“Fixing” the nuclear waste problem? The new political economy of spent fuel management in the United States
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
For abstract, see N78-12823.
In August 2008, the U.S. Department of Homeland Security (DHS) issued its final Protective Action Guide (PAG) for radiological dispersal device (RDD) and improvised nuclear device (IND) incidents. This document specifies protective actions for public health during the early and intermediate phases and cleanup guidance for the late phase of RDD or IND incidents, and it discusses approaches to implementing the necessary actions. However, while the PAG provides specific guidance for the early and intermediate phases, it prescribes no equivalent guidance for the late-phase cleanup actions. Instead, the PAG offers a general description of a complex process using a site-specific optimization approach. This approach does not predetermine cleanup levels but approaches the problem from the factors that would bear on the final agreed-on cleanup levels. Based on this approach, the decision-making process involves multifaceted considerations including public health, the environment, and the economy, as well as socio-political factors. In an effort to fully define the process and approach to be used in optimizing late-phase recovery and site restoration following an RDD or IND incident, DHS has tasked the NCRP with preparing a comprehensive report addressing all aspects of the optimization process. Preparation of the NCRP report is a three-year (2010-2013) project assigned to a scientific committee, the Scientific Committee (SC) 5-1; the report was initially titled, Approach to Optimizing Decision Making for Late- Phase Recovery from Nuclear or Radiological Terrorism Incidents. Members of SC 5-1 represent a broad range of expertise, including homeland security, health physics, risk and decision analysis, economics, environmental remediation and radioactive waste management, and communication. In the wake of the Fukushima nuclear accident of 2011, and guided by a recent process led by the White House through a Principal Level Exercise (PLE), the optimization approach has since been expanded to include off-site contamination from major nuclear power plant accidents as well as other nuclear or radiological incidents. The expanded application under the current guidance has thus led to a broadened scope of the report, which is reflected in its new title, Decision Making for Late-Phase Recovery from Nuclear or Radiological Incidents. The NCRP report, which is due for publication in 2013, will substantiate the current DHS guidance by clarifying and elaborating on the processes required for the development and implementation of procedures for optimizing decision making for late-phase recovery, enabling the establishment of cleanup goals on a site-specific basis. The report will contain a series of topics addressing important issues related to the long-term recovery from nuclear or radiological incidents. Special topics relevant to supporting the optimization of the decision-making process will include cost-benefit analysis, radioactive waste management, risk communication, stakeholder interaction, risk assessment, and decontamination approaches and techniques. The committee also evaluated past nuclear and radiological incidents for their relevance to the report, including the emerging issues associated with the Fukushima nuclear accident. Thus, due to the commonality of the late-phase issues (such as the potential widespread contamination following an event), the majority of the information pertaining to the response in the late-phase decision-making period, including site-specific optimization framework and approach, could be used or adapted for use in case of similar situations that are not due to terrorism, such as those that would be caused by major nuclear facility accidents or radiological incidents. To ensure that the report and the NCRP recommendations are current and relevant to the effective implementation of federal guidance, SC 5-1 has actively coordinated with the agencies of interest and other relevant stakeholders throughout the duration of the project. The resulting report will be an important resource to guide those involved in late-phase recovery efforts following a nuclear or radiological incident. (authors)
Studsviks' Processing Facility Erwin (SPFE) has been treating Low-Level Radioactive Waste using its patented THOR process for over 13 years. Studsvik has been mixing and processing wastes of the same waste classification but different chemical and isotopic characteristics for the full extent of this period as a general matter of operations. Studsvik utilizes the accountability method to track the movement of radionuclides from acceptance of waste, through processing, and finally in the classification of waste for disposal. Recently the NRC has proposed to revise the 1995 Branch Technical Position on Concentration Averaging and Encapsulation (1995 BTP on CA) with additional clarification (draft BTP on CA). The draft BTP on CA has paved the way for large scale blending of higher activity and lower activity waste to produce a single waste for the purpose of classification. With the onset of blending in the waste treatment industry, there is concern from the public and state regulators as to the robustness of the accountability method and the ability of processors to prevent the inclusion of hot spots in waste. To address these concerns and verify the accountability method as applied by the SPFE, as well as the SPFE's ability to control waste package classification, testing of actual waste packages was performed. Testing consisted of a comprehensive dose rate survey of a container of processed waste. Separately, the waste package was modeled chemically and radiologically. Comparing the observed and theoretical data demonstrated that actual dose rates were lower than, but consistent with, modeled dose rates. Moreover, the distribution of radioactivity confirms that the SPFE can produce a radiologically homogeneous waste form. The results of the study demonstrate: 1) the accountability method as applied by the SPFE is valid and produces expected results; 2) the SPFE can produce a radiologically homogeneous waste; and 3) the SPFE can effectively control the waste package classification. (authors)
The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.
Management of radioactive chemical waste can be a complicated business. H Canyon and F/H Analytical Labs are two facilities present at the Savannah River Site in Aiken, SC that are at the forefront. In fact H Canyon is the only large-scale radiochemical processing facility in the United States and this processing is only enhanced by the aid given from F/H Analytical Labs. As H Canyon processes incoming materials, F/H Labs provide support through a variety of chemical analyses. Necessary checks of the chemical makeup, processing, and accountability of the samples taken from H Canyon process tanks are performed at the labs along with further checks on waste leaving the canyon after processing. Used nuclear material taken in by the canyon is actually not waste. Only a small portion of the radioactive material itself is actually consumed in nuclear reactors. As a result various radioactive elements such as Uranium, Plutonium and Neptunium are commonly found in waste and may be useful to recover. Specific processing is needed to allow for separation of these products from the waste. This is H Canyon's specialty. Furthermore, H Canyon has the capacity to initiate the process for weapons-grade nuclear material to be converted into nuclear fuel. This is one of the main campaigns being set up for the fall of 2012. Once usable material is separated and purified of impurities such as fission products, it can be converted to an oxide and ultimately turned into commercial fuel. The processing of weapons-grade material for commercial fuel is important in the necessary disposition of plutonium. Another processing campaign to start in the fall in H Canyon involves the reprocessing of used nuclear fuel for disposal in improved containment units. The importance of this campaign involves the proper disposal of nuclear waste in order to ensure the safety and well-being of future generations and the environment. As processing proceeds in the fall, H Canyon will have a substantial number of samples being sent to F/H Labs. All analyses of these samples are imperative to safe and efficient processing. The important campaigns to occur would be impossible without feedback from analyses such as chemical makeup of solutions, concentrations of dissolution acids and nuclear material, as well as nuclear isotopic data. The necessity of analysis for radiochemical processing is evident. Processing devoid of F/H Lab's feedback would go against the ideals of a safety-conscious and highly accomplished processing facility such as H Canyon.
The PRISM (Prioritization Risk Integration Simulation Model), a computer model was developed to support the Department of Energy's Office of Environmental Management (DOE-EM) in its mission to clean up the environmental legacy from the Nation's nuclear weapons materials production complex. PRISM provides a comprehensive, fully integrated planning tool that can tie together DOE-EM's projects. It is designed to help DOE managers develop sound, risk-informed business practices and defend program decisions. It provides a better ability to understand and manage programmatic risks. The underlying concept for PRISM is that DOE-EM 'owns' a portfolio of environmental legacy obligations (ELOs), and that its mission is to transform the ELOs from their current conditions to acceptable conditions, in the most effective way possible. There are many types of ELOs - - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. For a given suite of planned activities, PRISM simulates the outcomes as they play out over time, allowing for all key identified uncertainties and risk factors. Each contaminated building, land area and waste stream is tracked from cradle to grave, and all of the linkages affecting different waste streams are captured. The progression of the activities is fully dynamic, reflecting DOE-EM's prioritization approaches, precedence requirements, available funding, and the consequences of risks and uncertainties. The top level of PRISM is the end-user interface that allows rapid evaluation of alternative scenarios and viewing the results in a variety of useful ways. PRISM is a fully probabilistic model, allowing the user to specify uncertainties in input data (such as the magnitude of an existing groundwater plume, or the total cost to complete a planned activity) as well as specific risk events that might occur. PRISM is based on the GoldSim software that is widely used for risk and performance assessment calculations. PRISM can be run in a deterministic mode, which quickly provides an estimate of the most likely results of a given plan. Alternatively, the model can be run probabilistically in a Monte Carlo mode, exploring the risks and uncertainties in the system and producing probability distributions for the different performance measures. The PRISM model demonstrates how EM can evaluate a portfolio of ELOs, and transform the ELOs from their current conditions to acceptable conditions, utilizing different strategic approaches. There are many types of ELOs - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. This scope of work for the PRISM process and the development of a dynamic simulation model are a logical extension of the GoldSim simulation software used by the OCRWM to assess the long-term performance for the Yucca Mountain Project and by NNSA to assess project risk at its sites. Systems integration modeling will promote better understanding of all project risks, technical and nontechnical, and more defensible decision-making for complex projects with significant uncertainties. It can provide effective visual communication and rapid adaptation during interactions with stakeholders (Administration, Congress, State, Local, and NGO). It will also allow rapid assessment of alternative management approaches. (authors)
This presentation presents a preliminary description of a concept of operations to incorporate advanced-reactor spent nuclear fuel (SNF) into an integrated waste-management system (IWMS). The evaluation includes SNF from four advanced-reactor concepts with the following fuel types: (1) small modular reactors using oxide fuels, (2) tristructural-isotropic (TRISO) fuels, (3) metallic fuels, and (4) fuel salts. To provide context for the proposed concept of operations for advanced reactors, a comparison is made with traditional light-water reactors (LWRs) to identify potential gaps in the IWMS. The technical differences between advanced reactors and LWRs are assessed to determine the feasibility of managing advanced-reactor waste streams using existing operations and technology. This presentation emphasizes fuel types from Advanced Reactor Demonstration Program reactors: Xe 100, which uses TRISO fuel and Natrium, with its metallic fuels while also analyzing management options for molten-salt reactors and advanced light-water reactors (ALWRs). Understanding the storage, transportation, and disposal requirements of SNF is dependent on both the quantity and characteristics of the SNF generated by nuclear reactors. This presentation provides a high level overview, comparing the anticipated concept of operations for different SNFs from advanced reactors. The IWMS includes at-reactor storage, transportation, potential off-site storage, potential treatment, and disposition. To assess the potential effect of advanced-reactor concept of operations on the IWMS, estimates were made for fuel characteristics that contribute to storage, transportation, disposal, and possible treatment of advanced-reactor SNF. These include canister heat load, dose rates, and criticality-control limits, which are important for determining the condition and configuration of the advanced reactor SNF. At-reactor storage of LWR SNF traditionally involves a spent-fuel pool (SFP) before transfer to an independent spent-fuel storage installation. However, some advanced-reactor concepts, particularly those using TRISO and salt fuels, do not anticipate the use of an SFP. This difference in at-reactor storage could impact the IWMS. Additionally, transportation of advanced-reactor SNF may include additional processes tied to potential off gassing, and transportation of microreactor SNF may occur within the reactor vessel. Some advanced-reactor SNF could also undergo treatment to meet requirements of an acceptable waste form for disposition, and the treatment location will be a major contributor to efficiently performing IWMS responsibilities. Moreover, the quantity of SNF generated is an important consideration for IWMS because it could affect the size of the transportation fleet and potential off-site storage requirements. Additionally, volume and heat load are the primary drivers for SNF disposition. This presentation compares potential packaging options for advanced reactor SNF with traditional LWR packaging to provide a high-level comparison for the needs of the IWMS for advanced-reactor SNF.
The DOE SNF Working Group ASNF Subgroup and the U.S. Nuclear Waste Technical Review Board have identified knowledge gaps regarding the management of aluminum-clad spent nuclear fuel (ASNF).[1, 2] The objectives of this research are to observe, sample and analyze the nature of aluminum surface corrosion and corrosion layer chemistry relevant to the ASNF performance over the duration of the dry storage segment of the fuel life cycle. The primary goal is to build an understanding of ASNF behavior, from reactor service and wet storage through drying and dry storage, with parallel testing of surrogate materials. The premise is that residual water affiliated with the aluminum oxide from corrosion during reactor service and wet storage, continues to influence ASNF performance during dry storage, and that even after successful drying the surface conditions of ASNF have yet to be satisfactorily characterized. The initial scope collected and analyzed specimens from irradiated non-fuel components of aluminum-clad Advanced Test Reactor (ATR) fuel elements that are routinely removed at the end of reactor service life. Techniques have been developed for remote material sampling from ATR elements from vented dry storage at the Irradiated Fuel Storage Facility (IFSF). These techniques involve 1) nipping off a small corner of the aluminum near where the end box had been removed and 2) scraping the exterior (non-fueled) plate surface to collect an oxide sample. This second effort targets ATR elements expected to have seen the longest residence in storage, both in the CPP-603 pool (with poor water quality) and in dry storage at IFSF, within the fuel handling scheduled to consolidate ATR at IFSF and receive the remaining inventory at CPP-666. Follow on work has been proposed to nip corners and collect scrapings immediately following ATR fuel drying, before placement in dry storage. Sample analysis will use multiple techniques to understand the chemical composition and morphology of the surface oxides. A simultaneous effort is progressing to develop surrogate materials to enable rigorous controlled experiments. Consistently produced, these surrogate materials can then be used to demonstrate limitations inherent to remote sampling and to validate performance models under relevant constraints. The combined efforts will substantiate ASNF performance and fuel management decisions regarding drying and packaging over a more complete range of life cycle conditions. [1] DOE Spent Nuclear Fuel Working Group, Aluminum-Clad Spent Nuclear Fuel: Technical Considerations and Challenges for Extended (>50 Years) Dry Storage, DOE/ID RPT#: 1575, prepared by Aluminum-Clad SNF Sub Working Group, June 2017. [2] U.S. Nuclear Waste Technical Review Board, Management and Disposal of U.S. Department of Energy Spent Nuclear Fuel, A Report to the United States Congress and the Secretary of Energy, December 2017, p. 143.
Concrete at nuclear facilities becomes radioactive when it is exposed to a neutron flux, and when such facilities are vacated, decommissioning activities are enacted to make the site safe for reuse. These activities generate wastes that the public expects to be managed in their best interest. This paper provides side-by-side comparisons of concrete bio-shielding encountered at typical reactor and cyclotron decommissioning projects. Three sites are considered, and results from characterization samples are used to demonstrate that the wastes generated by such sites are similar in terms of content and risk. First, the dose potential represented by each waste is determined from mass-based radioactivity concentration with the RESRAD-BUILD computer code. The resulting doses are translated into population-risk estimates by applying dose-response predictions from the National Academy of Sciences' 2006 BEIR VII report. In terms of possible adverse health outcomes, the risk of solid cancer or leukemia associated with the wastes this paper examines is 8 to 50 extra cases per 100,000 persons. The regulatory framework applicable to each site is also reviewed, and the waste management strategies used at each site are contrasted. This paper demonstrates that the wastes it examines are virtually indistinguishable. Contrary to this finding, the wastes are regulated, managed, and disposed in very different manners according to current U.S. nuclear waste policy. The value of this paper is that the side-by-side comparisons it presents provides an opportunity to examine the risk-benefit of existing policies in terms of the benefits or disparities they represent. (author)
The Department of Energy (DOE) is planning for future large-scale transport of commercial Spent Nuclear Fuel (SNF) and High-Level Radioactive Waste (HLW) to eventual disposal and/or storage facilities. Various options for procuring transportation services are being evaluated. To inform this work, a review of past comments received on DOE transportation acquisition activities in the early 1990's through 2016 was conducted. Through the course of data collection, staff analyzed comments submitted from ten DOE initiatives from DoE's Office of Civilian Radioactive Waste Management (OCRWM) and DoE's Office of Nuclear Energy (DOE-NE). This paper summarizes and outlines key themes arising from these comments. Past issues identified by a wide variety of commenters (nuclear industry and cask vendors, nuclear utilities and purchasers, states, Tribes, local governments, rail carriers, nongovernmental organizations, trade organizations, engineering firms, and members of the public) were examined. These issues concerned DoE's activities to make maximum use of the private sector to transport and store SNF and HLW. The key themes analyzed include: Uniqueness of the Shipping Campaign, Views on Privatization, Industry Risk and Privatization, Unclear Roles and Responsibilities, and Responsibilities Recommended for DOE to Maintain. This paper concludes by discussing lessons that can be learned from analyzing these public comments and what that may mean moving forward in the U.S. radioactive waste management program. (authors)
In 2009, after the General elections, the new German Government showed a relatively positive attitude towards a prolonged use of nuclear power. Power plant shutdown was planned for the year 2032. Nuclear power was considered as a sort of transition energy technology until the energy supply would take place by the use of renewable energy sources. This was in line with the legal framework and the political strategy of the energy turnaround. Then, 17 nuclear power plants (NPP) were operational. The Fukushima incident heralded the sound of drastic changes in the German energy policy: Besides an intermediate stop of operation of reactors until a so-called stress test was accomplished, the general political decision was to phase-out nuclear earlier than planned and to implement faster the decisions regarding the energy transition policy. The shut-down of the last German nuclear power plant will occur in 2022. Accordingly, all the necessary legal changes were made. A consensus about the appropriate waste management strategy for heat generating waste (spent nuclear fuel (SNF) and vitrified waste (HLW)) was still pending at this time. Public and political discussions on this subject continued as in the years before. In July 2013, after intensive discussions, most of the parties represented in the German parliament agreed to eventually tackle the challenge of finding a repository by a consensual, transparent and science-based approach. This was to be codified in a law. In July 2013, the Site Selection Act passed the parliament. This law should pave the way for a new holistic process that addresses social, political, and scientific aspects of siting and the site selection process. The basics for this process should be provided by the 'Commission Storage of Radioactive Waste Materials' which was established according this law. Against this background discussions showed that scientific-technical R and D activities should be mirrored accordingly and R and D has to deal both with the future challenges of radioactive waste HLW disposal and related aspects. Considering this the Federal Ministry for Economic Affairs and Energy (BMWi), which is responsible for non-site specific R and D, created the new Research Concept 'Research for the management of radioactive waste', being fundamental and the frame for non-site specific R and D projects funded by BMWi. Key changes - mirroring the new requirements and different aspects - touch the issues: host rock research, i.e. all potential host rocks available in Germany are equally addressed and there is no prioritization, consideration of consequences of prolonged storage at NPP sites, alternative waste management strategies compared to direct disposal in a mined repository, and involvement of socio-technical aspects.This paper intends to highlight the key changes, its consequences, and will give a brief overview on first initiated R and D activities. (authors)
This document responds to the August 30, 2012, New Mexico Environment Department- Hazardous Waste Bureau (NMED-HWB) Disapproval notice referenced above. The notice was issued for the Permit Modification Request for Technical Area 63, Transuranic Waste Facility, Hazardous Waste Container Storage Unit (PMR), Revision 2.0, submitted to NMED-HWB on July 13, 2012, by the United States Department of Energy (DOE) and Los Alamos National Security, LLC, collectively the Permittees. The Permittees are seeking to modify the Hazardous Waste Facility Permit (Permit) for Los Alamos National Laboratory (LANL) for approval of the construction of the Transuranic Waste Facility (TWF) at Technical Area 63 (TA-63) and permission to store hazardous waste there. This response may contain information regarding the management of radioactive materials, including source, special nuclear, and byproduct material. Information on radioactive materials and radionuclides, including the results of sampling and analysis of radioactive constituents, is voluntarily provided to NMED-HWB in accordance with DOE policy.
This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site Radioactive Waste Management Complex in Area 5. This report summarizes the first quarter of fiscal year 2020.
University education aims to supply qualified human resources for industries. In complex large scale engineering systems such as nuclear power plants, the importance of qualified human resources cannot be underestimated. The corresponding education program should involve many topics systematically. Recently a nuclear engineering program has been initiated in Dongguk University, South Korea. The current education program focuses on undergraduate level nuclear engineering students. Our main objective is to provide industries fresh engineers with the understanding on the interconnection of local parts and the entire systems of nuclear power plants and the associated systems. From the experience there is a huge opportunity for chemical engineering disciple in the context of giving macroscopic overview on nuclear power plant and waste treatment management by strengthening the analyzing capability of fundamental situations. (authors)
Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 325 Safety of Framatome Advanced Nuclear Steam Supply Systems Designs by J. A. Charles and D. Lange, 333 Book Review of Nuclear Accidents: Intervention Levels for the Protection of the Public by H. B. Piper; ACCIDENT ANALYSIS: 335 Living PRA Computer Systems by S. C. Dinsmore and H.-P. Balfanz, 343 Summary of ICAP Assessments of RELAP5/MOD2 by W. E. Driskell and R. G. Hanson; CONTROL AND INSTRUMENTATION: 352 Thermal Performance Monitoring System at Maanshan Nuclear Power Plant by H.-J. Chao, Y.-P. Lin, G.-H. Jou, L.-Y. Liao, and Y.-B. Chen; DESIGN FEATURES: 358 Warning Systems for Nuclear Power Plant Emergencies by J. H. Sorensen and D. S. Mileti; WASTE AND SPENT FUEL MANAGEMENT: 371 Activities Related to Waste Management Compiled by E G. Silver; OPERATING EXPERIENCES: 382 Steam Generator Tube Performance: Experience with Water-Cooled Nuclear Power Reactors During 1985 by O. S. Tatone and R. L. Tapping, 400 Systems Interaction Analyses: Concepts and Techniques (Part II) by M. D. Muhlheim and G. A. Murphy, 413 Reactor Shutdown Experience Compiled by J. W. Cletcher, 416 Operating U.S. Power Reactors Compiled by E G. Silver; RECENT DEVELOPMENTS: 440 General Administrative Activities Compiled by E G. Silver, 460 Reports, Standards, and Safety Guides by D. S. Queener, 466 Status of Power-Reactor Licensing Activities Compiled by E G. Silver, 470 Proposed Rule Changes as of Mar. 31, 1989; ANNOUNCEMENTS: 334 Proceedings Published, 351 CEC Seminar on Methods and Codes for Assessing the Off-Site Consequences of Nuclear Accidents, 357 Short Course on Multiphase Flow and Heat Transfer: Bases and Applications in A: The Nuclear Power Industry B: The Process Industries, 357 International Conference on Probabilistic Safety Assessment and Management, 478 International Topical Meeting on the Safety, Status, and Future of Non-Commercial Reactors and Irradiation Facilities, 475 The Authors.
Brazil has one of the biggest inventories of SRS in the world, not only because of the large industrial park, the well-developed health care infrastructure and the numerous mining operations, but also by the use of radioactive sources in consumer products, such as smoke detectors, lightning arresters, surge protectors and even cardiac pacemakers. Presently, the inventory of DSRS at the WML is of more than 10,000; if the sources from lightning arresters, smoke detectors and Ir-192 with activities above the clearance levels are included, the estimate is over 150,000. The Waste Management Laboratory (WML) of the Nuclear and Energy Research Institute (IPEN/CNEN-SP) is responsible for the management and treatment of these sources. An important aspect to consider is that Brazil does not have a defined strategy or a protocol for screening and inventorying these sources, whose management was limited only to storage. The WML started the development of methods and operational work, to characterize and reduce the total volume of this inventory for the borehole-type final disposal facility yet to be constructed, where the DSRS will be disposed of. The information available from these sources is in a database created in 1980, when the sources began to be received. Several records on the FRSD that were checked are incomplete or simply incorrect, since there is no correspondence between the dates of entry of these sources in the storage and their physical characteristics. Some reasons can be listed to try to understand the divergences: the inspection when receiving the sources was not possible, no inspection procedure was defined, there were technical difficulties to open the packages. The objective of this work is to organize the inventory in a standardized way, control access, traceability, reduction of the necessary time to locate and characterize the sources upon reception, and of the repetitive work in the operational routine, and finally release of space in the storage. (authors)
The Office for Nuclear Regulation (ONR) is an independent safety, security and transport regulator of the UK nuclear industry. ONR regulates all civil nuclear reactor power stations, fuel manufacture, enrichment, spent fuel reprocessing, most defence sites and installations that store and process legacy spent fuel and radioactive waste. The responsibility for funding and strategic direction of decommissioning and radioactive waste management of state owned legacy sites has rested solely with the Nuclear Decommissioning Authority (NDA) since 2005. A key component of NDA's mandate was to encourage new strategic approaches and innovation to dealing with the UK's waste legacy and which deliver value-for-money to the UK taxpayer. ONR, as an agency of the Health and Safety Executive, is entirely independent of NDA and regulates all prescribed activities on NDA's sites. NDA's competition of site management and closure contracts has attracted significant international interest and the formation of consortia comprised of major British, US, French and Swedish organizations bidding for those contracts. The prominence of US organizations in each of those consortia reflects the scale and breadth of existing waste management and D and D projects in the US. This paper will articulate, in broad terms, the challenges faced by international organizations seeking to employ 'off-the-shelf' technology and D and D techniques, successfully employed elsewhere, into the UK regulatory context. The predominantly 'goal-setting' regulatory framework in the UK does not generally prescribe a minimum standard to which a licensee must adhere. The legal onus on licensees in the UK is to demonstrate, whatever technology is selected, that in its applications, risks are reduced 'So Far As Is Reasonably Practicable' or 'SFAIRP'. By the nature of its role, ONR adopts a conservative approach to regulation; however ONR also recognises that in the decommissioning (and ultimately the site closure) domain, it is often necessary to consider and support novel approaches to achieve the nationally desired end-state. Crucial to successful and compliant operation in this regulatory environment is early and sustained engagement of the contractor with the regulator. There must be a 'no-surprises' culture to engender regulatory confidence early in a project. The paper considers some of the challenges facing international prime and lower tier contractors when undertaking D and D contracts in the UK, and emphasizes the importance of constructive and transparent dialogue with all regulators to sustain confidence at all stages of a major decommissioning project. The paper will also articulate ONR's strategy to increase collaboration with the US Department of Energy in light of increasing UK-US synergy in the area of waste management and to benchmark respective regulatory approaches. (authors)