Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Causal CCF Parameter Estimations 2020

This report documents the quantitative results of the causal common-cause failure (CCF) parameter estimations for the failure cause groups “component,” “design,” “environment,” “human,” and “other,” based on CCF data through 2020 in the U.S. Nuclear Regulatory Commission (NRC) CCF database: https://rads.inl.gov/Pages/CCF.aspx. This report utilizes the same data period (2006–2020) and CCF templates as INL/EXT-21-62940, Revision 1, CCF Parameter Estimations, 2020 Update. The 2015 causal CCF prior distributions for the specific failure cause groups (instead of the 2015 generic CCF prior distributions) were used in this report to estimate the associated causal CCF parameters. All the 2015 causal CCF prior distributions and generic CCF prior distributions were developed in INL/EXT-21-43723, Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors, using CCF data from 1997 to 2015. These quantitative results were developed to support the causal alpha factor model and should be used as appropriate in probabilistic risk assessment (PRA) studies such as the NRC Significance Determination Process for commercial nuclear power plants in the United States.

99 GENERAL AND MISCELLANEOUS↗

Uncertainty Analysis of Consequence Management (CM) Data Products.

The goal of this project is to develop and execute methods for characterizing uncertainty in data products that are deve loped and distributed by the DOE Consequence Management (CM) Program. A global approach to this problem is necessary because multiple sources of error and uncertainty from across the CM skill sets contribute to the ultimate p roduction of CM data products. This report presents the methods used to develop a probabilistic framework to characterize this uncertainty and provides results for an uncertainty analysis for a study scenario analyzed using this framework.

97 MATHEMATICS AND COMPUTING↗

Correlation between EVs and Other Loads in Probabilistic Load Flow for Distribution Systems

To date, most probabilistic studies have assumed independence between the various loads and other inputs on the distribution system. It is well know however, that this is typically not the case. The work presented in the paper expands upon a previous unbalanced three-phase probabilistic load flow study on a residential feeder with a 50 % penetration of electric vehicles, under three different charging schemes where different correlation scenarios between the load flow inputs are considered. The data for the probabilistic load flow study are derived from a voltage dependent time-variant deterministic load flow. Here the deterministic load flow data are examined further to gain a better understanding of the correlation between the customer and electric vehicle charging loads, and how different charging schemes may impact it further. Four different correlation scenarios are then created and details on how the probabilistic load flow inputs are created is also presented; demonstrating the need for better analysis on the correlation between system inputs. This paper hopes to open the discussion and start the push for future research into understanding the correlation and effects of various system inputs on the probabilistic nature of distribution systems, and how to apply this knowledge to future studies.

Melhorn, Alexander C.↗

Data-Driven Computation of Probabilistic Marching Cubes for Efficient Visualization of Level-Set Uncertainty

Uncertainty visualization is an important emerging research area. Being able to visualize data uncertainty can help scientists improve trust in analysis and decision-making. However, visualizing uncertainty can add computational overhead, which can hinder the efficiency of analysis. In this paper, we propose novel data-driven techniques to reduce the computational requirements of the probabilistic marching cubes (PMC) algorithm. PMC is an uncertainty visualization technique that studies how uncertainty in data affects level-set positions. However, the algorithm relies on expensive Monte Carlo (MC) sampling for the multivariate Gaussian uncertainty model because no closed-form solution exists for the integration of multivariate Gaussian. In this work, we propose the eigenvalue decomposition and adaptive probability model techniques that reduce the amount of MC sampling in the original PMC algorithm and hence speed up the computations. Our proposed methods produce results that show negligible differences compared with the original PMC algorithm demonstrated through metrics, including root mean squared error, maximum error, and difference images. We demonstrate the performance and accuracy evaluations of our data-driven methods through experiments on synthetic and real datasets.

Athawale, Tushar↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Approach to Dynamic Human Reliability Analysis Using the EMRALD Dynamic Risk Assessment Tool

There is a need for research into dynamic human reliability analysis (HRA) (i.e., simulation- or computation-based HRA), as many researchers have emphasized the importance of applying dynamic approaches to probabilistic safety assessments (PSAs). This study proposes the Procedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA), a dynamic HRA approach based on the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). This study suggests how this software can be used to model human actions and evaluate error probabilities. The applicability of this approach is also be investigated in light of an extended loss of AC power (ELAP) scenario. This paper then discusses the major insights derived by comparing this dynamic HRA approach against the static one.

99 GENERAL AND MISCELLANEOUS↗

UK regulatory review of the double contingency principle in criticality safety - 14379

The UK's regulatory regime is based on Licence Conditions (LCs) attached to a Nuclear Site Licence (NSL) and is non-prescriptive in nature. The law requires licensees to reduce health and safety risks to workers and the public 'so far as is reasonability practicable' (SFAIRP), and this framework provides licensees with flexibility to achieve this. Guidance for inspectors on the assessment of nuclear safety cases has been published in Office for Nuclear Regulation's (ONR) Safety Assessment Principles (SAPs) and supporting Technical Assessment Guides (TAGs). These guidance documents have recently been reviewed in the light of the Fukushima accident. The opportunity has also been taken to reconsider the use of the Double Contingency Principle used in criticality safety cases, an approach commonly regarded as the preferred means of criticality control internationally and featured in the SAPs and TAGs. Licensees in the UK have adopted several approaches in nuclear criticality safety cases based upon a combination of deterministic and probabilistic safety cases using the Double Contingency Principle and Design Basis Analysis. ONR has developed a targeted intervention to sample a number of nuclear safety cases in order to test the adequacy of methodologies used to secure nuclear criticality safety. This paper reports the results of this intervention and considers the need to review the advice currently given by the UK nuclear regulator, including on use of the Double Contingency Principle. (authors)

42 ENGINEERING↗

Envelope-driven comfort risk in residential demand response

Residential demand response (DR) is a valuable resource for grid reliability, but remains challenging because the highly heterogeneous residential building stock leads to widely varying and hard-to-predict load and comfort responses during DR events. Although prior research has estimated the technical potential of DR-capable technologies for achieving energy demand savings, little is known about how they affect thermal comfort. In particular, it remains unclear how indoor thermal conditions due to DR depend on the thermal envelope characteristics of the housing stock. To address this gap, this study provides a systematic, location-specific assessment of indoor thermal performance during DR-events across the US housing stock using both typical DR weather data and detailed building metadata. We evaluate how envelope characteristics influence indoor temperatures during realistic simulated summer and winter DR events across 37 US locations, applying both temperature threshold and rate of temperature change criteria to estimate region-level probabilities of discomfort. Additionally, we show the impact of distinct weather patterns that intensify or abate thermal stress on comfort outcomes. Results show a near-universal overheating risk in summer DR events, where comfort outcomes are strongly influenced by rapid risk of comfort violations. In contrast, overall winter DR discomfort risk is lower, risk escalation is more gradual and shows greater sensitivity to event duration. These findings offer a data-driven quantification of comfort risk across diverse climates and building envelopes, demonstrating the need for region-specific DR scheduling and discomfort mitigation strategies tailored to local weather patterns and the performance of existing residential buildings.

Demand response↗

Identifying human failure events (HFEs) for external hazard probabilistic risk assessment

In recent years, several advancements in nuclear power plant (NPP) probabilistic risk assessment (PRA) have been driven by increased understanding of external hazards, plant response, and uncertainties. However, major sources of uncertainty associated with external hazard PRA remain. One important source is how risk-significant human actions that are carried out to enable plant response and recovery from natural hazards cause the close coupling of physical impacts on plants and overall plant risk during these hazard events. This makes human reliability and human-plant interactions important elements to consider in resolving PRA gaps in external hazards. One of the challenges in considering human response in external hazard probabilistic risk assessment (XHPRA) is that most existing human reliability analysis (HRA) models were not developed for assessing actions outside the control room (termed ex-control room actions) and hazard response. To support this new scope, HRA models will need to be developed or modified to support identification of human activities, causal factors, and uncertainties inherent in external hazard response, thereby providing insights regarding event timing and physical event conditions as they relate to human performance. In this study, there are two main objectives: (1) evaluate the applicability of an existing cognitive-based HRA method, Phoenix, to ex-control room actions, and (2) identify sources of uncertainty to be characterized or reduced in order to make this method suitable for XHPRA. The first step of such work is performed by assessing the suitability of existing HRA methods to support identifying human failure events (HFEs) for human response to flooding hazards. These HFEs are human actions or inactions that are involved in human responses to flooding hazards and could contribute to the loss of a critical function for the plant in the scenario being examined. Here, in this work, decomposition analyses using the cognitive-based Phoenix HRA model are used to identify HFEs. The Phoenix method was found to be suitable for analyzing ex-control room actions as well as identifying specific HFEs and underlying crew failure modes (CFMs). However, the method's suitability for use in ex-control room actions would benefit from expanding the available CFMs to accommodate a larger variety of physical and communication tasks.

42 ENGINEERING↗

Grid Utility Asset Vulnerability Assessment (GUAVA) Software Tool

Increasing demand and changes in generation portfolios is pushing power grid to operate towards the limit. However, due to lack of analytical tools for understanding various scales of impact on grid, it is becoming more vulnerable to wide scale power outages and blackouts. A vulnerable grid operating at its limit can be easily disrupted by asset failures caused by devastating hurricanes which has been known to damage transmission and distribution lines along its track. In this direction, researchers have focused on determining these assets by conducting Monte Carlo simulations of hurricanes with uncertainties and collected a large set of simulation data. To determine the infrastructure updates necessary for mitigating wide scale impact of hurricanes on the grid, we propose a software tool named “Grid Utility Asset Vulnerability Analysis” (GUAVA) framework. GUAVA presents a novel data-driven probabilistic analytical approach to (1) post-process hurricane failure scenarios, (2) identify/rank assets that are most vulnerable and critical to failing and are associated with highest impact/risk, and (3) to inform system upgrade decisions & prioritization. Based on the observed results and employed data-driven methodology, it is expected GUAVA can be adapted to provide power system planners with a recommendation engine for making informed decisions to improve resilience of grid.

Mahapatra, Kaveri↗

Statistically significant relational data mining :

This report summarizes the work performed under the project (3z(BStatitically significant relational data mining.(3y (BThe goal of the project was to add more statistical rigor to the fairly ad hoc area of data mining on graphs. Our goal was to develop better algorithms and better ways to evaluate algorithm quality. We concetrated on algorithms for community detection, approximate pattern matching, and graph similarity measures. Approximate pattern matching involves finding an instance of a relatively small pattern, expressed with tolerance, in a large graph of data observed with uncertainty. This report gathers the abstracts and references for the eight refereed publications that have appeared as part of this work. We then archive three pieces of research that have not yet been published. The first is theoretical and experimental evidence that a popular statistical measure for comparison of community assignments favors over-resolved communities over approximations to a ground truth. The second are statistically motivated methods for measuring the quality of an approximate match of a small pattern in a large graph. The third is a new probabilistic random graph model. Statisticians favor these models for graph analysis. The new local structure graph model overcomes some of the issues with popular models such as exponential random graph models and latent variable models.

Berry, Jonathan W.↗

Baseline Test Specimen Machining Report

The Next Generation Nuclear Plant (NGNP) Project is tasked with selecting a high temperature gas reactor technology that will be capable of generating electricity and supplying large amounts of process heat. The NGNP is presently being designed as a helium-cooled high temperature gas reactor (HTGR) with a large graphite core. The graphite baseline characterization project is conducting the research and development (R&D) activities deemed necessary to fully qualify nuclear-grade graphite for use in the NGNP reactor. Establishing nonirradiated thermomechanical and thermophysical properties by characterizing lot-to-lot and billet-to-billet variations (for probabilistic baseline data needs) through extensive data collection and statistical analysis is one of the major fundamental objectives of the project. The reactor core will be made up of stacks of graphite moderator blocks. In order to gain a more comprehensive understanding of the varying characteristics in a wide range of suitable graphites, any of which can be classified as “nuclear grade,” an experimental program has been initiated to develop an extensive database of the baseline characteristics of numerous candidate graphites. Various factors known to affect the properties of graphite will be investigated, including specimen size, spatial location within a graphite billet, specimen orientation within a billet (either parallel to [P] or transverse to [T] the long axis of the as-produced billet), and billet-to-billet variations within a lot or across different production lots. Because each data point is based on a certain position within a given billet of graphite, particular attention must be paid to the traceability of each specimen and its spatial location and orientation within each billet. The evaluation of these properties is discussed in the Graphite Technology Development Plan (Windes et. al, 2007). One of the key components in the evaluation of these graphite types will be mechanical testing on specimens drawn from carefully controlled sections of each billet. To this end, this report will discuss the machining of the first set of test specimens that will be evaluated in this program through tensile, compressive, and flexural testing. Validation that the test specimens have been produced to the tolerances required by the applicable ASTM standards, and to the quality control levels required by this program, will demonstrate the viability of sending graphite to selected suppliers that will provide valuable and certifiable data to future data sets that are integral to the NGNP program and beyond.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Baseline Graphite Initial Mechanical Test Report

The Next Generation Nuclear Plant (NGNP) Project is tasked with selecting a high temperature gas reactor technology that will be capable of generating electricity and supplying large amounts of process heat. The NGNP is presently being designed as a helium-cooled high temperature gas reactor (HTGR) with a large graphite core. The graphite baseline characterization project is conducting the research and development (R&D) activities deemed necessary to fully qualify nuclear-grade graphite for use in the NGNP reactor. One of the major fundamental objectives of the project is establishing nonirradiated thermomechanical and thermophysical properties by characterizing lot-to-lot and billet-to-billet variations (for probabilistic baseline data needs) through extensive data collection and statistical analysis. The reactor core will be made up of stacks of graphite moderator blocks. In order to gain a more comprehensive understanding of the varying characteristics in a wide range of suitable graphites, any of which can be classified as “nuclear grade,” an experimental program has been initiated to develop an extensive database of the baseline characteristics of numerous candidate graphites. Various factors known to affect the properties of graphite will be investigated, including specimen size, spatial location within a graphite billet, specimen orientation within a billet (either parallel to [P] or transverse to [T] the long axis of the as-produced billet), and billet-to-billet variations within a lot or across different production lots. Because each data point is based on a certain position within a given billet of graphite, particular attention must be paid to the traceability of each specimen and its spatial location and orientation within each billet. The evaluation of these properties is discussed in the Graphite Technology Development Plan (Windes et. al 2007). One of the key components in the evaluation of these graphite types will be mechanical testing of specimens drawn from carefully controlled sections of each billet. This report is confirmation that the test procedures are in place and approved, and that mechanical testing of graphite under the Baseline Graphite Characterization program has commenced.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Risk assessment of safety-critical data communication in digital safety feature control system - 205

As one of the safety-critical systems in Advanced Power Reactor-1400 (APR-1400) nuclear power plant (NPP), the Engineered Safety Feature-Component Control System (ESF-CCS) employs safety data link and network communication for transmitting safety component actuation to effectively facilitate various safety-critical field controllers. However, data communication failure risk in the ESF-CCS has yet to be fully quantified, the probability that a safety-critical system in digitalized NPP becomes unsafe due to a network failure must be evaluated to quantify the risk of digital I and C system. In this study, a fault tree model was developed to assess the data link and data network failure-induced unavailability of a safety-critical system function used to generate an automated control signal for actuating design basis accident mitigation equipment. Especially, the risk of data communication failure in a digital safety feature control system was analyzed in consideration of interconnection between safety-critical controllers and the fault-tolerant algorithm implemented in the network configuration. Based on the developed fault tree model, case studies were performed to quantitatively assess the unavailability of ESF-CCS signal generation due to safety data link and network failure and their risk effect on safety signal generation unavailability. This study is expected to provide risk information on the safety-critical data communication in a digitalized NPP instrumentation and control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AUTOMATIC GENERATION OF EVENT TREES AND FAULT TREES: A MODEL-BASED APPROACH

In the past few decades, increasing complexity in modern engineering systems has been driven by the integration of a large number of components and by the fact that the system operations involve many disciplines (e.g., thermal-hydraulics, plant operations, cyber-security). Current safety/reliability modeling approaches to such systems are labor intensive, difficult to learn, and rely heavily on simplistic Boolean logic to depict failure propagation and accident progression. While these methods serve well for simple systems (i.e., linear causal systems with limited small inter- and intra-system interactions), their results are difficult to verify when modeling complex systems (typically performed through the extensive use of modeling assumptions). The development of new methods is addressed to meet these challenges through a model-based system engineering (MBSE) lens. Under MBSE philosophy, every aspect of the system (form or function) is represented by a model that completely characterizes its architecture or behavior. MBSE approach greatly improves the management of design, analysis and verification of complex systems. An integration of Dynamic Probabilistic Risk Assessment (DPRA) methods with MBSE models is proposed to perform safety/reliability analyses of engineering systems. In particular, MBSE representation of the system (performed using Systems Modeling Language [SysML]) is coupled with DPRA methods to automatically generate event trees and fault trees.

97 - MATHEMATICS AND COMPUTING↗

Investigation of the Use of Dynamic Probabilistic Risk Assessment Methodologies for Identifying Digital I&C System Common Cause Failures

Digital Instrumentation and Control (I&C) systems have a key role in nuclear power plants in the upgrade of aging analog systems. Digital systems improve plant safety and reliability through features such as increased hardware reliability and stability and improved failure detection capability. There is no consensus on which of the current probabilistic risk assessment methods are most suitable for use in the reliability analysis of digital I&C systems. While the traditional event-tree/fault-tree (ET/FT) approach is still used for their reliability modeling, there are concerns regarding this approach in properly accounting for dynamic interactions among system components since potentially significant dependencies among failure events may not be identified and/or their likelihood may not be properly quantified. Dynamic methodologies are expected to provide a much more accurate representation of probabilistic evolution of the I&C systems in time due to their capability to more properly account for complex interactions than the static approach. The applicability of dynamic PRA methodologies for digital I&C system is investigated using the criteria presented in the NUREG/CR-6901, and the comparisons made in NUREG/CR-6901 are updated in light of the latest studies. The Dynamic Event Tree (DET) approach has been identified as one of the top dynamic methods when evaluated against the requirements for the reliability modeling of digital I&C systems. The DET method is a strong candidate for integration into existing PRA studies, as it bears many similarities to the traditional ET approach. In this study, the DET approach has been applied to the Plant Protection System of the APR1400 design, and the results are compared to results from its available traditional ET/FT analysis. Possible approaches to evaluate and quantify the effects of common cause failures on system safety using dynamic methods are also examined.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Radiological Performance Modeling: Platform Comparison

Zapadnoe Uranium Mill Tailings Site, Pridneprovsky Chemical Plant Ukraine: Two exposure scenarios were utilized to develop performance assessment models in GoldSim and NORMALYSA. The first scenario is an onsite worker exposed to radioactivity through external ground irradiation as well as radon and radioactive dust inhalation. The second being an offsite Resident 300 years after institutional control exposed through the ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from Konoplyanka River, and agricultural activities in contaminated garden. NORMALYSA utilizes a modular interface to connect extensive pre-created modules to develop contaminant transport and risk assessment models for safety assessments and performance assessments at NORM and legacy sites. Developed by Facilia AB, the program was tested with the creation of the Zapadnoe model under the International Atomic Energy Agency MODARIA Il Working Group 1 (WG1). Default values are provided for input parameters where site specific data and distributions lack. Probabilistic simulations and inputs are limited to parameters with assigned Gaussian probability functions. Similar results for transient worker inhalation dose were found in comparison with the Zapadnoe GoldSim model. However, the NORMALYSA model has results larger by an order of magnitude for external radiation in the transient worker and for aquatic food ingestion, inhalation, and garden food ingestion to the resident. Performance Assessment Modeling: Radiological performance models promote good management and support in remediation and environmental decision making by optimizing radioactive waste disposal site performance. a performance assessment model of the Zapadnoe uranium mill tailings site and a model for calculating authorized limits at Los Alamos National Laboratory are created to demonstrate and highlight the respective capabilities of three modeling platforms: GoldSim, NORMALYSA, and RESRAD-Onsite. GoldSim is a general-purpose modeling platform with the ability to simulate site-specific FT radionuclide transport and risk assessment using a graphical interface to create and link elements that act as indivisible building blocks of the model. The Zapadnoe performance assessment model created in GoldSim is composed of input parameters collected from site specific parameters from WG1 as well as standard assumptions seen in the Generic PA Model from Neptune and Company. The multivariate Zapadnoe simulation contains both deterministic and probabilistic simulation capabilities with the ability to quantitatively represent the uncertainty and associated risks of the site via the Monte Carlo simulation method. Model parameters, documentation, and assumptions are built directly into the model creating a transparent, reproducible, and more purposeful site specific model. To demonstrate this, an ingestion of water pathway was included in addition to the exposure pathways included in the NORMALYSA model. GoldSim offers a wide variety of probability distributions to choose from as well as many tools to visualize the uncertainty of the models and explore which pathways and radionuclides dominate dose. In contrast to the NORMALYSA model, the GoldSim model uses dynamic simulation to calculate tritium concentrations. Authorized limits support the evaluation of radiological health effects from radionuclides present in bulk contaminated soil in order to assist in the process of clearing land for release under different uses. Calculations of authorized limits in RESRAD-Onsite and GoldSim models support the evaluation for 15 radionuclides using a residential exposure scenario, indoor and outdoor inhalation of dust and vapor phase radionuclides (tritium), incidental soil ingestion, and ingestion grown fruits and Vegetables. RESRAD-Onsite, developed by Argonne National Laboratory is a dedicated computer code for calculating radiation doses and cancer risks to an individual located on top of radioactively contaminated soils. It can also be used to provide guidelines for deriving radionuclide soil levels corresponding to a specific dose criterion. The menu driven user interface facilitates selection of radionuclides and soil concentrations, as well as defines parameter values related to materials, environmental factors, and exposure pathways. The program contains radionuclide-specific data such as dose conversion factors and risk coefficients, as well as soil-water partition coefficients and transfer factors for biotic media. The GoldSim model successfully emulates the RESRAD-Onsite code using identical radiological decay and ingrowth factors, radiation dose conversion factors, and other input parameters. DE EEDE ETS Each model supports dynamic modeling of radionuclide ingrowth and decay over time, and integrate this capability with the transport of radionuclides in the environment via processes such as advection and/or diffusion in fluids, or within porous solid media, The applicability of each program is heavily dependent on project context. In the context of developing Authorized Limits, RESRAD-Onsite may be a more desirable option as it was developed for this particular application. For simple disposal or legacy sites or sites that do not need site-specific model structure, NORMALYSA may be a desirable modeling platform, GoldSim can be used to model any problem for which RESRAD or NORMALYSA is applicable, but its strength lies in its flexibility, analytical, and probabilistic capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗