Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SLAG”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Analysis of Monolith Cores from an Engineering Scale Demonstration of a Prospective Cast Stone Process

The primary disposition path of Low Activity Waste (LAW) at the DOE Hanford Site is vitrification. A cementitious waste form is one of the alternatives being considered for the supplemental immobilization of the LAW that will not be treated by the primary vitrification facility. Washington River Protection Solutions (WRPS) has been directed to generate and collect data on cementitious or pozzolanic waste forms such as Cast Stone. This report documents the coring and leach testing of monolithic samples cored from an engineering-scale demonstration (ES Demo) with non-radioactive simulants. The ES Demo was performed at SRNL in October of 2013 using the Scaled Continuous Processing Facility (SCPF) to fill an 8.5 ft. diameter x 3.25 ft. high container with simulated Cast Stone grout. The Cast Stone formulation was chosen from the previous screening tests. Legacy salt solution from previous Hanford salt waste testing was adjusted to correspond to the average LAW composition generated from the Hanford Tank Waste Operation Simulator (HTWOS). The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS), were obtained from Lafarge North America in Pasco, WA. In 2014 core samples originally obtained approximately six months after filling the ES Demo were tested along with bench scale molded samples that were collected during the original pour. A latter set of core samples were obtained in late March of 2015, eighteen months after completion of the original ES Demo. Core samples were obtained using a 2” diameter x 11” long coring bit. The ES Demo was sampled in three different regions consisting of an outer ring, a middle ring and an inner core zone. Cores from these three lateral zones were further segregated into upper, middle and lower vertical segments. Monolithic core samples were tested using the Environmental Protection Agency (EPA) Method 1315, which is designed to provide mass transfer rates (release rates) of inorganic analytes contained in monolithic material under diffusion controlled release conditions as a function of leaching time. Compressive strength measurements and drying tests were also performed on the 2015 samples. Leachability indices reported are based on analyte concentrations determined from dissolution of the dried samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SCM Paste Samples Exposed To Aggressive Solutions. Cementitious Barriers Partnership

This report summarizes experimental work performed by SIMCO Technologies Inc. (SIMCO) as part of the Cementitious Barriers Partnership (CBP) project. The test series followed an experimental program dedicated to the study of ordinary Portland cement (OPC) hydrated cement pastes exposed to aggressive solutions. In the present study, the scope is extended to hydrated cement pastes incorporating supplementary cementitious materials (SCM) such as fly ash and ground granulated blast furnace slag (GGBFS). Also, the range of aggressive contact solutions was expanded. The experimental program aimed at testing aggressive contact solutions that more closely mimic the chemical composition of saltstone pore solution. Five different solutions, some of which incorporated high levels of carbonate and nitrate, were placed in contact with four different hydrated cement paste mixes. In all solutions, 150 mmol/L of SO 4 2– (14 400 ppm) were present. The solutions included different pH conditions and different sodium content. Two paste mixes were equivalent to Vault 1/4 and Vault 2 concrete mixes used at SRS in storage structures. Two additional paste mixes, cast at the same water-to-cement ratio and using the same cements but without SCMs, were also tested. The damage evolution in samples was monitored using ultrasonic pulse velocity (UPV) and mass measurements. After three and twelve months of exposure conditions, samples were taken out of solution containers and analyzed to perform migration tests and porosity measurements. Globally, results were in line with the previous study and confirmed that high pH may limit the formation of some deleterious phases like gypsum. In this case, ettringite may form but is not necessarily associated with damage. However, the high concentration of sodium may be associated with the formation of an AFm-like mineral called U-phase. The most significant evidences of damage were all associated with the Vault 2 paste analog. This material proved very sensitive to high pH. All measurement techniques used to monitor and evaluate damage to samples indicated significant alterations to this mix when immersed in contact solutions containing sodium hydroxide. It was hypothesized that the low cement content, combined with high silica content coming from silica fume, fly ash and GGBFS led to the presence unreacted silica. It is possible that the pozzolanic reaction of these SCMs could not be activated due to the low alkali content, a direct consequence of low cement content. In this scenario, the material end up having a lot of silica available to react upon contact with sodium hydroxide, possibly forming a gel that may be similar to the gel formed in alkali-silica reactions. This scenario needs further experimental confirmation, but it may well explain the poor behavior of mix PV2 in presence of NaOH.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on the FY18 creep rupture and creep-fatigue tests on the first commercial heat of Alloy 709

Creep, fatigue and creep-fatigue tests were performed on the Carlson plate of Alloy 709 (ID 58776). The plate, which is the first of the commercial heats tested, was divided into several sections, each undergoing different processing conditions. The effects of processing method and solution annealing temperature were studied in FY18 to inform best procedures for the second heat. The solution annealing temperature of 1050°C was found to be unacceptable due to the grain size being smaller than allowed by the specifications, as well as generally having poor creep properties. Both argon oxygen decarburization AOD and electro-slag remeltin ESR were found to have desirable properties, and the homogenization heat treatment was found to not significantly improve the mechanical properties.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demontration of Integrated Optimization Software at the Baldwin Energy Complex

This project encompassed the design, development, and demonstration of integrated online optimization systems at Dynegy Midwest Generation's Baldwin Energy Complex (BEC) located in Baldwin, Illinois. The overall project objective was to improve coal-based generation's emission profile, efficiency, maintenance requirements and plant asset life in order to enhance the long-term viability of the United States abundant coal resources. Five separate but integrated optimization products were developed, addressing combustion, sootblowing, SCR operations, overall unit thermal performance, and plant-wide availability optimization. Optimization results are inherently unit-specific and cannot be known for a particular generating unit in advance. However, NeuCo believed that the following were reasonable targets for the completed, integrated set of products: Furnace NOx reduction improvement by 5%, Heat rate improvement by 1.5%, Increase of annual Available MWh by 1.5%, Commensurate reductions in greenhouse gases, mercury, and particulates; and Commensurate increases in profitability from lower costs, improved reliability, and greater commercial availability. The goal during Phase I was to establish each system and demonstrate their integration in unified plant optimization. Efforts during Phase I focused on: (1) developing, deploying, integrating, and testing prototypes for each of the five products; (2) identifying and addressing issues required for the products to integrate with plant operations; and (3) systematically collecting and assimilating feedback to improve subsequent product releases. As described in the Phase II continuation application NeuCo successfully achieved the goal for Phase I. The goal of Phase II was to improve upon the products installed and tested in Phase I and to quantify the benefits of the integrated system. As this report documents, NeuCo has also successfully achieved the goal for Phase II. The overall results of the project, compared with the project goals, are: (1) NOx Reduction: The 5% target for NOx reduction was exceeded with average CEMS and SCR Inlet (furnace) NOx reduction of between 12% and 14%. (2) Heat Rate Improvement: The optimization systems delivered an average heat rate improvement of between 0.67% and 0.7%. This falls short of the 1.5% heat rate improvement target largely because Cyclone Stability (availability) and CEMS and SCR Inlet NOx were prioritized over heat rate in the event they needed to be traded-off with one another. A different prioritization of objectives could have driven a different balance, thereby meeting the target of 1.5% improvement. There were also several factors that could have been masking greater heat rate improvements such as the decrease in fuel density over the course of the project and the impact of actions taken as a result of advice provided by the optimizers that are difficult to quantify. (3) Increased Annual Available MWh: Although difficult to measure precisely, the target of increasing available MWh's by 1.5% was met by providing prioritized alerts and knowledge-based diagnostics for a wide array of plant equipment and process anomalies; helping the plant to move from high sulfur, high Btu Illinois coal to PRB and run that fuel at low stoichiometries without derates; and improved management of cyclone flame quality as well as improved vigilance with respect to cyclone conditions which avoided some degree of temporary de-rate due to cyclone slag build up. (4) Commensurate Reductions in Greenhouse Gases, Mercury, and Particulates: Reductions in all three of these indices can be associated directly with the optimization leverage observed in the heat rate and NOx reductions. (5) Commensurate Increases in Profitability from Lower Costs, Improved Reliability, and Greater Commercial Availability: Commensurate improvements in costs, reliability and availability resulted from the previously described benefits. Also playing a role were the sustained operation of the cyclones while using more available, less expensive but off-design fuel; more effective catalytic reduction of NOx; and the reduced time required to discover, prioritize and diagnose plant equipment issues. The total annual dollar value of the benefits associated with the products installed, refined, and commercialized at BEC are estimated to range from $1.8 to $3.2 million dollars per-unit, and $7.2 to $8.1 million dollars per year plant-wide depending on whether CO{sub 2} benefits are included. In summary, the NeuCo project at BEC was successfully completed and has demonstrated that advanced optimization technologies can play an important role in improving the environmental footprint of coal-based power generation while achieving other important operating objectives.

01 COAL, LIGNITE, AND PEAT↗

IMPACT OF TIME / TEMPERATURE CURING CONDITIONS AND ALUMINATE CONCENTRATIONS ON SALTSTONE PROPERTIES

This report addresses the impact of (1) the time and temperature curing conditions (profile) and (2) the impact of higher aluminate concentrations in the decontaminated salt solution on Saltstone processing and performance properties. The results demonstrate that performance properties as well as some of the processing properties of Saltstone are highly sensitive to the conditions of time and temperature under which curing occurs. This sensitivity is in turn dependent on the concentration of aluminate in the salt feed solution. In general, the performance properties and indicators (Young's modulus, compressive strength and total porosity) are reduced when curing is initially carried out under high temperature. However, this reduction in performance properties is dependent on the sequence of temperatures (the time/temperature profile) experienced during the curing process. That is, samples that are subjected to a 1, 2, 3 or 4 day curing time at 60 C followed by final curing at 22 C lead to performance properties that are significantly different than the properties of grouts allowed to cure for 1, 2, 3 or 4 days at 22 C followed by a treatment at 60 C. The performance properties of Saltstone cured in the sequence of higher temperature first are generally less (and in some cases significantly less) than performance properties of Saltstone cured only at 22 C. This loss in performance was shown to be mitigated by increased slag content or cement content in the premix at the expense of fly ash. For the sequence in which the Saltstone is initially cured at 22 C followed by a higher temperature cure, the performance properties can be equal to or greater than the properties observed with curing only at 22 C curing. The results in this report indicate that in order to meaningfully measure and report the performance properties of Saltstone, one has to know the time/temperature profile conditions under which the Saltstone will be cured. This will require thermal modeling and actual time/temperature profiles within the vaults under various pour schedules to determine (1) an average profile of time and temperature under normal processing conditions and (2) a conservative (worst case) time/temperature profile. Samples can then be cast and cured in the laboratory under these time and temperature profiles prior to measurement of the performance properties of the product waste forms From a processing perspective, a higher initial curing temperature decreased the set time to 1 day at both 40 C and 60 C and eliminated any bleed volume that was present for those samples that exhibited bleed at room temperature. However, the bleed water return system in the Saltstone Disposal Facility may remove bleed water before it can be reabsorbed. Aluminate concentrations at levels greater than 0.20 M in these salt solutions can lead to positive or negative effects on the performance properties. At a curing temperature of 22 C, aluminate increases Young's modulus and the compressive strength while reducing the total porosity. This generally corresponds to an improved (decreased) permeability (hydraulic conductivity) for Saltstone which is a positive outcome. On the other hand, with increased aluminate concentration there is a significant increase in heat of hydration that may limit pour schedule and must be considered in estimating the time/temperature profile to which Saltstone will be subjected during curing as discussed above. That is, higher temperatures in the vault (due to the higher heats of hydration) may present a greater challenge in controlling the curing time and temperature profile to achieve the desired performance properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fate of Contaminants in Contact with West Valley Grouts

The objective of the work described here is to determine to what extent a variety of contaminants, including fission products, actinides, and RCRA elements are sequestered by the two grout formulations. The conceptual model for this study is as follows: a large mass of grout having been poured into a high-level waste tank is in the process of aging and weathering for thousands of years. The waste remaining in the tank will contain radionuclides and other contaminants, much of which will adhere to tank walls and internal structures. The grout will encapsulate the contaminants. Initially the grout will be well sequestered, but over time rainwater and groundwater will gain access to it. Ultimately, the grout/waste environment will be an open system. In this condition water will move through the grout, exposing it to O{sub 2} and CO{sub 2} from the air and HCO{sub 3}{sup -} from the groundwater. Thus we are considering an oxic environment containing HCO{sub 3}{sup -}. Initially the solubility of many contaminants, but not all, will be constrained by chemistry dominated by the grout, primarily by the high pH, around 11.8. This is controlled and buffered by the portland cement and blast furnace slag components of the grout, which by themselves maintain a solution pH of about 12.5. Slowly the pH will diminish as Ca(OH){sub 2} and KOH dissolve, are carried away by water, and CaCO{sub 3} forms. As these conditions develop, the behavior of these elements comes into question. In our conceptual model, although the grout is formulated to provide some reducing capacity, in order to be conservative this mechanism is not considered. In addition to solubility constraints imposed by pH, the various contaminants may be incorporated into a variety of solid phases. Some may be incorporated into newly forming compounds as the grout sets and cures. Others (like soddyite, (UO{sub 2}){sub 2}SiO{sub 4}(H{sub 2}O){sub 2}) are the result of slower reactions but may become important over time as contaminants are exposed to evolving chemistry in the grout. Still other solid phases may form from reactions between the waste and grout components, not only the cementitious materials, but also the additives used in the grout. Another process that may exert some control on contaminant concentrations is adsorption onto solids within the grout. These may be additives such as the fluorapatite or zeolite that are substantial percentages of the grouts or they may be minerals, typically Ca-Al-Si materials, that form in the grout system as cement sets. In addition, as the grout weathers over time, CaCO{sub 3} minerals, such as calcite and aragonite, will form as a rind on the grout and as a fracture filling mineral. Some contaminants are likely to be incorporated into these minerals, to a greater or lesser extent, as they precipitate. For some elements, such as U, there is a significant literature exploring the incorporation into CaCO{sub 3}, but for others there is essentially no information. This is also the case for much of the chemical regime of the grouts. Initial conditions are at pH values around 12 and information is often sparse.

58 GEOSCIENCES↗

Self-degradable Cementitious Sealing Materials

A self-degradable alkali-activated cementitious material consisting of a sodium silicate activator, slag, Class C fly ash, and sodium carboxymethyl cellulose (CMC) additive was formulated as one dry mix component, and we evaluated its potential in laboratory for use as a temporary sealing material for Enhanced Geothermal System (EGS) wells. The self-degradation of alkali-activated cementitious material (AACM) occurred, when AACM heated at temperatures of {ge}200 C came in contact with water. We interpreted the mechanism of this water-initiated self-degradation as resulting from the in-situ exothermic reactions between the reactants yielded from the dissolution of the non-reacted or partially reacted sodium silicate activator and the thermal degradation of the CMC. The magnitude of self-degradation depended on the CMC content; its effective content in promoting degradation was {ge}0.7%. In contrast, no self-degradation was observed from CMC-modified Class G well cement. For 200 C-autoclaved AACMs without CMC, followed by heating at temperatures up to 300 C, they had a compressive strength ranging from 5982 to 4945 psi, which is {approx}3.5-fold higher than that of the commercial Class G well cement; the initial- and final-setting times of this AACM slurry at 85 C were {approx}60 and {approx}90 min. Two well-formed crystalline hydration phases, 1.1 nm tobermorite and calcium silicate hydrate (I), were responsible for developing this excellent high compressive strength. Although CMC is an attractive, as a degradation-promoting additive, its addition to both the AACM and the Class G well cement altered some properties of original cementitious materials; among those were an extending their setting times, an increasing their porosity, and lowering their compressive strength. Nevertheless, a 0.7% CMC-modified AACM as self-degradable cementitious material displayed the following properties before its breakdown by water; {approx}120 min initial- and {approx}180 min final-setting times at 85 C, and 1825 to 1375 psi compressive strength with 51.2 to 55.0% porosity up to 300 C.

15 GEOTHERMAL ENERGY↗

Y-12 Lessons Learned: Process Drift

Criticality Safety lessons learned in Uranium Chip Recovery, Briquettes, Reduction Sand Separator, Slag Accumulation, Holden Gas Furnace, and Accumulations in Casting Lines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coal combustion products 2007 production and use report

The American Coal Ash Association's 2007 Annual Coal Combustion Products (CCP) are derived from data from more than 170 power plants. The amount of CCPs used was 40.55%, a decrease of 2.88% from 2006, attributed to reduced fuel burn and a decrease in demand in the building industry. Figures are given for the production of fly ash, flue gas desulfurization gypsum, bottom ash, FBC ash and boiler slag. The article summarises results of the survey. 1 ref., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

The Cementitious Barriers Partnership (CBP) Software Toolbox Capabilities in Assessing the Degradation of Cementitious Barriers - 13487

The Cementitious Barriers Partnership (CBP) Project is a multi-disciplinary, multi-institutional collaboration supported by the U.S. Department of Energy (US DOE) Office of Tank Waste and Nuclear Materials Management. The CBP program has developed a set of integrated tools (based on state-of-the-art models and leaching test methods) that help improve understanding and predictions of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. Tools selected for and developed under this program have been used to evaluate and predict the behavior of cementitious barriers used in near-surface engineered waste disposal systems for periods of performance up to 100 years and longer for operating facilities and longer than 1000 years for waste disposal. The CBP Software Toolbox has produced tangible benefits to the DOE Performance Assessment (PA) community. A review of prior DOE PAs has provided a list of potential opportunities for improving cementitious barrier performance predictions through the use of the CBP software tools. These opportunities include: 1) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, 2) prediction of changes in K{sub d}/mobility as a function of time that result from changing pH and redox conditions, 3) concrete degradation from rebar corrosion due to carbonation, 4) early age cracking from drying and/or thermal shrinkage and 5) degradation due to sulfate attack. The CBP has already had opportunity to provide near-term, tangible support to ongoing DOE-EM PAs such as the Savannah River Saltstone Disposal Facility (SDF) by providing a sulfate attack analysis that predicts the extent and damage that sulfate ingress will have on the concrete vaults over extended time (i.e., > 1000 years). This analysis is one of the many technical opportunities in cementitious barrier performance that can be addressed by the DOE-EM sponsored CBP software tools. Modification of the existing tools can provide many opportunities to bring defense in depth in prediction of the performance of cementitious barriers over time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulating field conditions for the curing of salt-stone - 15501

salt-stone is a cementitious, low-level waste (LLW) material processed and stored at the Savannah River Site (SRS). It consists of fly ash (FA), blast furnace slag (BFS), and Portland cement that are blended with LLW salt solution. The dry feed materials and the salt solution are mixed at the salt-stone Production Facility (SPF), and the fresh grout subsequently pumped into a salt-stone Disposal Unit (SDU) in the salt-stone Disposal Facility (SDF) where it cures to form a rigid, cementitious monolith. In order to demonstrate the long-term performance of salt-stone, non-radioactive simulant samples are processed and cured in a laboratory environment and subsequently tested with respect to key performance properties. Of particular relevance to assessing the long-term stabilization and immobilization of radionuclides in salt-stone is the permeability, or saturated hydraulic conductivity, which determines the rate of infiltration for oxygen-bearing ground waters that can affect redox sensitive contaminants, such as {sup 99}Tc. Environmental conditions in the SDU, in particular temperature and humidity, are believed to affect the cured properties of salt-stone. With respect to humidity it has been determined that the average vapor space humidity in an SDU is at least 95%, and in addition the assumption can be made that underlying grout is subjected to a moisture-saturated environment by the grout poured over it. With respect to temperature, the SDUs contain thermo-well arrays that provide detailed vertical, and to a lesser degree radial, temperature profiles. Temperature data from the SDUs have subsequently been utilized to better simulate curing temperatures for simulant salt-stone in the laboratory. However, no two thermal profiles are the same, varying with respect to the following parameters: initial temperature, rate of temperature increase, maximum temperature attained, time at maximum temperature, and cooling rate. These temperature variables are dependent on the depth of grout (due to insulating effects of underlying and overlying grout), frequency of grout addition to the SDU (with more frequent additions causing grout temperatures to rise due to the exothermic hydration reactions), and, to a lesser degree, the ambient temperature of the external environment. Due to the variability in each thermal profile recorded in an SDU, the question arises as to which profile (or profiles) should be used in the simulated laboratory environment to best mimic the curing of field emplaced salt-stone, such that there is confidence that the properties measured for laboratory-prepared samples are representative of the grout in the SDU. Since the current SDU design contains sixty-six thermo-wells it is obviously not practical to process simulant samples according to each profile. Rather the aim would be to choose a reduced number of profiles that adequately encompass the range of recorded profiles, or to choose a single profile that is considered most conservative with respect to the resulting properties of interest. This is typically thought to be the profile exhibiting the highest peak temperature since for cement-based materials higher curing temperatures (> 60 deg. C), while resulting in enhanced reaction kinetics and strength development for short curing durations (∼28 days), have been shown to adversely affect the physical properties of the material after extended cure times. In choosing representative profiles it is important to consider not only the maximum temperature, but also the influence of rate of temperature rise to the maximum temperature, and time at or close to the maximum temperature on the post-cured properties. The intent of this paper is to consider the varied curing temperature profiles to which the salt-stone is exposed in an SDU, and to analyze the currently available data for elevated temperature curing of salt-stone to determine the potential thermal effects on the saturated hydraulic conductivity of salt-stone emplaced in an SDU. This may subsequently facilitate a more informed approach to simulating the curing of salt-stone in a laboratory environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering scale demonstration of a prospective cast Stone process - 15584

A cementitious waste form is one of the alternatives being evaluated for Supplemental Immobilization of Hanford Low Activity Waste (LAW). Washington River Protection Solutions (WRPS) is collecting data on cementitious or pozzolanic waste forms such as Cast Stone. The goal of this project for WRPS is to obtain data on the performance of the Cast Stone waste form for immobilizing LAW. As part of the data package being assembled, an engineering-scale demonstration with non-radioactive simulants was performed at the Savannah River National Laboratory (SRNL) using the Scaled Continuous Processing Facility (SCPF) to fill a container with simulated Cast Stone grout. Legacy salt solution from previous Hanford salt waste testing was trimmed to resemble the average composition generated from the Hanford Tank Waste Operation Simulator (HTWOS) used in the screening tests. The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS) were obtained from Lafarge North America in Pasco, WA. Over three days, the SCPF was used to fill a 6,056 liter (1600 gallon) container with simulated Cast Stone grout. The tank was instrumented with x-, y-, and z-axis thermocouples to monitor curing temperature and two formed core sampling vials. The target production rate was 5.7 L/min (1.5 gpm). This required a salt solution flow rate of approximately 3.78 L/min (1 gpm) and a premix feed rate of approximately 263 kh/h (580 lb/h). The final surface slope at a fill height of 100 cm was 2.5-3.8 cm across the 260 cm (8.5 ft) diameter tank. During processing, grout was collected from both the mixer discharge and the discharge into the tank. These samples were stored in a humid environment either in a closed box proximal to the tank or inside the laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal treatment of plutonium contaminated materials (PCM) Waste - 15714

Considering the high over all costs of waste disposal and the growing requirements for improved quality of the final waste form, the benefits offered by thermal processing become very significant. Key drivers for the application of thermal treatment processes include the reduced volume, improved passive safety, and superior long term stability, of the vitrified waste form products. The project has demonstrated these benefits are derived from the oxidation of the metallic waste fraction, destruction of organic components, and evaporation of entrained water, combined with simultaneous immobilization of radioactive and chemo-toxic elements with in a glass or slag (i.e. a partially crystallised glass) material. Currently a fundamental lack of scientific knowledge and understanding significantly hinders the uptake of thermal treatment processes for the immobilization and disposal of plutonium contaminated material waste. The project will contribute to accelerating the acquisition of knowledge and experience required to support the NDA in deploying thermal technologies as a national asset for ILW treatment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Effect of Environmental Relative Humidity on Carbonation and Oxidation in a Cementitious Waste Form - 18448

Cementitious material has been developed and used for the nuclear waste disposal. Cast Stone, a type of cementitious waste form, is considered for solidification and immobilization of part of low activity radioactive waste (LAW) at DOE Hanford Site in Richland, WA. During its life cycle, the waste form, which is produced from Portland cement, fly ash, blast furnace slag and liquid waste, is subject to reaction with carbon dioxide and oxygen, both in gaseous and dissolved form. The reactions may alter the physical and chemical properties of the waste form and thus change its retention ability for the radionuclides. Therefore, understanding the rate and the impact of oxidation and carbonation in the material is important for projecting the long-term performance of Cast Stone. However, the rate of carbonation and oxidation in Cast Stone closely depends on the moisture content in the material, which varies largely with the environmental relative humidity (RH). In this study, experiments are carried out to study the effect of environmental relative humidity on the carbonation and oxidation rate as well as the leaching of the constituents from Cast Stone. Cast Stone samples doped with Cr as a reaction indicator are aged for 16 to 32 weeks under N{sub 2}, air, and 2% CO{sub 2} (in nitrogen) environments with various relative humidities (15%, 40%, 68%, 100%). After aging, samples were tested for the pH-dependent leaching (EPA Method 1313) and mass transfer rate under diffusion-controlled leaching (EPA Method 1315) of constituents. The progress of the carbonation was measured for each condition to determine the rate of carbonation front ingress. The results show that environmental relative humidity strongly influences carbonation and oxidation in Cast Stone; however, the impact is different for the rate of reaction and for the extent of reactions. The former refers to the rate at which the reaction front ingresses, while the latter refers to the fraction of the material reacted. For both carbonation and oxidation, the largest impact of the reactions at the exposure surface is observed at intermediate relative humidity (68%). However, for carbonation, the reaction front evolves more rapidly under drier conditions, with the highest rate observed at 15% RH. As a result, carbonation and oxidation have different degree of impact on the leaching behavior of Cast Stone samples aged under various relative humidities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Taking in Nuclear Operation of the Plasma Facility for Treatment Industrial Radioactive Waste - 19346

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. Previous paper describes the construction and testing of the plasma melting facility at the Kozloduy NPP in Bulgaria. Now the paper focus on the nuclear starting up conducted in May 2018 with real radioactive waste and illustrates the first operational results such as types of waste treated, volume reduction factors, etc The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD and through Bulgarian national funding -Nuclear Facilities Decommissioning Fund and Radioactive Waste Fund. The KIDSF is funded by the European Union as well by the contributors to the KIDSF - Austria, Belgium, France, Greece, Ireland, The Netherlands, Spain, United Kingdom and Switzerland. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How do Early Age Geopolymers Respond to Gamma Irradiation Exposure? - 19515

Geopolymers have been proposed by the UK nuclear industry as a potential replacement for the currently accepted blend of Portland cement and supplementary cementitious materials, such as fly ash and blast furnace slag. This preferred grouting system is not ideal for the encapsulation of some problematic waste streams, such as oils and reactive metals. Metakaolin based geopolymers have been selected as the alternative grouting system, as this mitigates the supply risk which is currently associated with the supplementary cementitious materials described above. To allow these systems to be used as an alternative nuclear grouting system, the effect of irradiation on the 'neat' grout needs to be understood. The majority of the literature appears to present studies of the irradiation of aged grouts (3 - 7 days). This study will assess samples that have been irradiated at early age curing (20 hours). The effects of clay type and total dose will also be studied, and a comparison between the effects of rotary and flash calcined clays, irradiated to doses up to 1 MGy will be presented. The thermogravimetry data indicates that irradiation promotes the liberation of water and also the formation of carbonate species. The rotary calcined metakaolin liberates more water than the flash calcined metakaolin. Therefore, it is expected that the flash calcined system is more stable to irradiation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗