Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Replacement of HCFC-225 Solvent for Cleaning NASA Propulsion Oxygen Systems

Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon‐113 (CFC‐113) was banned, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon hydrochlorofluorocarbon‐225 (HCFC‐225) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of HCFC‐225, a Class II ODS, was prohibited by the Clean Air Act. In 2012 through 2014, leveraging resources from both the NASA Rocket Propulsion Test Program and the Defense Logistics Agency ‐ Aviation Hazardous Minimization and Green Products Branch, test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a replacement for HCFC‐225 that is both an effective cleaner and safe for use with oxygen systems. Candidate solvents were selected and a test plan was developed following the guidelines of ASTM G127, Standard Guide for the Selection of Cleaning Agents for Oxygen Systems. Solvents were evaluated for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Two solvents were determined to be acceptable for cleaning oxygen systems and one was chosen for implementation at NASA's rocket propulsion test facilities. The test program and results are summarized. This project also demonstrated the benefits of cross‐agency collaboration in a time of limited resources.

Mitchell, Mark A.↗

MO-D-213-06: Quantitative Image Quality Metrics Are for Physicists, Not Radiologists: How to Communicate to Your Radiologists Using Their Language

Purpose: A framework for explaining differences in image quality to non-technical audiences in medial imaging is needed. Currently, this task is something that is learned “on the job.” The lack of a formal methodology for communicating optimal acquisition parameters into the clinic effectively mitigates many technological advances. As a community, medical physicists need to be held responsible for not only advancing image science, but also for ensuring its proper use in the clinic. This work outlines a framework that bridges the gap between the results from quantitative image quality metrics like detectability, MTF, and NPS and their effect on specific anatomical structures present in diagnostic imaging tasks. Methods: Specific structures of clinical importance were identified for a body, an extremity, a chest, and a temporal bone protocol. Using these structures, quantitative metrics were used to identify the parameter space that should yield optimal image quality constrained within the confines of clinical logistics and dose considerations. The reading room workflow for presenting the proposed changes for imaging each of these structures is presented. The workflow consists of displaying images for physician review consisting of different combinations of acquisition parameters guided by quantitative metrics. Examples of using detectability index, MTF, NPS, noise and noise non-uniformity are provided. During review, the physician was forced to judge the image quality solely on those features they need for diagnosis, not on the overall “look” of the image. Results: We found that in many cases, use of this framework settled mis-agreements between physicians. Once forced to judge images on the ability to detect specific structures inter reader agreement was obtained. Conclusion: This framework will provide consulting, research/industrial, or in-house physicists with clinically relevant imaging tasks to guide reading room image review. This framework avoids use of the overall “look” or “feel” to dictate acquisition parameter selection. Equipment grants GE Healthcare.

60 APPLIED LIFE SCIENCES↗

Phase C/D program development plan. Volume 1: Program plan

The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

Source record↗

Shutter Interaction Study

The deployment, transport, and exchange procedures for the SOC logistics module and for logistics modules/cradles envisioned to support both the flight support facilities operation and the space construction operation were developed. The use of a holding and positioning aid device was determined to be the most desirable arrangement for the parking/holding of the modules during this exchange operation. The capability/feasibility of transporting eight crew members in the orbiter to and from the SOC was analyzed. Two arrangements were defined for this operation: (1) with the airlock in the orbiter cabin, and (2) with no airlock in the cabin.

Source record↗

STS-81 Flight Day 7

On this seventh first day of the STS-81 mission, the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and John Blaha, and the cosmonauts of the Russian Space Station Mir continue to transfer hundreds of pounds of water, supplies, and logistical items to each other's spacecraft. More than 1,300 pounds of water have now been transferred from Atlantis to the Mir to resupply the Russian outpost, along with equipment that will be used by astronaut Jerry M. Linenger during his four-month research mission. A bioprocessing device and an experiment used to grow cartilage cells during astronaut John Blaha's four month stay on the Mir is also transferred to Atlantis for the trip back to Earth. Linenger spends most of the day collecting water samples from the Mir for analysis back on Earth and Blaha continues to exercise on a treadmill on the Mir to stay in shape for his return to Earth and a readaptation to gravity after four months of weightlessness.

Source record↗

STS-108 Mission Highlights Resource Tape

This video is a continuation of 'STS-108 Mission Highlights Resource Tape: Part 1 of 3' (Internal ID 2002049331). Flight day four footage continues with a video tour of the International Space Station (ISS). During flight day five, an exterior view of the Multipurpose Logistics Module (MPLM) is seen, followed by the crew unloading the supplies and equipment from the MPLM. Commander Dominic Gorie and Mission Specialist Linda Godwin are seen making preparations for the Extravehicular Activity (EVA) scheduled for the following day. Footage of an exterior view of the ISS is also shown. Flight day six footage includes Godwin and Mission Specialist Daniel Tani suiting up for their EVA and the installation of thermal blankets around the solar array wings of the ISS. Expedition 3 Commander Frank Culbertson is seen working in the ISS laboratory during flight day seven. Views are shown of Saudi Arabia and the Red Sea, the western coast of Australia, Cuba and Florida, and Switzerland and Northern Italy. During flight day eight, the crew is seen stowing objects in the MPLM for return to earth. The video concludes with footage of the treadmill used by the astronauts for physical exercise. Flight days nine through twelve are included in 'STS-108 Mission Highlights Resource Tape: Part 3 of 3' (Internal ID 2002049329).

Source record↗

Risk Reduction for Use of Complex Devices in Space Projects

We present guidel!nes to reduce risk to an acceptable level when using complex devices in space applications. Application to Virtex 4 Field Programmable Gate Array (FPGA) on Express Logistic Carrier (ELC) project is presented.

Berg, Melanie↗

On-Orbit Maintenance Operations Strategy for the International Space Station - Concept and Implementation

The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

Patterson, Linda P.↗

Space shuttle solid rocket booster cost-per-flight analysis technique

A cost per flight computer model is described which considers: traffic model, component attrition, hardware useful life, turnaround time for refurbishment, manufacturing rates, learning curves on the time to perform tasks, cost improvement curves on quantity hardware buys, inflation, spares philosophy, long lead, hardware funding requirements, and other logistics and scheduling constraints. Additional uses of the model include assessing the cost per flight impact of changing major space shuttle program parameters and searching for opportunities to make cost effective management decisions.

Forney, J. A.↗

The Design, Planning and Control of Robotic Systems in Space

In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.

Dubowsky, Steven↗

The Design, Planning and Control of Robotic Systems in Space

In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating, the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics. This program was proposed and accepted as a three year research program, a period of time necessary to make the type of fundamental developments to make a significant contributions to space robotics. Unfortunately, less than a year into the program it became clear that the NASA Langley Research Center would be forced by budgetary constraints to essentially leave this area of research. As a result, the total funding we received under this grant represented approximately one year of the original, proposed and approved, funding. For some time, there was substantial uncertainty that even this very reduced level of funding would be provided. The spending of the reduced available funds was spread just over two years to provide the support to permit the MS students who had joined the program to receive their master's degree and terminate their studies in this area.

Dubowsky, Steven↗

International Space Station General Resource Reel

The construction and evolution of the International Space Station (ISS) is seen through various clips. Live footage shows the following: (1) the Zarya Module under construction and during launch preparations; (2) the Unity Module under construction, during launch preparations, and being lowered into the payload canister; (3) STS-88 Mission Specialists Jerry Ross and Jim Newman during training for their spacewalks, including activities in the Neutral Buoyancy Laboratory (NBL); (4) Zarya and Unity docking to the Service Module; (5) the Expedition 1 crew (William Shepherd, Yuri Gidzenko, and Sergei Krikalev) during emergency escape training in the Black Sea and during water survival training at Johnson Space Center; (6) the X-38 Crew Return Vehicle Drop Test; and (7) the US Destiny Laboratory Module, Pressurized Mating Adapter (PMA), Service Module, Italian Multi-Purpose Logistics Module, US Airlock, and US Habitation Module under construction. Computerized animations show the following: (1) an ISS fly-around; (2) the STS-88 Space Shuttle as it docks with Zarya and attaches Zarya to the Unity Module; (3) the Space Shuttle as it docks with ISS and installs the Z1 truss segment and PMA; (4) the Soyuz spacecraft as it docks with ISS; (5) interior and exterior views of the Columbus Attached Pressurized Module; and (6) a Transhab animation showing the interior and exterior and marking the components.

Source record↗

Japanese experiment module (JEM)

Japanese hardware elements studied during the definition phase of phase B are described. The hardware is called JEM (Japanese Experiment Module) and will be attached to the Space Station core. JEM consists of a pressurized module, an exposed facility, a scientific/equipment airlock, a local remote manipulator, and experimental logistic module. With all those hardware elements JEM will accommodate general scientific and technology development research (some of the elements are to utilize the advantage of the microgravity environment), and also accommodate control panels for the Space Station Mobile Remote Manipulator System and attached payloads.

Kato, T.↗

Comparison of Spares Logistics Analysis Techniques for Long Duration Human Spaceflight

As the durations and distances involved in human exploration missions increase, the logistics associated with the repair and maintenance becomes more challenging. Whereas the operation of the International Space Station (ISS) depends upon regular resupply from the Earth, this paradigm may not be feasible for future missions. Longer mission durations result in higher probabilities of component failures as well as higher uncertainty regarding which components may fail, and longer distances from Earth increase the cost of resupply as well as the speed at which the crew can abort to Earth in the event of an emergency. As such, mission development efforts must take into account the logistics requirements associated with maintenance and spares. Accurate prediction of the spare parts demand for a given mission plan and how that demand changes as a result of changes to the system architecture enables full consideration of the lifecycle cost associated with different options. In this paper, we utilize a range of analysis techniques - Monte Carlo, semi-Markov, binomial, and heuristic - to examine the relationship between the mass of spares and probability of loss of function related to the Carbon Dioxide Removal System (CRS) for a notional, simplified mission profile. The Exploration Maintainability Analysis Tool (EMAT), developed at NASA Langley Research Center, is utilized for the Monte Carlo analysis. We discuss the implications of these results and the features and drawbacks of each method. In particular, we identify the limitations of heuristic methods for logistics analysis, and the additional insights provided by more in-depth techniques. We discuss the potential impact of system complexity on each technique, as well as their respective abilities to examine dynamic events. This work is the first step in an effort that will quantitatively examine how well these techniques handle increasingly more complex systems by gradually expanding the system boundary.

Owens, Andrew↗

Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 1: User's guide

An interactive computer program for automatically generating traffic models for the Space Transportation System (STS) is presented. Information concerning run stream construction, input data, and output data is provided. The flow of the interactive data stream is described. Error messages are specified, along with suggestions for remedial action. In addition, formats and parameter definitions for the payload data set (payload model), feasible combination file, and traffic model are documented.

Dupnick, E.↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗

ISS Safety Requirements Documents: International Space Station Program (Baseline)

The International Space Station (ISS) Program (ISSP) establishes the technical requirements for the safe design, development, test and operation of end items. End items include, but are not limited to: ISS hardware/elements (inclusive of Contractor Furnished Equipment (CFE) and Government Furnished Equipment (GFE)), payload/science hardware, Visiting Vehicles (VV), logistics, crew psychological support items, tools, spare instruments and assemblies, including waste. SSP 41000, System Specification for the International Space Station, provides performance and design requirements for ISS and contains many ISS level safety and design requirements that must be considered when developing end item specification documents for ISS end items. SSP 51721, ISS Safety Requirements, exists to further define the safety requirements to be applied to end items developed for ISS

ISS↗

A Crew and Logistics Lander for the Common Habitat Architecture

The Common Habitat Architecture is a conceptual study that explores the use of a large habitat derived from the Space Launch System (SLS) liquid oxygen tank as a core habitation element that can be used for crew missions or training in 0g, 1/6g, 3/8g, and 1g. This is not part of current NASA Artemis mission planning, but instead represents an architecture that could potentially follow after the Artemis missions and initial human Mars landings. This architecture leverages Starship-derived vehicles for crew landing on and ascent from the Moon and Mars in support of long-duration surface missions with pressurized crew transfer baselined as a nominal capability. This is not the Human Landing System variant of Starship but represents a number of modifications to enable long-duration surface missions with an eight-person crew size. A rapid brainstorming study was conducted in February of 2021, using only public data, to identify options to deliver the 90-ton Common Habitat to the surface and emplace it at the intended habitation site. This study compared three lunar lander concepts and three Mars lander concepts before ultimately selecting the SpaceX Starship as the most viable lander. The Common Habitat Architecture assumes that this Starship variant can further be modified for crew and cargo delivery, assuming that the use of a common system will lead to cost benefits. It is assumed that the Starship will expend too much propellant in landing crew and logistics to be able to launch, given the assumed absence of surface propellant production. Consequently, a separable ascent stage is used for crew ascent. The pressurized elements of this modified Starship are discussed: Starship Ascent Module, Airlock, Transfer Tunnel, Pressurized Crew Transfer Module, and Logistics Modules. For each element, a description, dimensions, rough mass estimates, core capabilities, and design features are presented. Key mechanisms and internal structures of the starship are also discussed. This will include flame diverters for the ascend module, the orbital docking hatch, Pressurized Crew Transfer Module Garage door, Starship Ascent Module fairing, flame diverter blow-out panels, Pressurized Crew Transfer Module lift system, logistics module lift system, contingency crew ascent via the logistics module lift system, internal catwalks, and structural interfaces. Concept of Operations will be discussed for both Moon and Mars. This will include in-space crew rendezvous and transfer, crewed landing, shirtsleeve crew transfer, crew departure, contingency surface operations, and final element disposition. Key differences for Mars will be discussed, such as the Martian atmosphere, dust storms, the absence of crew handover, and Deep Space Exploration Vehicle rendezvous. Contingency microgravity maintenance access will also be discussed. This work will demonstrate viable pressurized crew transfer with a Starship-based lander architecture. Forward work includes Garage lighting and camera systems, Starship Ascent Module propulsion system and docking port trades, contingency habitation trades, and mass/power equipment estimation. Finally, forward work includes developing a heavy cargo return system derived from the Crew and Logistics Starship. The goal of this system is the return of at least 10,000 kg payloads from the surfaces of the Moon and Mars.

Lunar Lander↗