589 records · Page 33

Resilience Service Framework Using Transactive Systems Valuation Methodology

Recent outage events have spurred national and international interest in improving grid resilience. Actions to make the grid more resilient must be valued against their costs and benefits. This is the goal of this report. We explore a resilience valuation framework, where the services procured by the utility are arranged such that the values associated with them are pinpointed. This is demonstrated by utilizing various diagrams developed in Pacific Northwest National Laboratory’s Transactive System Program, called the Transactive Systems Valuation Methodology (TSVM). We show that TSVM can be utilized to guide traditional valuation methodologies such as integrated resource planning so that resilience considerations can be embedded. This report demonstrates this using a three-step procedure: (1) a use case is developed to define functional requirements, (2) value identification of the utility and the actors with which it interacts (both inside and outside its internal functions), and (3) value tracking of activity performed by actors interacting with the utility while services are procured to enable a resilient grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Interactive Micro-Distributed Refrigerated Display Case

Open-vertical medium-temperature refrigerated display cases comprise nearly 50% of total case lineups in a typical supermarket, with more than 80% of their cooling load attributed to infiltration of warm and moist air from the surrounding space. The infiltration takes place across the air curtain system of the display case. While the air curtain acts as a thermal shield and as a cooling mechanism to maintain product temperature, it also entrains large amounts of heat and moisture from the adjacent space. Additionally, from food safety and quality standpoints, these fixtures are vulnerable to electric outages and traditionally cannot participate in load flexibility events. This paper describes key features of an innovative design of a self-contained, water-cooled, medium-temperature, open-vertical display case. The novel concept will eliminate the inefficient air curtain system and incorporate a hybrid radiant and low-airflow convective cooling design with a thermal-energy-storage-coupled heat exchanger integrated into the refrigeration circuit. The focus of this paper is on evaluating the thermal performance of the novel hybrid design in maintaining target product temperature. It presents thermal performance findings from thermo-fluid system modeling and robust state-of-the-art laboratory experiments used to validate those models. Load flexibility attributes from thermal energy storage are not discussed. A controlled-environment chamber at the National Renewable Energy Laboratory was leveraged to validate the thermal performance of the novel technology. Final results from bench-scale experiments indicate the proposed design maintained mean product temperatures within food safety guidelines.

commercial refrigeration↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Curriculum-based Reinforcement Learning for Distribution System Critical Load Restoration

This paper focuses on the critical load restoration problem in distribution systems following major outages. To provide fast online response and optimal sequential decision-making support, a reinforcement learning (RL) based approach is proposed to optimize the restoration. Due to the complexities stemming from the large policy search space, renewable uncertainty, and nonlinearity in a complex grid control problem, directly applying RL algorithms to train a satisfactory policy requires extensive tuning to be successful. To address this challenge, this paper leverages the curriculum learning (CL) technique to design a training curriculum involving a simpler steppingstone problem that guides the RL agent to learn to solve the original hard problem in a progressive and more effective manner. We demonstrate that compared with direct learning, CL facilitates controller training to achieve better performance. To study realistic scenarios where renewable forecasts used for decision-making are in general imperfect, the experiments compare the trained RL controllers against two model predictive controllers (MPCs) using renewable forecasts with different error levels and observe how these controllers can hedge against the uncertainty. Results show that RL controllers are less susceptible to forecast errors than the baseline MPCs and can provide a more reliable restoration process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Resilience-Motivated Distribution System Restoration Considering Electricity-Water-Gas Interdependency

A major outage in the electricity distribution system may affect the operation of water and natural gas supply systems, leading to an interruption of multiple services to critical customers. Therefore, enhancing resilience of critical infrastructures requires joint efforts of multiple sectors. In this paper, a distribution system service restoration method considering the electricity-water-gas interdependency is proposed. The objective is maximizing the supply of electricity, water, and gas to critical customers after an extreme event. The operational constraints of electricity, water, and natural gas networks are considered. Additionally, the characteristics of electricity-driven coupling components, including water pumps and gas compressors, are also modeled. Relaxation techniques are applied to non convex constraints posed by physical laws of those networks. Consequently, the restoration problem is formulated as a mixed-integer second-order cone program, which can readily be solved by the off-the-shelf solvers. The proposed method is validated by numerical simulations on an electricity-water-gas integrated system, developed based on benchmark models of the subsystems. The results indicate that considering the interdependency refines the allocation of limited generation resources and demonstrate the exactness of the proposed convex relaxation

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Secure and Adaptive Hierarchical Multi-Timescale Framework for Resilient Load Restoration Using a Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMGs are challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. Here, this paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using new obtained forecasts, followed by the RT dispatch stage. To make the decisions more secure and robust against forecast errors, a novel concept called delayed recourse is designed. The approach is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS and hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure distribution network operation under different operating scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying Distribution System Resilience From Utility Data: Large Event Risk and Benefits of Investments

We focus on blackouts in electric distribution systems that have a large cost to customers. To quantify resilience to these events, we show how to calculate risk metrics from the historical outage data routinely collected by utilities' outage management systems. Risk is defined using a customer cost exceedance curve. The exceedance curve has a heavy tail that implies large fluctuations in large blackout costs, and this makes estimating the mean large cost in the usual way impractical. To avoid this problem, we use new resilience metrics describing the large event risk; these metrics are the probability of a large cost event, the annual log cost resilience index, and the average of the logarithm of the cost of large-cost events or the slope magnitude of the tail on a log–log exceedance curve. Resilience can be improved by planned investments to upgrade system components or speed up restoration. The benefits that these investments would have had if they had been made in the past can be quantified by “rerunning history” with the effects of the investment included, and then recalculating the large event risk to find the improvement in resilience. An example using utility data shows a 2% reduction in the probability of a large cost event due to 10% wind hardening and 6%–7% reduction due to 10% faster restoration in two different areas of a distribution utility. This new data-driven approach to quantify resilience and resilience investments is realistic and much easier to apply than complicated approaches based on modeling all the phases of resilience. Moreover, an appeal to improvements to past lived experience may well be persuasive to customers and regulators in making the case for resilience investments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recovery Simulator and Analysis Formulation: Mathematical Framework for Enhanced Resilience and Resource Allocation

This report introduces recovery simulator and analysis (RSA), a framework aimed at enhancing the resilience of electrical grids post-disruption. The RSA model leverages an optimization problem formulation that focuses on maximizing the load served (or optionally customers served) through a coordinated and cooptimized recovery of non-black start generation, transmission lines, feeders and substations subject to labor budget constraints. By integrating advanced linear programming techniques, the simulator selects efficient reocovery pathways, optimizing both short-term and long-term grid recovery strategies. The mathematical framework guides decision-making through a comprehensive evaluation of potential recovery actions, factoring in the trade-offs between labor constraints and load (or optionally customer) restoration efficacy. This enables grid operators to simulate diverse outage scenarios and delineate optimal recovery pathways, thereby prioritizing critical repair tasks and ensuring resource allocation is both economical and effective. The intended use case of RSA is to allow planners to explore many recovery scenarios quickly and determine assets most critical across a wide range of scenarios, and therefore strong candidates for hardening or additional investment. RSA might also be used in an operational setting, following a single event, for exploring efficient recovery pathways.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Microgrid Scheduling With Chance‐Constrained Resilience Consideration

Traditionally, it is assumed that microgrids transition seamlessly from grid‐connected operation to islanded mode in the event of sudden main grid outages. In reality, the islanding process, especially unintentional islanding, is rarely seamless. Instead, it is subject to voltage and frequency fluctuations caused by the instantaneous disconnection of the point of common coupling (PCC) switch, variations in loads and renewable generation output and even the protection tripping of distributed energy resources (DERs). To mitigate these fluctuations and facilitate a smooth islanding process, we propose a stochastic microgrid scheduling model that incorporates chance‐constrained resilience measures. Specifically, the resilience measure is defined as the probability of successful islanding (PSI), that is, the probability that a microgrid can mitigate the generation‐demand imbalance caused by the disconnection of the PCC switch, variations in load and renewable generation and DER tripping. This measure is modelled using chance constraints. Unlike existing reliability and resilience indices, which typically neglect the possibility of microgrid/DER failure under extreme events and assume their survival while primarily focussing on reducing impact duration or magnitude, the proposed PSI‐based framework explicitly addresses microgrid and DER survival during the islanding transition. The formulated nonlinear chance constraints are approximated using a multiinterval approach and equivalently represented as a mixed‐integer linear programming (MILP) formulation. Case study results validate the proposed method, showing that the PSI estimation error is reduced to less than 8%, compared to approximately 28% with existing methods. Various sensitivity analyses on the DER tripping rate and PSI settings were performed to validate the robustness of the proposed method. In particular, the necessity of accounting for DER tripping in the PSI calculation was demonstrated.

chance constrained optimization↗

Microgrid Conceptual Design Guidebook | 2022

This guide is meant to assist communities – from residents to energy experts to decision makers – in developing a conceptual microgrid design that meets site-specific energy resilience goals. Using the framework described in this guidebook, stakeholders can come together and start to quantify site-specific vulnerabilities, identify the most significant risks to delivery of electricity, and establish electric outage tolerances across the community. In addition to establishing minimum service needs, this framework encourages communities to consider broader sustainability goals and policy constraints and begin to estimate up-front costs associated with the installation of alternative microgrid solutions. The framework guides a community through data collection and a high-level assessment of its needs, constraints, and priorities, prior to engaging engineers, vendors, and contractors. The first sections of this guidebook provide a high-level primer on electric systems. The latter sections include guidance for step-by-step data gathering and analysis of site conditions. The ultimate product resulting from the stepwise approach is a conceptual microgrid design. A conceptual design is defined as an initial design (10%-20% complete) that considers the specific threats, needs, limitations, and investment options for a given location. Going through this exercise and developing the conceptual microgrid design as a community ensures the same community members who will ultimately live with the solution are the developers of its foundational design. Often, these are also the very same people who understand system tolerances and needs the best and are therefore the ideal candidates for establishing these criteria. Especially when it comes to evaluating critical infrastructure, it is the community that best understands the most critical services. The framework is intended to facilitate a systematic approach to planning for resilience and provide a deeper understanding of how to use a framework to make decisions around microgrid solutions. Like many processes where tradeoffs need to be considered, this is often an iterative process. If this guide serves to help educate and empower communities who are beginning the process of deploying a microgrid, it has met the goal of its authors.

24 POWER TRANSMISSION AND DISTRIBUTION↗