Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Stormwater Pollution Prevention Plan, TA-03-22 Power and Steam Plant, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements:(1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020 (Copy for Informational Puproses Only)

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements: (1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Laws in Order: An Inventory of State Renewable Energy Siting Policies

This report identifies which government entity or entities in each state or territory have the jurisdictional authority to make siting and permitting decisions about large scale wind and solar projects. The report also covers established timelines for siting and permitting processes, requirements for public involvement in those processes, and the availability of permitting guides and model ordinances designed to assist local jurisdictions. It details state renewable energy siting policies and permitting authorities across the United States, profiling all 50 states plus Puerto Rico. The report release also includes an interactive map that allows users to easily explore each state’s authorities and policy features. The map, hosted by DOE, includes high-level information on each state’s siting and permitting processes and link directly to the profiles in the report.

14 SOLAR ENERGY↗

Y-12 National Security Complex Biological Monitoring And Abatement Program 2008 Calendar Year Report

The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off the ORR and below an area of intensive commercial and light industrial development; EFK 13.8, located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1). Actual sampling locations on EFPC may differ slightly by task according to specific requirements of the task. Brushy Fork (BF) at kilometer (BFK) 7.6 and Hinds Creek at kilometer (HCK) 20.6 are the most commonly used reference sites for the Y-12 BMAP. Additional sites off the ORR are also occasionally used for reference, including Beaver Creek, Bull Run, Cox Creek, and Paint Rock Creek (Fig. 1.2). Summaries of the sampling designs for the three primary tasks of the Y-12 Complex BMAP for EFPC are presented in Tables 1.1-1.3. This report covers the 2008 period, although data collected outside this time period are included as appropriate. To address the biological monitoring requirements for Bear Creek and McCoy Branch, CERLCA-funded programs, data are summarized in Appendix A and Appendix B respectively. Data for these two watersheds are provided herein to address Section IX of the NPDES Permit for Y-12, where 'Results of these CERCLA programs can be used to meet the biological monitoring requirements of this permit...'. A summary of the toxicity testing results for Y-12 outfalls into upper EFPC is provided in Appendix C (these results have been previously reported) to provide a more thorough perspective of conditions in the stream. Data summarized in this report are available from the Oak Ridge Environmental Information system (OREIS) in an Arc-GIS usable format (http://www-oreis.bechteljacobs.org/oreis/help/oreishome.html). Per requirements specified in the NPDES permit, data collected following TDEC monitoring protocols (TDEC 2006) is also submitted directly to TDEC in Excel format.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Managing Environmental Effects to Facilitate Marine Renewable Energy Development

The marine renewable energy (MRE) industry is in the early stages of commercial development. In addition to the challenges of deploying and maintaining devices under harsh ocean conditions and transporting electricity to shore, concerns around potential environmental effects continue to slow permitting (consenting) processes. Regulators and stakeholders perceive a wide array of potential environmental interactions as risky and highly uncertain, and request that considerable baseline assessments and post-installation monitoring be carried out in order to permit or license a project. The MRE industry is struggling with the high cost of baseline assessments and post-installation monitoring, as well as extended timelines for obtaining permits, leading to uncertainty and risk for financing projects. As a means to mitigate this uncertainty and risk, regulators in the US have been engaged to ensure that they understand the underlying science that drives these challenges and to explore the feasibility of transferring learning and information from early MRE projects and analogous industry interactions to inform potential environmental effects and permitting for new MRE projects. The ability to use data and information from one project or location to another can aid the industry by reducing the high costs of environmental monitoring and accelerating permitting processes for future projects. This paper presents findings of a regulator survey and other engagements with regulators, provides insight into the process of data transferability, suggests a framework for data transferability and collection consistency, and details efforts to engage the research community in furthering this process.

Marine renewable energy, environmental effects, da↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TYPE AF CERTIFICATE FOR TRANSPORTATION OF LOW ENRICHED URANIUM OXIDE (LEUO) FOR DISPOSAL

Washington Savannah River Company (WSRC) operates the Savannah River Site (SRS) in Aiken, SC under contract with the U.S. Department of Energy (DOE). SRS had the need to ship 227 drums of low enriched uranium oxide (LEUO) to a disposal site. The LEUO had been packaged nearly 25 years ago in U.S. Department of Transportation (DOT) 17C 55-gallon drums and stored in a warehouse. Since the 235U enrichment was just above 1 percent by weight (wt%) the material did not qualify for the fissile material exceptions in 49 CFR 173.453, and therefore was categorized as 'fissile material' for shipping purposes. WSRC evaluated all existing Type AF packages and did not identify any feasible packaging. Applying for a new Type AF certificate of compliance was considered too costly for a one-time/one-way shipment for disposal. Down-blending the material with depleted uranium (to reduce enrichment below 1 wt% and enable shipment as low specific activity (LSA) radioactive material) was considered, but appropriate blending facilities do not exist at SRS. After reviewing all options, WSRC concluded that seeking a DOT Special Permit was the best option to enable shipment of the material for permanent disposal. WSRC submitted the Special Permit application to the DOT, and after one request-for-additional-information (RAI) the permit was considered acceptable. However, in an interesting development that resulted from the DOT Special Permit application process, it was determined that it was more appropriate for the DOE to issue a Type AF certificate [Ref. 1] for this shipping campaign. This paper will outline the DOT Special Permit application and Type AF considerations, and will discuss the issuance of the new DOE Type AF certificate of compliance.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2011 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA-000160-01), for the wastewater reuse site at the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from November 1, 2010 through October 31, 2011. The report contains the following information: (1) Facility and system description; (2) Permit required effluent monitoring data and loading rates; (3) Groundwater monitoring data; (4) Status of special compliance conditions; and (5) Discussion of the facility's environmental impacts. During the 2011 reporting year, an estimated 6.99 million gallons of wastewater were discharged to the Industrial Waste Ditch and Pond which is well below the permit limit of 13 million gallons per year. Using the dissolved iron data, the concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the Ground Water Quality Rule Primary and Secondary Constituent Standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2012 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2011 through October 31, 2012. The report contains the following information: • Facility and system description, • Permit required effluent monitoring data and loading rates, • Groundwater monitoring data, • Status of compliance activities, • Noncompliance issues, and • Discussion of the facility’s environmental impacts. During the 2012 permit year, approximately 183 million gallons of wastewater were discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters were below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.

2012 wastewater reuse report↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Adding Impacts and Mitigation Measures to OpenEI's RAPID Toolkit

The Open Energy Information platform hosts the Regulatory and Permitting Information Desktop (RAPID) Toolkit to provide renewable energy permitting information on federal and state regulatory processes. One of the RAPID Toolkit's functions is to help streamline the geothermal permitting processes outlined in the National Environmental Policy Act (NEPA). This is particularly important in the geothermal energy sector since each development phase requires separate land analysis to acquire exploration, well field drilling, and power plant construction permits. Using the Environmental Assessment documents included in RAPID's NEPA Database, the RAPID team identified 37 resource categories that a geothermal project may impact. Examples include impacts to geology and minerals, nearby endangered species, or water quality standards. To provide federal regulators, project developers, consultants, and the public with typical impacts and mitigation measures for geothermal projects, the RAPID team has provided overview webpages of each of these 37 resource categories with a sidebar query to reference related NEPA documents in the NEPA Database. This project is an expansion of a previous project that analyzed the time to complete NEPA environmental review for various geothermal activities. The NEPA review not only focused on geothermal projects within the Bureau of Land Management and U.S. Forest Service managed lands, but also projects funded by the Department of Energy. Timeline barriers found were: extensive public comments and involvement; content overlap in NEPA documents, and discovery of impacted resources such as endangered species or cultural sites.

15 GEOTHERMAL ENERGY↗

Air Pollutant Emissions and Regulatory Implications of a Biorefinery Producing Raw Bio-Oil: Preprint

Co-processing bio-oil with petroleum-derived intermediates in existing refineries attracted refineries' interest because it offers a promising opportunity to reduce the carbon intensity of transportation fuels produced and requires relatively low capital investments to retrofit the refineries. A biorefinery producing bio-oil is considered a chemical process plant under the Clean Air Act's permitting program and could be classified as a major or minor source based on the size of the facility and the magnitude of regulated pollutants expected to be emitted. Our analysis examines the air pollutant emissions and potentially applicable federal air quality regulations for a biorefinery utilizing an ex situ catalytic fast pyrolysis process with a design capacity of processing 2,000 dry metric tons of biomass per day to produce 4,200 barrels of raw bio-oil per day. We quantify the preliminary potential-to-emit (PTE) for the biorefinery producing raw bio-oil and examine the ramifications on potential air permit classifications. We also provide an alternative set of PTE estimate by assuming the adoption of selected technically feasible emission control options that could help the biorefinery avoid being subject to major source permitting requirements (e.g., prevention of significant deterioration). Our analysis is expected to provide insights for new bio-oil project developers to identify opportunities to mitigate emissions and develop strategies to overcome potential challenges associated with air permitting.

09 BIOMASS FUELS↗

Lessons Learned for Construction and Waste Water Management at Radioactive Waste Closure Site

Environmental remediation of three different radioactive waste closure sites each required exhaustive characterization and evaluation of sampling and analytical information in resolving regulatory and technical issues that impact cleanup activities. One of the many regulatory and technical issues shared by all three and impacting the cleanup activities is the compliant management and discharge of waste waters generated and resulting from the remediation activities. Multiple options were available for each closure site in resolving waste water management challenges depending upon the base regulatory framework defined for the cleanup or closure of the site. These options are typically regulated by the federal Clean Water Act (CWA), with exemptions available under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Superfund Amendments and Reauthorization Act of 1986 (SARA) or Memorandum of Understanding (MOU) between regulatory agencies. In general, all parties must demonstrate equivalent compliance when concerns related to the protection of the general public and the environment. As such, all options for management of waste water resulting from closure activities must demonstrate compliance to or equivalent actions under the CWA. The CWA provides for the National Pollution Discharge Elimination System (NPDES) that is typically maintained by individual states through permitting process to generators, public utilities, and more recently, construction sites. Of the three sites, different compliance strategies were employed for each. The approach for the Columbus Closure Project (CCP) was to initiate full scale compliance to the Ohio EPA General Construction Permit No. OHC000002. The CCP provided Notice of Intent (NOI) to the Ohio EPA to discharge under the general permit according to the regulator approved Storm Water Pollution Prevention Plan. For the second site, the Li Tungsten Superfund Site in Glen Cove, New York, the option was to manage and discharge waste water under a due diligence process to New York State General Permit No. GP-02-01. For the third site, the Middlesex Sampling Plant in Middlesex, New Jersey, the options was to manage and discharge waste water to the Publicly Owned Treatment Works (POTW). Each option has resulted in a safe, cost-effective, and compliant approach to managing discharging waste waters from the site closure activities. (authors)

54 ENVIRONMENTAL SCIENCES↗