Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCESSING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Calcined Waste Storage at the Idaho Nuclear Technology and Engineering Center

This comprehensive report provides definitive volume, mass, and composition (chemical and radioactivity) of calcined waste stored at the Idaho Nuclear Technology and Engineering Center. Calcine composition data are required for regulatory compliance (such as permitting and waste disposal), future treatment of the caline, and shipping the calcine to an off-Site-facility (such as a geologic repository). This report also contains a description of the calcine storage bins. The Calcined Solids Storage Facilities (CSSFs) were designed by different architectural engineering firms and built at different times. Each CSSF has a unique design, reflecting varying design criteria and lessons learned from historical CSSF operation. The varying CSSF design will affect future calcine retrieval processes and equipment. Revision 4 of this report presents refinements and enhancements of calculations concerning the composition, volume, mass, chemical content, and radioactivity of calcined waste produced and stored within the CSSFs. The historical calcine samples are insufficient in number and scope of analysis to fully characterize the entire inventory of calcine in the CSSFs. Sample data exist for all the liquid wastes that were calcined. This report provides calcine composition data based on liquid waste sample analyses, volume of liquid waste calcined, calciner operating data, and CSSF operating data using several large Microsoft Excel (Microsoft 2003) databases and spreadsheets that are collectively called the Historical Processing Model. The calcine composition determined by this method compares favorably with historical calcine sample data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar-base construction equipment and methods evaluation

A process for evaluating lunar-base construction equipment and methods concepts is presented. The process is driven by the need for more quantitative, systematic, and logical methods for assessing further research and development requirements in an area where uncertainties are high, dependence upon terrestrial heuristics is questionable, and quantitative methods are seldom applied. Decision theory concepts are used in determining the value of accurate information and the process is structured as a construction-equipment-and-methods selection methodology. Total construction-related, earth-launch mass is the measure of merit chosen for mathematical modeling purposes. The work is based upon the scope of the lunar base as described in the National Aeronautics and Space Administration's Office of Exploration's 'Exploration Studies Technical Report, FY 1989 Status'. Nine sets of conceptually designed construction equipment are selected as alternative concepts. It is concluded that the evaluation process is well suited for assisting in the establishment of research agendas in an approach that is first broad, with a low level of detail, followed by more-detailed investigations into areas that are identified as critical due to high degrees of uncertainty and sensitivity.

Boles, Walter W.↗

A WM Facility for the Processing of Radioactive Materials Arising from the Decommissioning Activities of the Belgian Nuclear Power Plant of Doel - 16042

Doel Nuclear Power Plant is located in the northern part of Belgium in the harbour of Antwerp on the Scheldt River. On this 80-hectare site Electrabel, the Belgian utility, operates four PWRs with a total generation capacity of 2911 MWe. Those nuclear power units were commissioned in 1975 (Doel 1 and 2 - twin units), in 1982 (Doel 3) and in 1985 (Doel 4). In light of the Belgian governments decision to definitively shutdown the oldest units of the site (Doel 1 and 2 - 433 MWe each) in 2015 at the end of their 40-year design lifetime, Electrabel launched a D and D program in partnership with Tractebel Engineering in July 2012. During the D and D preparation phase prior to the final shutdown, studies performed by Tractebel Engineering showed the added benefit of a purpose-built Waste Management Facility (WMF) specifically equipped to process contaminated and activated components generated by the in-situ dismantling activities. The WMF is a key infrastructure contributing to a large extent to the Waste Minimization Policy within the global D and D program. The present paper aims at presenting its strategic, logistic, infra-structural, and design principles. At the end of 2014, the Belgian government and Electrabel entered into discussions to envisage a 10-year lifetime extension of Doel 1 and 2 units. Therefore, Electrabel decided to put the D and D program on hold. Nevertheless, the preparatory studies for the future D and D activities on Doel site are set on solid assumptions and pave the way towards a safe, cost-effective and waste minimizing decommissioning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AOI2 - Initial Engineering, Testing, and Design of a Commercial-Scale Postcombustion CO 2 Capture System on an Existing Coal-Fired Generating Unit (Project Carbon)

The continued long-term use of North Dakota lignite is likely dependent on creating a business case for carbon capture, utilization, and storage (CCUS) that also addresses society’s desire to reduce carbon emissions. CCUS coupled with enhanced oil recovery appears to be the most feasible option for utilities to sustain and grow the lignite industry. Establishing a market where lignite-powered utilities provide carbon dioxide (CO 2 ) to oil producers depends upon having a cost-effective method to capture CO 2 . The application of CO 2 capture technology to lignite-fired flue gas has challenges in addition to the cost of capture, including the effects of the buildup of heat-stable salts, aerosol formation, degradation of solvents or solid sorbents, or subsequent solvent loss. Lignite, especially North Dakota lignite, presents its own set of challenges that include the combination of high sodium, sulfur, and ash contents; NO x reduction; and footprint limitations. Project Carbon was designed to address these technical barriers and provide pre-FEED (preliminary front-end engineering and design) information necessary for additional commercial demonstrations to move forward. A long-term pilot-scale evaluation of Mitsubishi Heavy Industries’ (MHI’s) KS-1™ solvent at Minnkota Power Cooperative’s lignite-fired Milton R. Young Station Unit 2 (MRY2) was a major objective of the project. The purpose of the test was to demonstrate the technology’s compatibility with MRY2’s flue gas over an extended period of time. During the long-term test, aerosol sampling and measurement were performed, and a pilot-scale baghouse was tested to determine the effect of bag material and operation on aerosol concentrations in the flue gas. Project engineering and design work were performed to support the other major project objective: a pre-FEED study of CO 2 capture at MRY2. Finally, a techno-economic assessment (TEA) of the application of CO 2 capture to MRY2 was performed. This project was performed over a period of 28 months, with a total budget of $12,700,000. The U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory, through the Energy & Environmental Research Center’s (EERC’s) Cooperative Agreement, the North Dakota Industrial Commission, and industry partners ALLETE and Minnkota Power Cooperative, funded the project. The pilot-scale test system at MRY2 performed very well for the continuous test period of 83 days. The CO 2 capture plant achieved stable operation while utilizing MHI’s KS-1™ solvent and the MHI amine emission reduction unit. No major concerns were encountered when capturing CO 2 from lignite-fired flue gas. Challenges were encountered because the cooling water temperature was warmer than needed for the capture system to operate efficiently. This affected the ability of the solvent to capture CO 2 and promoted solvent loss through solvent entrainment caused by high CO 2 gas temperature within a cyclone separator. The KS-1™ solvent and the lignite-derived flue gas were analyzed during the long-term test. Analysis of the solvent indicates that, although some metals and heat-stable salts increased over the course of the long-term test, they were at levels that can be treated with filtration and reclaiming and do not pose a concern for effective solvent operation. Fourier transform infrared (FTIR) spectrometry was successfully used to determine the composition of the lignite-derived flue gas as well as concentrations of select components of the flue gas at various locations within the EERC’s CO 2 capture system. The formation of aerosols during the capture process is of interest, as are approaches for their reduction, especially in a baghouse. Testing of aerosol removal was performed using the EERC’s portable baghouse. It was found that both Ryton and polytetrafluoroethylene (PTFE) membrane bags were effective at reducing the level of aerosols during steady-state operation. During backpulse events, however, the amount of aerosols passing through the bags was an order of magnitude lower for the Ryton bags than the PTFE membrane bags. The testing showed that proper design of the baghouse air-to-cloth ratio as well as minimization of backpulsing can dramatically reduce the amount of aerosols that pass through the bags and remain in the flue gas stream exiting a baghouse system. A technology maturation plan (TMP) was performed to enable successful development of the Kansai Mitsubishi Carbon Dioxide Recovery® (KM CDR®) Process for application to a combustion flue gas for which the process has not yet been demonstrated. In the TMP, new challenges to the MHI CO 2 capture technology during its application to MRY2 were identified. These challenges included capture from lignite-fired (as opposed to subbituminous coal-fired) flue gas, a larger scope than previous applications of the technology, and implementation in a colder climate that could affect process and equipment operability. Because MRY2 is located where stack icing in the winter could be problematic, a rime icing study was performed. Rime icing modeling indicated that, under both 100% and 50% operating loads, there is a potential for many icing events during any given part of the year in which below-freezing weather conditions exist. The models showed that a critical amount of rime ice could be formed at the stack top during two or more events per year. CO 2 capture plant stack height and location will need to be determined in order to minimize the formation of rime ice. It was found that the integration of the MHI CO 2 capture process into the normal operation of the MRY2 steam turbine is a viable alternative to a cogeneration facility to provide steam and power for the carbon capture facility. The research performed under this project showed that CO 2 capture at a lignite-fired power plant can successfully be performed. No known fatal flaws that would prevent the continued development of the MRY2 CO 2 capture facility were identified during the pre-FEED study. A TEA performed following DOE methodology shows that applying capture technology to MRY2 may not only meet but exceed the DOE-recognized state-of-the-art baseline.

20 FOSSIL-FUELED POWER PLANTS↗

Pyrochemical Recovery of Uranium from Monolithic U-10Mo Fuel Scrap

This report provides a description of a pyrochemical processing system designed to recover low enriched uranium from uranium 10 wt% molybdenum alloy (U-10Mo) scrap that is bonded to aluminum cladding. Approximately 44 wt% (2327 kg) of the initial U-10Mo fuel meat used to create fuel foils for the five U.S. high-performance research reactors will be recycled annually (Wachs et al. 2008). The U-10Mo recycle stream is a mixture of materials including casting scrap from the uranium down-blending process, shearing losses from foil sizing, rejected fuel elements, and material from hold-up in crucibles and other contaminated equipment. A description of the process chemistry, processing equipment including size, and approximate footprint of the proposed scrap recovery line is presented. In addition, a mass balance flowsheet that identifies and quantifies product streams, waste streams, and process reagent requirements is provided for the proposed recycle process.

Figueroa, J.↗

Standard Waste Box Lid Screw Removal Option Testing

This report provides results from test work conducted to resolve the removal of screws securing the standard waste box (SWB) lids that hold the remediated nitrate salt (RNS) drums. The test work evaluated equipment and process alternatives for removing the 42 screws that hold the SWB lid in place. The screws were secured with a red Loctite thread locker that makes removal very difficult because the rivets that the screw threads into would slip before the screw could be freed from the rivet, making it impossible to remove the screw and therefore the SWB lid.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systems engineering studies of lunar base construction

Many ingenious concepts have been proposed for lunar base construction, but few systematic studies exist which relate time-consistent lunar base construction technologies and the choice of lunar base approach with the long-term SEI objectives - i.e., lunar indigenous base construction and Mars Exploration equipment development. To fill this gap, CSC has taken a two-pronged approach. First, the Center undertook basic geotechnical investigations of lunar soil, fabrication of a scale prototype of a lunar construction crane, a multi-robot construction team laboratory experiment, and a preliminary design of lunar base structures. Second, during Jun. and Jul. 1991 two lunar base construction systems engineering studies were accomplished - a 'near term lunar base' study, and a 'far-term lunar base' study. The goals of these studies were to define the major lunar base construction research problems in consistent technology/construction frameworks, and to define design requirements for construction equipment such as a lunar crane and a regolith mover. The 'near-term lunar base' study examined three different construction concepts for a lunar base comprised of pre-fabricated, pre-tested, Space Station Freedom-type modules, which would be covered with regolith shielding. Concept A used a lunar crane for unloading and transportation; concept B, a winch and cart; and concept C, a walker to move the modules from the landing site to the base site and assemble them. To evaluate the merits of each approach, calculations were made of mass efficiency measure, source mass, reliability, far-term base mass, Mars base mass, and base assembly time. The model thus established was also used to define the requirements for crane speed and regolith mover m(sup 3)/sec rates. A major problem addressed is how to 'mine' the regolith and stack it over the habitats as shielding. To identify when the cost of using indigenous lunar materials to construct the base exceeds the cost of development and delivery of the equipment for processing lunar materials, a study of construction of a candidate sintered regolith 'far term lunar base' was undertaken. A technique was devised for casting slabs of sintered (basaltic) regolith and assembling these into a hemispherical (or geodesic) dome. The major problem occurs with the inner liner. At 14.7 psi and 20 percent oxygen internal atmosphere, the entire structure is in tension, even with the regolith load. Also, another study has indicated that at 14.7 psi major resupply of air will be needed because of leakage, and astronauts may have to engage in extensive pre-breathing and post-breathing for extravehicular activity (EVA) tasks, thus detracting from useful mission work time. An alternative is to operate part of the base at, say, 5 psi and 70 percent oxygen, or to equip the astronauts with hard suits at 8.3 psi or greater. All of these choices directly influence base design and construction techniques.

Morgenthaler, George W.↗

Exploration of Mars by Mariner 9 - Television sensors and image processing.

Two cameras equipped with selenium sulfur slow scan vidicons were used in the orbital reconnaissance of Mars by the U.S. Spacecraft Mariner 9 and the performance characteristics of these devices are presented. Digital image processing techniques have been widely applied in the analysis of images of Mars and its satellites. Photometric and geometric distortion corrections, image detail enhancement and transformation to standard map projection have been routinely employed. More specializing applications included picture differencing, limb profiling, solar lighting corrections, noise removal, line plots and computer mosaics. Information on enhancements as well as important picture geometric information was stored in a master library. Display of the library data in graphic or numerical form was accomplished by a data management computer program.

Cutts, J. A.↗

Calcined Waste Storage at the Idaho Nuclear Technology and Engineering Center

This comprehensive report provides definitive information regarding the volume, mass, and composition (chemical and radioactivity) of the calcined waste stored at the Idaho Nuclear Technology and Engineering Center on the Idaho National Laboratory Site. The calcine composition data are required for current regulatory compliance and safe operation of the INTEC’s six Calcined Solids Storage Facilities (CSSFs), as well as future retrieval, treatment, and shipping the calcine to an off-Site facility (such as a geologic repository). This report also contains a description of the calcine storage bins that compose each of the CSSFs, emphasizing the features that may be of concern to future calcine retrieval. The CSSFs were designed by different architectural engineering firms and built at different times. Each CSSF has a unique design, reflecting varying design criteria and lessons learned from historical CSSF operation. The varying CSSF designs will affect future calcine retrieval processes and equipment. This revision (5) of the report presents refinements of the databases used to calculate the volume, mass, chemical content, and radioactivity of calcined waste produced and stored within the CSSFs. This revision corrects minor errors and inconsistencies noted in an extensive validation and verification effort of the prior version of the Microsoft Excel workbooks upon which the calcine composition described in this report is based. Historical calcine samples are insufficient in number and scope of analysis to fully characterize the entire inventory of calcine in the CSSFs. Sample data exist for all of the liquid wastes that were calcined. This report provides calcine composition data based on liquid waste sample analyses, the volume of liquid waste calcined, calciner operating data, and CSSF operating data using several large Microsoft Excel (Microsoft 2010) databases and spreadsheets. The Excel spreadsheets are collectively called the Historical Processing Model (HPM). The calcine composition determined by this method compares favorably with historical calcine sample data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine Learning for Joint Quality Control

The use of lightweight material combinations has been highly demanded in manufacturing automotive structures. However, making robust dissimilar material joints of such lightweight materials is still challenging. A significant barrier to achieving high-quality and repeatable joint performance is a deficient understanding of the relationship between the welding process, joint attributes, and joint performance. In this context, welding factors refer to material, equipment, environment, and process parameters, while joint features comprise specific microstructural attributes of the weld such as nugget size, heat affected zone (HAZ) topology, intermetallic layer thickness, and sheet thickness reduction. Joint performance is quantified in terms of strength (e.g., tensile shear, coach peel, cross-tension), weld size, and hardness, among other factors. While there have been many attempts to establish this process-structure-property relationship by developing a model derived from the associated physics and first principles, the complexity of the joining processes compounded by the complex interactions with different materials in an automotive assembly line environment, has hindered the usefulness of such attempts. The complexity is further exacerbated using different stacking materials, especially comprising dissimilar material combinations. In practice, the common approach has been the laborious process of creating welds, characterizing them, and then physically testing them through experimentation. With the emergence of artificial intelligence (AI) methods, an alternative pathway to eliciting the desired process-structure-property relationship at an accelerated pace is to use a data-driven approach by employing machine-learning (ML) techniques. This approach is benefitted by the availability of large streams of data, generated through years of research and testing by original equipment manufacturers, in the form of material, process, environmental, equipment, microstructural, and bulk-scale performance information from multimodal, multiscale sensors making measurements from laboratory-scale to production-scale processes. During Phase I efforts, which ended in fiscal year (FY) 2021, the Oak Ridge National Laboratory and Pacific Northwest National Laboratory (ORNL/PNNL) team demonstrated the effectiveness of different ML/AI frameworks in modeling complex relationships between resistance spot welding (RSW) process parameters, weld attributes, and joint properties using a subset of data from General Motors (GM). In FY 2022, the project team further refined and expanded their respective ML models to analyze additional welds with new weld stack-ups and materials to enhance the ML model predictive capability. ORNL extended its unified deep neural networks (DNN) ML training and prediction framework with new data streams of process parameters, and PNNL extended its model describing RSW process parameters’ associations with weld attributes. In FY 2023, the project team completed the development of the AI/ML architecture for analyzing aluminum/steel joints manufactured by GM via RSW and transitioned into the inline welding quality monitoring task for steel/steel RSW joints provided by GM.

36 MATERIALS SCIENCE↗

Ion Exchange Testing with SRF Resin FY2012

Ion exchange using spherical resorcinol-formaldehyde (SRF) resin has been selected by the U.S. Department of Energy’s Office of River Protection (DOE-ORP) for use in the Pretreatment Facility (PTF) of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and for potential application in at-tank deployment. Numerous studies have shown SRF resin to be effective for removing 137Cs from a wide variety of actual and simulated tank waste supernatants (Adamson et al. 2006; Blanchard et al. 2008; Burgeson et al. 2004; Duignan and Nash 2009; Fiskum et al. 2006a; Fiskum et al. 2006b; Fiskum et al. 2006c; Fiskum et al. 2007; Hassan and Adu-Wusu 2003; King et al. 2004; Nash et al. 2006). Prior work at the Pacific Northwest National Laboratory (PNNL) has focused primarily on the loading behavior for 4 to 6 M Na solutions at 25 to 45°C. Recent proposed changes to the WTP ion exchange process baseline indicate that loading may include a broader range of sodium molarities (0.1 to 8 M) and higher temperatures (50°C) to alleviate post-filtration precipitation issues. This report discusses ion exchange loading kinetics testing activities performed in accordance with Test Plan TP-WTPSP-002, Rev. 3.0, which was prepared and approved in response to the Test Specification 24590 PTF-TSP-RT-09-002, Rev. 0 (Lehrman 2010) and Test Exception 24590 PTF TEF RT-11-00003, Rev. 0 (Meehan 2011). This testing focused on column tests evaluating the impact of elevated temperature on resin degradation over an extended period of time and batch contacts evaluating the impact on Cs loading over a broad range of sodium concentrations (0.1 to 5 M). These changes may be required to alleviate post-filtration precipitation issues and broaden the data range of SRF resin loading under the conditions expected with the new equipment and process changes.

Hanford Tank Waste Treatment and Immobilization Pl↗

Ion Exchange Testing with SRF Resin FY 2012

Ion exchange using spherical resorcinol-formaldehyde (SRF) resin has been selected by the U.S. Department of Energy’s Office of River Protection (DOE-ORP) for use in the Pretreatment Facility (PTF) of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and for potential application in at-tank deployment. Numerous studies have shown SRF resin to be effective for removing 137Cs from a wide variety of actual and simulated tank waste supernatants (Adamson et al. 2006; Blanchard et al. 2008; Burgeson et al. 2004; Duignan and Nash 2009; Fiskum et al. 2006a; Fiskum et al. 2006b; Fiskum et al. 2006c; Fiskum et al. 2007; Hassan and Adu-Wusu 2003; King et al. 2004; Nash et al. 2006). Prior work at the Pacific Northwest National Laboratory (PNNL) has focused primarily on the loading behavior for 4 to 6 M Na solutions at 25 to 45°C. Recent proposed changes to the WTP ion exchange process baseline indicate that loading may include a broader range of sodium molarities (0.1 to 8 M) and higher temperatures (50°C) to alleviate post-filtration precipitation issues. This report discusses ion exchange loading kinetics testing activities performed in accordance with Test Plan TP-WTPSP-002, Rev. 3.01, which was prepared and approved in response to the Test Specification 24590-PTF-TSP-RT-09-002, Rev. 0 (Lehrman 2010) and Test Exception 24590-PTF-TEF-RT-11-00003, Rev. 0 (Meehan 2011). This testing focused on column tests evaluating the impact of elevated temperature on resin degradation over an extended period of time and batch contacts evaluating the impact on Cs loading over a broad range of sodium concentrations (0.1 to 5 M). These changes may be required to alleviate post-filtration precipitation issues and broaden the data range of SRF resin loading under the conditions expected with the new equipment and process changes.

Ion exchange↗

Demontration of Integrated Optimization Software at the Baldwin Energy Complex

This project encompassed the design, development, and demonstration of integrated online optimization systems at Dynegy Midwest Generation's Baldwin Energy Complex (BEC) located in Baldwin, Illinois. The overall project objective was to improve coal-based generation's emission profile, efficiency, maintenance requirements and plant asset life in order to enhance the long-term viability of the United States abundant coal resources. Five separate but integrated optimization products were developed, addressing combustion, sootblowing, SCR operations, overall unit thermal performance, and plant-wide availability optimization. Optimization results are inherently unit-specific and cannot be known for a particular generating unit in advance. However, NeuCo believed that the following were reasonable targets for the completed, integrated set of products: Furnace NOx reduction improvement by 5%, Heat rate improvement by 1.5%, Increase of annual Available MWh by 1.5%, Commensurate reductions in greenhouse gases, mercury, and particulates; and Commensurate increases in profitability from lower costs, improved reliability, and greater commercial availability. The goal during Phase I was to establish each system and demonstrate their integration in unified plant optimization. Efforts during Phase I focused on: (1) developing, deploying, integrating, and testing prototypes for each of the five products; (2) identifying and addressing issues required for the products to integrate with plant operations; and (3) systematically collecting and assimilating feedback to improve subsequent product releases. As described in the Phase II continuation application NeuCo successfully achieved the goal for Phase I. The goal of Phase II was to improve upon the products installed and tested in Phase I and to quantify the benefits of the integrated system. As this report documents, NeuCo has also successfully achieved the goal for Phase II. The overall results of the project, compared with the project goals, are: (1) NOx Reduction: The 5% target for NOx reduction was exceeded with average CEMS and SCR Inlet (furnace) NOx reduction of between 12% and 14%. (2) Heat Rate Improvement: The optimization systems delivered an average heat rate improvement of between 0.67% and 0.7%. This falls short of the 1.5% heat rate improvement target largely because Cyclone Stability (availability) and CEMS and SCR Inlet NOx were prioritized over heat rate in the event they needed to be traded-off with one another. A different prioritization of objectives could have driven a different balance, thereby meeting the target of 1.5% improvement. There were also several factors that could have been masking greater heat rate improvements such as the decrease in fuel density over the course of the project and the impact of actions taken as a result of advice provided by the optimizers that are difficult to quantify. (3) Increased Annual Available MWh: Although difficult to measure precisely, the target of increasing available MWh's by 1.5% was met by providing prioritized alerts and knowledge-based diagnostics for a wide array of plant equipment and process anomalies; helping the plant to move from high sulfur, high Btu Illinois coal to PRB and run that fuel at low stoichiometries without derates; and improved management of cyclone flame quality as well as improved vigilance with respect to cyclone conditions which avoided some degree of temporary de-rate due to cyclone slag build up. (4) Commensurate Reductions in Greenhouse Gases, Mercury, and Particulates: Reductions in all three of these indices can be associated directly with the optimization leverage observed in the heat rate and NOx reductions. (5) Commensurate Increases in Profitability from Lower Costs, Improved Reliability, and Greater Commercial Availability: Commensurate improvements in costs, reliability and availability resulted from the previously described benefits. Also playing a role were the sustained operation of the cyclones while using more available, less expensive but off-design fuel; more effective catalytic reduction of NOx; and the reduced time required to discover, prioritize and diagnose plant equipment issues. The total annual dollar value of the benefits associated with the products installed, refined, and commercialized at BEC are estimated to range from $1.8 to $3.2 million dollars per-unit, and $7.2 to $8.1 million dollars per year plant-wide depending on whether CO{sub 2} benefits are included. In summary, the NeuCo project at BEC was successfully completed and has demonstrated that advanced optimization technologies can play an important role in improving the environmental footprint of coal-based power generation while achieving other important operating objectives.

01 COAL, LIGNITE, AND PEAT↗

Herbaceous Feedstock 2018 State of Technology Report

The U.S. Department of Energy (DOE) promotes the production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement with this mission, Idaho National Laboratory (INL) completes an annual SOT report for biomass feedstock logistics. This report summarizes supply system impacts of Bioenergy Technologies Office (BETO)-funded research and development efforts at INL and elsewhere (such as the High-Tonnage Feedstock Logistics projects (Webb et al. 2013a, Webb et al. 2013b, Webb et al. 2013c, Webb and Sokhansanj 2014, Sokhansanj et al. 2014) that lead to improvements in feedstock supply systems. These include improvements to and observed performance of innovative harvest and collection methods, storage technologies, transportation and handling approaches, and advanced preprocessing technologies. Biomass quality and variability, and the interface between feedstock quality and conversion performance are key drivers in addition to delivered feedstock cost. In this report, we estimate the benefits of R&D improvements to individual supply system unit operations, and present the status of feedstock logistics technology development for converting biomass into biofuels. These analyses are supported by experimental data where possible, and help to align the SOT relative to the cost goals defined in the Multi-Year Program Plan. The 2018 Herbaceous SOT aligned feedstock logistic design with current biorefinery’s design capacity utilized by biochemical conversion platform. Currently biochemical conversion platform utilizes a 725,000 dry ton/year biorefiney design for the techno economic analysis. Hence, feedstock delivered cost in the 2018 Herbaceous SOT is calculated based on biorefinery’s 725,000 dry ton design capacity instead of 800, 000 dry ton capacity utilized in the 2017 Herbaceous SOT. Biomass availabilities in this SOT were updated to year 2018 data from the 2016 Billion-Ton Report (BT16) (DOE 2016a), with the exception of switchgrass, for which the 2018 Herbaceous SOT utilized the 2019 switchgrass availability data from BT16. The BT16 report (DOE 2016a) does not project switchgrass availability in 2018; the soonest switchgrass is available in the BT16 report is 2019. Therefore, availability of switchgrass for this analysis was that projected for 2019. The 2018 Herbaceous SOT incorporates same technologies utilized in the 2017 Herbaceous SOT. However, a sensitivity analysis is performed to understand the impact of variation of process parameters on those technologies on feedstock logistic cost. New R&D data that shows the variations of process parameters affecting process performance is incorporated in the 2018 SOT to measure the variations in delivered feedstock cost. The 2018 Herbaceous SOT has also provided projected delivered feedstock of 2022 design case based on near term technical target under BETO funded R&D project. Finally, updated biorefinery size of 725,000 dry ton/year was incorporated within least-cost formulation model to select optimal siting and depot scales during optimization of the least cost blend. This modification to the optimization algorithm allows the trade-off between the cost of increased supply radius and the savings from selecting biomass from higher producing counties to be assessed. Such optimization has also showed the economic benefit of decentralized depots in comparison to centralized preprocessing co-located with the biorefinery by decoupling the biorefinery and feedstock locations. The 2018 Herbaceous SOT report documents the current modeled cost of a herbaceous feedstock supply system (from harvest to the pretreatment reactor throat, including grower payment) for hydrocarbon fuel production via biochemical conversion, based on equipment and processes now available or potentially available in the near term. The modeled cost also considers both the required quality and the availability of the biomass resources. The 2018 Herbaceous SOT predicts a modeled delivered feedstock cost of $83.67/dry ton (2016$); this is a $0.23/dry ton (2016$) decrease from the 2017 Herbaceous SOT. The modification of biorefinery’s designed capacity and increased projected biomass availability in the same supply shed contributed to this modeled cost reduction. The least-cost formulation model to optimally site and scale local distributed preprocessing depots also contributed to the cost reduction by considering county-level grower payment and distance from the biorefinery as variables in the optimization algorithm. Sensitivity analysis on various process parameters that affect delivered feedstock cost in the 2018 Herbaceous SOT shows that the delivered cost could varies from $80.45-$88.83/dry ton. The top factors that causes such variations are: effective baling rate, bale density, hammer mill throughput, interest rate and storage dry matter loss.

09 BIOMASS FUELS↗

Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

Kauffmann, Paul J.↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.

54 ENVIRONMENTAL SCIENCES↗

EVALUATION OF SOLID SORBENTS AS A RETROFIT TECHNOLOGY FOR CO2 CAPTURE FROM COAL-FIRED POWER PLANTS

Through a U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) funded cooperative agreement DE-NT0005649, ADA Environmental Solutions (ADA) has begun evaluating the use of solid sorbents for CO{sub 2} capture. The project objective was to address the viability and accelerate development of a solid-based CO{sub 2} capture technology. To meet this objective, initial evaluations of sorbents and the process/equipment were completed. First the sorbents were evaluated using a temperature swing adsorption process at the laboratory scale in a fixed-bed apparatus. A slipstream reactor designed to treat flue gas produced by coal-fired generation of nominally 1 kWe was designed and constructed, which was used to evaluate the most promising materials on a more meaningful scale using actual flue gas. In a concurrent effort, commercial-scale processes and equipment options were also evaluated for their applicability to sorbent-based CO{sub 2} capture. A cost analysis was completed that can be used to direct future technology development efforts. ADA completed an extensive sorbent screening program funded primarily through this project, DOE NETL cooperative agreement DE-NT0005649, with support from the Electric Power Research Institute (EPRI) and other industry participants. Laboratory screening tests were completed on simulated and actual flue gas using simulated flue gas and an automated fixed bed system. The following types and quantities of sorbents were evaluated: 87 supported amines; 31 carbon based materials; 6 zeolites; 7 supported carbonates (evaluated under separate funding); and 10 hydrotalcites. Sorbent evaluations were conducted to characterize materials and down-select promising candidates for further testing at the slipstream scale. More than half of the materials evaluated during this program were supported amines. Based on the laboratory screening four supported amine sorbents were selected for evaluation at the 1 kW scale at two different field sites. ADA designed and fabricated a slipstream pilot to allow an evaluation of the kinetic behavior of sorbents and provide some flexibility for the physical characteristics of the materials. The design incorporated a transport reactor for the adsorber (co-current reactor) and a fluidized-bed in the regenerator. This combination achieved the sorbent characterization goals and provided an opportunity to evaluate whether the potential cost savings associated with a relatively simple process design could overcome the sacrifices inherent in a co-current separation process. The system was installed at two field sites during the project, Luminant's Martin Lake Steam Electric Station and Xcel Energy's Sherburne County Generating Station (Sherco). Although the system could not maintain continuous 90% CO{sub 2} removal with the sorbents evaluated under this program, it was useful to compare the CO{sub 2} removal properties of several different sorbents on actual flue gas. One of the supported amine materials, sorbent R, was evaluated at both Martin Lake and Sherco. The 1 kWe pilot was operated in continuous mode as well as batch mode. In continuous mode, the sorbent performance could not overcome the limitations of the cocurrent adsorbent design. In batch mode, sorbent R was able to remove up to 90% CO{sub 2} for several cycles. Approximately 50% of the total removal occurred in the first three feet of the adsorption reactor, which was a transport reactor. During continuous testing at Sherco, CO{sub 2} removal decreased to approximately 20% at steady state. The lack of continuous removal was due primarily to the combination of a co-current adsorption system with a fluidized bed for regeneration, a combination which did not provide an adequate driving force to maintain an acceptable working CO{sub 2} capacity. In addition, because sorbent R consisted of a polymeric amine coated on a silica substrate, it was believed that the 50% amine loaded resulted in mass diffusion limitations related to the CO{sub 2} uptake rate. Three additional supported amine materials, sorbents AX, F, and BN, were selected for evaluation using the 1 kW pilot at Sherco. Sorbent AX was operated in batch mode and performed similarly to sorbent R (i.e. could achieve up to 90% removal when given adequate regeneration time). Sorbent BN was not expected to be subject to the same mass diffusion limitations as experienced with sorbent R. When sorbent BN was used in continuous mode the steady state CO{sub 2} removal was approximately double that of sorbent R, which highlighted the importance of sorbents without kinetic limitations.

01 COAL, LIGNITE, AND PEAT↗

Process capability determination of new and existing equipment

The objective of this paper is to illustrate a method of determining the process capability of new or existing equipment. The method may also be modified to apply to testing laboratories. Long term changes in the system may be determined by periodically making new test parts or submitting samples from the original set to the testing laboratory. The technique described has been developed through a series of projects in special topics manufacturing courses and graduate student projects. It will be implemented as a standard experiment in an advanced manufacturing course in a new Manufacturing Engineering program at the University of Wisconsin-Stout campus. Before starting a project of this nature, it is important to decide on the exact question to be answered. In this case, it is desired to know what variation can be reasonably expected in the next part, feature, or test result produced. Generally, this question is answered by providing the process capability or the average value of a measured characteristic of the part or process plus or minus three standard deviations. There are two general cases to be considered: the part or test is made in large quantities with little change, or the process is flexible and makes a large variety of parts. Both cases can be accommodated; however, the emphasis in this report is on short run situations.

Mcclelland, H. T.↗