Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Management of Metals from Decommissioning of Nuclear Facilities - 18411

The EDF group companies within the Cyclife platform have for decades performed treatment and recycling of metals. With different approaches but all considered international Good Practice, as valuable materials are recovered for safe recycling and volumes in the repositories for radioactive waste are saved. For an efficient decommissioning project, a well-defined waste management process is one of the critical paths, not least when it comes to routes for clearance and recycling of materials. It is easy to underestimate the complexity and bottlenecks caused by shortage of logistic space. In order to mitigate these risks, activities such as strengthening categorization, quantification and adopting different routes based on the material properties should be implemented. By categorization of the of waste and materials considered/classified as contaminated or potentially contaminated it is obvious that the management of the metals is a key parameter in nuclear decommissioning. Analyses performed by the EDF companies shows that a majority of the materials, classified as contaminated, from a BWR/PWR plant are metals. Experience gives that a high percentage of these metals from decommissioning can be subject to recycling either directly upon completion of the clearance process or after certain treatment. Non-technical key parameters like the regulatory requirements on applying the waste hierarchy, the impact on repository programs as well as, not at least, the regulatory and public acceptance of recycling of materials from the nuclear industry are, together with costs essential factors when forming the routing of metals and other waste materials from a decommissioning project. Today the EDF group companies are positioned to provide a wide range of services for management of the contaminated metals from decommissioning projects, spanning from industrial management of metals which directly will be subject general clearance after verification measurements up to decontamination and melting of selected reactor internals for recycling to public domain or within the nuclear industry. In this paper the typical waste material composition for BWR and PWR plants, the different ways to treat/manage the radioactive and potentially radioactive metals including a comparison of the different approach commonly used in a technical, logistical and economical perspectives. A few success stories will be resented as well as lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Relationship between recycling rate and air pollution: Waste management in the state of Massachusetts

Highlights: • This study examines the relationship between recycling rate of solid waste and air pollution. • Fixed effects Stochastic Frontier Analysis model with panel data are employed. • The case study is a waste municipality survey in the state of Massachusetts during 2009–2012. • The findings support that a negative relationship between air pollution and recycling. - Abstract: This study examines the relationship between recycling rate of solid waste and air pollution using data from a waste municipality survey in the state of Massachusetts during the period 2009–2012. Two econometric approaches are applied. The first approach is a fixed effects model, while the second is a Stochastic Frontier Analysis (SFA) with fixed effects model. The advantage of the first approach is the ability of controlling for stable time invariant characteristics of the municipalities, thereby eliminating potentially large sources of bias. The second approach is applied in order to estimate the technical efficiency and rank of each municipality accordingly. The regressions control for various demographic, economic and recycling services, such as income per capita, population density, unemployment, trash services, Pay-as-you-throw (PAYT) program and meteorological data. The findings support that a negative relationship between particulate particles in the air 2.5 μm or less in size (PM{sub 2.5}) and recycling rate is presented. In addition, the pollution is increased with increases on income per capita up to $23,000–$26,000, while after this point income contributes positively on air quality. Finally, based on the efficiency derived by the Stochastic Frontier Analysis (SFA) model, the municipalities which provide both drop off and curbside services for trash, food and yard waste and the PAYT program present better performance regarding the air quality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Transfer Planning and Control - 13465

Hanford tank waste cleanup requires efficient use of double-shell tank space to support single-shell tank retrievals and future waste feed delivery to the Waste Treatment and Immobilization Plant (WTP). Every waste transfer, including single-shell tank retrievals and evaporator campaign, is evaluated via the Waste Transfer Compatibility Program for compliance with safety basis, environmental compliance, operational limits and controls to enhance future waste treatment. Mixed radioactive and hazardous wastes are stored at the Hanford Site on an interim basis until they can be treated, as necessary, for final disposal. Implementation of the Tank Farms Waste Transfer Compatibility Program helps to ensure continued safe and prudent storage and handling of these wastes within the Tank Farms Facility. The Tank Farms Waste Transfer Compatibility Program is a Safety Management Program that is a formal process for evaluating waste transfers and chemical additions through the preparation of documented Waste Compatibility Assessments (WCA). The primary purpose of the program is to ensure that sufficient controls are in place to prevent the formation of incompatible mixtures as the result of waste transfer operations. The program defines a consistent means of evaluating compliance with certain administrative controls, safety, operational, regulatory, and programmatic criteria and specifies considerations necessary to assess waste transfers and chemical additions. Current operations are most limited by staying within compliance with the safety basis controls to prevent flammable gas build up in the tank headspace. The depth of solids, the depth of supernatant, the total waste depth and the waste temperature are monitored and controlled to stay within the Compatibility Program rules. Also, transfer planning includes a preliminary evaluation against the Compatibility Program to assure that operating plans will comply with the Waste Transfer Compatibility Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations and Lessons Learned from the Use of Gamma Spectroscopy Systems at FUSRAP Project Sites - 17459

This paper will discuss the application of gamma spectroscopy systems for analysis of environmental media samples for parents and daughter progeny of the Natural Uranium and Thorium Decay Series radionuclides. The concentrations and relative ratios of naturally occurring isotopes are used to confirm the presence of FUSRAP-related wastes and for understanding the associated potential dose and health risks. Focus will be given to lessons learned from the set-up and operation of onsite gamma spectroscopy laboratories used to provide stakeholders with defensible and timely results to support FUSRAP site investigations and remediation including adaptive survey design implementation, physical remediation and waste transport, and confirmatory final status survey activities. This paper focuses on the potential impacts to gamma spectroscopy measurement accuracy from the following: - Bias caused by sample matrix effects as well as use of different library reference values between performance evaluation study providers and testing laboratories; - Use of calibration sources with limited energy ranges, and; - Selection of available alternative isotopic decay reference data for the input of line energies and their intensities. These lessons learned include discussing how inter-laboratory measurement differences from blind performance evaluation samples are affected by the manufacturer's measurement method, including equilibrium assumptions; the isotope decay information source library used by the study provider and participating laboratories; and calibration source geometry/density variances from actual sample conditions. Any of these factors can significantly impact the accuracy of reported results data. Deepening the reader's understanding of the various factors that impact the accuracy, interpretation, and overall usability of gamma spectroscopy results data from laboratories will help ensure defensible decision-making and cost-effective mission implementation within FUSRAP and similar remediation programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Value of Integrated Risk and Issue Management - 17589

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational and Experimental Examination of Simulated Core Damage and Relocation Dynamics of a BWR Fuel Assembly - 16013

The Japan Atomic Energy Agency (JAEA) plans a large-scale test to evaluate damage and relocation behavior of Boiling Water Reactor (BWR) core materials consisting of fuel rods (zirconia as fuel simulant), channel boxes, control blade assemblies as well as lower core-support structures. Its purpose is to contribute to the understanding of the core material relocation behavior in the event of severe accidents with the BWR design conditions for which existing experimental database is quite limited. Prior to large-scale testing anticipated at JAEA in the future, JAEA desires preliminary investigations to examine melting test pieces, being composed of a mixture of zirconia and metals by a non-transferred thermal plasma heating system. The purpose of such tests is to verify the materials and test piece will be heated by plasma as a primary heat source to the target temperature of ca. 2900 K and to collect data about the relocation behavior of the high-temperature materials. This paper describes the first in a series of tests demonstrating the effective use of thermal plasma technology to recreate the dynamics of a typical fuel core bundle channel assembly section. Results from preliminary computational simulations of simplified fuel bundle assemblies are presented illustrating the effectiveness of a 150 kW, non transferred (NTR) configuration of a thermal plasma argon jet to heat the assembly within a highly-insulated containment vessel. An experimental test program using the computational analyses as a basis and a Phoenix Solutions Co (PSC) commercial model PT150, 150 kW plasma torch is described and the test results are presented illustrating the time versus temperature history of the fuel bundle assembly melting dynamics. Details on plasma operation are discussed including: power requirements, current flow, voltage levels achieved, argon gas flow rates, processing times and standoff distances of the torch discharge from the top of the fuel bundle assembly (achieved with remote control of the axial (vertical) translation of the torch within the containment processing chamber). Photos taken from the top of the processing chamber are presented illustrating the various phases of melting characteristics of the zircaloy-clad, zirconium oxide filled fuel tubes, all within a stainless steel tube bundle channel centered within an insulated zirconia crucible. Based on lessons learned from this initial test campaign, a brief discussion of the requirements and features of a follow-on Phase II test program is provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Single-Shell Tank and Double-Shell Tank Integrity Programs - 16390

Waste at Hanford is stored in 149 single-shell tanks and 28 double-shell tanks. Concerns related to aging radioactive waste storage facilities throughout the DOE complex led to Brookhaven National Laboratory (BNL) developing guidelines for structural integrity programs for tank systems. The committee of experts who developed these guidelines is commonly known as the Tank Structural Integrity Panel (TSIP). The DOE has subsequently adopted these guidelines, and requires site operators to have a program consistent with them. The Double-Shell Tank (DST) integrity is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods. In October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of 241-AY-102 was leaking. WRPS contracted a panel of experts from industry and academia to provide advice and recommendations for the DST Integrity Program. The panel focused on three concerns: - No Early warning - Determine why the existing DST Integrity Program did not predict a primary tank failure or provide early warning of the pending failure. - Program improvements - Recommend activities to either predict a primary tank failure or increase the probability of early warning. - Forensic recommendations - The panel provided additional recommendations regarding forensic assessment of Tank 241-AY-102 (AY-102) to facilitate a conclusion on why the leak occurred. WRPS has prepared a response to the concerns of the panel coupled with recommendations for project action to strengthen the DST Integrity Program [4]. The purpose of this DST Integrity Improvement Plan is to translate the recommendations to specific project activities that are technically and practically responsive. To improve the understanding of the Single-Shell Tank (SST) integrity, WRPS, the Department of Energy-Office of River Protection tank operations contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matter experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase, which was completed in 2015, was focused on efforts to envelope the integrity of the tanks. It was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary, based on the outcome from the initial work, a second phase would be focused on further definition of the integrity of the tanks and liners. The two combined phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by an Independent Qualified Registered Professional Engineer. This paper will summarize the current status of the DST and SST Integrity Programs and discuss the ongoing efforts to improve these programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International trade and waste and fuel managment issue, 2008

The focus of the January-February issue is on international trade and waste and fuel managment. Major articles/reports in this issue include: A global solution for clients, by Yves Linz, AREVA NP; A safer, secure and economical plant, by Andy White, GE Hitachi Nuclear; Robust global prospects, by Ken Petrunik, Atomic Energy of Canada Limited; Development of NPPs in China, by Chen Changbing and Li Huiqiang, Huazhong University of Science and Technology; Yucca Mountain update; and, A class of its own, by Tyler Lamberts, Entergy Nuclear. The Industry Innovation articles in this issue are: Fuel assembly inspection program, by Jim Lemons, Tennessee Valley Authority; and, Improved in-core fuel shuffle for reduced refueling duration, by James Tusar, Exelon Nuclear.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CHARACTERIZATION OF SURPLUS PLUTONIUM FOR DISPOSITION OPTIONS

The United States (U.S.) has identified 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Except for materials that remain in use for programs outside of national defense, including programs for nuclear-energy development, the surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. Some items will be disposed as transuranic waste, low-level waste, or spent fuel. The remaining surplus plutonium will be managed through: (1) the Mixed Oxide (MOX) Fuel Fabrication Facility (FFF), to be constructed at the Savannah River Site (SRS), where the plutonium will be converted to fuel that will be irradiated in civilian power reactors and later disposed to a high-level waste (HLW) repository as spent fuel; (2) the SRS H-Area facilities, by dissolving and transfer to HLW systems, also for disposal to the repository; or (3) alternative immobilization techniques that would provide durable and secure disposal. From the beginning of the U.S. program for surplus plutonium disposition, DOE has sponsored research to characterize the surplus materials and to judge their suitability for planned disposition options. Because many of the items are stored without extensive analyses of their current chemical content, the characterization involves three interacting components: laboratory sample analysis, if available; non-destructive assay data; and rigorous evaluation of records for the processing history for items and inventory groups. This information is collected from subject-matter experts at inventory sites and from materials stabilization and surveillance programs, in cooperation with the design agencies for the disposition facilities. This report describes the operation and status of the characterization program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of an Electrical Resistivity Imaging Program for Subsurface Characterization at Hanford

Recent successes in subsurface plume imaging over waste storage and disposal facilities using electrical resistivity geophysics has prompted the expansion of the science into a full program for environmental characterization. Characterization using direct current electrical resistivity imaging (ERI) was first tested over liquid waste disposal trenches at the BC Cribs and Trenches (BCCT) site, south of the 200 East area of Hanford. The geophysical data were compared to borehole data with favorable conclusions. Since the initial deployment at BCCT, the method has been applied at several other facilities within the Hanford Nuclear Reservation and significant achievements have been made to solve the complex nature of the industrial environment, namely metallic infrastructure such as storage tanks, pipes, wells, and other objects that interfere with plume imaging. The solution was to directly include the infrastructure into the measurement strategy. Other achievements include placement of deep subsurface electrodes during decommissioning of small-diameter characterization boreholes, permanent electrodes on the surface to allow reoccupation for time-lapsed imaging, enhancements in computer hardware and software to solve larger problems with increased resolution, and the installation of a quality assurance program to ensure instrument and data integrity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Problematic Reactive Metal Wastes Using GeoMelt ICV - WM2020 Conference Paper

Decommissioning of sodium-cooled reactors and fast reactor technologies has generated a number of reactive metal waste configurations that are problematic to treat and typically lack cost effective treatment methods and disposition options. As a result, Veolia Nuclear Solutions, under contract with Idaho National Laboratory (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) demonstrated its GeoMelt® In-Container Vitrification (ICV)™ technology to safely convert sodium metal to a non-reactive vitrified oxide form. The demonstration project, supported by glass formulation and crucible testing, consisted of a series of ICV™ melts that processed elemental sodium into stable non-reactive glass. INL is currently implementing GeoMelt® technology as a means to safely and reliably convert radioactive reactive metal residues that contaminate sodium cooled reactor components into waste forms that comply with existing disposition pathways. Reactive metal wastes require treatment in order to remove the Resource Conservation and Recovery Act (RCRA) reactivity and ignitability characteristics to comply with land disposal restrictions. GeoMelt®, which is an alternative to other potential treatment approaches, provides a robust approach that chemically converts the reactive metals to an inert oxide while also immobilizing radionuclides in a vitrified waste form with durability equal to or better than vitrified nuclear fuel reprocessing wastes (very robust and inert waste forms). Most other treatment approaches generate hydrogen gas which is problematic. In 2016, Veolia Nuclear Solutions first demonstrated the effectiveness of the GeoMelt® ICV™ process in deactivating reactive sodium metal. Crucible, bench-scale, and engineering-scale demonstrations were conducted on several surrogate waste configurations with various ratios of sodium metal and glass-formers. Each ratio and configuration demonstrated complete deactivation of the surrogate sodium metal. Follow-on work in 2017 demonstrated the deactivation of reactive sodium by GeoMelt® ICV™ at a higher waste loading relative to previously demonstrated work performed in 2016; the higher waste loading optimized glass chemistry while enhancing the economical full-scale treatment of reactive metals. Additionally, follow-on demonstration testing in 2018 and 2019 focused on more complex shapes and other reactive-metals (mocked up Experimental Breeder Reactor II [EBR-II] subassembly, sodium filled heat exchanger, and a can containing sodium potassium alloy) which were all performed at engineering-scale. Since 2018, a 10-metric ton full-scale GeoMelt unit (GeoMelt® Richland) was designed, installed, and commissioned at Perma-Fix Northwest in Richland, Washington for the treatment of reactive metal wastes. As of September 2019, over 900 55-gallon drums containing a total of around 3,500 lb of sodium with low levels of radioactivity have been treated at GeoMelt ® Richland, with resulting glass monoliths disposed at the Nevada National Security Site (NNSS). A full-scale radiological demonstration melt on an actual EBR-II subassembly has also been performed using the full-scale melter in 2019. The GeoMelt® technology is a proven radioactive waste treatment technology capable of immobilizing radioactive wastes, including bulk rubble such as drums and other steel vessels usually without pretreatment. Utilizing the GeoMelt® technology to treat reactive metals eliminates pretreatment steps resulting from having to separate the reactive metal from steel containers or jackets as GeoMelt® can easily operate at temperatures sufficient to melt the steel and expose the reactive metal for treatment. Eliminating handling steps of reactive metals is a significant safety advantage since reactive metals are pyrophoric. The results generated as a part of the 2018-2019 demonstration program are presented in the paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2007

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2007 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) confirm compliance with environmental standards and requirements; (4) highlight significant facility programs and efforts; and (5) describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) (NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗