Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Risks of Hazardous Substances in Radioactive Waste for the Konrad Repository in Germany - 17522

When disposing of radioactive waste with negligible heat generation, the activity of the radionuclides is limited. However, the waste including radioactive material comprises a certain proportion of non-radioactive material. The risk of hazardous contamination of the groundwater by non-radioactive substances must be taken into account. It must be ascertained that the non-radioactive material cannot affect near-surface groundwater, which is a resource for drinking water supply. To achieve this, limit values on the amount of hazardous substances in the total waste volume shall be determined. In 2002 a regulatory approval was granted to the 'Konrad' final storage facility for radioactive waste with negligible heat generation according to the German Water Resources Act. This approval is embedded in the license (plan-approval decision) based on the German Atomic Energy Act. The approval is based on the model of a possible discharge of contaminants from the final storage facility. In a long-term simulation spanning 300,000 years, contact of the waste with the groundwater in the surrounding rock formations over the postoperational phase was conservatively assumed. The maximum amount of allowable disposal of substances - such that no concern of affecting the near-surface groundwater arises - can be derived from the solubility of the respective substances. Implementing the permit according to the Water Resources Act requires: - classification of the waste through delivery declaration obligations - monitoring the substance inspection in the waste to assess its suitability for the disposal, and - stock keeping procedures for the disposal waste by the operator. While the repository is operated by the Federal Office for Radiation Protection (BfS) (http://www.bfs.de./EN/home/home{sub n}ode;), reporting to the Federal Environment Ministry, the statutory water permit is issued and applied by the State of Lower Saxony as responsible state authority. A waste package/container list supplements a comprehensive list of substances. From this - depending on the respectively conditioned waste - material vectors can be derived. For this purpose, BfS provides a database with a substances and container list to the waste owners. In the meantime, first experiences have been collected in applying the approval. More than 540 waste containers with a total mass of almost 6,000 Mg have been controlled and are ready for disposal. In our presentation we will show the recent development in supervising the preparation for the disposal of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HANFORD TANK CLEANUP UPDATE MAY 2009 [VISIT US AT WWW.WRPSTOC.COM OR WWW.HANFORD.GOV/ORP/ FOR MORE INFORMATION]

Retrieval of waste from single-shell tank C-110 resumed in January making it the first waste retrieval operation for WRPS since taking over Hanford's Tank Operations Contract last October. Now, with approximately 90 percent of the waste removed, WRPS believes that modified sluicing has reached the limits of the technology to remove any further waste and is preparing documentation for use in decision making about any future retrieval actions. Tank C-110 is located in C Fann near the center of the Hanford Site. It is a 530,000 gallon tank, built in 1946, and held approximately 126,000 gallons of sludge and other radioactive and chemical waste materials when retrieval resumed. Modified sluicing technology uses liquid waste from a nearby double-shell tank to break up, dissolve and mobilize the solid material so it can be pumped. Because of the variety of waste fon11S, sluicing is often not able to remove all of the waste. The remaining waste will next be sampled for analysis, and results will be used to guide decisions regarding future actions. Work is moving rapidly in preparation to retrieve waste from a second single-shell tank this summer and transfer it to safer double-shell tank storage. Construction activities necessary to retrieve waste from Tank C-104, a 530,000 gallon tank built in 1943, are approximately 60 percent complete as WRPS maintains its focus on reducing the risk posed by Hanford's aging single-shell waste tanks. C-104 is one of Hanford's oldest radioactive and chemical waste storage tanks, containing approximately 263,000 gallons of wet sludge with a top layer that is dry and powdery. This will be the largest sludge volume retrieval ever attempted using modified sluicing technology. Modified sluicing uses high pressure water or liquid radioactive waste sprayed from nozzles above the waste. The liquid dissolves and/or mobilizes the waste so it can be pumped. In addition to other challenges, tank C-104 contains a significant amount of plutonium and uranium. It also contains a host of contaminated legacy equipment so the entire process is being managed carefully to protect workers and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Design of Processing and Storage Facilities for Small Volumes of Low and Intermediate Level Radioactive Waste including Disused Sealed Sources - 12372

There are a number of IAEA Member States generating relatively small quantities of radioactive waste and/or disused sealed sources in application of nuclear techniques in medicine, industry and research and in nuclear research centres having small research reactors. At present many of these Member States do not have facilities for processing and storing their radioactive wastes; notably in those countries with small quantities of generated radioactive wastes. In other Member States the existing waste processing and storage facilities (WPSF) are in need of varying degrees of upgrading in order to address new waste streams, incorporate new waste processing technologies, or expand interim storage capacities. The IAEA has developed a modular design approach for a WPSF that is based on a variety of modules for different waste stream treatment and conditioning processes. The modular WPSF design is elaborated in a substantial Design Engineering Package that will be published by IAEA as a technical report. The Design Engineering Package enables users to select the optimum waste processing and storage modules to meet their needs, and to specify the requirements for procurement of individual modules and their integration into a waste processing and storage facility. The Design Engineering Package is planned for publication by the IAEA in 2012 and is presented as: - A Design Engineering Package Summary document. - A supporting CD that contains: - Process module general specifications. - Process module interface specifications. - Design Engineering Package for process modules. - Sample technical specifications for design and construction of modular processing facility. - Design Engineering Package for storage modules. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Disused Sealed Sources in Austria - 12147

The use of sealed radiation sources is regulated by the Austrian Radiation Protection Act and the General Radiation Protection Ordinance. The Austrian radiation protection legislation requires minimisation of radioactive waste. The preferred radioactive waste management option concerning sealed sources, both spent and disused, is the return to the manufacturer. If this is not possible a reuse by a third party is encouraged. According to this requirement, disused sealed sources shall, as far as possible, be stored on the site of the licence holder until a new owner is found. If this is not possible, disused sealed sources shall be transported to Nuclear Engineering Seibersdorf, which is a recognised storage facility for radioactive waste in Austria, for temporary storage pending reuse. Sources, which cannot be reused, are declared as radioactive waste. Since Austria is a Member State of the European Union, the Council Directive 122/2003/Euratom on High Activity Sealed Sources and Orphan Sources is applied. This directive defines high activity sealed sources on the basis of their total activity. The possession of such sources is subject to certain obligations. Therefore it is in the interest of the owner to return disused sources as soon as possible to the manufacturer or to deliver them to Nuclear Engineering Seibersdorf. In case of the loss and finding of an 'orphan' source the competent authority secures, recovers and stores the source at the cost of the owner of the source with recourse. In line with the directive the licensee of a High Activity Sealed Source has to notify the main data concerning this source to the Central Source Register which is maintained by the Federal Minister of Agriculture, Forestry, Environment and Water Management for all radioactive sources. This register was put into operation in 2006. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Niagara Falls Storage Site - Interim Waste Containment Structure - 16199

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U.S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper will discuss the following: - Provide background information on the NFSS including the nature of the materials within the IWCS. - Explain the steps of the CERCLA and associated processes the Formerly Utilized Sites Remedial Action Program (FUSRAP) employs. - Describe the OUs for the NFSS property and the subunit designations used in the FS evaluations for the IWCS OU. - Provide the current project status within the CERCLA framework and path forward for all OUs and Vicinity Properties (VPs). Identify the Applicable or Relevant and Appropriate Requirements (ARARs) preferred by USACE and the regulatory agencies and explain the differences between the two positions. - Provide the comparative evaluation of the remedial alternatives assessed in the FS. - Identify the justifications for the USACE - Buffalo District selecting the preferred remedial alternative within the Proposed Plan. The remedial action objectives for the IWCS OU are designed to provide short- and long-term protection of human health and the environment. CERCLA requires that any action taken be protective of human health and the environment as well as be compliant with identified ARARs. USACE evaluated 'No Action' and four potential remedial alternatives for the IWCS OU that ranged from leaving all of the wastes in-place and installing a final cover to partial and full removal of the contents. The four alternatives met the remedial action objectives defined identified for the IWCS OU. In accordance with the statutory requirements of CERCLA Section 121, remedial alternatives must comply with two threshold criteria, overall protection of human health and the environment and compliance with ARARs, in order to be carried forward for further evaluation. If a remedial alternative meets the threshold criteria, it is evaluated against the following five balancing criteria: - Long-term effectiveness and permanence; - Reduction in toxicity, mobility, or volume through treatment; - Short-term effectiveness; - Implementability; and, - Cost. The Feasibility Study evaluation led to the preferred remedial alternative selection and this will be the focus of this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE HEEL REMOVAL BY ALUMINUM DISSOLUTION AT SAVANNAH RIVER SITE 12390

High Level Waste (HLW) at the Savannah River Site (SRS) is currently stored in aging underground storage tanks. This waste is a complex mixture of insoluble solids, referred to as sludge, and soluble salts. Continued long-term storage of these radioactive wastes poses an environmental risk. Operations are underway to remove and disposition the waste, clean the tanks and fill with grout for permanent closure. Heel removal is the intermediate phase of the waste retrieval and tank cleaning process at SRS, which is intended to reduce the volume of waste prior to treatment with oxalic acid. The goal of heel removal is to reduce the residual amount of radioactive sludge wastes to less than 37,900 liters (10,000 gallons) of wet solids. Reducing the quantity of residual waste solids in the tank prior to acid cleaning reduces the amount of acid required and reduces the amount of excess acid that could impact ongoing waste management processes. Mechanical heel removal campaigns in Tank 12 have relied solely on the use of mixing pumps that have not been effective at reducing the volume of remaining solids. The remaining waste in Tank 12 is known to have a high aluminum concentration. Aluminum dissolution by caustic leaching was identified as a treatment step to reduce the volume of remaining solids and prepare the tank for acid cleaning. Dissolution was performed in Tank 12 over a two month period in July and August, 2011. Sample results indicated that 16,440 kg of aluminum oxide (boehmite) had been dissolved representing 60% of the starting inventory. The evolution resulted in reducing the sludge solids volume by 22,300 liters (5900 gallons), preparing the tank for chemical cleaning with oxalic acid.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Documented Safety Analysis for the Waste Storage Facilities March 2010

This Documented Safety Analysis (DSA) for the Waste Storage Facilities was developed in accordance with 10 CFR 830, Subpart B, 'Safety Basis Requirements,' and utilizes the methodology outlined in DOE-STD-3009-94, Change Notice 3. The Waste Storage Facilities consist of Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area portion of the DWTF complex. These two areas are combined into a single DSA, as their functions as storage for radioactive and hazardous waste are essentially identical. The B695 Segment of DWTF is addressed under a separate DSA. This DSA provides a description of the Waste Storage Facilities and the operations conducted therein; identification of hazards; analyses of the hazards, including inventories, bounding releases, consequences, and conclusions; and programmatic elements that describe the current capacity for safe operations. The mission of the Waste Storage Facilities is to safely handle, store, and treat hazardous waste, transuranic (TRU) waste, low-level waste (LLW), mixed waste, combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL (as well as small amounts from other DOE facilities).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of historical waste from research reactors: the Dutch experience

Most radioactive waste emerges as well-defined waste streams from operating power reactors. The management of this is an on-going practice, based on comprehensive (IAEA) guidelines. A special waste category however consists of the historical waste from research reactors, mostly originating from various experiments in the early years of the nuclear era. Removal of the waste from the research site, often required by law, raises challenges: the waste packages must fulfill the acceptance criteria from the receiving storage site as well as the criteria for nuclear transports. Often the aged waste containers do not fulfill today's requirements anymore, and their contents are not well documented. Therefore removal of historical waste requires advanced characterization, sorting, sustainable repackaging and sometimes conditioning of the waste. This paper describes the Dutch experience of a historical waste removal campaign from the Petten High Flux research reactor. The reactor is still in operation, but Dutch legislation asks for central storage of all radioactive waste at the COVRA site in Vlissingen since the availability of the high- and intermediate-level waste storage facility HABOG in 2004. In order to comply with COVRA's acceptance criteria, the complex and mixed inventory of intermediate and low level waste must be characterized and conditioned, identifying the relevant nuclides and their activities. Sorting and segregation of the waste in a Hot Cell offers the possibility to reduce the environmental footprint of the historical waste, by repackaging it into different classes of intermediate and low level waste. In this way, most of the waste volume can be separated into lower level categories not needing to be stored in the HABOG, but in the less demanding LOG facility for low-level waste instead. The characterization and sorting is done on the basis of a combination of gamma scanning with high energy resolution of the closed waste canister and low-resolution localized gamma scanning inside a hot cell. A complicating factor is that the conditioning of the waste, consisting of compacting and cementing, would require such an extensive infrastructure at the Petten site, that it appeared to be more practical to have it executed by a foreign service provider. Therefore the waste packages have to comply with cross-border transport and waste acceptance criteria, and the national legislation of this service provider too. This paper describes this historical waste project, focusing on the fast and precise characterization approach, the expert system behind it, and the sorting and repackaging effort at the Petten site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Monitoring and Control Before Decommissioning of the Research Reactor VVR-S from Magurele-Bucharest

The research reactor type VVR-S (tank type, water is cooler, moderator and reflector, thermal power- 2 MW, thermal energy- 9. 52 GW d) was put into service in July 1957 and, in December 1997 was shout down. In 2002, Romanian Government decided to put the research reactor in the permanent shut-down in order to start the decommissioning. This nuclear facility was used in nuclear research and radioisotope production for 40 years, without events, incidents or accidents. Within the same site, in the immediate vicinity of the research reactor, there are many other nuclear facilities: Radioactive Waste Treatment Plant, Tandem Van der Graaf heavy ions accelerator, Cyclotron, Industrial Irradiator, Radioisotope Production Center. The objectives of this work were dedicated on the water underground analyses described in the following context: - presentation of the approaches in planning the number of drillings, vertical soil profiles (characteristics, analyses, direction of the flow of underground water, uncertainties in measurements); - presentation of the instrumentation used in analyses of water, soil and vegetation samples - analyses and final conclusions on results of the measurements; - comparison of the results of measurements on underground water from drillings with the measurements results on samples from the town and the system of drinking water - supplied from the second level of underground water. According to the analysis, in general, no values higher than the Minimum Detectable Activity were detected in water samples (MDA) for Pb{sup 212}, Bi{sup 214}, Pb{sup 214}, Ac{sup 228}, but situated under values foreseen in drinking water. Distribution of Uranium As results of the Uranium determination, values higher than 0,004 mg/l (4 ppb) were detected, values that represent the average contents in the underground water. The higher values, 2-3 times higher than background, were detected in the water from the drillings F15, F12, F5, F13, drillings located between RWTP (Radioactive Waste Treatment Plant) - the 300 m{sup 3} tanks and the Spent Filters Storage (SFS). At south of this area, on the leaking direction of the underground water layer, in the drillings F1, F2, F3, F18 and at east, in F6, F7, the natural Uranium values are within the background for the underground-water. Distribution of Radon For the Radon determination with RAD 7 equipment, water samples were taken from the same piezo-metrical drilling, 2 or 4 times during of six months period, and then, the average contents were calculated, which varied between 0,35 - 2,1 Bq/l. The values higher than 1,1 -1,2 Bq/l were detected in the water taken from the drillings located in the northern part (F10, F11) and in the eastern part (F6, F8) of the Institute fences (around of the radioactive waste storage facilities). The concentrations of 0,3 - 0,5 Bq/l are in the underground-water layer 'intercepted' by the piezo-metrical drillings (F1, F2, F3) located near the Nuclear Reactor. Concentration of heavy metals: 0.04-0.08 mg/l Pb in F5, F14, F7, F8 exceeding MCA-Maximum Admissible Concentration (0.01 mg/l) for Pb, and for Zn in F5, F7, F8, F14 are 0.2-0.5 mg/l situated under MCA , and 0.18 mg/l in F18, in accordance with tendency of decreasing of concentration of contaminants. After 50 years of deploying nuclear activities on the site the underground water quality is in very good condition. Taking into consideration the direction of the underground water flow, it results that, only in the area of underground pipe, around of the research reactor and radioactive waste treatment plant, the quality of water is influenced, and remediation actions are not necessary. Based on measurements executed in F18, the water quality is the same with any other part of the region. During the decommissioning of the Research Reactor, the samples from 18 drillings will be analysed monthly, and the contents of the heavy metals, Pb and Zn, will be monitored carefully, together with all the factors: air, soil, vegetation, subsoil, water surface and underground water. A great attention will be paid to the dismantlement of the underground structures, the 30 m{sup 3} tank, that collects all the liquid radioactive waste from the reactor, the pipes that connects this tank to the other two 300 m{sup 3} tanks, from RWTP, the ventilation ducts between the Spent Filters Storage and reactor's stack, in order to prevent contamination of surface and underground water. Engineering Absorbent Barriers will be used both for hydrophilic substances and for hydrophobic substances, tents will be used for preventing the spread of possible contaminants from the pipes and tanks, owing to the precipitation or wind, and the tanks and pipes will be drained to eliminate the spills. Since we are dealing with a multinuclear facility site, the on site and off site Monitoring Program of Institute will be properly upgraded, taking into account the values of the derived emission limit approved by Regulatory Body, before, during and after the completion of the works with impact on underground water. In another work will be presented radiological map of land associated of decommissioning project (on surface, at 0.15 m and 0.30 m in depth of soil) and estimation of migration rate in soil up to ground water level. Applying these measures, taking account of the radiological status at the beginning of the project, will mean savings and a good protection of the environment in completing the decommissioning project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The status of LILW disposal facility construction in Korea - 15158

In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste (LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongil-ri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drums of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums was completed by the end of June 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a receipt and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an access shaft for workers, and six silos for final disposal of radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the West Valley Demonstration Project Fuel Receiving and Storage Debris and Filters at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the West Valley Demonstration Project (WVDP) Fuel Receiving and Storage (FRS) Debris and Filters waste stream is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the WVDP FRS Debris and Filters low-level waste meets all DOE M 435.1-1 performance objectives. The WVDP FRS Debris and Filters waste stream is recommended for acceptance with the condition that the total 226Ra activity not exceed 2E9 Bq.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Integrity Program for INTEC Calcined Solids Storage Facilities

This report documents the activities of the structural integrity program at the Idaho Nuclear Technology and Engineering Center relevant to the high-level waste Calcined Solids Storage Facilities and associated equipment, as required by DOE M 435.1-1, 'Radioactive Waste Management Manual'. Based on the evaluation documented in this report, the Calcined Solids Storage Facilities are not leaking and are structurally sound for continued service. Recommendations are provided for continued monitoring of the Calcined Solids Storage Facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The status of LILW disposal facility construction in Korea

In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drums of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Automation in Low Level Waste Storage and Management - 19227

The Australian Nuclear Science and Technology Organisation (ANSTO) generates Low Level Waste (LLW) and Intermediate Level Waste (ILW) from various site operations such as the operation of a research Reactor and the manufacture of Molybdenum 99. The Low Level Solid Waste (LLSW) generated is stored at ANSTO before and after conditioning. The current process flow involves the storage of LLSW waste before conditioning on racks, handled using forklifts. When the unconditioned waste is ready for conditioning, it is transferred to another facility, where volume reduction and packaging is carried out. Once conditioned, the waste is placed in further storage, pending dispatch to the proposed Australian National Radioactive Waste Management Facility (NRWMF). A new purpose built facility has been constructed, adjacent to the LLSW processing facility, for the storage and management of LLSW in both unconditioned and conditioned forms. This new facility will streamline the waste management process and significantly enhance the safety and efficiency of the process. In line with international best practises, the new facility utilises automation solutions to minimise the build footprint, and minimise the use of forklifts and other mobile plant. Most importantly, it applies the principle of ALARA (As Low as Reasonably Achievable) to minimise operator activities in areas where radioactive material is stored and eliminates double handling of the waste. The automation for unconditioned waste utilises an Automated Storage and Retrieval System (ASRS), a vertical stacker crane within high density racking, to provide easy storage and retrieval for processing and/or routine inspections. This system allows operators to control it from outside of the storage area whilst utilising integrated software that allows for the required tracking of the unconditioned waste. From the ASRS storage area, unconditioned waste will have a smooth transition to the processing facility which is located adjacent to the ASRS system. Once conditioned, the waste is catalogued and returned to a designated storage area within the new facility using an automated building gantry crane with a target delivery system to eliminate the need for operators in the main storage bay. The waste will be held here in preparation for dispatch to the future repository. The utilisation of the ASRS for the purpose of storing LLSW is an innovative use of automation that will eliminate operators from active areas, reduce dose rates received and integrate with the waste tracking software. Furthermore, the system has significant advantages with operational efficiencies increased, reduced double handling of nuclear waste and maximum use of building footprint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proposal of a Descriptive Modeling of Portland Cement Behavior under Radioactive Waste Repository Environment - 17267

Storage and disposal of DSRS is a problem in many countries over the world. Brazilian inventory is about 300,000 sources (in use or stored), many of them with high activity and long lived radionuclides. Our proposal to deposition of DSRS: Dispose of the DSRS in a deep borehole repository. The IPEN concept was adapted from the BOSS Concept, developed by the NECSA/IAEA. Cementitious materials are intended to be used as a backfill material between the steel casing and the geological formation around the borehole and Casing. The required service life of the installation is counted in thousands of years. Issues to be addressed: Assessment of cement paste long-term durability and its behavior under radiation, high pressure and temperature and penetration of groundwater containing chemically aggressive species. The present study aims at defining the relevant external factors and their influence on the durability of hydrated cement. This study will be helpful on modeling the long-term reactions in the cement matrix and can improve the safety assessment. The synergism between all factors that can affect the cement is hard to predict and have to take into account many processes. For example, the calcium ion content in a cementitious matrix can be altered by many factors and depends on the cement mix designs and environmental factors that will prevail at the repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TN{sup R} MW- Multi Waste Package 'All In One Solution' For Conditioning - Transport - Storage - Up To Final Disposal - 17196

For the management of radioactive waste, either during nuclear facility operation or decommissioning, one must consider a diverse array of nuclear waste forms of various types, volumes and activities. Examples are: activated metallic waste; legacy waste; sludge; resins; and orphan waste. Customers are frequently faced with the obligation of undertaking multiple, costly waste management operations. These operations activities include handling, reconditioning or material transfers between packages, as in the case when moving material from on-site storage to transportation, and then from transportation to final disposal. To address this issue, a new - highly flexible up to reversible - cask system, the TN{sup R} MW, is being developed as an 'All in One Solution'. TN{sup R} MW has a total weight of 10 metric tons and is compliant with the 2012 International Atomic Energy Agency (IAEA) regulations. It was developed to provide flexibility and designed with the capability to be adaptable to the various needs of the nuclear industry. From IP-2 and Type A containers to Type B(U) and B(U)F casks, this cask offers different options to sufficiently address the requirements of each step of the waste stream from on-site and international transport to long-term interim storage and final disposal. Licensing and manufacturing of a number of packagings in this TN{sup R} MW family are underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of treatment as an alternative WM pathway: examples of I-graphite and metallic components such as steam generators - 15212

EDF is working continuously to optimize and secure its waste management pathways, leading in some case to develop appropriate treatment solutions that could be implemented parallel to reference solutions, complementary or as alternative solutions to already existing paths. This approach is illustrated by the examples of steam generators replaced during the operation of French PWR power plants, and of irradiated graphite (stacks and sleeves), coming from the decommissioning of UNGG reactors, which have been shut down. Concerning graphite wastes, the near surface disposal facility intended for this waste does not exist yet, and is currently giving rise to the research of a suitable site, and an evaluation of its performances. While accompanying ANDRA (French national agency for nuclear waste management), in charge of the development of the facility, and while waiting for more data to be available, EDF is continuing the consolidation of graphite wastes radiological inventory, and is working on the development of an alternative management solution, based on a thermal treatment process. Depending on the nature of the treatment, and on the choice of operating parameters, this treatment may contribute to reduce graphite wastes volume and/or promote its acceptance in a disposal facility. Reducing the radiological inventory by decontamination is one of the means to achieve these objectives. Concerning replaced steam generators, nearly 200 of them will have been removed by 2030, and stored on site waiting for their treatment, which represents about 65 000 tons of metal. Initially intended to be cut and packed on NPPs' sites during their dismantling, EDF is studying the economic value of having the steam generators treated in a centralized facility, which allows reducing the volume of final wastes by optimizing cutting operations, while considering recycling after melting. However, this studied pathway implies a number of difficulties to be overcome. In particular, the shipment of such large components to a centralized facility may be complex. Moreover, French regulatory framework does not allow recycling outside nuclear industry, therefore limiting recycling opportunities to storage containers for radioactive wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗