Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEEP SPACE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

The successful conclusion of the Deep Space 1 Mission: important results without a flashy title

In September 2001, Deep Space 1 (DS1) completed a high-risk and flawless encounter with comet 19P/Borrelly. Its data provide a detailed view of this comet and offere surprising and exciting insights. With this successful conclusion of its extended mission, DS1 undertook a hyperextended mission. Following this period of extremely agressive testing, with no further technology or science objectives, the mission was terminated on December 18, 2001, with the powering off of the spacecraft's trnasmitter, although the receiver was left on. By the end of its mission, DS1 had returned a wealth of important science data and engineering data for future missions.

Deep Space 1 DS1 comets SEP solar electric propuls↗

A Plasma Aerocapture and Entry System for Manned Missions and Planetary Deep Space Orbiters

A rapid mission to Mars requires a large change in vehicle velocity upon arrival to establish a stable orbit. This demand is even greater for a Neptune science, requiring many kilometers per second of V. It is clear from past mission studies that a manned Mars mission and deep space planetary orbiters require aerobraking and aerocapture which use aerodynamic drag forces to slow the spacecraft. Aerocapture would enable long term studies of the outer planets and moons that would not be possible with existing braking methodologies. While the ability to utilize these atmospheres to slow down and capture spacecraft would dramatically reduce the cost, launch mass, and travel time, currently planned approaches require significant additional spacecraft mass and risk as the spacecraft must descend deep into the planetary atmosphere in order to produce significant drag on a relatively small aeroshell. The plasma based Magnetoshell being developed in this program holds the potential to perform the desired braking with significantly increased drag and control while dramatically reducing mass. Most importantly, this technology significantly lowers the risk involved with aerocapture thereby making manned planetary missions possible. The fundamental physics of the Magnetoshell is based on demonstrated experimental results. Successful implementation will dramatically decrease radiation exposures, mission risk, launch cost, and launch mass. Implementation of aerobraking by employing a solid deflector or aeroshell as a method for orbit insertion and circularization has been successfully demonstrated in the past, resulting in launch mass savings greater than 50%. In order to reduce the effect of frictional heating and dynamic pressure on the typically fragile aeroshell, or worse solar panels, the braking must be distributed over many orbital passes at a high altitude in the less dense regions of the atmosphere. It can thus take several months for a meter-scale, 1000 kg, aeroshell to execute the many elliptic orbital passes through the atmosphere to achieve the required V. This rather slow method of braking not only reduces frictional heating and dynamic forces, but also avoids unpredictable dynamic behavior due to turbulence, as well as unknown and seasonally variable atmospheric composition and temperature which has led to dangerous, mission-critical events. For exploration class missions such as DRA 5.0 aerocapture and Thermal Protection Systems (TPS) are proposed for breaking at Mars for cargo missions. Traditional aerocapture is considered too risky for manned missions. Even with the enormous mass savings that aerocapture allows, it still requires 80 tons of aeroshell and significantly increased launch mass and propellant. As will be shown, by using Magnetoshells for aerobraking, the DRA 5.0 mission will save 224 metric tons (MT) and greater than $2 B in launch costs. Beyond the dramatic savings for existing mission architectures, a low-mass, risk-free aerocapture system would allow much more rapid missions to Mars and deep space orbiters by allowing direct, faster trajectories. As will be shown, the plasma Magnetoshell Aerobraking, Aerocapture, and Entry System (AAES) not only reduces mass and cost while enabling significant new mission architectures, but also significantly reduces radiation exposures by decreasing trip times.

Manned Missions↗

The orbiting deep space relay station - A study report

This paper is an interim report on a study being carried out to assess the requirements for tracking and communications with deep-space probes in the post-1985 time frame and to evaluate approaches to meeting those requirements. The orbiting deep-space relay station (ODSRS) is one approach to meeting those requirements that appears to have some significant advantages over ground-based stations. A detailed conceptual design of an ODSRS is compared with other tracking and communications system configuration options. The comparison includes a life-cycle cost analysis as well as operations and performance capabilities. Reported results of the study to date include a preliminary assessment of post-1985 requirements, a discussion of planned ODSRS system capabilities as well as of tracking and communications system advantages and problems that are peculiar to an OSDRS, a look at the current status of the conceptual design of the ODSRS, and a summary of the plan for the remainder of the study.

Hunter, J. A.↗

Ion Thruster Used to Propel the Deep Space 1 Spacecraft to Comet Encounters

The NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) Project provided a xenon ion propulsion system to the Deep Space 1 (DS1) spacecraft to validate the propulsion system as well as perform primary propulsion for asteroid and comet encounters. The On-Board Propulsion Branch of the NASA Glenn Research Center at Lewis Field developed engineering model versions of the 30-cm-diameter ion thruster and the 2.5-kW power processor unit (PPU). Glenn then transferred the thruster and PPU technologies to Hughes Electron Dynamics and managed the contract, which supplied two flight sets of thrusters and PPU s to the Deep Space 1 spacecraft and to a ground-based life verification test at the Jet Propulsion Laboratory (JPL). In addition to managing the DS1 spacecraft development, JPL was responsible for the NSTAR Project management, thruster life tests, the feed system, diagnostics, and propulsion subsystem integration. The ion propulsion development team included NASA Glenn, JPL, Hughes Electronics, Moog Inc., and Spectrum Astro Inc. The overall NSTAR subsystem dry mass, including thruster, PPU, controller, cables, and the xenon storage and feed system, is 48 kg. The mass of the xenon stored onboard DS1 was about 81 kg, and the spacecraft wet mass was approximately 500 kg.The DS1 spacecraft was launched on October 24, 1998, and on July 29, 1999, it flew within 16 miles of the small asteroid Braille (formerly 1992KD) at a relative speed of 35,000 mph. As of November 1999, the ion propulsion system had performed flawlessly for nearly 149 days of thrusting. NASA has approved an extension to the mission, which will allow DS1 to continue thrusting to encounters with two comets in 2001. The DS1 optical and plasma diagnostic instruments will be used to investigate the comet and space environments. The spacecraft is scheduled to fly past the dormant comet Wilson- Harrington in January 2001 and the very active comet Borrelly in September 2001, at which time approximately 500 days of ion engine thrusting will have been completed.

Sovey, James S.↗

Development of realtime connected element interferometry at the Goldstone Deep Space Communications Complex

Connected-element interferometry (CEI) has the potential to provide high-accuracy angular spacecraft tracking on short baselines by making use of the very precise phase delay observable. Within the Goldstone Deep Space Communications Complex (DSCC), one of three tracking complexes in the NASA Deep Space Network, baselines of up to 21 km in length are available. Analysis of data from a series of short-baseline phase-delay interferometry experiments are presented to demonstrate the potential tracking accuracy on these baselines. Repeated differential observations of pairs of angularly close extragalactic radio sources were made to simulate differential spacecraft-quasar measurements. Fiber-optic data links and a correlation processor are currently being developed and installed at Goldstone for a demonstration of real-time CEI in 1990.

Edwards, C. D.↗

Enabling Science and Deep Space Exploration through Space Launch System (LSL) Secondary Payload Opportunities

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). By reaching this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. NASA is making investments to expand science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1), currently planned for launch no earlier than July 2018, will be the first mission to carry such payloads on the SLS. The EM-1 launch will include thirteen 6U Cubesat small satellites that will be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Gateway Program Safety and Mission Assurance Integration - The Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther from Earth, spacecraft designs must optimize mass and volume while minimizing human and spacecraft risk. To accomplish this, the Gateway Program Safety and Mission Assurance (S&MA) office develops, implements, and ensures compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability, and quality assurance. This paper will detail the evolution of the Gateway Program S&MA integration functions, and provide its current status and lessons learned for future human spaceflight programs.

Helen Vaccaro↗

GOPEX - A deep-space optical communications demonstration with the Galileo spacecraft

The Galileo Optical communications from an Earth-based Xmtr (GOPEX) demonstration is designed to exhibit deep-space optical communications using the Galileo spacecraft. The optical transmitter consists of a Nd:YAG laser coupled to a 24-in. telescope at the Table Mountain Observatory (TMO), and the receiver is the Solid-State Imaging camera on board Galileo. The objectives of the demonstration are to understand the issues involved in blind-pointing to a spacecraft in deep space, and to assess the quality of the optical uplink by comparing the experimental results with theoretical predictions. The demonstration is proposed for December 1992 during the second earth-flyby period of Galileo's trajectory.

Wilson, Keith E.↗

Ion Thruster and Power Processor Developed for the Deep Space 1 Mission

The NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) Program has provided a single-string primary propulsion system to NASA's Deep Space 1 spacecraft. This spacecraft will carry about 81 kg of xenon propellant for the ion thruster, which can be throttled down from 2.3 to 0.5 kW as the spacecraft moves away from the Sun. The propellant load will provide about 20 months of propulsion at the one-half power throttle setpoint of 1.2 kW. This mission will validate the 2.5-kW ion propulsion system and will fly by the asteroid 1992 KD in 1999. If funding permits, Deep Space 1 also will encounter comets Wilson-Harrington and Borrelly in 2001. NASA Lewis Research Center's On-Board Propulsion Branch was responsible for the development of the 30-cm-diameter ion thruster, the 2.5-kW power processor unit (PPU), and the Digital Control and Interface Unit (DCIU) that controls the PPU/thruster/feed system and provides data and recovery from fault conditions. Lewis transferred the thruster and PPU technologies to the Hughes Electron Dynamics Division, which was selected to build two sets of flight thrusters, as well as the PPU's and DCIU's. Hughes subcontracted the DCIU development to Spectrum Astro Incorporated. The Jet Propulsion Laboratory (JPL) was primarily responsible for the NSTAR project management, thruster lifetests, the feed system, diagnostics, and the propulsion subsystem integration. A total of four engineering model thrusters and three breadboard PPU's were built, integrated, and tested. More than 50 development tests were conducted along with thruster design verification tests of 2000 and 1000 hours. In addition, an 8000-hr life demonstration test was successfully completed and demonstrated wear-rates consistent with full-power lifetimes in excess of 12,000 hours.

Sovey, James S.↗

Detection Performance of Upgraded "Polished Panel" Optical Receiver Concept on the Deep-Space Network's 34 Meter Research Antenna

The development and demonstration of a "polished panel" optical receiver concept on the 34 meter research antenna of the Deep Space Network (DSN) has been the subject of recent papers. This concept would enable simultaneous reception of optical and microwave signals by retaining the original shape of the main reflector for microwave reception, but with the aluminum panels polished to high reflectivity to enable focusing of optical signal energy as well. A test setup has been installed on the DSN's 34 meter research antenna at Deep Space Station 13 (DSS-13) of NASA's Goldstone Communications Complex in California, and preliminary experimental results have been obtained. This paper describes the results of our latest efforts to improve the point-spread function (PSF) generated by a custom polished panel, in an attempt to reduce the dimensions of the PSF, thus enabling more precise tracking and improved detection performance. The design of the new mechanical support structure and its operation are described, and the results quantified in terms of improvements in collected signal energy and optical communications performance, based on data obtained while tracking the planet Jupiter with the 34 meter research antenna at DSS-13.

photon-bucket receiver↗

Issues and Design Drivers for Deep Space Habitats

A cross-disciplinary team of scientists and engineers applied expertise gained in Lunar Lander development to the conceptual design of a long-duration, deep space habitat for Near Earth Asteroid (NEA) missions. The design reference mission involved two launches to assemble 5-modules for a 380-day round trip mission carrying 4 crew members. The conceptual design process yielded a number of interesting debates, some of which could be significant design drivers in a detailed Deep Space Habitat (DSH) design. These issues included: Design to minimize crew radiation exposure, launch loads, communications challenges, docking system and hatch commonality, pointing and visibility, consumables, and design for contingency operations.

Rucker, Michelle A.↗