Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

MEASURING RISK IMPORTANCE IN A DYNAMIC PRA FRAMEWORK

Risk importance measures are indexes that are used to rank systems, structures and components (SSCs) using risk-informed methods. The most used/known measures are: Risk Reduction Worth (RRW), Risk Achievement Worth (RAW), Birnbaum (B) and Fussell-Vesely (FV). Once obtained from classical Probabilistic Risk Analysis (PRA) analyses, these risk measures can be effectively employed to optimize component testing and maintenance. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. The objective of this paper is to present a series of algorithms that can be used to determine classical risk importance measures (RRW, RAW, B and FV) along with newly developed ones from a Dynamic PRA analysis.

97 MATHEMATICS AND COMPUTING↗

Risk-Informed Applications and Science – Past, Present, & Future

This is a presentation to be made at the University of Tokyo. The Idaho National Laboratory is creating the next-generation reliability- and risk-assessment methods and tools that support risk-informed decision-making by combining physics-based models with probabilistic quantification approaches. Integrating these two worlds of physics and probability using a simulation framework leads us to predictions based upon an approach called “computational risk assessment” which will serve as the technical basis for the future of reliability and risk approaches. The driving factors for this new approach includes: temporal (timing issues), spatial (location issues), mechanistic (physics issues), and topological (complexity issues). By combining phenomenology directly with stochastic quantification, we are able to perform advanced uncertainty analysis directly on both parameters and models. In addition, new tools allow for the creation of reduced order models that mimic high-fidelity engineering models while still permitting the realization of thousands of simulation iterations in short run-times on current workstation-class computers. While these advanced methods and tools can provide increased realism in our engineering safety and risk approaches, their greater benefit is to provide a risk-informed engineering framework for design and operation. This talk will briefly review the history of risk assessment and risk-informed applications, describe some of the current research and development found at the Idaho National Laboratory, and discuss potential future applications and approaches for advanced methods and tools.

97 MATHEMATICS AND COMPUTING↗

Radionuclide Risk Coefficient Uncertainty Distributions for Use in Performance Assessments - 19156

Traditionally, radiation dose has been used as the regulatory criterion for decision making in performance assessments (PAs), despite the concept of cancer risk arguably being a more easily understood endpoint than dose for the public, and a preferable metric for decision analysis. However, the United States Environmental Protection Agency (EPA) has developed risk parameters for use in risk assessments and PAs in the form of radionuclide-specific risk coefficients, or RCs, which are published in various Federal Guidance Reports (FGRs). RCs are employed as scalars to convert environmental radionuclide exposure (via ingestion, inhalation, and external exposure) estimates to incremental lifetime cancer risk (ILCR). ILCR is the additional cancer risk averaged over a lifetime, over-and-above all-cause cancer risk, associated with carcinogen exposure. Uncertainties associated with RCs are discussed in FGR 13 and in a joint report published by EPA and Oak Ridge National Laboratory, but statistical distributions for the RCs were not directly developed. The uncertainty assessments in the EPA/ONRL report were based on dosimetric modeling and elicitation of nine experts. From these sources, five uncertainty categories were defined based on ratios of the 5. and 95. quantiles of uncertainty. Thus, the representations of uncertainty defined by EPA/ORNL are not distributions in a traditional sense. Furthermore, the authors only addressed uncertainty in RCs for inhalation and ingestion pathways. We develop a methodology for assigning statistical distributions to EPA's published mortality RC values (i.e. to estimate the probability of dying from radiation-induced cancers) for the inhalation (slow, medium, and fast absorption types), ingestion (water, food, and soil), and external exposure pathways associated with all cancer types. We employed the same dosimetric concepts and assumptions as EPA/ORNL, including cancer risk (dose-response) distributional information from a previous expert elicitation, which was also employed by EPA/ORNL in their work. We assumed that uncertainty in RCs can be described by lognormal distributions based on the modeling conducted previously by EPA/ORNL, and that point estimates tabulated in FGR 13 represent median values of the distributions. We also extended EPA/ORNL's uncertainty ratios to statistical distributions for external exposure RCs. The results are a set of radionuclide-specific distributions that are applicable in PAs that focus on cancer mortality. These distributions are currently and will subsequently be employed in PAs at various sites, in addition to the required regulatory dose limits. Quantification of ILCRs and associated uncertainty in PAs will provide regulators and the public with additional information for good decision making. Future directions include further refinement of the distributions and development of statistical distributions for morbidity RCs, which are used to estimate the probability of developing, but not necessarily dying as a result of, radiation-induced cancer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Health Risk Assessment for Improper Landfill Disposal of End-of-Life CdTe Modules

The present work is a continuation of the 2020 IEA PVPS Task 12 Human Health Risk Assessment Methods for PV Part 3: Module Disposal Risks. The 2020 report performed a human health risk assessment (HHRA) for disposal of a cadmium telluride (CdTe) PV module in an unlined landfill, focusing solely on risks from cadmium. This study extends the 2020 HHRA on CdTe PV, analyzing eleven constituent elements: Cd, Se, Te, Cu, Si, Cr(III), Mo, Sn, Zn, Ni, and Al. The present HHRA was performed through two methods: utilization of the U.S. Environmental Protection Agency's (USEPA) Delisting Risk Assessment Software (DRAS V.4.0) on eight exposure pathways for cancer risk and non-cancer hazards; and comparison of exposure point concentrations to federal standards for groundwater, surface water, air, and soil exposure pathways. Cancer risks and non-cancer hazards posed by elemental leaching through all evaluated exposure pathways, using both methods, were found to be several orders of magnitude below USEPA health-protective thresholds. Cadmium exhibited both the highest risks and lowest uncertainty considering data availability on chemical content, leachate, and federal screening levels.

CdTe↗

Addressing Consequence within Operational Risk (O.T. Gagnon III) 9-18-2024

Addressing Consequence within Operational Risk: Why threats and security are just not that important! When dealing with cyber or physical risk within any critical infrastructure (CI) environment, don’t concern yourself with vulnerabilities and threats, at least not at first! Also, don’t be overly fixated on “securing the systems” within the organization. The endeavor of tackling operational risk focused on consequences in any critical infrastructure environment to include the complex Aviation ecosystem is challenging even for the most resourced entity but can be advanced though a simplified approach: identifying, binning, and prioritizing the infrastructure environment. While no two entities within a single element of the 16 critical infrastructure sectors are exactly alike when it comes to risk, there is a basic process to move toward a greater understanding of operational risk through becoming more informed about the infrastructure environment in which the entity exists. The process starts with bringing internal and external stakeholders and subject matter experts together to analyze key areas such as Information Technology (IT) and Operational Technology (OT) components and points of convergence, analyzing internal and external cyber and physical dependencies, accounting for explosive growth in devices and wireless technology, and leveraging the contributions of people inside and outside the operational environment. Attaining a common understanding of the infrastructure environment as part of addressing consequences within operational risk is not easy to do or resource light, but the process outlined provides the framework to further any entity’s efforts in this space. When it comes to cyber risks, before an organization can consider vulnerabilities within and threats to its operations, it must first have a solid understanding of the consequences existing inside its infrastructure environment. Idaho National Lab’s Consequence-Driven, Cyber-Informed Engineering is offered as an example of this approach to effective and efficient cyber risk mitigation.

99 GENERAL AND MISCELLANEOUS↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant (Presentation)

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizable. To address this challenge, this study aims to develop a financial model that quantifies the risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of value at risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and assess the potential reduction in investor risk exposure. This paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verifying the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. This paper’s results present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Digital risk analysis in nuclear engineering projects: Designing for safety, performance, reliability, and security

Cyber-informed engineering and security-by-design frameworks are important in promoting the need to identify cybersecurity concerns early in the systems engineering lifecycle so risks from adversarial cyber-attacks can be eliminated or reduced through engineering design practices. In addition to adversarial risk, risk in operational technology systems also includes non-adversarial and unintentional risk from other factors such as human performance errors, environmental conditions, design flaws, and device degradation or failure. This paper introduces a new concept for characterizing digital risk, both adversarial and non-adversarial, and provides the basis for initial research into a novel digital risk analysis approach focused on incorporating attack difficulty into a multi-attribute analysis technique using robust decision-making. This digital risk characterization is also used to frame a discussion on the challenges of competing objectives and competing stakeholder requirements in an integrated energy system project that incorporates a small modular reactor and industrial facility.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development and validation of a diabetes risk score among two populations

The purpose of this study was to assess the validity of a practical diabetes risk score amongst two heterogenous populations, a working population and a non-working population. Study population 1 (n = 2,089) participated in a large-scale screening program offered to retired workers to discover previously undetected/incipient chronic illness. Study population 2 (n = 3,293) was part of a Colorado worksite wellness program health risk assessment. We assessed the relationship between a continuous diabetes risk score at baseline and development of diabetes in the future using logistic regression. Receiver operating curves and sensitivity/specificity of the models were calculated. Across both study populations, we observed that participants with diabetes at follow-up had higher diabetes risk scores at baseline than participants who did not have diabetes at follow-up. On average, the odds ratio of developing diabetes in the future was 1.38 (95% CI: 1.26–1.50, p < 0.0001) for study population 1 and 1.68 (95% CI: 1.45–1.95, p-value < 0.0001) for study population 2. These findings indicate that the diabetes risk score may be generalizable to diverse individuals, and thus potentially a population level diabetes screening tool. Minimally-invasive diabetes risk scores can aid in the identification of sub-populations of individuals at risk for diabetes.

60 APPLIED LIFE SCIENCES↗

Female “Paradox” in Atrial Fibrillation—Role of Left Truncation Due to Competing Risks

Female sex in patients with atrial fibrillation (AF) is a controversial and paradoxical risk factor for stroke—controversial because it increases the risk of stroke only among older women of some ethnicities and paradoxical because it appears to contradict male predominance in cardiovascular diseases. However, the underlying mechanism remains unclear. We conducted simulations to examine the hypothesis that this sex difference is generated non-causally through left truncation due to competing risks (CR) such as coronary artery diseases, which occur more frequently among men than among women and share common unobserved causes with stroke. We modeled the hazards of stroke and CR with correlated heterogeneous risk. We assumed that some people died of CR before AF diagnosis and calculated the hazard ratio of female sex in the left-truncated AF population. In this situation, female sex became a risk factor for stroke in the absence of causal roles. The hazard ratio was attenuated in young populations without left truncation and in populations with low CR and high stroke incidence, which is consistent with real-world observations. This study demonstrated that spurious risk factors can be identified through left truncation due to correlated CR. Female sex in patients with AF may be a paradoxical risk factor for stroke.

59 BASIC BIOLOGICAL SCIENCES↗

Risk as a Resource: A New Paradigm

In the new NASA, risk management must be developed as a skill to a far greater degree than has existed in the past. Past approaches have produced great successes but at great cost and lengthy schedules. In the future, risk and its component contributors must be re-evaluated. There are three contexts of risk that will be addressed in this paper: risk as a resource, which expands and shifts traditional risk considerations; marginal cost of risk, which addresses the cumulative and time related effects of risk reduction; and an alternative definition or new meaning of success and how it relates to work.

risk management risk success mission risk↗

Third-Party Supplier Risk Re-Classification Using Multi-Model Semantic Voting and External Web Augmentation

Risk decisions in many third-party risk management (TPRM) workflows rely on static inherent risk questionnaires (IRQ). These static forms provide a snapshot of the vendor from the business users’ perspective, as these requests are processed without cross-referencing for evidence. Consequently, responses can be misinformed or embellished with inaccuracies, thereby masking the vendor’s true risk to the enterprise. This paper presents a multi-stage verification framework to augment IRQs with web evidence and a deterministic ensemble of large language model assessors to reclassify risk. In a case study of 100 submissions previously misclassified as low risk, the proposed framework correctly identified 76% of the cases as high risk, while the existing workflow identified none. McNemar’s continuity corrected statistics of 74 were obtained with a two sided p-value of 2.65 × 10-23, indicating a significantly more effective workflow compared to the legacy model.

99 - GENERAL AND MISCELLANEOUS↗

Health, safety, and environmental risks from energy production: A year-long reality check

Large-scale carbon dioxide capture and storage (CCS) offers the benefit of reducing CO{sub 2} emissions and thereby mitigating climate change risk, but it will also bring its own health, safety, and environmental risks. Curtis M. Oldenburg, Editor-in-Chief, considers these risks in the context of the broader picture of energy production. Over the last year, there have been major acute health, safety, and environmental (HSE) consequences related to accidents involving energy production from every major primary energy source. These are, in chronological order: (i) the Upper Big Branch (coal) Mine disaster, (ii) the Gulf of Mexico Macondo (oil) well blowout, (iii) the San Bruno (natural gas) pipeline leak and explosion, and (iv) the Fukushima (nuclear) reactor radioactivity releases. Briefly, the Upper Big Branch Mine disaster occurred in West Virginia on April 5, 2010, when natural methane in the mine ignited, causing the deaths of 29 miners, the worst coal mine disaster in the USA since 1970. Fifteen days later, the Macondo oil well in the Gulf of Mexico suffered a blowout, with a gas explosion and fire on the floating drilling platform that killed 11 people. The oil and gas continued to flow out of the well at the seafloor until July 15, 2010, spilling a total of approximately 5 million barrels of oil into the sea. On September 9, 2010, a 30-inch (76-cm) buried, steel, natural gas pipeline in San Bruno, California, leaked gas and exploded in a residential neighborhood, killing 8 people in their homes and burning a total of 38 homes. Flames were up to 1000 ft (300 m) high, and the initial explosion itself reportedly measured 1.1 on the Richter scale. Finally, on March 11, 2011, a magnitude 9.0 earthquake off the coast of Japan's main island, Honshu, caused a tsunami that crippled the backup power and associated cooling systems for six reactor cores and their spent fuel storage tanks at the Fukushima nuclear power plant. At time of writing, workers trying to bring the crisis under control have been exposed to dangerous levels of radiation, and radioactive water and particulates have been released to the sea and atmosphere. These four disasters, all of which occurred within the past 12 months, were not unprecedented; similar events differing only in detail have happened around the world before, and such events will occur again. Today, developed nations primarily use fossil fuels to create affordable energy for comforts such as lighting, heating and air-conditioning, refrigeration, transportation, education, and entertainment, as well as for powering manufacturing, which creates jobs and a wealth of material goods. In addition to the risks of the existing energy infrastructure that have become obvious through these recent disasters, there is also the ongoing risk of climate change that comes from the vast emissions of greenhouse gases, primarily CO{sub 2}, from the burning of fossil fuels. The implementation of CO{sub 2} capture and storage (CCS) will help mitigate CO{sub 2} emissions from fossil fuel energy, but it also carries with it HSE risks. In my personal interactions with the public and with students, the main concern voiced is whether CO{sub 2} could leak out of the deep reservoirs into which it is injected and rise up out of the ground, smothering people and animals at the ground surface. Another concern expressed is that CO{sub 2} pipelines could fail and cause similar gaseous plumes of CO{sub 2}. The widespread concerns about CO{sub 2} leaking out over the ground surface may be inspired by events that have happened within natural systems in equatorial Africa, in Indonesia, and in Italy. Researchers have been investigating a wide variety of HSE risks of geologic CO{sub 2} storage for some time and have determined that wells are the main potential pathways for significant leakage from the deep subsurface. I discuss the acute HSE risks of CO{sub 2} leakage through wells and from pipelines, and compare the behavior of failures in CO{sub 2} wells and pipelines with oil and gas analogues from which most of our experience derives.

54 ENVIRONMENTAL SCIENCES↗

Risk Prediction of New Adjacent Vertebral Fractures After PVP for Patients with Vertebral Compression Fractures: Development of a Prediction Model

PurposeWe aim to determine the predictors of new adjacent vertebral fractures (AVCFs) after percutaneous vertebroplasty (PVP) in patients with osteoporotic vertebral compression fractures (OVCFs) and to construct a risk prediction score to estimate a 2-year new AVCF risk-by-risk factor condition.Materials and MethodsPatients with OVCFs who underwent their first PVP between December 2006 and December 2013 at Hospital A (training cohort) and Hospital B (validation cohort) were included in this study. In training cohort, we assessed the independent risk predictors and developed the probability of new adjacent OVCFs (PNAV) score system using the Cox proportional hazard regression analysis. The accuracy of this system was then validated in both training and validation cohorts by concordance (c) statistic.Results421 patients (training cohort: n = 256; validation cohort: n = 165) were included in this study. In training cohort, new AVCFs after the first PVP treatment occurred in 33 (12.9%) patients. The independent risk factors were intradiscal cement leakage and preexisting old vertebral compression fracture(s). The estimated 2-year absolute risk of new AVCFs ranged from less than 4% in patients with neither independent risk factors to more than 45% in individuals with both factors.ConclusionsThe PNAV score is an objective and easy approach to predict the risk of new AVCFs.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Local Ultrasound-Facilitated Thrombolysis in High-Risk Pulmonary Embolism: First Dutch Experience

Purpose: To provide insight into the current use and results of ultrasound-facilitated catheter-directed thrombolysis (USAT) in patients with high-risk pulmonary embolism (PE). Introduction: Systemic thrombolysis is an effective treatment for hemodynamically unstable, high-risk PE, but is associated with bleeding complications. USAT is thought to reduce bleeding and is therefore advocated in patients with high-risk PE and contraindications for systemic thrombolysis. Methods: We conducted a retrospective cohort study of all patients who underwent USAT for high-risk PE in the Netherlands from 2010 to 2017. Characteristics and outcomes were analyzed. Primary outcomes were major (including intracranial and fatal) bleeding and all-cause mortality after 1 month. Secondary outcomes were all-cause mortality and recurrent venous thromboembolism within 3 months. Results: 33 patients underwent USAT for high-risk PE. Major bleeding occurred in 12 patients (36%, 95% CI 22–53), including 1 intracranial and 3 fatal bleeding. All-cause mortality after 1 month was 48% (16/33, 95% CI 31–66). All-cause mortality after 3 months was 50% (16/32, 95% CI 34–66), recurrent venous thromboembolism occurred in 1 patient (1/32, 3%, 95% CI 1–16). Conclusions: This study was the first to describe characteristics and outcomes after USAT in a study population of patients with high-risk PE only, an understudied population. Although USAT is considered a relatively safe treatment option, our results illustrate that at least caution is needed in critically ill patients with high-risk PE. Further research in patients with high-risk PE is warranted to guide patient selection.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Geomechanical risk assessment for subsurface fluid disposal operations

Numerical models are commonly used to estimate the state of stress in the subsurface for various engineering applications. These estimates are subject to considerable uncertainty, and yet, the estimates are almost always deterministic, yielding no information about the certainty of the prediction. For some applications, unquantified uncertainties in stress are often acceptable, because the risks related to geomechanics may be of low relative importance compared to other risks (e.g. recoverable resource volume), for which uncertainties are often quantified. Furthermore, many geomechanics-related risks in the petroleum industry are relatively short lived (e.g. well bore stability), and decrease in importance with time. In contrast, for waste water injection or geologic carbon sequestration (GCS), geomechanics-related risks (e.g. seal integrity, induced seismicity) are on par with resource-related risks and are of long-term concern, with the risk generally increasing in importance for a significant period of time. For these reasons, the deterministic stress estimation and risk analysis approaches generally applied in the petroleum industry are insufficient for GCS applications. This paper describes a Bayesian approach to geomechanical uncertainty quantification and risk assessment. The method is demonstrated using data from an active enhanced oil recover/geologic carbon sequestration field as a case study

Burghardt, Jeffrey A.↗