Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Stan : A Probabilistic Programming Language

Stan is a probabilistic programming language for specifying statistical models. A Stan program imperatively defines a log probability function over parameters conditioned on specified data and constants. As of version 2.14.0, Stan provides full Bayesian inference for continuous-variable models through Markov chain Monte Carlo methods such as the No-U-Turn sampler, an adaptive form of Hamiltonian Monte Carlo sampling. Penalized maximum likelihood estimates are calculated using optimization methods such as the limited memory Broyden-Fletcher-Goldfarb-Shanno algorithm. Stan is also a platform for computing log densities and their gradients and Hessians, which can be used in alternative algorithms such as variational Bayes, expectation propagation, and marginal inference using approximate integration. To this end, Stan is set up so that the densities, gradients, and Hessians, along with intermediate quantities of the algorithm such as acceptance probabilities, are easily accessible. Stan can also be called from the command line using the cmdstan package, through R using the rstan package, and through Python using the pystan package. All three interfaces support sampling and optimization-based inference with diagnostics and posterior analysis. rstan and pystan also provide access to log probabilities, gradients, Hessians, parameter transforms, and specialized plotting.

97 MATHEMATICS AND COMPUTING↗

SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory

A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Naval Reactors Facility (NRF), and the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) (Figure 1-1). The PSHA followed the approaches and procedures appropriate for a Study Level 1 provided in the guidance advanced by the Senior Seismic Hazard Analysis Committee (SSHAC) in U.S. Nuclear Regulatory Commission (NRC) NUREG/CR-6372 and NUREG-2117 (NRC, 1997; 2012a). The SSHAC Level 1 PSHAs for MFC and ATR were conducted as part of the Seismic Risk Assessment (SRA) project (INL Project number 31287) to develop and apply a new-risk informed methodology, respectively. The SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels. The SRA project is developing a new risk-informed methodology that will provide a systematic approach for evaluating the need for an update of an existing PSHA. The new methodology proposes criteria to be employed at specific analysis, decision, or comparison points in its evaluation process. The first four of seven criteria address changes in inputs and results of the PSHA and are given in U.S. Department of Energy (DOE) Standard, DOE-STD-1020-2012 (DOE, 2012a) and American National Standards Institute/American Nuclear Society (ANSI/ANS) 2.29 (ANS, 2008a). The last three criteria address evaluation of quantitative hazard and risk-focused information of an existing nuclear facility. The seven criteria and decision points are applied to Seismic Design Category (SDC) 3, 4, and 5, which are defined in American Society of Civil Engineers/Structural Engineers Institute (ASCE/SEI) 43-05 (ASCE, 2005). The application of the criteria and decision points could lead to an update or could determine that such update is not necessary.

58 GEOSCIENCES↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High Temperature Electrolysis Hydrogen Production Plant

Two generic probabilistic risk assessments (PRA) for the addition of a heat extraction system (HES) addition to a light water reactor (LWR) are performed, one for a pressurized water reactor (PWR) and one for a boiling water reactor (BWR). The results investigate the applicability of the potential licensing approaches which do not require a full U.S. Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic, and some assumptions are made. Many conservative assumptions from a the preliminary PWR PRA report were eliminated using design data for both the HES and the high temperature electrolysis facility (HTEF). The results of the PRA indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all DBAs, none exceeding 5.6%. The PRA results for CDF and LERF support the use of RG 1.174 as further risk information that supports a change without a full LAR. Further insights provided through hazard analysis and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and a HTEF sited at 1.0 km from the NPP is strong and that the placement of a HTEF at 0.5 km is a viable case. Site specific information can alter these conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Probabilistic Risk Assessment of a Light-Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This report details an expansion of the original two generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to a light-water reactor, one for a pressurized-water reactor and one for a boiling-water reactor. The new material in this revision includes a new HES design, direct electrical coupling of the nuclear power plant to the High-Temperature Electrolysis Facility (HTEF), and a smaller 100-MWt HTEF analysis. The results investigate the applicability of the potential licensing approaches, which do not require a full United States Nuclear Regulatory Commission licensing review. The PRAs are generic and include some assumptions. We eliminated many conservative assumptions from the preliminary pressurized-water reactor PRA report using design data for both the HES and HTEF. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 5.6%. The PRA results for core damage frequency and large early release frequency support the use of RG 1.174 as further risk information that supports a change without a full licensing amendment review. Further insights provided through hazard analyses and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and an HTEF sited 1.0 km from the nuclear power plant is strong and that the placement of a HTEF at 0.5 km is also a viable case. Site-specific information can alter these conclusions.

08 HYDROGEN↗

Benchmarking of Probabilistic Fracture Mechanics Models in Grizzly

In 2020, as part of contract/task order 31310019N0006/31310020F0060, the Nuclear Regulatory Commission tasked Idaho National Laboratory (INL) with benchmarking the MOOSE/GRIZZLY code against the NRC’s Fracture Analysis of Vessels - Oak Ridge (FAVOR), version 16.1 code. Both codes can predict large light-water reactor vessel integrity deterministically and probabilistically. In fact, such predictions are the primary purpose of the FAVOR code, and are a main focus of the GRIZZLY code, although GRIZZLY is capable of modeling a wider range of geometries and problems. The vessel integrity modeling capabilities of the GRIZZLY code are still under development and being gradually expanded, and the capability to model vessel fracture by crack growth has not yet been integrated into GRIZZLY (although it does exist in pre-release versions). Thus, the present benchmark study focused on comparing predictions for the conditional probability of crack growth initiation (CPI) between GRIZZLY and FAVOR v16.1. The present benchmarking study expands on a previous study completed in 2020, which focused on single plate regions, various flaw types, and full vessel studies. The previous study was limited in scope and revealed some relatively large discrepancies, particularly in the case of weld regions. In the present study, detailed investigations into the sources of discrepancies between GRIZZLY and FAVOR were performed, with a focus on weld regions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic physics of failure approach to fusion systems & Risk-efficiency optimization of nuclear co-generation [Slides]

An overview of the progress made towards two separate summer internship projects: a probabilistic physics of failure approach to fusion systems and a risk efficiency optimization of nuclear co-generation. Original version summarized the progress through end of June, and the revision version summarizes the progress through the entire internship to August 1st.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

An overview of the evolution of human reliability analysis in the context of probabilistic risk assessment.

Since the Reactor Safety Study in the early 1970's, human reliability analysis (HRA) has been evolving towards a better ability to account for the factors and conditions that can lead humans to take unsafe actions and thereby provide better estimates of the likelihood of human error for probabilistic risk assessments (PRAs). The purpose of this paper is to provide an overview of recent reviews of operational events and advances in the behavioral sciences that have impacted the evolution of HRA methods and contributed to improvements. The paper discusses the importance of human errors in complex human-technical systems, examines why humans contribute to accidents and unsafe conditions, and discusses how lessons learned over the years have changed the perspective and approach for modeling human behavior in PRAs of complicated domains such as nuclear power plants. It is argued that it has become increasingly more important to understand and model the more cognitive aspects of human performance and to address the broader range of factors that have been shown to influence human performance in complex domains. The paper concludes by addressing the current ability of HRA to adequately predict human failure events and their likelihood.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Production Systems with Probabilistic Perturbations

Probabilistic perturbations associated with scattering of the operating periods and equipment faults in flexible production systems are considered. The perturbations are taken into account in computer simulation of the operation of a flexible production system. The proposed modeling application is described.

42 ENGINEERING↗

Probabilistic Perturbations in Flexible Production Systems

In formulating the engineering principles for flexible production systems, the probabilistic perturbations of their operation must be taken into account. A set of computational experiments based on a special computer application is described. The place of the proposed method in the overall predesign sequence is established.

42 ENGINEERING↗

Probabilistic Modeling of Microbial Metabolic Networks for Integrating Partial Quantitative Knowledge Within the Nitrogen Cycle

Understanding the interactions between microbial communities and their environment sufficiently to predict diversity on the basis of physicochemical parameters is a fundamental pursuit of microbial ecology that still eludes us. However, modeling microbial communities is problematic, because (i) communities are complex, (ii) most descriptions are qualitative, and (iii) quantitative understanding of the way communities interact with their surroundings remains incomplete. One approach to overcoming such complications is the integration of partial qualitative and quantitative descriptions into more complex networks. Here we outline the development of a probabilistic framework, based on Event Transition Graph (ETG) theory, to predict microbial community structure across observed chemical data. Using reverse engineering, we derive probabilities from the ETG that accurately represent observations from experiments and predict putative constraints on communities within dynamic environments. These predictions can feedback into the future development of field experiments by emphasizing the most important functional reactions, and associated microbial strains, required to characterize microbial ecosystems.

59 BASIC BIOLOGICAL SCIENCES↗

Probabilistic Mixture Model-Based Spectral Unmixing

Spectral unmixing attempts to decompose a spectral ensemble into the constituent pure spectral signatures (called endmembers) along with the proportion of each endmember. This is essential for techniques like hyperspectral imaging (HSI) used in environment monitoring, geological exploration, etc. Several spectral unmixing approaches have been proposed, many of which are connected to hyperspectral imaging. However, most extant approaches assume highly diverse collections of mixtures and extremely low-loss spectroscopic measurements. Additionally, current non-Bayesian frameworks do not incorporate the uncertainty inherent in unmixing. We propose a probabilistic inference algorithm that explicitly incorporates noise and uncertainty, enabling us to unmix endmembers in collections of mixtures with limited diversity. We use a Bayesian mixture model to jointly extract endmember spectra and mixing parameters while explicitly modeling observation noise and the resulting inference uncertainties. We obtain approximate distributions over endmember coordinates for each set of observed spectra while remaining robust to inference biases from the lack of pure observations and the presence of non-isotropic Gaussian noise. As a direct impact of our methodology, access to reliable uncertainties on the unmixing solutions would enable robust solutions to noise, as well as informed decision-making for HSI applications and other unmixing problems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Inference of Unresolved Point Sources at High Galactic Latitudes Using Probabilistic Catalogs

The detection of point sources in images is a fundamental operation in astrophysics, and is crucial for constraining population models of the underlying point sources or characterizing the background emission. Standard techniques fall short in the crowded-field limit, losing sensitivity to faint sources and failing to track their covariance with close neighbors. We construct a Bayesian framework to perform inference of faint or overlapping point sources. The method involves probabilistic cataloging, where samples are taken from the posterior probability distribution of catalogs consistent with an observed photon count map. In order to validate our method, we sample random catalogs of the gamma-ray sky in the direction of the North Galactic Pole (NGP) by binning the data in energy and point-spread function classes. Using three energy bins spanning 0.3–1, 1–3, and 3–10 GeV, we identify 270{sub −10}{sup +30} point sources inside a 40{sup ∘}×40{sup ∘} region around the NGP above our point-source inclusion limit of 3×10{sup −11} cm{sup −2} s{sup −1} sr{sup −1} GeV{sup −1} at the 1–3 GeV energy bin. Modeling the flux distribution as a power law, we infer the slope to be −1.92{sub −0.05}{sup +0.07} and estimate the contribution of point sources to the total emission as 18{sub −2}{sup +2}%. These uncertainties in the flux distribution are fully marginalized over the number as well as the spatial and spectral properties of the unresolved point sources. This marginalization allows a robust test of whether the apparently isotropic emission in an image is due to unresolved point sources or of truly diffuse origin.

79 ASTRONOMY AND ASTROPHYSICS↗

Probabilistic inference of basic stellar parameters: application to flickering stars

The relations between observable stellar parameters are usually assumed to be deterministic. That is, given an infinitely precise measurement of independent variable, “x”, and some model, the value of dependent variable, “y” can be known exactly. In practice this assumption is rarely valid and intrinsic stochasticity means that two stars with exactly the same “x” will have slightly different “y”s. The relation between short-timescale brightness fluctuations (flicker) of stars and both surface gravity and stellar density are two such stochastic relations that have until now been treated as deterministic ones. We recalibrate these relations in a probabilistic framework, using hierarchical Bayesian modeling to constrain the instrinsic scatter in the relations. We find evidence for additional scatter in the relationship, that cannot be accounted for by the observational uncertainties alone. The scatter in surface gravity and stellar density does not depend on flicker, suggesting that using flicker as a proxy for logg and ρ {sub ⋆} is equally valid for dwarf and giant stars, despite the fact that the observational uncertainties tend to be larger for dwarfs.

79 ASTRONOMY AND ASTROPHYSICS↗

A Language for Probabilistic Modeling of Scientific Data

We describe a portable container which allows specification of the probabilistic relations between several variables. The applications motivating this work are mainly scientific inference problems.

probabilistic modeling scientific data↗

A Strategy to Integrate Probabilistic Risk Assessment into Design and Development Processes for Aerospace Based pon Mars Exploration Rover Experiences

This paper will discuss the Probabilistic Risk Assessment (PRA) effort and its involvement with related activities during the development of the Mars Exploration Rover (MER). The Rovers were launched 2003.June.10 (Spirit) and 2003.July.7 (Opportunity), and both have proven very successful. Although designed for a 90-day mission, the Rovers have been operating for over two earth years. This paper will review aspects of how the MER project integrated PRA into the design and development process. A companion paper (Development of the Mars Exploration Rover PRA) will describe the MER PRA and design changes from those results.

Probabilistic Risk Assessment (PRA)↗

Probabilistic Reasoning for Plan Robustness

A planning system must reason about the uncertainty of continuous variables in order to accurately project the possible system state over time. A method is devised for directly reasoning about the uncertainty in continuous activity duration and resource usage for planning problems. By representing random variables as parametric distributions, computing projected system state can be simplified in some cases. Common approximation and novel methods are compared for over-constrained and lightly constrained domains. The system compares a few common approximation methods for an iterative repair planner. Results show improvements in robustness over the conventional non-probabilistic representation by reducing the number of constraint violations witnessed by execution. The improvement is more significant for larger problems and problems with higher resource subscription levels but diminishes as the system is allowed to accept higher risk levels.

autonomous planning↗

Toward the Probabilistic Forecasting of High-latitude GPS Phase Scintillation

The phase scintillation index was obtained from L1 GPS data collected with the Canadian High Arctic Ionospheric Network (CHAIN) during years of extended solar minimum 2008-2010. Phase scintillation occurs predominantly on the dayside in the cusp and in the nightside auroral oval. We set forth a probabilistic forecast method of phase scintillation in the cusp based on the arrival time of either solar wind corotating interaction regions (CIRs) or interplanetary coronal mass ejections (ICMEs). CIRs on the leading edge of high-speed streams (HSS) from coronal holes are known to cause recurrent geomagnetic and ionospheric disturbances that can be forecast one or several solar rotations in advance. Superposed epoch analysis of phase scintillation occurrence showed a sharp increase in scintillation occurrence just after the arrival of high-speed solar wind and a peak associated with weak to moderate CMEs during the solar minimum. Cumulative probability distribution functions for the phase scintillation occurrence in the cusp are obtained from statistical data for days before and after CIR and ICME arrivals. The probability curves are also specified for low and high (below and above median) values of various solar wind plasma parameters. The initial results are used to demonstrate a forecasting technique on two example periods of CIRs and ICMEs.

scintillation↗