Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Radiator Study for Stationary Lunar Landers

This paper provides an overview of a study to identify, select and evaluate potential heat rejection radiators for application to small, low power, stationary lunar landers. While this study supported risk mitigation activities related to the International Lunar Network project, the radiator concepts and performance assessments are applicable to a wide range of lunar lander applications. The radiator concepts identified and evaluated in this study were aimed at providing reliable heat rejection for landers that might be subjected to hot lunar noon conditions at the equator. As a part of the study, a literature search of lunar radiators was performed from which many radiator designs were developed. These designs were compared in a trade study and two of the most promising were used to develop six concepts. These six radiator concepts went through a more detailed thermal analysis using Thermal Desktop. The analysis considered heat rejection capability, and sensitivity to many factors such as dust deposition, latitude, life, and topographical features like landing on a hill, on a rock, or in a hole/crater. From the result of the analysis, two radiator concepts were selected for recommendation: a flat horizontal plate with a dust cover and a stacked vertical radiator with parabolic reflectors and a one degree tilting mechanism.

OConnor, Brian↗

Modal Analysis and Model Correlation of the Mir Space Station

This paper will discuss on-orbit dynamic tests, modal analysis, and model refinement studies performed as part of the Mir Structural Dynamics Experiment (MiSDE). Mir is the Russian permanently manned Space Station whose construction first started in 1986. The MiSDE was sponsored by the NASA International Space Station (ISS) Phase 1 Office and was part of the Shuttle-Mir Risk Mitigation Experiment (RME). One of the main objectives for MiSDE is to demonstrate the feasibility of performing on-orbit modal testing on large space structures to extract modal parameters that will be used to correlate mathematical models. The experiment was performed over a one-year span on the Mir-alone and Mir with a Shuttle docked. A total of 45 test sessions were performed including: Shuttle and Mir thruster firings, Shuttle-Mir and Progress-Mir dockings, crew exercise and pushoffs, and ambient noise during night-to-day and day-to-night orbital transitions. Test data were recorded with a variety of existing and new instrumentation systems that included: the MiSDE Mir Auxiliary Sensor Unit (MASU), the Space Acceleration Measurement System (SAMS), the Russian Mir Structural Dynamic Measurement System (SDMS), the Mir and Shuttle Inertial Measurement Units (IMUs), and the Shuttle payload bay video cameras. Modal analysis was performed on the collected test data to extract modal parameters, i.e. frequencies, damping factors, and mode shapes. A special time-domain modal identification procedure was used on free-decay structural responses. The results from this study show that modal testing and analysis of large space structures is feasible within operational constraints. Model refinements were performed on both the Mir alone and the Shuttle-Mir mated configurations. The design sensitivity approach was used for refinement, which adjusts structural properties in order to match analytical and test modal parameters. To verify the refinement results, the analytical responses calculated using original and refined math models were compared with the measured responses. The results from this study show that the refined models predict more accurately the dynamics of the actual structure. The MiSDE test and analysis results provided the information and experience on test design, flight testing, and data analysis for the ISS and other future spacecraft, which are critical to the verification of analytical models and structural loads.

Kim, Hyoung M.↗

AIAA Aerospace America Magazine - Year in Review Article, 2010

NASA Stennis Space Center has implemented a pilot operational Integrated System Health Management (ISHM) capability. The implementation was done for the E-2 Rocket Engine Test Stand and a Chemical Steam Generator (CSG) test article; and validated during operational testing. The CSG test program is a risk mitigation activity to support building of the new A-3 Test Stand, which will be a highly complex facility for testing of engines in high altitude conditions. The foundation of the ISHM capability are knowledge-based integrated domain models for the test stand and CSG, with physical and model-based elements represented by objects the domain models enable modular and evolutionary ISHM functionality.

Figueroa, Fernando↗

An Overview of Propulsion Concept Studies and Risk Reduction Activities for Robotic Lunar Landers

In support of designing robotic lunar lander concepts, the propulsion team at NASA Marshall Space Flight Center (MSFC) and the Johns Hopkins University Applied Physics Laboratory (APL), with participation from industry, conducted a series of trade studies on propulsion concepts with an emphasis on light-weight, advanced technology components. The results suggest a high-pressure propulsion system may offer some benefits in weight savings and system packaging. As part of the propulsion system, a solid rocket motor was selected to provide a large impulse to reduce the spacecraft s velocity prior to the lunar descent. In parallel to this study effort, the team also began technology risk reduction testing on a high thrust-to-weight descent thruster and a high-pressure regulator. A series of hot-fire tests was completed on the descent thruster in vacuum conditions at NASA White Sands Test Facility (WSTF) in New Mexico in 2009. Preparations for a hot-fire test series on the attitude control thruster at WSTF and for pressure regulator testing are now underway. This paper will provide an overview of the concept trade study results along with insight into the risk mitigation activities conducted to date.

Trinh, Huu P.↗

Climbing the Extravehicular Activity (EVA) Wall - Safely

The success of the EVA team, that includes the EVA project office, Crew Office, Mission Operations, Engineering and Safety, is assured by the full integration of all necessary disciplines. Safety participation in all activities from hardware development concepts, certification and crew training, provides for a strong partnership within the team. Early involvement of Safety on the EVA team has mitigated risk and produced a high degree of mission success.

Fuentes, Jose↗

Guidance, Navigation and Control (GN and C) Design Overview and Flight Test Results from NASA's Max Launch Abort System (MLAS)

The National Aeronautics and Space Administration Engineering and Safety Center designed, developed and flew the alternative Max Launch Abort System (MLAS) as risk mitigation for the baseline Orion spacecraft launch abort system already in development. The NESC was tasked with both formulating a conceptual objective system design of this alternative MLAS as well as demonstrating this concept with a simulated pad abort flight test. Less than 2 years after Project start the MLAS simulated pad abort flight test was successfully conducted from Wallops Island on July 8, 2009. The entire flight test duration was 88 seconds during which time multiple staging events were performed and nine separate critically timed parachute deployments occurred as scheduled. This paper provides an overview of the guidance navigation and control technical approaches employed on this rapid prototyping activity; describes the methodology used to design the MLAS flight test vehicle; and lessons that were learned during this rapid prototyping project are also summarized.

Dennehy, Cornelius J.↗

Evaluation of the NASA Arc Jet Capabilities to Support Mission Requirements

NASA accomplishes its strategic goals through human and robotic exploration missions. Many of these missions require launching and landing or returning spacecraft with human or return samples through Earth's and other planetary atmospheres. Spacecraft entering an atmosphere are subjected to extreme aerothermal loads. Protecting against these extreme loads is a critical element of spacecraft design. The safety and success of the planned mission is a prime concern for the Agency, and risk mitigation requires the knowledgeable use of thermal protection systems to successfully withstand the high-energy states imposed on the vehicle. Arc jets provide ground-based testing for development and flight validation of re-entry vehicle thermal protection materials and are a critical capability and core competency of NASA. The Agency's primary hypersonic thermal testing capability resides at the Ames Research Center and the Johnson Space Center and was developed and built in the 1960s and 1970s. This capability was critical to the success of Apollo, Shuttle, Pioneer, Galileo, Mars Pathfinder, and Orion. But the capability and the infrastructure are beyond their design lives. The complexes urgently need strategic attention and investment to meet the future needs of the Agency. The Office of Chief Engineer (OCE) chartered the Arc Jet Evaluation Working Group (AJEWG), a team of experienced individuals from across the Nation, to capture perspectives and requirements from the arc jet user community and from the community that operates and maintains this capability and capacity. This report offers the AJEWG's findings and conclusions that are intended to inform the discussion surrounding potential strategic technical and investment strategies. The AJEWG was directed to employ a 30-year Agency-level view so that near-term issues did not cloud the findings and conclusions and did not dominate or limit any of the strategic options.

Calomino, Anthony↗

NASA TEERM Hexavalent Chrome Alternatives Projects

This slide presentation reviews the NASA/DOD projects to select an alternative to hexavalent chrome in the aerospace industry. The Phase I process of the project performed: (1) Evaluation and testing of non-chromated coating systems as replacements for hexavalent chrome coatings in aircraft and aerospace applications. (2) Testing of coating systems to DoD and NASA specifications for corrosion resistance and adhesion. (3) Bare corrosion resistance and atmospheric exposure will be focus areas of Phase II Testing. The description includes a chart that summarizes the 3000 hour salt fog test results. The second phase of the project includes (1) Evaluation and testing of coating systems that do not contain hexavalent chrome as replacements for aerospace applications. (2) Evaluation of coatings at Beach Test Site and Launch Complex 39B (3) Evaluation of non-chrome coatings for electronic housings (bare corrosion resistance and electrical impedance) is a part of this round of testing. This project was performed for the Technology Evaluation for Environmental Risk Mitigation (TEERM)

Rothgeb, Matt↗

NASA TEERM Hexavalent Chrome Alternatives Projects

This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.

Kessel, Kurt↗

The Role of Uncertainty in Aerospace Vehicle Analysis and Design

Effective uncertainty quantification (UQ) begins at the earliest phase in the design phase for which there are adequate models and continues tightly integrated to the analysis and design cycles as the refinement of the models and the fidelity of the tools increase. It is essential that uncertainty quantification strategies provide objective information to support the processes of identifying, analyzing and accommodating for the effects of uncertainty. Assessments of uncertainty should never render the results more difficult for engineers and decision makers to comprehend, but instead provide them with critical information to assist with resource utilization decisions and risk mitigation strategies. Success would be measured by the tools to enable engineers and decision makers to effectively balance critical project resources against system requirements while accounting for the impact of uncertainty.

Kenny, Sean P.↗

Modeling, Analysis and Simulation Approaches Used in Development of the National Aeronautics and Space Administration Max Launch Abort System

The National Aeronautics and Space Administration (NASA) Engineering and Safety Center was chartered to develop an alternate launch abort system (LAS) as risk mitigation for the Orion Project. Its successful flight test provided data for the design of future LAS vehicles. Design of the flight test vehicle (FTV) and pad abort trajectory relied heavily on modeling and simulation including computational fluid dynamics for vehicle aero modeling, 6-degree-of-freedom kinematics models for flight trajectory modeling, and 3-degree-of-freedom kinematics models for parachute force modeling. This paper highlights the simulation techniques and the interaction between the aerodynamics, flight mechanics, and aerodynamic decelerator disciplines during development of the Max Launch Abort System FTV.

Yuchnovicz, Daniel E.↗

Communicating Medical Needs to Non-Medical Managers

Differences in communication styles and languages between groups often lead to miscommunication, confusion, and/or frustration. Engineers, computer specialists, clinicians, and managers often utilize the English language in very different ways, with different groups using the same words to represent different concepts ("complaint" is a typical example). In addition, medical issues are often perceived as "off-nominal" and not "primary mission tasks" by managers, which can cause them to assign lower priorities to medical training time and resources. Knowledge bases differ due to variations in training and skill sets, and the goals (both immediate and long-term) of the communicators may also vary, with managers being primarily concerned with overall mission objectives, while clinicians focus on individual or group health issues. Furthermore, true communication is only possible when clinicians possess a deep understanding of mission requirements as well as the ability to communicate medical requirements on a priority basis using risk assessment, added value, and cost benefit analysis. These understandable differences may contribute to difficulties in expressing concerns and ideas in an efficient manner, particularly in projects, such as the space program or many military operations, where these varied groups must collaborate, and where the final decisions must be made by fully informed mission commanders. Methods: Three scenario-based approaches were developed utilizing decision trees and problem based learning, to help define and integrate these concepts. Results: Use of these techniques by NASA and military personnel will be presented. Discussion: To enhance communication, particularly of medical needs, one must identify the concerns and motivating factors for the other groups; for example, members of management may focus on financial concerns, a desire for risk mitigation, public perceptions, mission objectives, etc. Training clinicians to frame issues in these terms may lead to better understanding of the medical concerns by other groups.

Bacal, Kira↗

A Review of the NASA MLAS Flight Demonstration

The NASA Engineering and Safety Center (NESC) has tested the Max Launch Abort System (MLAS) as a risk-mitigation design should problems arise with the baseline Orion spacecraft launch abort design. The Max in MLAS is not Maximum, but rather dedicated to Max Faget, the renowned NASA Spacecraft designer. In July 2009, the mission was flown, with great success, from the NASA Wallops Flight Facility. The MLAS flight test vehicle prototype consists of a boost skirt, coast skirt, and the MLAS fairing itself, which houses an Orion Command Module (CM) boilerplate. The objective of the MLAS flight test is to reorient the fairing with the CM, weighing approximately 29,000 lbs and traveling 290 fps, 180 degrees to an orientation suitable for the release of the CM during a pad abort or low altitude abort. The boost and coast skirts provide the necessary thrust and stability to establish the flight test conditions and are released prior to the reorientation of the fairing. A secondary test objective after successful release of the CM from the fairing is to demonstrate the removal of the CM forward bay cover (FBC) with the CM drogue parachutes, and subsequent deployment of the CM main parachutes attached to the FBC. Although multiple parachute deployments are used in the MLAS flight test vehicle to complete its objective, there are only two parachute types employed in the flight test. Five of the nine parachutes used for MLAS are 27.6 ft DO ribbon parachutes already proven as a spin/stall parachute for military aircraft, and the remaining four are G-12 cargo parachutes modified for increased strength and reefing. This paper presents an overview of the 27.6 ft DO ribbon parachute system employed on the MLAS flight test vehicle for coast skirt separation, fairing reorientation, and as CM drogue parachutes. Discussion will include: the process used to select this design; descriptions of all components of the parachute system; the minor modifications necessary to adapt the parachute to the MLAS program; the techniques used to analyze the parachute for the multiple roles it performs including discussions of how the evolution of the program affected parachute usage and analysis; a summary of the results of the highly successful flight test, including video of the flight test; and an overview of the subsequent post-test analysis.

Taylor, Anthony P.↗

Development of Tools and Techniques for Processing STORRM Flight Data

While at JSC for the summer of 2011, I was assigned to work on the sensor test for Orion relative-navigation risk mitigation (STORRM) development test objective (DTO). The STORRM DTO was flown on-board Endeavor during STS-134. The objective of the STORRM DTO is to test the visual navigation system (VNS), which will be used as the primary relative navigation sensor for the Orion spacecraft. The VNS is a flash lidar system intended to provide both line of sight and range information during rendezvous and proximity operations. The STORRM DTO also serves as a testbed for the high-resolution docking camera. This docking camera will be used to provide piloting cues for the crew during proximity operations. These instruments were mounted next to the trajectory control sensor (TCS) in Endeavour s payload bay. My principle objective for the summer was to generate a best estimated trajectory (BET) for Endeavor using the flight data collected by the VNS during rendezvous and the unprecedented re-rendezvous with the ISS. I processed the raw images from the VNS to produce range and bearing measurements. I then aggregated these measurements and extracted the measurements corresponding to individual reflectors. I combined the information contained in these measurements with data from the Endeavour's inertial sensors using Kalman smoothing techniques to ultimately produce a BET. This work culminated with a final presentation of the result to division management. Development of this tool required that traditional linear smoothing techniques be modified in a novel fashion to permit for the inclusion of non-linear measurements. This internship has greatly helped me further my career by providing exposure to real engineering projects. I also have benefited immensely from the mentorship of the engineers working on these projects. Many of the lessons I learned and experiences I had are of particular value because then can only be found in a place like JSC.

Robinson, Shane↗

Radiation Status of Sub-65 nm Electronics

Ultra-scaled complementary metal oxide semiconductor (CMOS) includes commercial foundry capabilities at and below the 65 nm technology node Radiation evaluations take place using standard products and test characterization vehicles (memories, logic/latch chains, etc.) NEPP focus is two-fold: (1) Conduct early radiation evaluations to ascertain viability for future NASA missions (i.e. leverage commercial technology development). (2) Uncover gaps in current testing methodologies and mechanism comprehension -- early risk mitigation.

Pellish, Jonathan A.↗

Cooperative Lander-Surface/Aerial Microflyer Missions for Mars Exploration

Concepts are being investigated for exploratory missions to Mars based on Bioinspired Engineering of Exploration Systems (BEES), which is a guiding principle of this effort to develop biomorphic explorers. The novelty lies in the use of a robust telecom architecture for mission data return, utilizing multiple local relays (including the lander itself as a local relay and the explorers in the dual role of a local relay) to enable ranges ~10 to 1,000 km and downlink of color imagery. As illustrated in Figure 1, multiple microflyers that can be both surface or aerially launched are envisioned in shepherding, metamorphic, and imaging roles. These microflyers imbibe key bio-inspired principles in their flight control, navigation, and visual search operations. Honey-bee inspired algorithms utilizing visual cues to perform autonomous navigation operations such as terrain following will be utilized. The instrument suite will consist of a panoramic imager and polarization imager specifically optimized to detect ice and water. For microflyers, particularly at small sizes, bio-inspired solutions appear to offer better alternate solutions than conventional engineered approaches. This investigation addresses a wide range of interrelated issues, including desired scientific data, sizes, rates, and communication ranges that can be accomplished in alternative mission scenarios. The mission illustrated in Figure 1 offers the most robust telecom architecture and the longest range for exploration with two landers being available as main local relays in addition to an ephemeral aerial probe local relay. The shepherding or metamorphic plane are in their dual role as local relays and image data collection/storage nodes. Appropriate placement of the landing site for the scout lander with respect to the main mission lander can allow coverage of extremely large ranges and enable exhaustive survey of the area of interest. In particular, this mission could help with the path planning and risk mitigation in the traverse of the long-distance surface explorer/rover. The basic requirements of design and operation of BEES to implement the scenarios are discussed. Terrestrial applications of such concepts include distributed aerial/surface measurements of meteorological events, i.e., storm watch, seismic monitoring, reconnaissance, biological chemical sensing, search and rescue, surveillance, autonomous security/ protection agents, and/or delivery and lateral distribution of agents (sensors, surface/subsurface crawlers, clean-up agents). Figure 2 illustrates an Earth demonstration that is in development, and its implementation will illustrate the value of these biomorphic mission concepts.

Thakoor, Sarita↗

Software for Probabilistic Risk Reduction

A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.

Hensley, Scott↗

Technology Development to Support Human Health and Performance in Exploration Beyond Low Earth Orbit

In the course of defining the level of risks and mitigating the risks for exploration missions beyond low Earth orbit, NASA s Human Research Program (HRP) has identified the need for technology development in several areas. Long duration missions increase the risk of serious medical conditions due to limited options for return to Earth; no resupply; highly limited mass, power, volume; and communication delays. New space flight compatible medical capabilities required include: diagnostic imaging, oxygen concentrator, ventilator, laboratory analysis (saliva, blood, urine), kidney stone diagnosis & treatment, IV solution preparation and delivery. Maintenance of behavioral health in such an isolated, confined and extreme environment requires new sensory stimulation (e.g., virtual reality) technology. Unobtrusive monitoring of behavioral health and treatment methods are also required. Prolonged exposure to weightlessness deconditions bone, muscle, and the cardiovascular system. Novel exercise equipment or artificial gravity are necessary to prevent deconditioning. Monitoring of the degree of deconditioning is required to ensure that countermeasures are effective. New technologies are required in all the habitable volumes (e.g., suit, capsule, habitat, exploration vehicle, lander) to provide an adequate food system, and to meet human environmental standards for air, water, and surface contamination. Communication delays require the crew to be more autonomous. Onboard decision support tools that assist crew with real-time detection and diagnosis of vehicle and habitat operational anomalies will enable greater autonomy. Multi-use shield systems are required to provide shielding from solar particle events. The HRP is pursuing the development of these technologies in laboratories, flight analog environments and the ISS so that the human health and performance risks will be acceptable with the available resources.

Kundrot, C.E.↗