SEARCH · Engineering Papers
Results for “HOUSES”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A putative house-cleaning enzyme encoded within an integron array: 1.8 Å crystal structure defines a new MazG subtype
Abstract not provided
In-house synthesized poly(ether ether ketone) ionenes. I. ToF-SIMS spectra in the positive ion mode
Static time-of-flight secondary ion mass spectrometry (ToF-SIMS) was performed for acquiring the high-resolution surface spectra of four types of synthesized imidazolium ionene membranes. These novel membranes have aromatic ether–ketone–ether linkages inspired by poly(ether ether ketone) (PEEK). The PEEK-ionenes synthesized for this study have imidazolium cations placed in the polymeric backbone with bistriflimide [Tf 2 N]- counterions. The attention given to synthetically modified PEEK derivatives, such as PEEK-ionenes, is considerable due to their ability to selectively capture CO 2 molecules and other light gases. Therefore, it is important to characterize the surface of these synthesized novel PEEK-ionenes. In this work, characteristic and unique peaks were identified in the positive spectra of each sample. The differences in mass spectra among the samples provide insights for optimizing or fine-tuning the PEEK-ionenes synthesis to achieve a high-performance CO 2 separation membrane with enhanced permeability, selectivity, and mechanical stability. The SIMS spectra and identified characteristic peaks of these synthesized ionenes will serve as a reference in the positive mode, complementing the corresponding spectra reported in the negative ion mode (Paper II).
In-house synthesized poly(ether ether ketone) ionenes. II. ToF-SIMS spectra in the negative ion mode
Time-of-flight secondary ion mass spectrometry (ToF-SIMS) was used to analyze poly(ether ether ketone) (PEEK) based membranes. PEEK membranes have been shown to be effective in the separation of CO 2 from flue gases (post-combustion technique). The PEEK membranes were synthesized using novel aromatic ether-ketone linkages inspired by PEEK with polymeric backbone bistriflimide [Tf2N]− counterions. One of the keys to advancing this technology is developing membranes that are selective and permeable toward CO 2 , in which PEEK based membranes have been shown to be. Furthermore, the compatibility between various water lean solvents also needs to be investigated. Surface analytical techniques such as x-ray photoelectron spectroscopy and ToF-SIMS are useful for investigating chemical changes between membranes. Herein, we present ToF-SIMS data obtained in the negative ion mode for four different PEEK membranes designed for use in CO 2 capture systems. Positive ion mode spectra are reported in Paper I.
SU-E-T-41: A Method for Performing An In-House Batch Assay of I-125 Seeds Used for Prostate Implants
Purpose: The purpose of this work is to evaluate a method for confirming source strength of I-125 seeds in a bulk assay while maintaining sterility and time efficiency. Methods: The I-125 seeds used in this study (STM 1251, Bard Brachytherapy, Inc.) were available as loose seeds or linked in 3, 4, or 5 seed configurations. A third party 10% assay (NIST traceable) is provided. Source strengths ranging from 0.395 to 0.504 U were available for this study. A stand was built out of aluminum to hold an exposure meter (Inovision (Fluke) 451P) at 25 cm above the I-125 sources to measure the exposure rate. Three different seed configurations were measured: loose, linked, and loaded needles (Bard FastFil Seed Implant Needle). The measurements were made in an operating room, and a sterile sheet was used under the non-sterile aluminum stand. Seeds and needles were placed in a sterile tray. Results: One hundred forty-two loose seeds in 5 batches (0.395, 0.395, 0.409, 0.444, 0.444 U/seed) and 902 seeds in 7 batches containing various strands (0.444, 0.444,.0444, 0.466, 0.466, 0.504, 0.504 U/seed) were measured. The average exposure rate per unit activity was measured to be 0.593 mR per hr per U with a standard deviation of 0.016. The Result for loaded needles was 0.261 mR per hr per U with a standard deviation of 0.014. Once the apparatus is set up, measurements of 180 linked sources as supplied in the Bard package requires only a few minutes. Conclusion: The proposed method can confirm the activity of a batch of loose or stranded I-125 seeds within a range of 5%.
TH-E-209-03: Development of An In-House CT Dose Monitoring and Management System Based On Open-Source Software Resources -- Pearls and Pitfalls
Radiation dose monitoring solutions have opened up new opportunities for medical physicists to be more involved in modern clinical radiology practices. In particular, with the help of comprehensive radiation dose data, data-driven protocol management and informed case follow up are now feasible. Significant challenges remain however and the problems faced by medical physicists are highly heterogeneous. Imaging systems from multiple vendors and a wide range of vintages co-exist in the same department and employ data communication protocols that are not fully standardized or implemented making harmonization complex. Many different solutions for radiation dose monitoring have been implemented by imaging facilities over the past few years. Such systems are based on commercial software, home-grown IT solutions, manual PACS data dumping, etc., and diverse pathways can be used to bring the data to impact clinical practice. The speakers will share their experiences with creating or tailoring radiation dose monitoring/management systems and procedures over the past few years, which vary significantly in design and scope. Topics to cover: (1) fluoroscopic dose monitoring and high radiation event handling from a large academic hospital; (2) dose monitoring and protocol optimization in pediatric radiology; and (3) development of a home-grown IT solution and dose data analysis framework. Learning Objectives: Describe the scope and range of radiation dose monitoring and protocol management in a modern radiology practice Review examples of data available from a variety of systems and how it managed and conveyed. Reflect on the role of the physicist in radiation dose awareness.
Carnivorous Nepenthes Pitchers with Less Acidic Fluid House Nitrogen-Fixing Bacteria
Plants use different strategies to obtain the nutrients that they need to grow. Some plants access their nitrogen directly from the soil, while others rely on microbes to access the nitrogen for them.
HERO WEC V1 Upgrades - SolidWorks Models (WEC, RO System, and Submersible Pump Housing)
The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration. These 3 models were upgraded in 2023 from their baseline models. The HERO WEC model does not include all aspects of the design (i.e. RO system, electrical enclosure, hose, cable), it only includes the WEC and PTO (power take-off) design. This model supersedes the old MHKDR model submission, linked below. The RO model file includes a SolidWorks (version 2023) pack-and-go assembly of the RO assembly that was used for HERO WEC as it was upgraded in 2023. This model ONLY includes the RO assembly and not the WEC, hoses, etc. The submersible pump enclosure model includes a SolidWorks (version 2023) pack-and-go assembly of the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration HERO WECas it was upgraded in 2023. This model ONLY includes the submersible pump assembly and not the WEC, RO system, hoses, etc. This work has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.
Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York (Final Report)
The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.
Independent Confirmatory Survey Report for the Reactor Building, Hot Laboratory, Primary Pump House, and Land Areas at the Plum Brook Reactor Facility, Sandusky, Ohio
In 1941, the War Department acquired approximately 9,000 acres of land near Sandusky, Ohio and constructed a munitions plant. The Plum Brook Ordnance Works Plant produced munitions, such as TNT, until the end of World War II. Following the war, the land remained idle until the National Advisory Committee for Aeronautics later called the National Aeronautics and Space Administration (NASA) obtained 500 acres to construct a nuclear research reactor designed to study the effects of radiation on materials used in space flight. The research reactor was put into operation in 1961 and was the first of fifteen test facilities eventually built by NASA at the Plum Brook Station. By 1963, NASA had acquired the remaining land at Plum Brook for these additional test facilities
Design and Evaluation of a Net Zero Energy Low-Income Residential Housing Development in Lafayette, Colorado
This abbreviated report outlines the lessons learned and sub-metered energy performance of an ultra low energy single family ranch home and duplex unit, called the Paradigm Pilot Project and presents the final design recommendations for a 153-unit net zero energy residential development called the Josephine Commons Project.
Housing Stock Characterization Study: An Innovative Approach to Measuring Retrofit Impact
A residential energy efficiency retrofit loan program depends on a self-sustaining finance option and optimized retrofit measures that recoup their unsubsidized costs through energy bill savings alone within the useful life of the retrofit. A first step in evaluating retrofit options is to measure and verify their energy savings. This report evaluates Orlando Utilities Commission (OUC)residential energy-efficiency demand side management (DSM) programs to assess their relative energy and economic performance.
Survey of Whole House Programs in Midwestern Climates
Existing single family whole home energy efficiency programs in cold weather climates, focused on the Midwest, were analyzed in detail to understand program design, including requirements, processes, incentives and outcomes, focusing on savings and participation. The report presents information about specific programs, aggregated program trends and observations, and recommendations for futurecold weather climate whole home program design and implementation. This study makes several recommendations to whole home program designers and implementers on improving the cost-effectiveness and reach of whole home programs.
Annual Report on Institutional Computing Resources: Multi-scale Modeling of Green House Gas Emissions Performed on Institutional Computing Project HIGRADchem
Agreements to limit greenhouse gas emissions require scientifically valid methods for monitoring and validating anthropogenic emissions. The task of monitoring CO 2 emissions is difficult because relatively small increases need to be detected against CO 2 's variable and large background concentrations. To ensure fair compliance everywhere on the globe, remotely sensed measurements and an understanding of the atmospheric transport of CO 2 from its sources are required. The climate treaty verification LDRD project addresses these challenges. The Remote Sensing Verification Project (RSVP) test2bed located in the Four Corners region of Arizona, Utah, Colorado, and New Mexico offers a unique opportunity to develop new approaches for estimating emissions of CO 2 . Two major power plants located in this area produce very large signals of co-emitted CO 2 and NO 2 in this rural region. In addition to the Environmental Protection Agency (EPA) maintaining Continuous Emissions Monitoring Systems (CEMS) on each of the power plant stacks, the RSVP program has deployed an array of in-situ and remote sensing instruments, which provide both point and integrated measurements.
Acquisition of an In-House X-ray Scattering Facility for Nanostructure Characterization and Student Training
This equipment grant was specifically dedicated to the development of a "state of the art" x-ray scattering facility. After a detailed competitive process a rotating anode Bruker AXS instrument was configured and purchased. The final purchase process for this equipment was very detailed and involved lengthy correspondence among Professor Schuller, the researchers in the lab, and Bruker AXS. Due to a variety of technical issues the instrument took much longer to become functional. Fortunately now the instrument is up and operational and producing state of the art data. The availability of this equipment had a major impact on a large number of young students and postdocs and on many DOE funded projects. The very strongly materials based research underway at UCSD could not be pursued without the availability of such an instrument.
Bay Ridge Gardens - Mixed-Humid Affordable Multifamily Housing Deep Energy Retrofit
Under this project, Newport Partners (as part of the BA-PIRC research team) evaluated the installation, measured performance, and cost-effectiveness of efficiency upgrade measures for a tenant-in-place DER at the Bay Ridge multifamily (MF) development in Annapolis, Maryland. The design and construction phase of the Bay Ridge project was completed in August 2012. This report summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete. The Bay Ridge project is comprised of a 'base scope' retrofit which was estimated to achieve a 30%+ savings (relative to pre-retrofit) on 186 apartments, and a 'DER scope' which was estimated to achieve 50% savings (relative to pre-retrofit) on a 12-unit building. The base scope was applied to the entire apartment complex, except for one 12-unit building which underwent the DER scope. A wide range of efficiency measures was applied to pursue this savings target for the DER building, including improvements/replacements of mechanical equipment and distribution systems, appliances, lighting and lighting controls, the building envelope, hot water conservation measures, and resident education. The results of this research build upon the current body of knowledge of multifamily retrofits. Towards this end, the research team has collected and generated data on the selection of measures, their estimated performance, their measured performance, and risk factors and their impact on potential measures.
Results and Preliminary Inferences from Tracer Tests in Smith Ranch Mining Unit 4, Header House 4-6
This report documents results from tracer tests in Smith Ranch Mining Unit 4.
Detonator Bridgewire Gap Tests Using SE-1/31 Detonator Housings with High Surface Area PETN
The purpose of this work is to develop a basis for addressing broken and damaged bridgewires in exploding bridgewire (EBW) detonators and their vulnerability to electrostatic discharge (ESD) sources. Parameters such as gap width, breakdown voltage, charge voltage, and source energy are explored. We are interested in understanding how bridgewire gap length affects the detonator initiability and safety.