Summary of Factory Fueling and Testing Risks to Support the Transformation of Regulatory Requirements for Microreactors
Microreactors have the potential to open new markets and applications for nuclear energy. New manufacturing and operational regimes, such as factory fueling and testing prior to site installation, are being proposed to meet these new markets. The radiological hazards associated with traditional commercial power reactors are not the same as the hazards of a reactor being constructed in a factory. Currently, a reactor operating license specified under 10 CFR Part 50, Part 52, or (in the near future) Part 53 is required prior to loading fuel in the reactor. This is logical for plants that are immediately to begin full-power operations soon after fuel loading. However, for microreactors, this may not be the case. Some deployment concepts may stage reactors as “ready to go” in a factory prior to site installation and startup. This approach is being considered in the case of diesel generator replacements, mobile or roaming mining operations, and emergency response situations, such as after a major disaster event. Therefore, it is necessary to evaluate hazards assuming low power operation for a short irradiation time. This report investigates the primary hazards unique to microreactors associated with low power reactor and physics tests necessary to confirm core safety assumptions, neutronic and core design performance parameters, and other assumptions.