Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Arrival”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Autonomous Aircraft Operations using RTCA Guidelines for Airborne Conflict Management

A human-in-the-loop experiment was performed at the NASA Langley Research Center to study the feasibility of DAG-TM autonomous aircraft operations in highly constrained airspace. The airspace was constrained by a pair of special-use airspace (SUA) regions on either side of the pilot's planned route. Traffic flow management (TFM) constraints were imposed as a required time of arrival and crossing altitude at an en route fix. Key guidelines from the RTCA Airborne Conflict Management (ACM) concept were applied to autonomous aircraft operations for this experiment. These concepts included the RTCA ACM definitions of distinct conflict detection and collision avoidance zones, and the use of a graded system of conflict alerts for the flight crew. Three studies were conducted in the course of the experiment. The first study investigated the effect of hazard proximity upon pilot ability to meet constraints and solve conflict situations. The second study investigated pilot use of the airborne tools when faced with an unexpected loss of separation (LOS). The third study explored pilot interactions in an over-constrained conflict situation, with and without priority rules dictating who should move first. Detailed results from these studies were presented at the 5th USA/Europe Air Traffic Management R&D Seminar (ATM2003). This overview paper focuses on the integration of the RTCA ACM concept into autonomous aircraft operations in highly constrained situations, and provides an overview of the results presented at the ATM2003 seminar. These results, together with previously reported studies, continue to support the feasibility of autonomous aircraft operations.

Krishnamurthy, Karthik↗

En route Spacing Tool: Efficient Conflict-free Spacing to Flow-Restricted Airspace

This paper describes the Air Traffic Management (ATM) problem within the U.S. of flow-restricted en route airspace, an assessment of its impact on airspace users, and a set of near-term tools and procedures to resolve the problem. The FAA is committed, over the next few years, to deploy the first generation of modem ATM decision support tool (DST) technology under the Free-Flight Phase-1 (FFp1) program. The associated en route tools include the User Request Evaluation Tool (URET) and the Traffic Management Advisor (TMA). URET is an initial conflict probe (ICP) capability that assists controllers with the detection and resolution of conflicts in en route airspace. TMA orchestrates arrivals transitioning into high-density terminal airspace by providing controllers with scheduled times of arrival (STA) and delay feedback advisories to assist with STA conformance. However, these FFPl capabilities do not mitigate the en route Miles-In-Trail (MIT) restrictions that are dynamically applied to mitigate airspace congestion. National statistics indicate that en route facilities (Centers) apply Miles-In-Trail (MIT) restrictions for approximately 5000 hours per month. Based on results from this study, an estimated 45,000 flights are impacted by these restrictions each month. Current-day practices for implementing these restrictions result in additional controller workload and an economic impact of which the fuel penalty alone may approach several hundred dollars per flight. To mitigate much of the impact of these restrictions on users and controller workload, a DST and procedures are presented. The DST is based on a simple derivative of FFP1 technology that is designed to introduce a set of simple tools for flow-rate (spacing) conformance and integrate them with conflict-probe capabilities. The tool and associated algorithms are described based on a concept prototype implemented within the CTAS baseline in 1995. A traffic scenario is used to illustrate the controller's use of the tool, and potential display options are presented for future controller evaluation.

Green, S.↗

3D Printing in Zero G Technology Demonstration Mission: Summary of On-Orbit Operations, Material Testing, and Future Work

Human space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS), an orbiting laboratory 200 miles above the earth, provides a unique and incredible opportunity for researchers to prove out the technologies that will enable humans to safely live and work in space for longer periods of time and venture farther into the solar system. The ability to manufacture parts in-space rather than launch them from earth represents a fundamental shift in the current risk and logistics paradigm for human spaceflight. In particularly, additive manufacturing (or 3D printing) techniques can potentially be deployed in the space environment to enhance crew safety (by providing an on-demand part replacement capability) and decrease launch mass by reducing the number of spare components that must be launched for missions where cargo resupply is not a near-term option. In September 2014, NASA launched the 3D Printing in Zero G technology demonstration mission to the ISS to explore the potential of additive manufacturing for in-space applications and demonstrate the capability to manufacture parts and tools on-orbit. The printer for this mission was designed and operated by the company Made In Space under a NASA SBIR (Small Business Innovation Research) phase III contract. The overarching objectives of the 3D print mission were to use ISS as a testbed to further maturation of enhancing technologies needed for long duration human exploration missions, introduce new materials and methods to fabricate structure in space, enable cost-effective manufacturing for structures and mechanisms made in low-unit production, and enable physical components to be manufactured in space on long duration missions if necessary. The 3D print unit for fused deposition modeling (FDM) of acrylonitrile butadiene styrene (ABS) was integrated into the ISS Microgravity Science Glovebox (MSG) in November 2014 and phase I printing operations took place from November through December of that year. Phase I flight operations yielded 14 unique parts (21 total specimens) that could be directly compared against ground-based prints of identical geometry manufactured using the printer prior to its launch to ISS. The 3DP unit functioned safely and produced specimens necessary to advance the understanding of the critical design and operational parameters for the FDM process as affected by the microgravity environment. From the standpoint of operations, 3DP demonstrated the ability to remove parts from the build-tray on-orbit, teleoperate the printer from the ground, perform critical maintenance functions within defined human factors limits, produce a functional tool that could be evaluated for form/fit/function, and uplink a new part file from the ground and produce it on the printer. The flight parts arrived at NASA Marshall Space Flight Center in Huntsville, Alabama in April 2015, where they underwent months of testing in the materials and processes laboratory. Ground and flight prints completed the following phases of testing: photographic/visual inspection, mass and density evaluation, structured light scanning, XRay and CT, mechanical testing, optical microscopy, scanning electron microscopy, and chemical analysis. This presentation will discuss the results of this testing as well as phase II operations for the printer, which took place in June and July of 2016. Lessons learned from the tech demo and their impacts on the design and development of the second generation 3D printer for ISS, the Additive Manufacturing Facility (AMF) by Made In Space will also be presented. In addition, progress in other elements of NASA's In Space Manufacturing (ISM) initiative such as the on-demand ISM utilization catalog, in-space Recycler ISS Technology Demonstration development, launch packaging recycling, in-space printable electronics, development of higher strength polymeric materials for 3D printing and Additive Construction by Mobile Emplacement (ACME) will also be addressed.

Prater, Tracie↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

The Development of the Puerto Rico Lightning Detection Network for Meteorological Research

A land-based Puerto Rico Lightning Detection Network (PR-LDN) dedicated to the academic research of meteorological phenomena has being developed. Five Boltek StormTracker PCI-Receivers with LTS-2 Timestamp Cards with GPS and lightning detectors were integrated to Pentium III PC-workstations running the CentOS linux operating system. The Boltek detector linux driver was compiled under CentOS, modified, and thoroughly tested. These PC-workstations with integrated lightning detectors were installed at five of the University of Puerto Rico (UPR) campuses distributed around the island of PR. The PC-workstations are left on permanently in order to monitor lightning activity at all times. Each is networked to their campus network-backbone permitting quasi-instantaneous data transfer to a central server at the UPR-Bayam n campus. Information generated by each lightning detector is managed by a C-program developed by us called the LDN-client. The LDN-client maintains an open connection to the central server operating the LDN-server program where data is sent real-time for analysis and archival. The LDN-client also manages the storing of data on the PC-workstation hard disk. The LDN-server software (also an in-house effort) analyses the data from each client and performs event triangulations. Time-of-arrival (TOA) and related hybrid algorithms, lightning-type and event discriminating routines are also implemented in the LDN-server software. We also have developed software to visually monitor lightning events in real-time from all clients and the triangulated events. We are currently monitoring and studying the spatial, temporal, and type distribution of lightning strikes associated with electrical storms and tropical cyclones in the vicinity of Puerto Rico.

Legault, Marc D.↗

An Integrated Approach to Life Cycle Analysis

Life Cycle Analysis (LCA) is the evaluation of the impacts that design decisions have on a system and provides a framework for identifying and evaluating design benefits and burdens associated with the life cycles of space transportation systems from a "cradle-to-grave" approach. Sometimes called life cycle assessment, life cycle approach, or "cradle to grave analysis", it represents a rapidly emerging family of tools and techniques designed to be a decision support methodology and aid in the development of sustainable systems. The implementation of a Life Cycle Analysis can vary and may take many forms; from global system-level uncertainty-centered analysis to the assessment of individualized discriminatory metrics. This paper will focus on a proven LCA methodology developed by the Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center to quantify and assess key LCA discriminatory metrics, in particular affordability, reliability, maintainability, and operability. This paper will address issues inherent in Life Cycle Analysis including direct impacts, such as system development cost and crew safety, as well as indirect impacts, which often take the form of coupled metrics (i.e., the cost of system unreliability). Since LCA deals with the analysis of space vehicle system conceptual designs, it is imperative to stress that the goal of LCA is not to arrive at the answer but, rather, to provide important inputs to a broader strategic planning process, allowing the managers to make risk-informed decisions, and increase the likelihood of meeting mission success criteria.

Chytka, T. M.↗

Mars Science Laboratory Navigation Results

The Mars Science Laboratory (MSL), carrying the Curiosity rover to Mars, was launched on November 26, 2011, from Cape Canaveral, Florida. The target for MSL was selected to be Gale Crater, near the equator of Mars, with an arrival date in early August 2012. The two main interplanetary navigation tasks for the mission were to deliver the spacecraft to an entry interface point that would allow the rover to safely reach the landing area, and to tell the spacecraft where it entered the atmosphere of Mars, so it could guide itself accurately to close proximity of the landing target. MSL used entry guidance as it slowed down from the entry speed to a speed low enough to allow for a successful parachute deployment, and this guidance allowed shrinking the landing ellipse to a 99% conservative estimate of 7 by 20 kilometers. Since there is no global positioning system in Mars, achieving this accuracy was predicated on flying a trajectory that closely matched the reference trajectory used to design the guidance algorithm, and on initializing the guidance system with an accurate Mars-relative entry state that could be used as the starting point to integrate the inertial measurement unit data during entry and descent. The pre-launch entry flight path angle (EFPA) delivery requirement was +/- 0.20 deg, but after launch a smaller threshold of +/- 0.05 deg was used as the criteria for late trajectory correction maneuver (TCM) decisions. The pre-launch requirement for entry state knowledge was 2.8 kilometers in position error and 2 meters per second in velocity error, but also smaller thresholds were defined after launch to evaluate entry state update opportunities. The biggest challenge for the navigation team was to accurately predict the trajectory of the spacecraft, so the estimates of the entry conditions could be stable, and late trajectory correction maneuvers or entry parameter updates could be waved off. As a matter of fact, the prediction accuracy was such that the last TCM performed was a small burn executed eight days before landing, and the entry state that was calculated just 36 hours after that TCM, and that was uploaded to the spacecraft the same day, did not need to be updated. The final EFPA was 0.013 deg shallower than the -15.5 deg target, and the on-board entry state was just 200 meters in position and 0.11 meters per second in velocity from the post-landing reconstructed entry state. Overall the entry delivery and knowledge requirements were fulfilled with a margin of more than 90% with respect to the pre-launch thresholds. This excellent accuracy contributed to a very successful and accurate entry, descent, and landing, and surface mission.

navigation↗

FCC-hh: The Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a highest-energy hadron collider with a centre-of-mass collision energy of 100 TeV and an integrated luminosity of at least a factor of 5 larger than the HL-LHC. It will extend the current energy frontier by almost an order of magnitude. The mass reach for direct discovery will reach several tens of TeV, and allow, for example, to produce new particles whose existence could be indirectly exposed by precision measurements during the earlier preceding e+e– collider phase. This collider will also precisely measure the Higgs self-coupling and thoroughly explore the dynamics of electroweak symmetry breaking at the TeV scale, to elucidate the nature of the electroweak phase transition. WIMPs as thermal dark matter candidates will be discovered, or ruled out. As a single project, this particle collider infrastructure will serve the world-wide physics community for about 25 years and, in combination with a lepton collider (see FCC conceptual design report volume 2), will provide a research tool until the end of the 21st century. Collision energies beyond 100 TeV can be considered when using high-temperature superconductors. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular energy frontier collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy circular hadron collider can be brought to the technology readiness level required for constructing within the coming ten years through a focused R&D programme. The FCC-hh concept comprises in the baseline scenario a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. On a longer timescale, high-temperature superconductors can be developed together with industrial partners to achieve an even more energy efficient particle collider or to reach even higher collision energies.The re-use of the LHC and its injector chain, which also serve for a concurrently running physics programme, is an essential lever to come to an overall sustainable research infrastructure at the energy frontier. Strategic R&D for FCC-hh aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate technology-related risks and ensure that industry can benefit from an acceptable utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan in agreement with the host-states’ requirements, to optimise the disposal of land and underground volumes, and to prepare the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

A Comprehensive Framework for Valuation of Ecosystem Services in the Context of Hydropower

While models to value ecosystem services exist, they suffer from a lack of “portability” in the sense that a single modelling framework developed for one site cannot be imported and applied to another. Additionally, benefit estimations are often fragmented, incomplete, incomparable, and in heterogenous metrics, thus preventing aggregation to arrive at one comprehensive value. In the context of hydropower, the methods, as well as the metrics used to value the associated ecosystem services, vary between stakeholders (e.g., competing water users, agencies, etc.), detracting from the ability to assess the total value of a hydropower project, water management schemes, or comparing value between competing water users. Further, current methods to value water neglect non-market ecosystem services’ values by failing to account for externalities, resulting in misallocation of costs (e.g., obligatory stakeholder payments for water use) and misinterpretation of hydropower benefits. The benefit-cost ratios in hydropower development are often incomplete because non-market benefits are excluded (e.g., benefits, such as fish habitat resiliency and agricultural water reliability, derived from hydropower development). An approach to enable consistent, standardized hydropower benefit-cost analyses does not currently exist. This paper conceptualizes a methodology to standardize ecosystem services valuation in the context of hydropower projects through the integration of the U.S. Environmental Protection Agency’s existing Final Ecosystem Goods and Services Classification System framework and economic valuation techniques, and demonstrates the applicability of this methodology through a limited proof-of-concept application (the New Waddell Plant, a pumped hydroelectric energy storage facility in Phoenix, AZ). The beauty of our proposed framework lies in its ability to be imported and applied to any other pumped storage facility after accounting for site-specific features.

13 HYDRO ENERGY↗

Initial Analysis of Digitally Enabled Cooperative Operations in Class D Terminal Airspace

The primary contribution of this paper is an initial analysis of integrating digitally enabled cooperative operations (or digital operations for short) with Visual Flight Rules (VFR) and Instrument Flight Rules (IFR) operations in the terminal airspace around a Class D airport, specifically around Fort Worth Alliance airport (KAFW). Enabled by connected digital technologies and automated information exchange, digital operations as envisioned would utilize cooperative practices and operator-responsible separation to ensure safety. In the present study, three conflict management configurations for digital operations were analyzed: 1) centralized with a single instance of a conflict management service to model a scenario with only one fleet operator conducting digital operations or all fleet operators utilizing the same service, 2) federated with two different instances to model a scenario with two different fleet operators conducting digital operations, and 3) fully distributed with a different instance for each digital operation. In simulations in which recorded tracks for VFR and IFR operations were played back and digital operations were modeled that would nominally arrive at KAFW once every 20 minutes (given no conflict resolution maneuvers), there were one or fewer losses of separation (LOS) across the three conflict management configurations. The same result was seen in simulations in which digital operations would nominally arrive at KAFW once every 10 minutes. However, in simulations in which digital operations would nominally arrive at KAFW once every 5 minutes, the number of LOS ranged between six and ten. This highlights the need for follow-on research to investigate the extent to which additional capabilities for digital operations, such as complexity management and/or flow organization, may be needed.

digitally enabled cooperative operations, digital ↗

Initial Analysis of Digitally Enabled Cooperative Operations in Class D Terminal Airspace

The primary contribution of this paper is an initial analysis of integrating digitally enabled cooperative operations (or digital operations for short) with Visual Flight Rules (VFR) and Instrument Flight Rules (IFR) operations in the terminal airspace around a Class D airport, specifically around Fort Worth Alliance airport (KAFW). Enabled by connected digital technologies and automated information exchange, digital operations as envisioned would utilize cooperative practices and operator-responsible separation to ensure safety. In the present study, three conflict management configurations for digital operations were analyzed: 1) centralized with a single instance of a conflict management service to model a scenario with only one fleet operator conducting digital operations or all fleet operators utilizing the same service, 2) federated with two different instances to model a scenario with two different fleet operators conducting digital operations, and 3) fully distributed with a different instance for each digital operation. In simulations in which recorded tracks for VFR and IFR operations were played back and digital operations were modeled that would nominally arrive at KAFW once every 20 minutes (given no conflict resolution maneuvers), there were one or fewer losses of separation (LOS) across the three conflict management configurations. The same result was seen in simulations in which digital operations would nominally arrive at KAFW once every 10 minutes. However, in simulations in which digital operations would nominally arrive at KAFW once every 5 minutes, the number of LOS ranged between six and ten. This highlights the need for follow-on research to investigate the extent to which additional capabilities for digital operations, such as complexity management and/or flow organization, may be needed.

digitally enabled cooperative operations↗

LET spectra measurements on LDEF: variations with shielding and location

LET spectra measurements made with passive plastic nuclear track detectors (PNTDs) were found to depend on detector orientation, shielding and experiment location. LET spectra were measured at several locations on LDEF as part of the P0006 LETSME experiment (Benton and Parnell, 1984), the P0004 Seeds in Space experiment (Parks and Alston, 1984), the A00l5 Free Flyer Biostacks and the M0004 Fiber Optics Data Link experiment (Taylor, 1984). Locations included the east, west and Earth sides of the LDEF satellite. The LET spectra measured with PNTDs deviated significantly from calculations, especially for high LET particles (LET infinity H2O > or = 100 keV/micrometer). At high LETs, short-range inelastic secondary particles produced by trapped proton interactions with the nuclei of the detector were found to be the principal contributor to LET spectra. At lower LETs, the spectra appeared to be due to short-range, inelastic and stopping primary protons, with primary GCR particles making a smaller contribution. The dependence of LET spectra on detector orientation and shielding was studied using the four orthogonal stacks in the P0006 experiment. Both measurements of total track density and LET spectra showed a greater number of particles arriving from the direction of space than from Earth. Measurements of LET spectra in CR-39 PNTD on the east (leading) and west (trailing) sides of LDEF showed a higher rate of production at the west side. This was caused by a larger flux of trapped protons on the west side as predicted by the east/west trapped proton anisotropy in the South Atlantic Anomaly (SAA). Track density measured in CR-39 PNTDs increased as a function of shielding depth in the detector stack. A similar measurement made in a thick stack of CR-39 interspersed with layers of Al and exposed to 154 MeV protons at a ground-based accelerator showed a similar result, indicating that a significant fraction of the particle events counted were from secondaries and that the total cross-section for production of proton-induced secondaries increased as the energy of primary protons attenuated. Little change was seen in either total differential or integral LET spectra as a function of shielding depth, indicating that the increase in cross section with decreasing proton energy affected mostly the shorter range secondary components. Similarity in the slopes of LET spectra from ground-based proton exposures and the A00l5 LET spectra showed that modeling of a monoenergetic proton beam transported through a 1-D geometry was a useful first step in modeling the production of secondary particles by trapped protons in the SAA.

long duration↗

SU-E-T-512: Electromagnetic Simulations of the Dielectric Wall Accelerator

Purpose: To characterize and parametrically study the key components of a dielectric wall accelerator through electromagnetic modeling and particle tracking. Methods: Electromagnetic and particle tracking simulations were performed using a commercial code (CST Microwave Studio, CST Inc.) utilizing the finite integration technique. A dielectric wall accelerator consists of a series of stacked transmission lines sequentially fired in synchrony with an ion pulse. Numerous properties of the stacked transmission lines, including geometric, material, and electronic properties, were analyzed and varied in order to assess their impact on the transverse and axial electric fields. Additionally, stacks of transmission lines were simulated in order to quantify the parasitic effect observed in closely packed lines. Particle tracking simulations using the particle-in-cell method were performed on the various stacks to determine the impact of the above properties on the resultant phase space of the ions. Results: Examination of the simulation results show that novel geometries can shape the accelerating pulse in order to reduce the energy spread and increase the average energy of accelerated ions. Parasitic effects were quantified for various geometries and found to vary with distance from the end of the transmission line and along the beam axis. An optimal arrival time of an ion pulse relative to the triggering of the transmission lines for a given geometry was determined through parametric study. Benchmark simulations of single transmission lines agree well with published experimental results. Conclusion: This work characterized the behavior of the transmission lines used in a dielectric wall accelerator and used this information to improve them in novel ways. Utilizing novel geometries, we were able to improve the accelerating gradient and phase space of the accelerated particle bunch. Through simulation, we were able to discover and optimize design issues with the device at low cost. Funding: Morgridge Institute for Research, Madison WI; Conflict of Interest: Dr. Mackie is an investor and board member at CPAC, a company developing compact accelerator designs similar to those discussed in this work, but designs discussed are not directed by CPAC. Funding: Morgridge Institute for Research, Madison WI; Conflict of Interest: Dr. Mackie is an investor and board member at CPAC, a company developing compact accelerator designs similar to those discussed in this work, but designs discussed are not directed by CPAC.

43 PARTICLE ACCELERATORS↗

A Multi-modal Approach to Understanding Degradation of Organic Photovoltaic Materials

State-of-the-art organic photovoltaic (OPV) materials are composed of complex, chemically diverse polymeric and molecular structures that form highly intricate solid-state interactions, collectively yielding exceptional tunability in performance and aesthetics. These properties are especially attractive for semitransparent power-generating windows or shades in living environments, greenhouses, or other architectural integrations. However, before such a future is realized, a broader and deeper understanding of property stability must be acquired. Stability during operating and environmental conditions is critical, namely, material color steadfastness, optoelectronic performance retention, morphological rigidity, and chemical robustness. To date, no single investigation encompasses all four distinct, yet interconnected, metrics. Here, we present a multimodal strategy that captures a dynamic and interconnected evolution of each property during the course of an accelerated photobleaching experiment. We demonstrate this approach across relevant length scales (from molecular to visual macroscale) using X-ray photoelectron spectroscopy, grazing-incidence X-ray scattering, microwave conductivity, and time-dependent photobleaching spectroscopies for two high-performance semitransparent OPV blends—PDPP4T:PC 60 BM and PDPP4T:IEICO-4F, with comparisons to the stabilities of the individual components. We present direct evidence that specific molecular acceptor (fullerene vs nonfullerene) designs and the resulting donor–acceptor interactions lead to distinctly different mechanistic routes that ultimately arrive at what is termed “OPV degradation.” We directly observe a chemical oxidation of the cyano endcaps of the IEICO-4F that coincides with a morphological change and large loss in photoconductivity while the fullerene acceptor-containing blend demonstrates a significantly greater fraction of oxygen uptake but retains 55% of the photoconductivity. Finally, this experimental roadmap provides meaningful guidance for future high-throughput, multimodal studies, benchmarking the sensitivity of the different analytical techniques for assessing stability in printable active layers, independent of complete device architectures.

14 SOLAR ENERGY↗

HE-LHC: The High-Energy Large Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a high-energy hadron collider, which extends the current energy frontier by almost a factor 2 (27 TeV collision energy) and an integrated luminosity of at least a factor of 3 larger than the HL-LHC. In connection with four experimental detectors, this infrastructure will deepen our understanding of the origin of the electroweak symmetry breaking, allow a first measurement of the Higgs self-coupling, double the HL-LHC discovery reach and allow for in-depth studies of new physics signals arising from future LHC measurements. This collider would directly produce particles at significant rates at scales up to 12 TeV. The project re-uses the existing LHC underground infrastructure and large parts of the injector chain at CERN. This particle collider would succeed the HL-LHC directly and serve the world-wide physics community for about 20 years beyond the middle of the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular high-energy hadron collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a High-Energy LHC can be brought to the technology readiness level required for construction within the coming ten years through a committed and focused R&D programme. The concept comprises a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. Re-use of the LHC underground civil infrastructure worth about 500 million CHF at the time of its construction, extension of the surface sites and use of the existing injector chain that also serve for a concurrently running physics programme are levers to come to a sustainable research infrastructure at the energy frontier. Strategic R&D for HE-LHC aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It needs to mitigate technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan considering the constraints emerging from using the existing infrastructure and the host states’ requirements, optimising the use of land, resources and preparing the construction project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Role of Disproportionation in the Dissolution of Mn from Lithium Manganate Spinel

Dissolution of Mn from lithium-manganese spinel has hindered its commercialization as a cathode material in Li-ion batteries. Disproportionation of near-surface Mn(III), in the presence of acid, has been widely thought to result in dissolved divalent Mn. To what extent stray acidic water in the cell (as opposed to the organic electrolyte) acts as the solvent for Mn ions has not been established. Simulations by Leung show that a small displacement of trivalent Mn from its equilibrium site at an LiMn 2 O 4 (001)/ ethylene carbonate interface leads to its reduction to Mn(II). In the present work, Thermodynamic Integration is performed, based on first-principles molecular dynamics simulations within the Blue-Moon ensemble, for the detachment of Mn(III) ions at the LiMn 2 O 4 (001)/water interface. The results show that reduction of Mn(III) to Mn(II) occurs also in the case of an aqueous interface. The simulations were performed for both neutral and acidic water (in the presence of HF), with the coordination number of the dissolving Mn ion with substrate oxygen ions taken as the reaction coordinate. The simulations indicate that an F - ion strongly binds to a surface Mn(III) ion, and weakens its adhesion to the substrate. Owing to this weakening, a surface Mn-F complex traverses regions of phase space at room temperature where disproportionation becomes energetically favorable. Although this disproportionation occurs close to the substrate, where the Mn coordination number is only slightly lowered from its equilibrium value, we argue that the likelihood of reattachment after disproportionation is small (Leung arrived at a similar interpretation in the case of the LiMn 2 O 4 (001)/ EC interface). We suggest that the critical role of F - in promoting dissolution is to weaken the Mn binding to the substrate so as to enable disproportionation. The partially detached MnF complex may then undergo additional interaction with the solvent to form, e.g., MnF 2 , which would enable transport away from the substrate. In conclusion, the EPR measurements by Shilina et al. which appear to show Mn(III) as the predominant solvated species are discussed.

25 ENERGY STORAGE↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Achieving Equilibrium for Dense, Integrated, Vehicle Navigation

Drone usage has proliferated in recent years with many applications that have market-changing potential. Applications that include parcel delivery, wildlife protection, precision farming, law enforcement, and industrial inspection, just to name a few. In this paper, the term drone is used to mean both Unmanned Aerial Vehicle and small Unmanned Aircraft System vehicles. Flight infrastructure can currently only support a few thousand aircraft flying over the United States National Airspace System (NAS) at any given time. A delay atone airport sends ripple effects through the system, causing more delays and missed connections. Once regulations and safety policies are put in place to allow for the widespread use of unmanned drones, the number of aircraft in the NAS is expected to skyrocket to millions, potentially congesting the airspace resulting in possible separation violations. In air traffic control, separation is the concept of keeping an “ownship” aircraft outside a minimum distance from “intruder” aircraft to reduce the risk of the aircraft colliding, as well as preventing accidents due to secondary factors, such as wake turbulence. Maintaining proper separation is a safety critical property for drones in the airspace. This paper addresses separation in time and in distance for high volume corridors (en-route) and lanes(on ground). The requirements and necessary conditions for maintaining proper separation and reaching maximum throughput for a given corridor/lane are addressed assuming unidirectional corridors/lanes where an aircraft arrives from one side and departs from the opposite side. Simulation results are presented that show the presented solution guarantees a set of drones to reach the equilibrium state by adjusting their speed based on their distance to the aircraft in front of them. The equilibrium state is defined as a state when a set of n aircraft moving at a relatively constant speed and uniform spacing from each other in a congested system. A congested system is defined as a state when the aircraft cannot move at their maximum allowed speed. Unlike existing centralized and pre-planned approaches, the proposed solution is fully distributed and enables autonomous aircraft to decide to adjust their speed and distance with respect to the preceding aircraft, dynamically. Simulation results are presented that assess the feasibility of the approach using a large number of drones and evaluate the scalability of the proposed solution.

Mahyar R. Malekpour↗