Photovoltaic Inverter Momentary Cessation: Recovery Process is Key

Momentary cessation refers to an inverter control mode. When the inverter terminal voltage falls below (or exceeds) a certain level, the inverter ceases to output any current, but attempts to maintain (or quickly regain) phase-locked loop synchronization to allow for quick reinjection of current when the voltage recovers to a certain point. This paper presents a photovoltaic (PV) momentary cessation model developed in PSS/E. Simulations are presented for a high voltage transmission line fault contingency in the Hawaiian island of Oahu power system on a validated PSS/E model, modified to include a custom distributed PV inverter model, and different near-future distributed PV penetration levels. Simulations for the island power system include different penetration levels of PV, and different recovery times (ramp rates and delays) after momentary cessation. The results indicate that during low voltage events, such as faults, momentary cessation can produce severe under frequency events, causing significant load shed and shortly thereafter, in some cases, over frequency events that cause generation to trip offline. The problem is exacerbated with higher penetration levels of PV. If momentary cessation is used (as is typically the case for distribution-connected resources), the recovery process after momentary cessation should be carefully considered to minimize impacts to bulk power system stability.

14 SOLAR ENERGY↗

Data efficiency assessment of generative adversarial networks in energy applications

This study investigates the data requirements of generative artificial intelligence (AI), particularly generative adversarial networks (GANs), for reliable data augmentation in energy applications. Generative AI, though seen as a solution to data limitations, requires substantial data to learn meaningful distributions—a challenge often overlooked. This study addresses the challenge through synthetic data generation for critical heat flux (CHF) and power grid demand, focusing on renewable and nuclear energy. Two variants of GAN employed are conditional GAN (cGAN) and Wasserstein GAN (wGAN). Our findings include the strong dependency of GAN on data size, with performance declining on smaller datasets and varying performance when generalizing to unseen experiments. Mass flux and heated length significantly influence CHF predictions. wGAN is more robust to feature exclusion, making it suitable for constrained synthetic data generation. In energy demand forecasting, wGAN performed well for solar, wind, and load predictions. Longer lookback hours and larger datasets improved predictions, especially for load power. Seasonal variations posed challenges, with wGAN achieving a relatively high error of Root Mean Squared Error (RMSE) of 0.32 for load power prediction, compared to RMSE of 0.07 under same-season conditions. Feature exclusions impacted cGAN the most, while wGAN showed greater robustness. This study concludes that, while generative AI is effective for data augmentation, it requires substantial data and careful training to generate realistic synthetic data and generalize to new experiments in engineering applications.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Life Cycle Emissions Factors for Electricity Generation Technologies

This dataset consists of a table containing the distribution of literature estimates of greenhouse gas emissions for the following electricity generation and storage technologies: biopower, coal, concentrating solar power, geothermal, hydrogen storage, hydropower, lithium-ion battery storage, natural gas, nuclear, ocean, oil, photovoltaic, pumped-storage hydropower, and wind. Quartile estimates of life cycle emissions factors in units of grams of carbon dioxide equivalent per kilowatt hour of generation (g CO2e/kWh) are provided for the following life cycle stages: one-time upstream, ongoing combustion, ongoing non-combustion, one-time downstream, and total. Literature estimates were compiled by the LCA Harmonization study and subsequent updates, as detailed in the factsheet which accompanies this dataset, https://www.nlr.gov/docs/fy21osti/80580.pdf .

01 COAL, LIGNITE, AND PEAT↗

Distributed Solar Quality and Safety in India: Key Challenges and Potential Solutions

The quality and safety of solar systems and their installation has become a concern for investors, regulators, consumers, and Discoms in India. The push for low prices and lack of quality standards are driving project developers to install low quality products, with poor system design and execution on-site. Existing literature and stakeholder interviews point to the rampant use of low quality, sub-standard solar products in India. These products deliver less energy than expected, or have high detrition rates, or have lower product life–all of which are serious issues for developers whose return on investment depend on the amount of power generation from these solar systems for the expected life of the project. Equipment which does not conform to the minimum quality standards also creates safety risks for the distribution network. Performance and safety concerns lower investor and consumer confidence in solar products with the potential to threaten market development. This report formulates a set of recommendations to concerned authorities in India to improve the quality and safety of rooftop solar systems. Primary and secondary sources are employed to understand the current solar quality and safety scenario in India to provide the basis for future recommendations. An overview of international experiences and lessons learned on solar quality and safety issues is also conducted to understand potential solutions for India.

24 POWER TRANSMISSION AND DISTRIBUTION↗

REopt/Microgrid Analysis (CRADA Final Report)

NREL is the only DOE national laboratory solely dedicated to advancing energy efficiency (EE) and renewable energy (RE) technologies and applications. Since its inception, NREL has supported both the public and the private sectors in implementing EE and RE systems and strategies to lower energy use and to meet remaining energy needs with resources having minimal environmental impact. NREL is now a sought-after resource for EE, RE, and energy systems integration expertise. CU Boulder is a public university located in Boulder, Colorado, with over 30,000 students. CU is committed to environmental sustainability and is interested in partnering with NREL to explore opportunities for RE on campus and evaluate an RE microgrid. The goal of this project is to assess the technical and economic potential for RE generation at CU and evaluate how RE may be incorporated as part of a microgrid to increase energy resiliency on campus.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Distributed Solar Photovoltaic Deployment via Barrier Mitigation or Removal in the Western Interconnection (Final Technical Report)

In 2017, the Western Electricity Coordinating Council (WECC) 2026 Common Case projected that distributed solar PV deployment in the Western U.S. would meet or exceed 16,106 MW of installed capacity by 2026. Of this total, 12,218 MW was projected to be deployed in California and another 3,888 MW was projected to be deployed across Arizona, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. However, WIEB recognized that barriers to distributed solar PV deployment could cause the region to fall short of these projections. WIEB identified three types of perceived barriers that might interfere with the deployment of distributed solar PV generation in the West, including: (1) interconnection barriers; (2) utility rate-design barriers; and (3) reliability barriers.

14 SOLAR ENERGY↗

Solar Radiation Research Laboratory (SRRL) Core Project Final Report: Fiscal Years 2022-2024

The Solar Radiation Research Laboratory (SRRL) at the National Laboratory of the Rockies (NLR) is a world-leading solar calibration and measurement facility and maintains and disseminates the World Radiation Reference (essentially the W/m2) for the United States that is essential for traceable and accurate measurements of solar radiation at all solar generation facilities. SRRL operates two calibration facilities that meet International Standards Organization-17025 (ISO-17025) standards and provide unique high-quality calibrations to NREL and other U.S. Department of Energy laboratories. The Baseline Measurement System (BMS) at SRRL provides a high-quality record of solar irradiance and surface meteorological conditions. SRRL capabilities are used to develop (1) improved methods for the calibration of solar radiometers; (2) new standards through the ISO, the International Electrotechnical Commission (IEC), and the American Standards for Testing of Materials (ASTM) International; (c) solar radiation and meteorological models; and (d) advanced instrumentation and methods for operating solar measurement stations. The SRRL datasets are also critical for the validation of new models and datasets, such as the National Solar Radiation Database (NSRDB). The research and development of solar radiation measurement systems and resource modeling techniques are essential for advancing the scientific basis for producing reliable resource data. Specifically, the spatial, temporal, and spectral (wavelength dependency) characteristics of the solar resource are required in several different time frames for various project phases.

14 SOLAR ENERGY↗

Performance Evaluation of Next-Generation Grid Automation and Controls with High PV Penetration

This paper presents a hardware-in-the-loop (BIL) simulation to evaluate the performance of an advanced grid automation architecture, referred to as data-enhanced hierarchical control (DEHC), in achieving voltage regulation and conservation voltage reduction (CVR) in distribution networks with very high photovoltaic (PV) generation. This architecture comprises an advanced distribution management system (ADMS), a distributed energy resource management system (DERMS), and grid-edge devices working synergistically to provide the grid benefits. The HIL setup used for the evaluation includes ADMS, DERMS, and grid-edge devices. The DEHC performance is evaluated in two representative scenarios considering loose and tight constraints of the power factor at the substation. The results show that the DEHC architecture is effective in achieving voltage regulation and CVR and thus enables the grid integration of high levels of PV generation.

ADMS↗

Distributed Intrusion Detection System using Semantic-based Rules for SCADA in Smart Grid

Cyber-physical system (CPS) security for the smart grid enables secure communication for the SCADA and wide-area measurement system data. Power utilities world-wide use various SCADA protocols, namely DNP3, Modbus, and IEC 61850, for the data exchanges across substation field devices, remote terminal units (RTUs), and control center applications. Adversaries may exploit compromised SCADA protocols for the reconnaissance, data exfiltration, vulnerability assessment, and injection of stealthy cyberattacks to affect power system operation. In this paper, we propose an efficient algorithm to generate robust rule sets. We integrate the rule sets into an intrusion detection system (IDS), which continuously monitors the DNP3 data traffic at a substation network and detects intrusions and anomalies in real-time. To enable CPS-aware wide-area situational awareness, we integrated the methodology into an open-source distributed-IDS (D-IDS) framework. The D-IDS facilitates central monitoring of the detected anomalies from the geographically distributed substations and to the control center. The proposed algorithm provides an optimal solution to detect network intrusions and abnormal behavior. Different types of IDS rules based on packet payload, packet flow, and time threshold are generated. Further, IDS testing and evaluation is performed with a set of rules in different sequences. The detection time is measured for different IDS rules, and the results are plotted. All the experiments are conducted at Power Cyber Lab, Iowa State University, for multiple power grid models. After successful testing and evaluation, knowledge and implementation are transferred to field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Response of Distributed Energy Resources Considering the Requirements of IEEE 1547-2018

Inverter-based DER responses to faults on the electric power system are different than those of conventional generators and are often poorly understood. Inverter fault responses are largely software-defined, within physics-based constraints. DERs are regulated by standards and grid codes that also constrain their responses. Though fault response of DERs will vary widely, for any DER following any particular standard, a pattern of fault response can be synthesized by observing that particular standard. In this paper, the recently published IEEE 1547-2018 is examined to explore the general fault response of any DER that follows IEEE 1547-2018. Additionally, an IEEE 1547-2018 compliant inverter model is developed and tested in simulation to find the fault response, and that response is compared with the fault response of a commercial off-the-shelf inverter.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Fault Response of Distributed Energy Resources Considering the Requirements of IEEE 1547-2018

Inverter-based DER responses to faults on the electric power system are different than those of conventional generators and are often poorly understood. Inverter fault responses are largely software-defined, within physics-based constraints. DERs are regulated by standards and grid codes that also constrain their responses. Though fault response of DERs will vary widely, for any DER following any particular standard, a pattern of fault response can be synthesized by observing that particular standard. In this paper, the recently published IEEE 1547-2018 is examined to explore the general fault response of any DER that follows IEEE 1547-2018. Additionally, an IEEE 1547-2018 compliant inverter model is developed and tested in simulation to find the fault response, and that response is compared with the fault response of a commercial off-the-shelf inverter.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Nonlinear Virtual Inertia Control of WTGs for Enhancing Primary Frequency Response and Suppressing Drivetrain Torsional Oscillations

Virtual inertia controllers (VICs) for wind turbine generators (WTGs) have been recently developed to compensate the reduction of inertia in power systems. However, VICs can induce drivetrain torsional oscillations of WTGs. This paper addresses this issue and develops a novel nonlinear VIC based on objective holographic feedback theory and the definition of a completely controllable system of Brunovsky type. Simulation results under various scenarios demonstrate that the proposed technique outperforms existing VICs in terms of enhancement of system frequency nadir, suppression of WTG drivetrain torsional oscillations, fast and smooth recovery of WTG rotor speed to the original maximum power point (MPP) before the disturbance as well as preventing secondary frequency dip caused by traditional VIC. The proposed technique is also able to adaptively coordinate multiple WTGs to enhance the frequency support and the dynamic performance of each WTG.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Communication Network Layer State Estimation Measurement Model for a Cyber-Secure Smart Grid

Network communication has been proven to be a very important tool and a key factor in the recent development and progress of the power grid operation. It is also considered as the foundation for the smart grid because information and communication are integrated into electricity distribution to achieve reliable and accurate knowledge of the power grid. In previous years, absorbing energy from substations and delivering it to customers was the only type of interaction we knew between utility companies and customers. Presently, the growing connections of small distributed generation units caused by the cost reduction of most of the technologies used in generation and storage of electrical energy, along with the potential benefits of renewable energy have pushed many researchers to look into the improvement of information and communication technologies (ICT) in order to ensure a bidirectional flow of power and data. Moreover, the evolution of information and communication technologies and its applications to smart grid have converted the smart grid into a cyber-physical system where vulnerabilities and additional security challenges such as cyber-threats and cyber-attacks have emerged. Previously, we have demonstrated that using machine learning-based processing on data gathered from communication networks and the power grid was a promising solution for detecting cyber threats by implementing a co-simulation of cyber-security for cross-layer strategy. Since the majority of the challenges observed can only be solved in the network communication layer, we present in this work a physics-based state estimation model of the communication network system towards enhanced cyber-physical security of the smart grid. Information integration with the previously developed machine learning model is developed, providing a enhanced cyber-physical security application for the smart grid. Easy-to-implement model, without hard-to-derive parameters, highlight potential aspects of the model for real-life applications.

Mathieu, Reynold↗

Stochastic pre-event preparation for enhancing resilience of distribution systems

Extreme weather events are the common causes for power supply interruptions and power outages in electrical distribution systems. Improving the distribution system and enhancing its resilience is becoming crucial due to the increased frequency of extreme weather events. Preparation and allocation of multiple flexible resources, such as mobile resources, fuel resources, and labor resources before extreme weather events can mitigate the effects of extreme weather events and enhance the resilience of power distribution systems. Here, in this paper, a two-stage stochastic mixed-integer linear programming (SMILP) is proposed to optimize the preparation and resource allocation process for upcoming extreme weather events, which leads to faster and more efficient post-event restoration. The objective of the proposed two-stage SMILP is to maximize the served load and minimize the operating cost of flexible resources. The first stage in the optimization problem selects the amounts and locations of different resources. The second stage considers the operational constraints of the distribution system and repair crew scheduling constraints. The proposed stochastic pre-event preparation model is solved by a scenario decomposition method, Progressive Hedging (PH), to ease the computational complexity introduced by a large number of scenarios. Furthermore, to show the impact of solar photovoltaic (PV) generation on system resilience, three types of PV systems are considered during a power outage and the resilience improvements with different PV penetration levels are compared. Numerical results from simulations on a large-scale (more than 10,000 nodes) distribution feeder have been used to validate the effectiveness and scalability of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Small-Signal Stability Conditions for Inverter-Based Unbalanced Microgrids

The proliferation of inverter-based generation and advanced sensing, controls, and communication infrastructure have facilitated accelerated deployment of microgrids. A coordinated network of microgrids can maintain reliable power delivery to critical facilities during extreme events. Low-inertia offered by the power-electronics–interfaced energy resources, however, can present significant challenges to ensuring stable operation of the microgrids. In this work, distributed small-signal stability conditions for inverter-based microgrids are developed that involve the droop-controller parameters and the network parameters (e.g. line impedances, loads). The distributed closed-form parametric stability conditions derived in this paper can be verified in a computationally efficient manner, facilitating reliable design and operations of networks of microgrids. Dynamic phasor models have been used to capture the effects of electromagnetic transients. Furthermore, numerical results are presented, along with PSCAD simulations, to validate the analytical stability conditions. Effects of design choices, such as the conductor types, and inverter sizes, on the small-signal stability of inverter-based microgrids are investigated to derive useful engineering insights.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Long-Term Planning for the Tamil Nadu Power System

Increased deployment of wind and solar raises new questions for power system planners regarding the future mix of generation technologies, optimal siting of generation capacity, trade-offs between generation and transmission investments, and system flexibility needs. The National Renewable Energy Laboratory (NREL) is working with Tamil Nadu Generation and Distribution Company (TANGEDCO) to answer the following questions: How much—and what type—of generation and transmission investments are needed to serve future demand at least cost? How can variable resources such as wind and solar be considered in the planning process? What are the key drivers (e.g., policies, technology costs, fuel constraints) for investments?

Children's Investment Fund Foundation↗

Electro-mechanical Modeling of Wind Turbine and Energy Storage Systems with Enhanced Inertial Response

In this paper, a coordinated control scheme for wind turbine generator (WTG) and supercapacitor energy storage system (ESS) is proposed for temporary frequency supports. Inertial control is designed by using generator torque limit considering the security of WTG system, while ESS releases its energy to compensate the sudden active power deficit during the recovery process of turbine rotor. WTG is modeled using the fatigue, aerodynamic, structure, turbulence (FAST) code, which identifies the mechanical loadings of the turbine and addresses electro-mechanical interactions in the wind energy system. A damping controller is augmented to the inertial control to suppress severe mechanical oscillations in the shaft and tower of the turbine during frequency supports. Furthermore, the result of small-signal stability analysis shows that the WTG-ESS tends to improve the stability of the whole multi-energy power grid. The major contributions of this paper will be validated by utilizing the proposed control method that combines the grid support capability and maintaining the integrity of structural design of the turbine for normal operations.

17 WIND ENERGY↗