Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233( 233 U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233 U waste stream requires a special analysis because the concentrations of thorium- 229 ( 229 Th), 230 Th, 232 U, 233 U, and 234 U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233 U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233 U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233 U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233 U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233 U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95 th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of compliance with all performance objectives. Tier II results indicate that the long-term performance of the OR CEUSP 233 U waste stream is protective of human health and the environment. The Area 5 RWMS is located in one of the least populated and most arid regions of the U.S. Site characterization data indicate that infiltration of precipitation below the plant root zone at 2.5 meters (8.2 feet) ceased 10,000 to 15,000 y ago. The site is not expected to have a groundwater pathway as long as the current arid climate persists. The national security mission of the NNSS and the location of the Area 5 RWMS within the Frenchman Flat Corrective Action Unit require that access controls and land use restrictions be maintained indefinitely. PA modeling results for 10,000 to 60,000 y also indicate that the OR CEUSP 233 U waste stream is acceptable for near-surface disposal. The mean resident air pathway annual total effective dose (TED), the resident all-pathways annual TED, and the acute drilling TED are less than their performance objectives for 10,000 y after closure. The mean radon-222 (222Rn) flux density exceeds the performance objective at 4,200 y, but this is due to waste already disposed at the Area 5 RWMS and is only slightly affected by disposal of the CEUSP 233 U. The peak resident all-pathways annual TED from CEUSP key radionuclides occurs at 48,000 y and is less than the 0.25 millisievert performance objective. Disposal of the OR CEUSP 233 U waste stream in a typical SLB trench slightly increases PA results. Increasing the depth was found to eliminate any impacts of the OR CEUSP 233 U waste stream. Containers could not be shown to have any significant impact on performance due to the long half-life of the waste stream and a lack of data for pitting corrosion rates of stainless steel in soil. The results of the SA indicate that all performance objectives can be met with disposal of the OR CEUSP 233 U waste stream in the SLB units at the Area 5 RWMS. The long-term performance of the OR CEUSP 233 U waste stream disposed in the near surface is protective of human health and the environment. The waste stream is recommended for disposal without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

COMPARISON OF RESULTS FOR QUARTER 3 SURFACE WATER SPLIT SAMPLES COLLECTED AT THE NUCLEAR FUEL SERVICES SITE, ERWIN, TENNESSEE

Oak Ridge Associated Universities (ORAU), under the Oak Ridge Institute for Science and Education (ORISE) contract, collected split surface water samples with Nuclear Fuel Services (NFS) representatives on March 20, 2013. Representatives from the U.S. Nuclear Regulatory Commission and the Tennessee Department of Environment and Conservation were also in attendance. Samples were collected at four surface water stations, as required in the approved Request for Technical Assistance number 11-018. These stations included Nolichucky River upstream (NRU), Nolichucky River downstream (NRD), Martin Creek upstream (MCU), and Martin Creek downstream (MCD). Both ORAU and NFS performed gross alpha and gross beta analyses, and Table 1 presents the comparison of results using the duplicate error ratio (DER), also known as the normalized absolute difference. A DER {<=} 3 indicates that at a 99% confidence interval, split sample results do not differ significantly when compared to their respective one standard deviation (sigma) uncertainty (ANSI N42.22). The NFS split sample report does not specify the confidence level of reported uncertainties (NFS 2013). Therefore, standard two sigma reporting is assumed and uncertainty values were divided by 1.96. In conclusion, most DER values were less than 3 and results are consistent with low (e.g., background) concentrations. The gross beta result for sample 5198W0012 was the exception. The ORAU result of 9.23 &plusmn 0.73 pCi/L from location MCD is well above NFS's result of -0.567 &plusmn 0.63 pCi/L (non-detected). NFS's data package included a detected result for U-233/234, but no other uranium or plutonium detection, and nothing that would suggest the presence of beta-emitting radionuclides. The ORAU laboratory reanalyzed sample 5198W0012 using the remaining portion of the sample volume and a result of 11.3 &plusmn 1.1 pCi/L was determined. As directed, the laboratory also counted the filtrate using gamma spectrometry analysis and identified only naturally occurring or ubiquitous man-made constituents, including beta emitters that are presumably responsible for the elevated gross beta values.

54 ENVIRONMENTAL SCIENCES↗

Evaluating FRI3D for Cost Savings in Fire Hazard Analysis at DOE Sites

A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.

97 - MATHEMATICS AND COMPUTING↗

Demolition of the K-27 Building at the East Tennessee Technology Park (ETTP) - 17423

On February 8, 2016, URS - CH2M Oak Ridge LLC (UCOR) initiated the demolition of the East Tennessee Technology Park's (ETTP's) final gaseous diffusion building in DOE's Oak Ridge Environmental Management program. Building K-27 was a 35,582 m{sup 2} (383,000 ft{sup 2}) gaseous diffusion building that contained approximately 92,903 m{sup 2} (1 million ft{sup 2}) of floor space. It was one of five gaseous diffusion buildings at the site, formerly known as the Oak Ridge Gaseous Diffusion Plant. The actual demolition of this facility took approximately seven months to complete; however, planning and preparation took more than three years. The deactivation process was a critical element in preparing the building for demolition. UCOR's K-27 deactivation activities began in April 2012 with the installation of safe walking paths and fall protection systems to allow safe work access. Next, all mechanical and electrical systems associated with the facility were shut down and isolated, a process known as 'cold and dark.' More than 19.3 km (12 mi) of process piping and components were marked and measured. Additionally, workers performed nondestructive assay (NDA) and vent-purge-and-drain activities and applied foam to piping and components as needed [1]. Based on characterization results, approximately 4.8 km (3 mi) of process piping, and 372 converters and compressors were removed and shipped offsite prior to demolition. Lower-hazard materials and equipment were demolished with the building structure and transported to onsite disposal facilities. Upfront waste characterization and ongoing monitoring were key to the successful disposal of demolition debris at onsite facilities. Due to process improvements in waste loading recommended by work crews, the project achieved a 50 percent improvement in the daily hauling rate during the 9,000-truckload shipping campaign. Crews worked in high-risk, high-hazard conditions and were exposed to radiological and chemical contaminants, extreme temperatures, and deteriorating infrastructure. However, the hazard controls that were put in place, based on the Integrated Safety Management System (ISMS) walk-downs and hazard determination, made the effort manageable. The overall safety performance during demolition of the facility was excellent, with no significant injuries, and exceeded industry standards and DOE target levels. Outstanding safety performance was a testament to the dedication of the workforce, given the significant hazards presented by the demolition of the Hazard Category 2 nuclear facility. Another key element to the success of the K-27 demolition was the support and approval of all stakeholders involved in this effort, including DOE, the surrounding communities, the State of Tennessee, the UCOR management team, and, most importantly, the workforce that performed this highly hazardous work. This $52 million demolition project was completed ahead of schedule with no significant injuries and in compliance with all DOE orders, site procedures, and environmental controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis for the Disposal of the Lawrence Livermore National Laboratory EnergyX Macroencapsulated Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This special analysis (SA) evaluates whether the Lawrence Livermore National Laboratory (LLNL) EnergyX Macroencapsulated waste stream (B LAMACRONCAP, Revision 1) is suitable for disposal by shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site (NNSS). The LLNL EnergyX Macroencapsulated waste stream is macroencapsulated mixed waste generated during research laboratory operations and maintenance (LLNL 2015). The LLNL EnergyX Macroencapsulated waste stream required a special analysis due to tritium (3H), cobalt-60 (60Co), cesium-137 (137Cs), and radium-226 (226Ra) exceeding the NNSS Waste Acceptance Criteria (WAC) Action Levels (U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office [NNSA/NFO] 2015).The results indicate that all performance objectives can be met with disposal of the waste stream in a SLB trench. Addition of the LLNL EnergyX Macroencapsulated inventory slightly increases multiple performance assessment results, with the largest relative increase occurring for the all-pathways annual total effective dose (TED). The maximum mean and 95th percentile 222Rn flux density remain less than the performance objective throughout the compliance period. The LLNL EnergyX Macroencapsulated waste stream is suitable for disposal by SLB at the Area 5 RWMS. The waste stream is recommended for approval without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Massively parallel, computationally guided design of a proenzyme

Proteins have shown promise as therapeutics and diagnostics, but their effectiveness is limited by our inability to spatially target their activity. To overcome this limitation, we developed a computationally guided method to design inactive proenzymes or zymogens, which are activated through cleavage by a protease. Since proteases are differentially expressed in various tissues and disease states, including cancer, these proenzymes could be targeted to the desired microenvironment. We tested our method on the therapeutically relevant protein carboxypeptidase G2 (CPG2). We designed Pro-CPG2s that are inhibited by 80 to 98% and are partially to fully reactivatable following protease treatment. The developed methodology, with further refinements, could pave the way for routinely designing protease-activated protein-based therapeutics and diagnostics that act in a spatially controlled manner. Confining the activity of a designed protein to a specific microenvironment would have broad-ranging applications, such as enabling cell type-specific therapeutic action by enzymes while avoiding off-target effects. While many natural enzymes are synthesized as inactive zymogens that can be activated by proteolysis, it has been challenging to redesign any chosen enzyme to be similarly stimulus responsive. Here, we develop a massively parallel computational design, screening, and next-generation sequencing-based approach for proenzyme design. For a model system, we employ carboxypeptidase G2 (CPG2), a clinically approved enzyme that has applications in both the treatment of cancer and controlling drug toxicity. Detailed kinetic characterization of the most effectively designed variants shows that they are inhibited by ∼80% compared to the unmodified protein, and their activity is fully restored following incubation with site-specific proteases. Introducing disulfide bonds between the pro- and catalytic domains based on the design models increases the degree of inhibition to 98% but decreases the degree of restoration of activity by proteolysis. A selected disulfide-containing proenzyme exhibits significantly lower activity relative to the fully activated enzyme when evaluated in cell culture. Structural and thermodynamic characterization provides detailed insights into the prodomain binding and inhibition mechanisms. The described methodology is general and could enable the design of a variety of proproteins with precise spatial regulation.

59 BASIC BIOLOGICAL SCIENCES↗

Confirmatory Survey Results for the Abb Combustion Engineering Site Windsor, Connecticut

The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

54 ENVIRONMENTAL SCIENCES↗

Comparison of results for quarter 5 surface water split samples collected at the nuclear fuel services site Erwin Tennessee

Oak Ridge Associated Universities (ORAU), under the Oak Ridge Institute for Science and Education (ORISE) contract, collected split surface water samples with Nuclear Fuel Services (NFS) representatives on August 21, 2013. Representatives from the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Department of Environment and Conservation were also in attendance. Samples were collected at four surface water stations, as required in the approved Request for Technical Assistance number 11-018. These stations included Nolichucky River upstream (NRU), Nolichucky River downstream (NRD), Martin Creek upstream (MCU), and Martin Creek downstream (MCD). Both ORAU and NFS performed gross alpha and gross beta analyses, and the comparison of results using the duplicate error ratio (DER), also known as the normalized absolute difference, are tabulated. All DER values were less than 3 and results are consistent with low (e.g., background) concentrations.

54 ENVIRONMENTAL SCIENCES↗

Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

13 HYDRO ENERGY↗

Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut (Final Report)

The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

54 ENVIRONMENTAL SCIENCES↗

3rd Quarter Transportation Report FY 2014: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 3rd quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crimean-Congo hemorrhagic fever survivors elicit protective non-neutralizing antibodies that target 11 overlapping regions on glycoprotein GP38

Crimean-Congo hemorrhagic fever virus can cause lethal disease in humans yet there are no approved medical countermeasures. Viral glycoprotein GP38, exclusive to Nairoviridae , is a target of protective antibodies and is a key antigen in preclinical vaccine candidates. Here, we isolate 188 GP38-specific antibodies from human survivors of infection. Competition experiments show that these antibodies bind across 5 distinct antigenic sites, encompassing 11 overlapping regions. Additionally, we show structures of GP38 bound with 9 of these antibodies targeting different antigenic sites. Although these GP38-specific antibodies are non-neutralizing, several display protective efficacy equal to or better than murine antibody 13G8 in two highly stringent rodent models of infection. Together, these data expand our understanding regarding this important viral protein and may inform the development of broadly effective CCHFV antibody therapeutics.

59 BASIC BIOLOGICAL SCIENCES↗

Design, Synthesis, and Biological Activity of Novel Ornithine Decarboxylase (ODC) Inhibitors

We here describe the design, synthesis, and biological activity of novel ornithine decarboxylase (ODC) inhibitors that show significantly higher potency in vitro than α-difluoromethylornithine (DFMO), a U.S. Food and Drug Administration (FDA) approved drug. We report two X-ray structures of ODC complexed with new ODC inhibitors, computational docking, molecular dynamics, and binding free energy calculations to validate the experimental models. The X-ray structures reveal that covalent adducts with pyridoxal phosphate (PLP) are formed in the active site of the human ODC enzyme, as verified by their preparation and enzymatic testing. Finally, we verified that the cellular activity of endogenous ODC was inhibited, and polyamine levels were reduced. Given that ODC is a clinically validated target, combined with the fact that DFMO is currently the only ODC inhibitor in clinical use for several indications, the further development of more potent ODC inhibitors with superior activity and physical properties is warranted.

60 APPLIED LIFE SCIENCES↗

SU-E-T-599: Patient Safety Enhancements Through a Study of R&V System Override Data

Purpose: Record and verify (R&V) software systems include safety checks that compare actual machine parameters with prescribed values for a patient’s treatment, such as treatment couch position, linac, energy, and MUs. The therapist is warned of a mismatch with a pop-up and prompted to approve an override in order to continue without changes. Override approval is often legitimate, but the pop-up can also genuinely indicate a problem that would Result in the wrong treatment. When there are numerous pop-up warnings, human nature leads us to approve any override without careful reading, undermining the effectiveness of the safety mechanism. Methods: Override data was collected from our R&V system for all patients treated between October 8 and 29, 2012, on four linacs and entered into a spreadsheet. Additional data collected included treatment technique, disease site, immobilization, time, linac, and whether localization images were obtained. Data were analyzed using spreadsheet tools to reveal trends, patterns and associations that might suggest appropriate process changes that could decrease the total number of overrides. Results: 76 out of 113 patients had overrides. Out of the 944 treatments, 599 override items were generated. The majority were due to couch positions. 74 of the 84 overrides on a linac equipped with a 6D couch were due to the use of the rotational corrections and the fact that the 6D couch control does not communicate with the R&V system; translations required to rotate the couch appear to the R&V system as translations outside the tolerance range. Conclusion: Many findings were interesting but did not suggest a process change. Proposed process changes include creating site-specific instead of just technique-specific tolerance tables for couch shifts. Proposed improvements to the vendor are to facilitate direct communication between the 6D couch and the R&V system to eliminate those override warnings related to lack of communication.

61 RADIATION PROTECTION AND DOSIMETRY↗

Solid Waste Management Units And Areas Of Concern Annual Long-Term Monitoring & Maintenance Report For Calendar Year 2016.

Long-term controls were maintained at 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) in accordance with the requirements of the “Long-Term Monitoring and Maintenance Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit, which took effect February 26, 2015. Maintenance and controls at these SWMUs and AOCs are described and documented in this report. Conditions requiring maintenance or repair activities were not identified for any of the inspected SWMUs or AOCs. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment. This report does not present monitoring and maintenance activities for SWMU 76, the Mixed Waste Landfill; those activities adhere to the approved MWL LTMM Plan, Section 4.8.1 requiring a separate annual report which will be submitted to the NMED by June 30, 2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory Hazardous Waste Facility Permit Community Relations Plan

The requirements of the Hazardous Waste Facility Permit are fulfilled through execution of LANL's fourth strategic goal: “Enabling mission delivery through next-generation facility, infrastructure, and operational excellence.” With input from our stakeholders, we will continue to fulfill those requirements and to improve our waste operations. In 2015, the Laboratory purpose statement focused waste management efforts by directing delivery of mission success through operational effectiveness and scientific excellence. This Plan advances that purpose through community involvement. In the process of achieving our national security mission, Los Alamos National Laboratory generates some hazardous and mixed waste. Hazardous waste is solid waste that is dangerous or potentially harmful to human health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded as commercial products, such as cleaning fluids or pesticides, or as the byproducts of operations. Specific substances are listed in 40 Code of Federal Regulations (CFR), Part 261: 40 CFR Part 261. Hazardous waste management activities are regulated by the U. S. Environmental Protection Agency and the New Mexico Environment Department (NMED) pursuant to New Mexico Hazardous Waste Act (HWA; Chapter 74, Article 4 NMSA 1978) and regulations under the Act. In 1989, NMED issued the Hazardous Waste Facility Permit (EPA ID Number NM0890010515-1) that established standards for the Laboratory to manage, store, and treat hazardous wastes on-site and to undertake the closure, post closure care, and cleanup as necessary, of permitted waste management units. On November 30, 2010, NMED renewed the Hazardous Waste Facility Permit (the Permit). In June 2020 the Permittees submitted a permit renewal application to the NMED for their review and approval. The Hazardous Waste Facility Permit Community Relations Plan (CRP) describes the scope of public involvement in the activities of the Permit. The CRP is specifically designed to facilitate the community outreach, engagement, and relations activities concerning the Laboratory’s Hazardous Waste Facility Permit and coordinates with but does not include public involvement for other Laboratory programs, initiatives, or environmental activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Impacts of Risk-Based Methods for Defining AoR and PISC Duration of a CO 2 Storage Project Using NRAP Tools and FE/NETL CO 2 Saline Storage Cost Model

The purpose of this analysis is to assess the fiscal impact of using risk-based methods to define the area of review (AoR) and post-injection site care (PISC) duration for a geologic carbon dioxide (CO 2 ) storage project. The Office of Fossil Energy (FE)/National Energy Technology Laboratory (NETL) CO 2 Saline Storage Cost Model (“cost model”) was utilized to evaluate CO 2 storage economics in this study. The cost model is a widely used tool for evaluating CO 2 storage costs in geologic settings. It estimates costs for storage operations conducted under compliance to the United States Environmental Protection Agency (EPA) Underground Injection Control (UIC) Class VI regulations. This analysis evaluates and compares the costs of storage (on a first-year break-even dollar per tonne [2018$] basis) at the proposed FutureGen 2.0 site as a case study storage location by implementing different approaches to determine AoR and PISC given the prevailing geologic conditions and injection volume and duration considerations. The approaches include the use of 1) risk-based methods to define AoR and PISC duration, 2) an EPA-approved AoR and PISC documented in the FutureGen 2.0 UIC Class VI permit applications, and 3) cost model default settings that utilize uncertainty multipliers to estimate CO 2 plume and pressure front extent as part of AoR determination, as well as a 50-year PISC default. From all three sources, the AoR and PISC specified in the Class VI permit applications for FutureGen 2.0 were the largest and longest relative to the other two sources.

54 ENVIRONMENTAL SCIENCES↗

Inhibition of the C1s Protease and the Classical Complement Pathway by 6-(4-Phenylpiperazin-1-yl)Pyridine-3-Carboximidamide and Chemical Analogs

Abstract The classical pathway (CP) is a potent mechanism for initiating complement activity and is a driver of pathology in many complement-mediated diseases. The CP is initiated via activation of complement component C1, which consists of the pattern recognition molecule C1q bound to a tetrameric assembly of proteases C1r and C1s. Enzymatically active C1s provides the catalytic basis for cleavage of the downstream CP components, C4 and C2, and is therefore an attractive target for therapeutic intervention in CP-driven diseases. Although an anti-C1s mAb has been Food and Drug Administration approved, identifying small-molecule C1s inhibitors remains a priority. In this study, we describe 6-(4-phenylpiperazin-1-yl)pyridine-3-carboximidamide (A1) as a selective, competitive inhibitor of C1s. A1 was identified through a virtual screen for small molecules that interact with the C1s substrate recognition site. Subsequent functional studies revealed that A1 dose-dependently inhibits CP activation by heparin-induced immune complexes, CP-driven lysis of Ab-sensitized sheep erythrocytes, CP activation in a pathway-specific ELISA, and cleavage of C2 by C1s. Biochemical experiments demonstrated that A1 binds directly to C1s with a K d of ∼9.8 μM and competitively inhibits its activity with an inhibition constant (K i) of ∼5.8 μM. A 1.8-Å-resolution crystal structure revealed the physical basis for C1s inhibition by A1 and provided information on the structure–activity relationship of the A1 scaffold, which was supported by evaluating a panel of A1 analogs. Taken together, our work identifies A1 as a new class of small-molecule C1s inhibitor and lays the foundation for development of increasingly potent and selective A1 analogs for both research and therapeutic purposes.

Immunology↗