Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Transition From Operation to Decommissioning with a Sudden Decision to Permanent Shutdown and with Parallel Operation On-site - 18559

In a short time the Swedish nuclear operator OKG have to shift from a operator of three nuclear power plants at one site to a company where both decommissioning and operation will take place in parallel for numerous of years as a result of a decision to permanently shut down two of the three reactors. The paper will be focusing on the challenges to change organization and mind-set from operations to decommissioning within parts of a company while still maintaining and developing the highest standard for the plant still in operation, and this in the combination with a decision of permanent shutdown earlier than expected. The paper will also address how OKG managed to create and maintain momentum in essential processes like permits, defueling and project planning before, during and short after the organization was changed and some of the employees had to leave the company. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The New Modular High-Energy X-ray Source Facility Shielding Design

Several new research facilities will soon be constructed as part of the creation of a new engineering complex on the campus of the University of Tennessee, Knoxville (UTK). As part of this renovation, a state of the art nuclear engineering building will be constructed. This building will include a critical experiment facility, a graphite pile, and a modular high-energy X-ray source (or accelerator facility). The proximity of these new facilities to UTK's football stadium brings heightened attention to their design and safety. An important aspect of this specific design is that shielding is required to contain the new radiation sources. The work completed will reflect the specific project planning and novel two-story facility design of the modular high-energy X-ray source. It will also provide a detailed shielding and dose analysis of the facility as a whole. The end design places an accelerator into a well-shielded room; it will then direct the x-ray beam through a collimating hole in the shielding wall into the next room. The x-ray beam is to be used as a part of a materials irradiation and imaging laboratory in the adjoining room. The design satisfies all regulatory requirements, and it will serve as the preliminary facility layout design and shielding analysis for a novel two-story modular high energy X-ray source facility. The dose rates calculated by the Monte Carlo models using the NCRP shielding thickness values are well below the dose limitations set by the State of Tennessee, which leaves room for optimization. Further work could be done to complete the optimization by reducing the shielding thickness while maintaining a dose below dose regulations by using a less conservative method for calculating the initial thicknesses. (authors)

43 PARTICLE ACCELERATORS↗

Final Technical Report

The project goal is to demonstrate low-cost, interlocking, and carbon-storing insulation materials with thermal insulation of R5/inch, flexural modulus > 10 MPa, low material price < $ 0.5/ft2 wall area (materials cost for ½” thick panel), and net embodied carbon of 0.8t net CO2e/t (60% reduction compared to gypsum), respectively, which can meet the cost and performance targets of department of energy (DOE)’s 2050 climate target. To achieve this goal, the project plans three tasks, and each has a specific objective: 1) Modular design and engineering analysis of interlocking insulation panel blocks using biogenic materials (cellulose, straw, etc.): with the consideration of potential assembling and recycling. 2) Scalable manufacturing of biogenic-based interlocking insulation panels: scale up the modular panel production using ambient pressure drying and surface superhydrophobic modification at 1ft*1ft with the potential for further scalable mass production of 4ft*4ft. 3) Code-compliant testing, recycling and carbon footprint analysis of manufactured interlocking insulation panels examined using ASTM standards of thermal insulation (ASTM C518), mechanical properties (ASTM C1161), and water vapor transmission (ASTM E96).

Ren, Shenqiang↗

What Is Data Analysis?

A quick guide to understand your data and use it to tell compelling stories. Data analysis helps develop insights for research projects, planning interventions, or systematic information gathering. This guide highlights important aspects of the data analysis process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Correlation Between Weather Alerts and Grid Component Failures for Grid Alert

Weather events cause most grid failures. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Recent research at Idaho National Laboratory into electric grid risk analysis methods resulted in a tool that allows for the development of the most likely scenarios given failure probabilities of grid components. INL has a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response (CESER) program to develop a Grid Alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios uses MASTERRI and then notifies the utility if there is significant risk. Historical failure data of elements that comprise the U.S. electric grid have been compiled by utilities and organizations such as the international regulatory body North American Electric Reliability Corporation (NERC). Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates are needed for different component types given the alert type, severity, and location. Historic weather-related grid element failures are correlated with historic weather events from Integrated Public Alert & Warning System (IPAWS). These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. This discusses the Grid Alert project plan but focuses on the data gathered and process used in determining failure rates for possible grid failure scenarios.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Software Verification and Validation Plan Activities, 2011, Project Number: N6423, SAPHIRE Version 8

The SV&V Plan experienced changes over the past year to bring it into the operational software life cycle of SAPHIRE 8 and to maintain its sections on design features. Peer review of the SVVP with the former IV&V members identified the need for the operational use of metrics as a tool for quality maintenance and improvement. New tests were added to the SVVP to verify the operation of the new design features incorporated into SAPHIRE 8. Other additions to the SVVP were the addition of software metrics and the PDR and CDR processes. Audit support was provided for the NRC Technical Manager and Project Manager for the NRC OIG Audit performed throughout 2011. The SVVP is considered to be an up to date reference and useful roadmap of verification and validation activities going forward.

42 ENGINEERING↗

Historic Buildings Report: Five-Year Preservation Planning for Manhattan Project National Historical Park Sites

This report offers a preservation maintenance plan for the next five years for buildings and structures included in or eligible for inclusion in the Manhattan Project National Historical Park at Los Alamos National Laboratory. There are twenty-three buildings, structures, and ruins of previously standing buildings covered within this report. Many of the preservation maintenance issues addressed here concern problems with health and live safety of staff and visitors alike, and also structural concerns that affect the long-term preservation of these important buildings.

42 ENGINEERING↗

Use of Climate Change Projections for Resilience Planning in Rio de Janeiro, Brazil

In this study we use three different methodologies to document and compare temperature and precipitation projections for the city of Rio de Janeiro (RJ) over the 21st century. It aims to explore in what way the differences and similarities of those methodologies and their outcomes support the incorporation of climate risks in urban planning and improve effective urban climate change governance. We compared the projections for RJ from the Eta Regional Climate Model from the Brazilian National Institute for Space Research nested in two Hadley Center Global Climate Models (GCMs) (Eta-HadCM3 method and Eta-HadGEM2-ES method) and 33 GCMs from the Coupled Model Intercomparison Project Phase 5 multi-model dataset (Urban Climate Change Research Network - UCCRN method). The three methods showed increasing temperatures for RJ at the end of the century. Precipitation projections span a 13% decrease to a 12% increase when using the UCCRN method or are reduced between 0.4 and 0.5%, when using the Eta-HadGEM2-ES method. However, the middle range of the projections from UCCRN and Eta-HadGEM2-ES is similar. The three methods project an increase of warm days and nights and a decrease of cold days and nights. Nevertheless, although the directions of change are the same applying the three methods, the magnitude differs when considering warm and cold nights. Hence, city stakeholders are better informed when we apply different projection methods as it gives them the opportunity to consider the level of risk they are willing to bear in the future. We observed that defining climate change projections on the city scale based on clear communication and an interactive process between scientists and stakeholders can be used to inform citywide adaptation strategies and sector-specific uses, as well as promote urban climate risk governance.

urban governance and management↗

Hanford Tank Farm Occupational Exposure and Risk Assessment Plan: Health Process Project (Rev.1)

The overall objective of the Hanford Tank Farm Occupational Exposure and Risk Assessment Plan (hereafter referred to as the “Assessment Plan”) is to provide the Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS), and the U.S. Department of Energy (DOE) with a plan for developing a transparent, peer-reviewed process for assessing potential health risks associated with worker exposures to chemical emissions from the Hanford tank farms. Revision 1 (2018) incorporates changes to the original draft plan prepared in 2016 to reflect updated strategies based on initial implementation of the recommended actions.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

Ahtna Tribal Energy Planning and Technical Assistance Project (Final Report)

Ahtna Intertribal Resource Commission (AITRC) provided technical assistance and capacity building activities for eight (8) tribal communities in the Ahtna region to: 1. reduce energy costs; 2. improve community wildfire readiness and biomass utilization; 3. provide local food security; and 4. reduce unemployment, poverty and outmigration in the Ahtna villages. AITRC provided community education on energy needs, conservation and efficiency, issues and options, assisted the tribes in identifying appropriate renewable energy systems, and increased their capacity to implement successful energy projects that employed local tribal members. AITRC also successfully assisted the member Tribes and Alaska Native Corporations in pursuing additional funding to advance their energy goals and projects, including Tribal Resiliency Planning, community biomass heating and wood resource assessment projects, and hydroelectric.

09 BIOMASS FUELS↗

NASA Global Hawk: Project Update and Future Plans

The NASA Global Hawk Project is supporting Earth Science research customers. These customers include: US Government agencies, civilian organizations, and universities. The combination of the Global Hawk's range, endurance, altitude, payload power, payload volume and payload weight capabilities separates the Global Hawk platform from all other platforms available to the science community. This presentation includes an overview of the concept of operations and an overview of the first two science campaigns. In addition the future science plans, using the NASA Global Hawk System, will be presented.

Naftel, Chris↗

NASA Global Hawk: Project Overview and Future Plans

The NASA Global Hawk Project is supporting Earth Science research customers. These customers include: US Government agencies, civilian organizations, and universities. The combination of the Global Hawk's range, endurance, altitude, payload power, payload volume and payload weight capabilities separates the Global Hawk platform from all other platforms available to the science community. This presentation includes an overview of the concept of operations and an overview of the first two science campaigns. In addition the future science plans, using the NASA Global Hawk System, will be presented.

Naftel, Chris↗

Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Real-Time Projection to Verify Plan Success During Execution

The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.

Wagner, David A.↗

Low Impact Development Master Plan

This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

54 ENVIRONMENTAL SCIENCES↗