Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scenario planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.↗

Application of heuristic satellite plan synthesis algorithms to requirements of the WARC-88 allotment plan

Creation of an Allotment Plan for the Fixed Satellite Service at the 1988 Space World Administrative Radio Conference (WARC) represented a complex satellite plan synthesis problem, involving a large number of planned and existing systems. Solutions to this problem at WARC-88 required the use of both automated and manual procedures to develop an acceptable set of system positions. Development of an Allotment Plan may also be attempted through solution of an optimization problem, known as the Satellite Location Problem (SLP). Three automated heuristic procedures, developed specifically to solve SLP, are presented. The heuristics are then applied to two specific WARC-88 scenarios. Solutions resulting from the fully automated heuristics are then compared with solutions obtained at WARC-88 through a combination of both automated and manual planning efforts.

Heyward, Ann O.↗

2023 Standard Scenarios Report: A U.S. Electricity Sector Outlook

This report, originally published in December 2023, has been revised in January 2024. There were three changes in the revision. First, Anthony Lopez was added as a contributing author, as he had been erroneously omitted in the original publication. Second, in appendix section A.1 the cost of upgrading a hydrogen combustion turbine from a natural gas turbine was erroneously reported as 20% when it should have been 33%. Lastly, appendix Figure A-8 was erroneously a duplication of the same figure from the Standard Scenarios 2022, it has now been updated to reflect this year’s data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA/MOD Operations Impacts from Shuttle Program

Operations plays a pivotal role in the success of any human spaceflight program. This paper will highlight some of the core tenets of spaceflight operations from a systems perspective and use several examples from the Space Shuttle Program to highlight where the success and safety of a mission can hinge upon the preparedness and competency of the operations team. Further, awareness of the types of operations scenarios and impacts that can arise during human crewed space missions can help inform design and mission planning decisions long before a vehicle gets into orbit. A strong operations team is crucial to the development of future programs; capturing the lessons learned from the successes and failures of a past program will allow for safer, more efficient, and better designed programs in the future. No matter how well a vehicle is designed and constructed, there are always unexpected events or failures that occur during space flight missions. Preparation, training, real-time execution, and troubleshooting are skills and values of the Mission Operations Directorate (MOD) flight controller; these operational standards have proven invaluable to the Space Shuttle Program. Understanding and mastery of these same skills will be required of any operations team as technology advances and new vehicles are developed. This paper will focus on individual Space Shuttle mission case studies where specific operational skills, techniques, and preparedness allowed for mission safety and success. It will detail the events leading up to the scenario or failure, how the operations team identified and dealt with the failure and its downstream impacts. The various options for real-time troubleshooting will be discussed along with the operations team final recommendation, execution, and outcome. Finally, the lessons learned will be summarized along with an explanation of how these lessons were used to improve the operational preparedness of future flight control teams.

Fitzpatrick, Michael↗

Traverse Planning Experiments for Future Planetary Surface Exploration

This paper describes the results of a recent (July-August 2010 and July 2011) planetary surface traverse planning experiment. The purpose of this experiment was to gather data relevant to robotically repositioning surface assets used for planetary surface exploration. This is a scenario currently being considered for future human exploration missions to the Moon and Mars. The specific scenario selected was a robotic traverse on the lunar surface from an outpost at Shackleton Crater to the Malapert Massif. As these are exploration scenarios, the route will not have been previously traversed and the only pre-traverse data sets available will be remote (orbital) observations. Devon Island was selected as an analog location where a traverse route of significant length could be planned and then traveled. During the first half of 2010, a team of engineers and scientists who had never been to Devon Island used remote sensing data comparable to that which is likely to be available for the Malapert region (eg., 2-meter/pixel imagery, 10-meter interval topographic maps and associated digital elevation models, etc.) to plan a 17-kilometer (km) traverse. Surface-level imagery data was then gathered on-site that was provided to the planning team. This team then assessed whether the route was actually traversable or not. Lessons learned during the 2010 experiment were then used in a second experiment in 2011 for which a much longer traverse (85 km) was planned and additional surface-level imagery different from that gathered in 2010 was obtained for a comparative analysis. This paper will describe the route planning techniques used, the data sets available to the route planners and the lessons learned from the two traverses planned and carried out on Devon Island.

Hoffman, S. J.↗

Transforming Energy Through Computational Excellence: A Virtual Test-Drive of Energy Scenarios

Researchers at the National Renewable Energy Laboratory (NREL) are conducting groundbreaking research to decarbonize transportation systems and reduce emissions. As they plan for growing populations and related demands on aging infrastructure and energy systems, local transportation departments and city planners are facing significant, complex challenges. New approaches to planning and operations, as well as capitalizing on rapidly advancing technology, can address mobility and energy-centric challenges, including cost and energy efficiency, emissions reduction, decarbonization, and congestion.

33 ADVANCED PROPULSION SYSTEMS↗

Region based route planning - Multi-abstraction route planning based on intermediate level vision processing

Intermediate and high level processing operations are performed on vision data for the organization of images into more meaningful, higher-level topological representations by means of a region-based route planner (RBRP). The RBRP operates in terrain scenarios where some or most of the terrain is occluded, proceeding without a priori maps on the basis of two-dimensional representations and gradient-and-roughness information. Route planning is accomplished by three successive abstractions and yields a detailed point-by-point path by searching only within the boundaries of relatively small regions.

Doshi, Rajkumar S.↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

NASA analysis of space mission options for the 2025 planetary defense conference hypothetical asteroid impact threat scenario

The 2025 Planetary Defense Conference (PDC) hypothetical asteroid impact threat exercise is being conducted in coordination with the United Nations-endorsed Space Mission Planning Advisory Group (SMPAG), exercising SMPAG's processes for assessing space mission options and communicating to decision makers. Here, in this paper, we describe the work performed by our NASA-led team and present the results we contributed to the SMPAG effort for the exercise. Our NASA-led team assessed mission options for asteroid reconnaissance (flyby and rendezvous), deflection, and robust disruption using several viable techniques: kinetic impactors, ion beam deflection, and nuclear explosive devices. Our simulations and analyses considered how much change-in-velocity an asteroid can tolerate before fragmentation onset, and we worked towards establishing requirements for robustly disrupting an asteroid. Heuristics informed by the simulation results are incorporated into optimization of deflection and disruption mission campaign options. Finally, we make some observations about useful generalizations from these results with potential applicability to any planetary defense scenario.

Asteroid deflection↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Major Impact of Fleet Renewal Over Airports Located in the Most Important Region of Brazil

The present article discusses and analyses the major impacts of the Brazilian carriers fleet renewal regarding Brazilian airport infrastructure in the most important region of the country, the Southeast (SE). A brief historical overview of the country's airline fleet will be presented, demonstrating the need for its renewal (m fact, Brazilian carriers started a major fleet renewal program m the last five years), while analyzing the periods in which a new breed of aircraft was put into service by the major carriers operating in the SE region. The trend of operating the classic regional jets plus the forthcoming entry into service of the "large regional jets" (LRJ, 70-115 seaters) in several point-to-point routes are presented along with the country's carriers" reality of operating these former aircraft in several high-capacity and medium-range routes. The article will focus on the ability of four of the major Southeast's airports to cope with the fleet modernization, mainly due to the fact that the region studied is the most socioeconomic developed, by far, with the largest demand for air transportation, thus making the impacts much more perceptible for the communities and the airport management involved. With the emergence of these impacts, several new projects and investments are being discussed and pushed forward, despite budgetary constrains being a reality in almost every Brazilian city, even in the SE region. In view of this, the paper presents how the general planning could be carried out in order to adapt the airports' infrastructures in function of the proposed (and in some cases, necessary) fleet renewal. Ultimately, we will present the present picture and two future scenarios m order to determine the level of service in the existent passenger terminal facilities in the wake of the possible operation of several new aircraft. Keywords: Airline fleet planning, Airport planning, Regional development, Regional Jets.

Maters, Rafael Waltz↗

Securing Distributed Energy Resource Integration

The penetration of distributed energy resources (DER) is growing at much higher rates than predicted 20 years ago. Far from being used only in residential settings, DER are now installed on distribution and transmission circuits. In this position, they do not have the same properties as traditional generators and are more flexible in many cases. The growing penetration and range of uses for DER motivate the need to reliably and safely integrate them into the grid. Operators must be able to rely on them not only for normal operation, but also during abnormal conditions like black starts or adverse cyber scenarios. To that end, we study the communications, device interfaces, and potential consequences of DER operation under abnormal and adversarial conditions. The weaknesses of communications networks are studied based on the industrial protocols used, and the benefits of security features are examined. The device interfaces are found to be vulnerable to attack based on the requirements in the IEEE-1547 standard for DER interconnection and interoperability, which is expected to be adopted in the next ten years. In addition to exploring the requirements of the standard, we show that these vulnerabilities and others do exist and can be used maliciously in a modern storage system DER. Consequences of these vulnerabilities range from exacerbated grid instability, to simultaneous loss of large portions of DER penetration, to physical damage to inverters or DER themselves and other sensitive equipment. We tie these outcomes to specific attacker actions in an effort to give operators a better threat intelligence view that allows them to prioritize mitigations. Finally, we discuss mitigations that could prevent many of the adversarial scenarios described. Some solutions can be added to existing infrastructure, while others may require longer term planning for grid modernization with consideration for security.

25 ENERGY STORAGE↗

Status Report on Design of In-situ Thermomechanical Testing at LANSCE

Nuclear fuel encounters severe thermomechanical environments in which its mechanical response is determined by its microstructure, temperature and stress level histories. Simulating the response of such microstructures is crucial for predicting both performance and transient fuel mechanical responses and experimental verification of such predictions is therefore of great interest. While most of the deformation in a nuclear fuel rod occurs in the cladding, deformation of the fuel itself is still of interest with deformation mechanisms at operating temperature and above including creep, swelling, cracking as well as pellet-clad interaction. Characterization of these properties and understanding of the underlying deformation phenomena at operating or excursion temperatures is therefore of great importance for development and ultimately licensing of improved and novel nuclear fuel forms. Diffraction techniques offer unique insight on the atomistic (e.g. crystal structure) and microstructure (e.g. phase transformations, texture, defects) length scales and have a long history of providing unique data to inform relevant deformation models that enable the required predictive capabilities. For example, dislocations lead to diffraction peak broadening that can be characterized to estimate the dislocation density and study the role of dislocations on the deformation while measuring lattice strains allows to studie load sharing in two phase materials. In this report the requirements for a sample environment for high temperature deformation of nuclear fuels are defined. The HIPPO neutron time-of-flight diffractometer at LANSCE will host this sample environment and is also described. This instrument covers diffraction angles from 140° to 40° and is also equipped with an event-mode neutron imaging detector system, enabling energy-resolved neutron imaging in parallel with the diffraction that could measure sample temperature from Doppler broadening of neutron absorption resonances or measure pore densities from changes in the attenuation. Designs of devices to characterize thermomechanical properties of nuclear fuel without diffraction are also considered to guide the design. While this report is focused on applications for nuclear fuels, the device can also characterize cladding, moderator or structural materials and therefore contribute to other fields of research and development for advanced reactors. The temperatures planned to be reached are above 2000℃, thus enabling characterization of LWR reactor fuels under accident scenarios but also reaching temperatures of fuels developed for nuclear thermal propulsion and providing opportunities to characterize those. In conjunction with the energy-resolved neutron imaging detector, this setup would allow to measure neutron cross-sections at high temperatures, filling a gap towards development of reactors operating at high temperatures.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Operational Methodology for the International Space Station (ISS) High Rate Communications Outage Recorder (HCOR)

The HCOR will be used onboard the ISS to record digital data during Ku-band Loss of Signal (LOS) periods. This recorded data will be played back to the ground during Ku-band Acquisition of Signal (AOS) periods. The Data Management (DM) Team at the Payload Operations and Integration Center is the primary operator of this complex recorder. The record and playback capabilities - along with the memory management functions - are presented in this paper. To illustrate how the DM Team plans to manage the record, playback and memory management tasks of operating the HCOR, an operational scenario for a ninety-minute orbit is presented.

Mixson, C. David↗

Cooperative Collision Avoidance Step 1 - Technology Demonstration Flight Test Report. Revision 1

The National Aeronautics and Space Administration (NASA) Access 5 Project Office sponsored a cooperative collision avoidance flight demonstration program for unmanned aircraft systems (UAS). This flight test was accomplished between September 21st and September 27th 2005 from the Mojave Airport, Mojave, California. The objective of these flights was to collect data for the Access 5 Cooperative Collision Avoidance (CCA) Work Package simulation effort, i.e., to gather data under select conditions to allow validation of the CCA simulation. Subsequent simulation to be verified were: Demonstrate the ability to detect cooperative traffic and provide situational awareness to the ROA pilot; Demonstrate the ability to track the detected cooperative traffic and provide position information to the ROA pilot; Demonstrate the ability to determine collision potential with detected cooperative traffic and provide notification to the ROA pilot; Demonstrate that the CCA subsystem provides information in sufficient time for the ROA pilot to initiate an evasive maneuver to avoid collision; Demonstrate an evasive maneuver that avoids collision with the threat aircraft; and lastly, Demonstrate the ability to assess the adequacy of the maneuver and determine that the collision potential has been avoided. The Scaled Composites, LLC Proteus Optionally Piloted Vehicle (OPV) was chosen as the test platform. Proteus was manned by two on-board pilots but was also capable of being controlled from an Air Vehicle Control Station (AVCS) located on the ground. For this demonstration, Proteus was equipped with cooperative collision sensors and the required hardware and software to place the data on the downlink. Prior to the flight phase, a detailed set of flight test scenarios were developed to address the flight test objectives. Two cooperative collision avoidance sensors were utilized for detecting aircraft in the evaluation: Traffic Alert and Collision Avoidance System-II (TCAS-II) and Automatic Dependent Surveillance Broadcast (ADS-B). A single intruder aircraft was used during all the flight testing, a NASA Gulfstream III (G-III). During the course of the testing, six geometrically different near-collision scenarios were evaluated. These six scenarios were each tested using various combinations of sensors and collision avoidance software. Of the 54 planned test points 49 were accomplished successfully. Proteus flew a total of 21.5 hours during the testing and the G-III flew 19.8 hours. The testing fully achieved all flight test objectives. The Flight IPT performed an analysis to determine the accuracy of the simulation model used to predict the location of the host aircraft downstream during an avoidance maneuver. The data collected by this flight program was delivered to the Access 5 Cooperative Collision Avoidance (CCA) Work Package Team who was responsible for reporting on their analysis of this flight data.

Trongale, Nicholas A.↗

EVs@Scale Deep Dive - SCM/VGI (Day 1: SCM/VGI Analysis)

The U.S. Department of Energy (DOE) Electric Vehicles at Scale Laboratory Consortium (EVs@Scale Lab Consortium) is accelerating research to support the establishment of a secure and scalable national network of charging infrastructure. Critical to this effort is an understanding of the potential grid impacts of EV charging and possible smart charge management (SCM) or vehicle-grid integration (VGI) capabilities that could mitigate these impacts. The EVs@Scale SCM/VGI Pillar is analyzing the impacts of EV charging and developing and demonstrating the capabilities of both SCM and VGI with many different vehicle use cases and grid scenarios. This Deep Dive Discussion from year 1 of the project encompasses the progress and future plans for the analysis components of the FUSE (Flexible charging to Unify the grid and transportation Sectors for Evs at scale) project.

ADVANCED PROPULSION SYSTEMS↗

EVs@Scale Deep Dive - SCM/VGI (Day 2: SCM/VGI Demonstration)

The U.S. Department of Energy (DOE) Electric Vehicles at Scale Laboratory Consortium (EVs@Scale Lab Consortium) is accelerating research to support the establishment of a secure and scalable national network of charging infrastructure. Critical to this effort is an understanding of the potential grid impacts of EV charging and possible smart charge management (SCM) or vehicle-grid integration (VGI) capabilities that could mitigate these impacts. The EVs@Scale SCM/VGI Pillar is analyzing the impacts of EV charging and developing and demonstrating the capabilities of both SCM and VGI with many different vehicle use cases and grid scenarios. This Deep Dive Discussion from year 1 of the project encompasses the progress and future plans for the demonstration components of the FUSE (Flexible charging to Unify the grid and transportation Sectors for Evs at scale) project.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗