to use. This single system need not be monolithic; ADAPT facilitates the construction of both integrated and modular distributed systems.

Peebles, R.↗

Severe storms measurement system real time data processing and displays

The objectives of the system are to provide the system operator with real time system performance check and to provide data recording of all SSMS data. Meteorologists are provided with real time indication of meteorological data measurements including aid for directing flight profiles in real time and aid for directing SSMS operations. A day-to-day feedback is provided to meteorologists, system operators, and flight crews for flight planning on subsequent flight tests days.

Jeffreys, H. B.↗

Computer program compatible with a laser nephelometer

The laser nephelometer data system was updated to provide magnetic tape recording of data, and real time or near real time processing of data to provide particle size distribution and liquid water content. Digital circuits were provided to interface the laser nephelometer to a Data General Nova 1200 minicomputer. Communications are via a teletypewriter. A dual Linc Magnetic Tape System is used for program storage and data recording. Operational programs utilize the Data General Real-Time Operating System (RTOS) and the ERT AIRMAP Real-Time Operating System (ARTS). The programs provide for acquiring data from the laser nephelometer, acquiring data from auxiliary sources, keeping time, performing real time calculations, recording data and communicating with the teletypewriter.

Paroskie, R. M.↗

Performance impacts of look-ahead execution in the conversation scheme

The look-ahead execution approach, which allows participant processes that exist early to exit from a conversation before other participants finish their conversation activities, is presented here as a fundamental approach to reducing the synchronization overhead. Queuing network models are developed for systems operating under the basic conversation execution scheme and systems operating under the look-ahead execution scheme. Based on the models, various performance indicators such as the system throughput, the average number of processors idling inside a conversation due to the synchronization required, and the average time spent in conversation are evaluated numerically for different application environments. The results provide insights into the extent of benefits provided by the look-ahead execution approach.

Kim, K. H.↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Function (POIF) is increasing, via the High Operations Tempo (HOT) initiative, its ability to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's need to support this increased crew presence mandated the need for a series of software tools to better handle the increasing pace of payload science operations. The overall need was clear from the outset, but the full scope and user experience for each tool, were not as well understood, so establishing a fixed set of initial requirements was not feasible. An Agile Software Development (ASD) paradigm takes advantage of uncertainty, and plans for it, so it was deemed the most appropriate approach to create room for exploring novel concepts, and to mount a rapid and flexible response to inevitiably changing requirements. It facilitated the need for unprecedented collaboration between the Product Team (i.e. users from the Flight Control Team) and the Development Team (i.e. POIC systems engineers, developers, testers). This is a process shift in the development, test, and release of software from one that is prescriptive to one that is adaptive, which is necessary for these tools to have longevity. The application of ASD to the product development lifecycle permitted the timely incorporation of customer feedback, and, allowed for continuous quality improvements. This resulted in a suite of tools that are efficient, user-friendly, and enable POIF ground systems to support the increasing pace of payload science operations. ASD is not as much a set of prescriptive processes as it is a shift in mindset; one that moves from planning against change, to planning for change, thereby iteratively growing software towards user-defined value.

Albers, Cerese M.↗

Operations management system advanced automation: Fault detection isolation and recovery prototyping

The purpose of this project is to address the global fault detection, isolation and recovery (FDIR) requirements for Operation's Management System (OMS) automation within the Space Station Freedom program. This shall be accomplished by developing a selected FDIR prototype for the Space Station Freedom distributed processing systems. The prototype shall be based on advanced automation methodologies in addition to traditional software methods to meet the requirements for automation. A secondary objective is to expand the scope of the prototyping to encompass multiple aspects of station-wide fault management (SWFM) as discussed in OMS requirements documentation.

Hanson, Matt↗

NASA Centennial Challenge: 3D Printed Habitat, Phase 3 Final Results

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Construction↗

Nasa Centennial Challenge: Three Dimensional (3d) Printed Habitat, Phase 3

NASA's Centennial Challenges program uses prize competitions with the goal of accelerating innovation in the aerospace industry. Competitions in the Centennial Challenges portfolio have previously focused on advancements in space robotics, regolith excavation, bio-printing, astronaut suit design, small satellites, and solar-powered vehicles. NASA's Three Dimensional (3D) Printed Habitat Centennial Challenge represents a partnership between NASA and the non-profit partner: Bradley University, with co-sponsors Caterpillar, Bechtel, Brick and Mortar Ventures, the American Concrete Institute, and the United States Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) to spur development in automated additive construction technologies. The challenge asks teams to design and construct a scaled and simulated Martian habitat using indigenous materials and large scale 3D automated printing systems. Phase 1 of the competition, held in 2015, was an architectural design competition for habitat concepts that could be 3D printed. Phase 2, completed in 2017, asked teams to develop feedstocks from indigenous materials and hydrocarbon polymer recyclables, and demonstrate automated printing systems to manufacture these feedstocks into test specimens to assess mechanical strength. This paper will discuss the Phase 3 competition, focusing on technology outcomes that can potentially be infused into both terrestrial and planetary construction applications. The Phase 3 competition was divided into two sub-competitions: 1) virtual construction, where teams created a high fidelity building information model (BIM) of their 3D-printed habitat design and 2) the construction competition, which required teams to 3D print a structural foundation and subject materials samples to freeze/thaw testing and impact testing (level 1), produce a habitat element and complete a hydrostatic test (level 2), and additively manufacture a 1:3 scale habitat onsite in a head to head competition at Caterpillar, inc.'s Edwards Demonstration & Learning Center near Peoria, Illinois over the course of three days (level 3). While the Phase 2 competition focused primarily on the development of novel feedstocks and robotic printing systems, Phase 3 emphasized the scale-up of these systems and autonomous operation (demonstrating the capability to operate systems on precursor missions prior to the arrival of crew, or terrestrially in field operation settings where human tending of a manufacturing system may be limited). The Phase 3 virtual construction levels yielded a number of novel habitat designs, including both modular habitats and vertically-oriented habitat concepts. The Phase 3 construction competition also challenged teams to autonomously place penetrations and interfacing elements in additively manufactured structures. The paper will emphasize potential applications for the new materials and technologies developed under the umbrella of the competition within NASA's portfolio and in Earth-based applications such as disaster response and infrastructure improvement.

Centennial challenge↗

Payload operation television system

The TV system assembled is intended for laboratory experimentation which would develop operational techniques and lead to the design of space-borne TV equipment whose purpose would be to assist the astronaut-operator aboard a space station to load payload components. The TV system assembled for this program is a black and white, monocular, high performance system. The equipment consists principally of a good quality TV camera capable of high resolving power; a TV monitor; a sync generator for driving camera and monitor; and two pan/tilt units which are remotely controlled by the operator. One pan/tilt unit provides control of the pointing of the camera, the other similarly controls the position of a simulated payload.

Source record↗

An Overview of ANN Application in the Power Industry

The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.

artificial neural networks ANN electric power syst↗

Program For Parallel Discrete-Event Simulation

User does not have to add any special logic to aid in synchronization. Time Warp Operating System (TWOS) computer program is special-purpose operating system designed to support parallel discrete-event simulation. Complete implementation of Time Warp mechanism. Supports only simulations and other computations designed for virtual time. Time Warp Simulator (TWSIM) subdirectory contains sequential simulation engine interface-compatible with TWOS. TWOS and TWSIM written in, and support simulations in, C programming language.

Beckman, Brian C.↗

Queueing Network Models for Parallel Processing of Task Systems: an Operational Approach

Computer performance modeling of possibly complex computations running on highly concurrent systems is considered. Earlier works in this area either dealt with a very simple program structure or resulted in methods with exponential complexity. An efficient procedure is developed to compute the performance measures for series-parallel-reducible task systems using queueing network models. The procedure is based on the concept of hierarchical decomposition and a new operational approach. Numerical results for three test cases are presented and compared to those of simulations.

Mak, Victor W. K.↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

OAO ground system and operations

OAO for observations of stars, galaxies, planets and nebulae, discussing ground system and men and data systems integration

Osler, S. J.↗

PILOT: An intelligent distributed operations support system

The Real-Time Data System (RTDS) project is exploring the application of advanced technologies to the real-time flight operations environment of the Mission Control Centers at NASA's Johnson Space Center. The system, based on a network of engineering workstations, provides services such as delivery of real time telemetry data to flight control applications. To automate the operation of this complex distributed environment, a facility called PILOT (Process Integrity Level and Operation Tracker) is being developed. PILOT comprises a set of distributed agents cooperating with a rule-based expert system; together they monitor process operation and data flows throughout the RTDS network. The goal of PILOT is to provide unattended management and automated operation under user control.

Rasmussen, Arthur N.↗

Multiagent Modeling and Simulation in Human-Robot Mission Operations Work System Design

This paper describes a collaborative multiagent modeling and simulation approach for designing work systems. The Brahms environment is used to model mission operations for a semi-autonomous robot mission to the Moon at the work practice level. It shows the impact of human-decision making on the activities and energy consumption of a robot. A collaborative work systems design methodology is described that allows informal models, created with users and stakeholders, to be used as input to the development of formal computational models.

Sierhuis, Maarten↗

Space Operations Center system analysis study extension. Volume 2: Programmatics and cost

A summary of Space Operations Center (SOC) orbital space station costs, program options and program recommendations is presented. Program structure, hardware commonality, schedules and program phasing are considered. Program options are analyzed with respect to mission needs, design and technology options, and anticipated funding constraints. Design and system options are discussed.

Source record↗

Systems and operations - Living with complexity and growth

Since the space station concept currently being developed by NASA calls for system updates and additions over a period of at least ten years following launch, attention must be given to the interfaces between station elements. Efforts have begun to develop generic fault detection, isolation, and correction techniques that could simplify on-orbit operations, maintenance and repair. An integrated hydrogen-oxygen system has been identified as the feature promising the greatest reduction in resupply costs. Scavenging excess fuel from the Space Shuttle's internal and external tanks, and using leftover Shuttle payload for fluid tankage, could supply hydrogen and oxygen for consumption in the form of propellants, fuel cell electricity, and life support gases. Advancements in cryogenic fluid management and storage technology are the keys to the design of this integrated system. Attention is given to the Interactive Design and Evaluation of Advanced Spacecraft computer-aided design and analysis system, which allows system engineers to study the integration problems presented by 40 technical modules.

Hook, W. R.↗