Iodine Flowsheet Status Report

A simplified flowsheet was developed to evaluate the impact of varied assumptions of I-129 decontamination factors on the overall I-129 material balance in the Direct Feed Low-Activity Waste (DFLAW) facility. The flowsheet allows inputs for I-129 feed and Decontamination Factors (DFs) for multiple DFLAW unit operations and provides information on I-129 partitioning to output streams. A series of 6 DFs were evaluated, including baseline DFs from a prior Waste Treatment and Immobilization Plant (WTP) study and refined values based on a Savannah River National Laboratory (SRNL) review. The Microsoft Excel flowsheet spreadsheet will be provided to WRPS to allow further evaluation of the impact of DF assumptions on output streams. The spreadsheet is not specific to iodine, the partitioning of any species can be estimated by entering the assumed DFs for each unit operation. Flowsheet outputs matched results from the prior WTP study and show that different assumptions for the DFs can greatly impact iodine partitioning to primary and secondary waste streams. Results from SRNL's baseline DF values suggest less than 50% of I-129 would be retained in glass versus the 96% when using the BNI DF values. In addition, the flowsheet demonstrated that more than 5 DFLAW operational cycles are required to achieve a steady-state of I-129 to the primary waste stream. It is not possible with the data available to determine whether the BNI approach or the approach taken in this study will be a better match for the iodine partitioning once the LAW facility begins operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Continuous Laboratory-Scale Melter Runs for System Evaluation

The Waste Treatment and Immobilization Plant (WTP) will process and stabilize waste that is stored in underground tanks on the Hanford Site. Currently, the first phase of the planned WTP startup and operation, called Direct Feed Low-Activity Waste (DFLAW), involves directly feeding only the liquid portion of the waste to electric melters in the WTP Low-Activity Waste (LAW) Vitrification Facility without full pretreatment. A second portion of the tank waste, called high-level waste (HLW), is set to contain most of the radioactivity inventory.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Crystalline Silicotitanate Storage Study—Post AP-105DF Processing

A Tank-Side Cesium Removal (TSCR) system is under development by Washington River Protection Solutions to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. Tank waste supernate is filtered to remove suspended solids and then Cs is removed by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The Cs-loaded CST columns will be stored indefinitely, with a goal of eventual CST removal and treatment. Thus, the spent CST needs to be recoverable after undetermined storage time. Previous testing with AP-105 simulant showed that rinsing the CST bed with 3 bed volumes (1.4 apparatus volumes [AVs]) of 0.1 M NaOH resulted in a dried bed that maintained flow characteristics indicative of ease of recovery. This study explored the intermediate conditions (between feed dried in place and the 1.4 AVs of 0.1 M NaOH rinse) to evaluate CST bed properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 49H Solids Disturbance Analysis

Tank 49H will serve as the feed tank for the Salt Waste Processing Facility (SWPF). Transfers into Tank 49H may disturb solids that have settled to the bottom of the tank, resulting in feed that may exceed the insoluble solids content limit of 1,200 mg/L from the SWPF Waste Acceptance Criteria (WAC). During a transfer into Tank 49H, material that free falls into Tank 49H through a downcomer and passes through the supernate could potentially disturb the solids on the bottom of the tank and scour or suspend solids from a settled solids layer or turbid region. A previous analysis and report evaluated the potential to disturb solids when transferring into Tank 49H through the B4 riser and recommended a minimum tank level of 120 inches to prevent disturbing any solids in the bottom of the tank. The scope of this task is to perform additional fluid flow analysis to determine the impact of a “plunging jet” through the C3 downcomer on solids in Tank 49H and to determine a minimum liquid level to be maintained in Tank 49H prior to transfers that will minimize disturbing the solids and exceeding the SWPF WAC limits for insoluble solids carryover to SWPF since the C3 riser downcomer is at a lower elevation and farther away from the B5 transfer pump than the B4 downcomer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of High-Cr Glass in Research-Scale Melter

This test report describes the experimental results from a small-scale test using the research-scale melter (RSM) at Pacific Northwest National Laboratory to demonstrate processing of a high-Cr simulated feed stream, designated HLW-HCr-16. The RSM is a small, joule-heated melter capable of processing melter feed continuously. The melter is equipped with Inconel ® 693 electrodes, Monofrax ® K-3 refractory, and an Inconel 690 pour spout. An electric kiln surrounds the melter body and minimizes heat loss from the melter body during operation. The RSM is equipped with an offgas treatment system that employs quenching, wet scrubbing, and high-efficiency mist elimination. The glass-discharge section is heated to facilitate pouring of the glass. The melter is fitted with a melt cavity that is ~25 cm (10 in.) in diameter with a nominal glass depth of 8.9 cm (3.5 in.). The melter was operated with a target glass temperature of 1150°C and target plenum temperature between 550°C and 700°C for this test. The air bubbling rate was 4.2 L/min. Overall, during the continuous operation of the melter for ~ 103 hours, ~ 141 kg of glass was produced. At the conclusion of the test, the melter and exhaust lines were visually inspected for particulate deposition and corrosion. Entrained material had adhered to the underside of the melter lid and to the exhaust piping. Enrichments in elements such as Cl, F, B, K, Li, P, Na, and S were measured in these deposits through inductively coupled plasma–optical emission spectroscopy and X-ray fluorescence analysis. When the melter electrodes and air bubbler tube were removed from the glass in the RSM, the electrodes appeared discolored, but no significant loss of metal was observed. The processing of a high-Cr simulant, HLW-HCr-16, in the RSM produced glass at an average rate of 1.36 kg/h, equaling a melter-surface-area normalized glass generation rate of 654 kg/day/m 2 . The resulting glass met the toxicity characteristic leaching procedure requirement. Test results of crystallinity, electrical conductivity, and viscosity showed good processing properties of this high-Cr high-level waste glass. RSM offgas was also sampled and analyzed at periodic intervals during steady-state operating conditions. The total decontamination factor averaged by four sampling periods was 134. The concentrations of CO and NO x in emissions were 237 to 422 and 69 to 94 parts per million by volume, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-21-24, -25) and Tank 43H (HTF-43-21-26, -27) Samples for Support of the Enrichment Control and Corrosion Control Programs

Feed limits have been established for the 2H-Evaporator system to ensure nuclear criticality is not possible and corrosion is minimized. These limits are protected by the Enrichment Control Program (ECP) and the Corrosion Control Program (CCP) that require periodic sampling and analysis to confirm that the waste supernate composition stays within the limits. Savannah River Remediation (SRR) obtained samples from two different heights within each of the two waste tanks supporting the 2H-Evaporator operations on March 26, 2021. The Tank 38H (evaporator drop tank) and Tank 43H (evaporator feed tank) samples were received by the Savannah River National Laboratory (SRNL) Shielded Cells on March 26, 2021. Analysis of these samples provides information necessary for determining compliance with the ECP and CCP. The sample characterization was requested via a Technical Task Request (TTR) and conducted based on a Task Technical and Quality Assurance Plan (TTQAP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Assessment of the Materials of Construction for the Transfer Lines and Unit Operations Equipment Associated with the Recycle Diversion Process

The Defense Waste Processing Facility (DWPF) processes and vitrifies radioactive waste that it receives from the Concentration, Storage, and Transfer Facility (CSTF) and Salt Waste Processing Facility (SWPF). As a result of the evaporation of water during both the melter feed preparation and the melter feed vitrification steps in DWPF, a recycle waste stream is generated, neutralized, and sent back to the CSTF. The recycle waste is a dilute water stream originating from the collection of condensate liquids containing some minor sludge and frit solids and other waste components primarily resulting from entrainment into the condensate during foam-over events. The recycle stream volume is significant and is expected to approach 3 million gallons per year once the SWPF reaches full operation. Diverting the bulk of the recycle waste stream from the CSTF is essential for the eventual closure of the waste tanks, and hence the completion of the SRS liquid waste mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 49H Solids Disturbance Analysis

Tank 49H will serve as the feed tank for the Salt Waste Processing Facility (SWPF). Transfers into Tank 49H may disturb solids that have settled to the bottom of the tank, resulting in feed that may exceed the insoluble solids content limit of 1,200 mg/L from the SWPF Waste Acceptance Criteria (WAC). During a transfer into Tank 49H, material that free falls into Tank 49H through a downcomer and passes through the supernate could potentially disturb the solids on the bottom of the tank and scour or suspend solids from a settled solids layer or turbid region. A previous analysis and report evaluated the potential to disturb solids when transferring into Tank 49H through the B4 riser and recommended a minimum tank level of 120 inches to prevent disturbing any solids in the bottom of the tank. The scope of this task is to perform additional fluid flow analysis to determine the impact of a “plunging jet” through the C3 downcomer on solids in Tank 49H and to determine a minimum liquid level to be maintained in Tank 49H prior to transfers that will minimize disturbing the solids and exceeding the SWPF WAC limits for insoluble solids carryover to SWPF since the C3 riser downcomer is at a lower elevation and farther away from the B5 transfer pump than the B4 downcomer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Staged OMB for Modular Gasifier/Burner

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0031506. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) has developed a staged opposed multi-burner (OMB) gasifier, scaled down from a commercial gasification technology to utilize coal slurry as feed for the high-temperature gasification. The project involved the design, fabrication, commissioning, parametric testing, and performance validation of the entrained gasifier with multiple burners to narrow the major near-term technical gaps that impede the application of small-size gasification by modularizing the system. Project results verified the UK CAER approach to address the major technical challenges on the gasification modularization for a distributed application at a small scale of 1-5 MWe, while maintaining advantages in cost and flexibility, which include: 1) a cost-effective burner configuration to provide high flexibility in both load and fuel feed; 2) the modularized staged-OMB to provide better gasification performance such as a desired temperature profile, better fuel conversion, better gasification efficiency, and long lifetimes of the refractory wall and burners; and 3) load control simply through changing the number of burners firing. UK CAER’s staged gasifier configuration, fuel blend performance, and economic evaluation shows promise, as summarized in this report, as an effective means for improved gasification efficiency with reduced operation cost and process complexity.

01 COAL, LIGNITE, AND PEAT↗

Production and Performance of High Sulfur Concentration Waste Glasses (FY21)

In FY21 Savannah River National Laboratory (SRNL) was tasked to investigate the practical aspects of low activity waste (LAW) glass production with high sulfur loading for the Office of River Protection (ORP). Relationships between sulfur solubility, retention, and melter resonance need to be evaluated to refine waste loading limits and the super saturated melting (triple melt, grind, and wash) methodology. The impact of high sulfur concentration on durability and phase stability (crystallization and liquid-liquid immiscibility) during slow cooling also needs to be further evaluated. To accomplish this, SRNL proposed scaled melter testing using simulants with matched physicochemical properties to melter feed, as opposed to laboratory reagents. This type of testing is expected to validate applicability to design parameters and functional criteria expected during unit operations. This work was expected to commence in FY21, with the first melter tests being performed near the end of the FY. However, reduced access to Savannah River Site and personnel availability during the COVID-19 pandemic significantly reduced the amount of time and resources available to perform the task. This report documents the experimental plan and progress towards this task. The following is a summarized list of scheduled testing that will be performed on feed, condensate, cold cap and glass: 1) Melter runs; 2) Product consistency test (PCT); 3) Inductively coupled plasma optical emission spectroscopy (ICP-OES); and 4) Optical (OM) and scanning electron microscopy (SEM).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Temperature Effect of Cesium Exchange onto Crystalline Silicotitanate in AP-107 and AP-105 Hanford Tank Wastes and Two Simulants

Washington River Protection Solutions, LLC (WRPS) is charged with the development of the Tank Side Cesium Removal (TSCR) system to process Hanford tank waste supernates in preparation for vitrification. In addition to a filtration step, TSCR will remove cesium (Cs) using ion exchange columns filled with crystalline silicotitanate (CST) ion exchange media. CST is produced by Honeywell UOP, LLC. The documented safety analysis (DSA) developed for the TSCR system limits a single column loading to 141,600 Ci 137 Cs. Given a 137 Cs isotopic mass fraction of 20% and the planned CST bed size of 596 L (157.5 gal) in a TSCR column, this equates to 0.10 mmole Cs per g CST (Cs distribution coefficient, K d , 1400 mL/g). Factors that influence Cs uptake by CST include (but are not limited to) (1) CST production (lot-to-lot variations), (2) contact temperature, (3) contact duration, (4) competitors in the tank waste feed, (5) anionic composition of the tank waste feed, and (6) the 137 Cs isotopic mass fraction (differs slightly among tank wastes and decreases with time).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Experimental Decontamination Factors (DF) of Iodine in the Pilot-Scale Law Melter Off-Gas Systems

The Low Activity Waste (LAW) melters at the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will convert low-activity tank wastes containing high concentrations of sodium salts into glass for onsite disposal. Much of the airborne particulates during the calcination/fusion of the feed solids will be removed by condensation and scrubbing of the melter exhaust in the Submerged Bed Scrubber (SBS) and Wet Electrostatic Precipitator (WESP)of the primary off-gas treatment system. The gases exiting the WESP enter a secondary off-gas treatment system, which includes a High-Efficiency Particulate Air (HEPA) filter, an activated carbon absorber, a Thermal Catalytic Oxidizer (TCO), a Selective Catalytic Reduction (SCR) unit, a caustic scrubber, and an exhauster. Much of the volatile organics and NOx will be removed in the TCO and SCR, respectively. Under WTP Direct Feed LAW (DFLAW) configuration, the liquid effluents from the SBS and WESP will be collected and evaporated under vacuum with the evaporator concentrate recycled back to the LAW melter, while the evaporator condensate will be merged with the caustic scrubber solution and sent to the Effluent Treatment Facility (ETF).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Extraction, Recovery and Upgrading of Rare Earth Elements from Coal-Based Resources (Final Report)

The overall objective of this project is to produce a rare earth elements product with greater than 8% rare earth elements from coal-based resources using an economically viable and environmentally benign processing methodology. The objective of the coal processing work will be to acquire appropriate coal feed and produce a viable clean coal product, a concentrated REE feed stream, and a pyrite stream (where available) that can be used to enhance leaching. The objective of the bio-oxidation portion of the project is to utilize bacteria to oxidize sulfide minerals and ferrous ions to ferric ions to accelerate leaching and remove the sulfides to prevent future acid mine drainage and related liabilities. The objective of the solution conditioning work is to remove iron and control leaching solution conditions to facilitate extraction of REEs without significant thorium extraction. The objective of the column leaching work is to engineer/model and simulate heap leaching to demonstrate low-cost extraction of REEs from coal-based resources. The objective of the solvent extraction work is to selectively extract and recover through controlled stripping of REEs that are solubilized through leaching. The objective of the precipitation portion of the project is to recover the REEs from the solvent extraction stripping solutions and dry them to achieve the final product of rare earth elements that is > 8 % REEs. The objective of the technical, economic, and environmental analysis is to determine the overall viability of the processing approach that is demonstrated in this project

01 COAL, LIGNITE, AND PEAT↗

Operation Teapot

As part of Operation Teapot, reporter Joan Collin came to the Nevada Test Site in early May 1955 to narrate a Federal Civil Defense Administration motion picture film on the explosive and radioactive effects of a nuclear detonation on food supplies, houses, communication systems, and energy sources. After watching efforts to feed the many people involved in test site activities, Collin asked the question of how to mass feed people after a nuclear attack. She was one of the few persons perceptive enough to recognize the significance of this issue.

99 GENERAL AND MISCELLANEOUS↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

FY2021 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Testing of Selected Process Models

Sandia National Laboratories continued evaluation of the total system performance assessment (TSPA) for License Application (LA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. The FY21 task included continued operation of the cluster; maintenance of the TSPA-LA models (with GoldSim 9.60.300); continued assessment of the status of the Infiltration Model; (a process model that feeds the TSP -LA) and preliminary assessments of the Unsaturated Zone Flow Model and the Saturated Zone Flow and Transport Model Abstraction (process models that feed the TSPA-LA). The 2014 cluster and supporting software systems are currently fully operational to support TSPA-LA type analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Injection Dynamics and Composition Effects on RDE Performance

Rotating detonation engines (RDEs) provide a promising route to substantially increasing cycle efficiency in stationary gas turbines. Much of this increase relies on the ability to achieve consistent pressure gain within the combustor. In particular, the design of injectors that feed fuel and air into the detonation channel plays a crucial role. Such injectors have to ensure proper mixing of fuel and oxidizer, while minimizing backflow of detonation products into the feed plenums, and reduce susceptibility to the complex wave structures that exist within the combustor. From a practical perspective, such RDEs also need to operate with variable fuel composition. When fuel mixtures with components that possess vastly different oxidation pathways and time-scales are used, there could be additional losses through deflagrative burning instead of detonation-driven heat release. Such sensitivity to the complete flow path is akin to the physics of thermoacoustic instabilities in conventional gas turbines. In this sense, RDEs pose a unique research challenge: the performance of the device relies on the small-scale heat release process, which is highly dependent on the flow interactions within the full-scale system. As a result, canonical flow configurations, instrumented with detailed diagnostics or modeled using high-fidelity tools, but only focus on the small-scale processes will not contain the key system-level interactions. At the same time, macroscopic measurements and models that only capture system-level performance will not provide insight into the key sources of pressure losses. These couplings and sensitivities provide a formidable challenge to both experimental and simulation studies of the effects Thus, a joint experimental/computational program designed specifically to address these challenges was undertaken in this program. The focus of this program was on two key topics: a) the interaction between injector flow and the overall wave dynamics within the combustor, and b) the deflagration/detonation structure in multi-component fuels that are of practical interest. Both topics involve interaction of small-scale heat release processes with the geometry-dependent wave structure. Studies focused on the study of full-scale RDE systems, based on a 6-inch conventional annular geometry. Experimentally RDEs were studied using a combination of diagnostics. A combination of optical diagnostics and aero-thermo-acoustic analysis based on a combination of spectral and mode decomposition analysis was used to identify the dynamics of the detonation wave and other secondary waves that exist in the system. These studies have helped the identification and investigation of injector and detonation dynamics arising from coupling, and how they affect RDE mixing, detonation structure, operability and performance. Performance of RDEs was investigated through thrust stand measurements, which was used to evaluate the effective pressure gain generated by the system through the concept of equivalent available pressure. Optical diagnostics were developed and implemented to investigate the distribution of heat release, across the detonation wave. Novel optical diagnostics of NIR imaging was also developed and applied to investigate the high temperature / high pressure distribution across the detonation wave. In order to complement the experiments, the computational tools were geared to simulate the full experimental setup. GPU-based acceleration of the models and computations were developed to enable rapid simulation of the full system. In addition, the use of adaptive mesh refinement, and unstructured grid formulation, enabled the investigation of realistic geometries studied in the laboratory. The simulations produced a wealth of detail on the structure of the detonation wave under different operating conditions. Emphasis was placed on quantifying mixture pre-burning and the impact on wave propagation and structure.

03 NATURAL GAS↗

Controls Optimization Final Report, Controls Algorithms Report, Control Optimization - SPA II: Heaving Buoy Test Results [Three reports]

The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be considered as an integral part of every stage of device development. Using a building-blocks approach to optimal controls development, this effort will result in the full development of a feed-forward and feed-back control approach and a wave prediction system. Phase I focused primarily on numerical offline optimization and validation using wave tank testing of three industry partners’ WEC devices, including; CalWave, Ocean Energy, and Resolute Marine Energy. These industry partnerships allowed us to identify optimal control strategies for these different WEC topologies at different maturity levels. Phase II focused on demonstrating an integrated control system on an at-sea prototype that is to be custom-built and maturing the HW and SW required to successfully run our advanced controls code frameworks on at-sea systems. A secondary focus during phase II is to adapt our systems identification, controls and wave-prediction frameworks to become more robust and comprehensive in respect to RT capability, robustness, and reliability.

16 TIDAL AND WAVE POWER↗