Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Concerns in Marine Renewable Energy Projects

To accelerate the adoption of these emerging marine hydrokinetic technologies, navigational and environmental issues and concerns must be identified and addressed. As hydrokinetic projects move forward, various stakeholders will need to be engaged; one of the key issues that project proponents face as they engage stakeholders is that many conflicting uses and environmental issues are not well-understood. Much of this lack of understanding comes from a limited understanding of the technologies themselves. To address this issue, in September 2008, RE Vision consulting, LLC, was selected by the Department of Energy, under their market acceleration program, to apply a scenario-based assessment approach to the emerging hydrokinetic technology sector. The goal was to improve understanding of potential environmental and navigation impacts of these technologies and focus stakeholders on the critical issues. To meet this goal, the study established baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios captured variations in technical approaches and deployment scales and thus grounded the analysis in realistic constraints. The work conducted under this award provides an important foundation to other market acceleration activities carried out by the DOE and other stakeholders in this sector. The scenarios were then evaluated using a framework developed by H.T. Harvey & Associates to identify and characterize key environmental concerns and uncertainties. In collaboration with PCCI and the U.S. Coast Guard, navigation issues were assessed and guidelines developed to assure the safe operation of these systems. Finally, the work highlights “next steps” to take to continue development and adoption of marine hydrokinetic energy. Throughout the project, close collaboration with device developers, project developers and regulatory stakeholders was pursued to ensure that assumptions and constraints are realistic. Results concur with most of the permitting hurdles experienced by on-going projects in the U.S., and specific recommendations are provided for identifying and addressing them. While many areas of further research were identified, the study did not identify any major show-stoppers, largely because these technologies have a relatively low environmental risk-profile if compared to other activities routinely permitted in the marine environment. The frameworks and representative scenarios developed provide an objective and transparent tool for stakeholders, regulators and developers to assist in the decision-making process for siting wave and tidal energy plants, and meet our goal of improving understanding between all stakeholders. The final product consists of three reports: Report 1 - Wave Energy Scenarios. This report includes: A technology characterization of four different wave energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of two potential deployment sites located in Hawaii and California; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts. Report 2 - Tidal Energy Scenarios. This report includes: A technology characterization of three tidal energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of one potential deployment location in the Puget Sound, Washington; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts.Report 3 - Framework for Identifying Key Environmental Concerns. This report describes frameworks for identifying key environmental effects and applies them to the wave and tidal energy deployment scenarios described in the first two reports. It highlights critical issues and recommendations for future research.

16 TIDAL AND WAVE POWER↗

Phase 1 Final status survey plan for the West Valley demonstration project.

This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

54 ENVIRONMENTAL SCIENCES↗

Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan (Final Report No. 2)

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Confirmatory Survey Results for Portions of the ABB Combustion Engineering Site in Windsor, Connecticut During the Fall of 2011

From the mid-1950s until mid-2000, the Combustion Engineering, Inc. (CE) site in Windsor, Connecticut (Figure A-1) was involved in the research, development, engineering, production, and servicing of nuclear fuels, systems, and services. The site is currently undergoing decommissioning that will lead to license termination and unrestricted release in accordance with the requirements of the License Termination Rule in 10 CFR Part 20, Subpart E. Asea Brown Boveri Incorporated (ABB) has been decommissioning the CE site since 2001.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

GrayQb TM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQb TM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQb TM SF2 (Single Faced Version 2) is a non-destructive examination device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basement Fill Model Evaluation of Maximum Radionuclide Concentrations for Initial Suite of Radionuclides. Zion Station Restoration Project

ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The current decommissioning plan involves removing all above-grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made. The remaining backfilled structures will be the two reactor Containment Buildings, a Spent Fuel Building, an Auxiliary Building, a Turbine Building, a Crib House/Forebay Building and a Waste Water Treatment Facility (WWTF).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model. Zion Station Restoration Project

ZionSolutions is in the process of decommissioning the Zion Nuclear Power Station (ZNPS). After decommissioning is completed, the site will contain two reactor Containment Buildings, the Fuel Handling Building and Transfer Canals, Auxiliary Building, Turbine Building, Crib House/Forebay, and a Waste Water Treatment Facility that have been demolished to a depth of 3 feet below grade. Additional below ground structures remaining will include the Main Steam Tunnels and large diameter intake and discharge pipes. These additional structures are not included in the modeling described in this report, but the inventory remaining (expected to be very low) will be included with one of the structures that are modeled as designated in the Zion Station Restoration Project (ZSRP) License Termination Plan (LTP). The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined review of the HMS software algorithms and supporting field measurements lead to the conclusion that the majority of process gas pipe measurements are adequately corrected for source self-attenuation using HMS4. While there will be instances where the UO{sub 2}F{sub 2} holdup mass presents an infinitely thick deposit to the NaI-HMS4 system these situations are expected to be infrequent. This work confirms that the HMS4 system can quantify UO{sub 2}F{sub 2} holdup, in its current configuration (deposition, enrichment, and geometry), below the DQO levels for the K-25 building decommissioning and demolition project. For an area measurement of process gas pipe in the K-25 building, if an infinitely thick UO{sub 2}F{sub 2} deposit is identified in the range of enrichment of {approx}4-40%, the holdup quantity exceeds the corresponding DQO established for the K-25 building demolition project.

54 ENVIRONMENTAL SCIENCES↗

100 Area D4 Project Building Completion Report - July 2007 to December 2008

This report documents the decontamination, decommissioning, and demolition of the 105-NB, 163-N, 183-N, 183-NA, 183-NB, 183-NC, 184-N, 184-NA, 184-NB, 184-NC, 184-ND, 184-NE, 184-NF, 1312-N, 1330-N, 1705-N, 1705-NA, 1706-N, 1712-N, 1714-N, 1714-NA, 1714-NB, 1802-N, MO-050, MO-055, MO-358, MO-390, MO-900, MO-911, and MO-950 facilities in the 100 Area of the Hanford Site. The D4 activities for these facilities include utility disconnection, planning, characterization, engineering, removal of hazardous and radiological contaminated materials, equipment removal, decommissioning, deactivation, decontamination, demolition of the structure, and removal of the remaining slabs.

100 Area↗

Lifecycle Assessment of Beijing-Area Building Energy Use and Emissions: Summary Findings and Policy Applications

Buildings are at the locus of three trends driving China's increased energy use and emissions: urbanization, growing personal consumption, and surging heavy industrial production. Migration to cities and urban growth create demand for new building construction. Higher levels of per-capita income and consumption drive building operational energy use with demand for higher intensity lighting, thermal comfort, and plug-load power. Demand for new buildings, infrastructure, and electricity requires heavy industrial production. In order to quantify the implications of China's ongoing urbanization, rising personal consumption, and booming heavy industrial sector, this study presents a lifecycle assessment (LCA) of the energy use and carbon emissions related to residential and commercial buildings. The purpose of the LCA model is to quantify the impact of a given building and identify policy linkages to mitigate energy demand and emissions growth related to China's new building construction. As efficiency has become a higher priority with growing energy demand, policy and academic attention to buildings has focused primarily on operational energy use. Existing studies estimate that building operational energy consumption accounts for approximately 25% of total primary energy use in China. However, buildings also require energy for mining, extracting, processing, manufacturing, and transporting materials, as well as energy for construction, maintenance, and decommissioning. Building and supporting infrastructure construction is a major driver of industry consumption--in 2008 industry accounted for 72% of total Chinese energy use. The magnitude of new building construction is large in China--in 2007, for example, total built floor area reached 58 billion square meters. During the construction boom in 2007 and 2008, more than two billion m{sup 2} of building space were added annually; China's recent construction is estimated to account for half of global construction. Lawrence Berkeley National Laboratory (LBNL) developed an integrated LCA model to capture the energy and emissions implications of all aspects of new buildings from material mining through construction, operations, and decommissioning. Over the following four sections, this report describes related existing research, the LBNL building LCA model structure and results, policy linkages of this lifecycle assessment, and conclusions and recommendations for follow-on work. The LBNL model is a first-order approach to gathering local data and applying lifecycle assessment to buildings in the Beijing area--it represents one effort among a range of established, predominantly American and European, LCA models. This report identifies the benefits, limitations, and policy applications of lifecycle assessment modeling for quantifying the energy and emissions impacts of specific residential and commercial buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Secure Retrieval of FFTF Testing, Design, and Operating Information

One of the goals of the Advanced Fuel Cycle Initiative (AFCI) is to preserve the knowledge that has been gained in the United States on Liquid Metal Reactors (LMR). In addition, preserving LMR information and knowledge is part of a larger international collaborative activity conducted under the auspices of the International Atomic Energy Agency (IAEA). A similar program is being conducted for EBR-II at the Idaho Nuclear Laboratory (INL) and international programs are also in progress. Knowledge preservation at the FFTF is focused on the areas of design, construction, startup, and operation of the reactor. As the primary function of the FFTF was testing, the focus is also on preserving information obtained from irradiation testing of fuels and materials. This information will be invaluable when, at a later date, international decisions are made to pursue new LMRs. In the interim, this information may be of potential use for international exchanges with other LMR programs around the world. At least as important in the United States, which is emphasizing large-scale computer simulation and modeling, this information provides the basis for creating benchmarks for validating and testing these large scale computer programs. Although the preservation activity with respect to FFTF information as discussed below is still underway, the team of authors above is currently retrieving and providing experimental and design information to the LMR modeling and simulation efforts for use in validating their computer models. On the Hanford Site, the FFTF reactor plant is one of the facilities intended for decontamination and decommissioning consistent with the cleanup mission on this site. The reactor facility has been deactivated and is being maintained in a cold and dark minimal surveillance and maintenance mode until final decommissioning is pursued. In order to ensure protection of information at risk, the program to date has focused on sequestering and secure retrieval. Accomplishments include secure retrieval of: more than 400 boxes of FFTF information, several hundred microfilm reels including Clinch River Breeder Reactor (CRBR) information, and 40 boxes of information on the Fuels and Materials Examination Facility (FMEF). All information preserved to date is now being stored and categorized consistent with the IAEA international standardized taxonomy. Earlier information largely related to irradiation testing is likewise being categorized. The fuel test results information exists in several different formats depending upon the final stage of the test evaluation. In some cases there is information from both non-destructive and destructive examination while in other cases only non-destructive results are available. Non-destructive information would include disassembly records, dimensional profilometry, gamma spectrometry, and neutron radiography. Information from destructive examinations would include fission gas analysis, metallography, and photomicrographs. Archiving of FFTF data, including both the reactor plant and the fuel test information, is being performed in coordination with other data archiving efforts underway under the aegis of the AFCI program. In addition to the FFTF efforts, archiving of data from the EBR-II reactor is being carried out by INL. All material at risk associated with FFTF documentation has been secured in a timely manner consistent with the stated plan. This documentation is now being categorized consistent with internationally agreed upon IAEA standards. Documents are being converted to electronic format for transfer to a large searchable electronic database being developed by INL. In addition, selected FFTF information is being used to generate test cases for large-scale simulation modeling efforts and for providing Design Data Need (DDN) packages as requested by the AFCI program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk Methodology for Assessment of Fuel Debris Retrieval Options at the Fukushima Daiichi Nuclear Power Station

The mission of the Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF) includes the mid-to-long-term decommissioning planning of the reactors at the Fukushima Daiichi Nuclear Power Station. To carry out its mission, NDF needs to be able to assess worker safety and public health risks that currently exist at the Fukushima Daiichi Nuclear Power Station and the implications of various actions that may be taken to reduce such risks. Pacific Northwest National Laboratory (PNNL) entered into a contract with NDF to support NDF’s mission by developing a risk assessment methodology that will support NDF’s evaluation of options for transitioning molten and solidified fuels within each unit into safer, more stable, configurations given the ever-changing state of knowledge and large uncertainties. The underpinning of this approach, which incorporates both expert elicitation and adapts probabilistic risk assessment and hazard analysis techniques, is its organization of potential release mechanisms and accident scenarios into a more manageable set of safety issues, which are systematically characterized to allow for useful comparison between fuel debris retrieval options as well as the identification of risk drivers and discriminators. The approach also lends itself to be easily updated as the general state of knowledge improves and will serve as a vital input to prioritizing future investigations associated with human health and safety at the Fukushima site. This paper describes the overall approach developed by PNNL to risk-inform the comparison between fuel debris retrieval strategies and discusses lessons learned from implementing the approach.

Fukushima, Risk Assessmnet, Nuclear Decommissionin↗

Measuring progress on HEU minimization - The need for acceleration and addressing 'out-of- scope' activities

Currently, 294 reactors and isotope production facilities use HEU fuel or target material, out of which 154 are used for naval propulsion. These facilities are in annual need of more than 3 500 kg HEU for naval propulsion, more than 900 kg HEU in research reactors, and more than 80 kg HEU for isotope production in civilian facilities, in addition to 6 000 kg HEU in various other types of reactors. 48 civilian research reactors, representing a decrease in the HEU consumption on 278 kg - or 19% compared to the amount of HEU consumed in 1978 in similar facilities, have completed the conversion to LEU as a result over continued international assistance over three decades. The establishment of baseline measurements for assessing the results of the current HEU minimization effort calls for additional focus on the scope and methodology for HEU minimization. The justification for addressing only 54% of the remaining HEU-fueled research reactors as part of the GTRI program should be addressed together with increased focus on facility decommissioning as 120 HEU-fueled reactors with HEU consumption on 450 kg have been shutdown since 1978. There should be no need for converting all the remaining 133 HEU-fueled research reactors as decommissioning and dismantling should play a more prominent role in the future HEU minimization effort. As other sectors reduce the HEU fuel inventory, there is a need to evaluate the risk associated with the continued use of large quantities of weapons-grade HEU fuel for naval propulsion. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Historical Waste Retrieval and Clean-up Operations at Nuclear facility no.56, at the Cadarache Nuclear Research Centre

Among the different activities of the CEA research centre in Cadarache, located in the south of France, one of the most important involves cleaning, cleansing dismantling, decommissioning, and recovery of legacy wastes. This presentation will give an overview of the waste retrieval project from the historical interim storage facility called INB 56. The project is divided into three different sub-projects: the historical unpacked waste retrieval, the historical canister retrieval and the draining and clean-up of the spent fuel pools. All the described operations are conducted in accordance with the ALARA principle and the optimization of the waste categorization. The overall project, including the complete clean-up of the facility and its de-licensing, is due to end by 2020. The aim of this document is to outline the general ongoing historical waste retrieval operations and future projects on the INB 56 at the Cadarache research centre. In the final analysis, it can be seen that most of the waste is to be sent to the new CEDRA facility. Nevertheless one major goal of this project is to optimize the waste categorization and therefore to send the canisters to the ANDRA LLW site whenever possible. Two means will allow us to reach this goal: - The sorting out of un-packed waste in order to constitute a LLW canister - A wide range of measurements (gamma spectrometry, neutron measurement, tomography) in order to assess the exact nature of the contents in the historical canisters. Taking waste treatment and conditioning into account well in advance is a factor of prime importance that must be managed early in the elaboration of the decommissioning scenario. Precise knowledge of the physical and radiological inventories is of the utmost importance in defining the best waste pathway. Overall operations on the facility are due to end by 2020 including complete clean-up of the facility and its de-licensing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternatives To The Burial Of Low-Level Radioactive Waste

The approach for management of LLRW in different countries has evolved differently due to many factors such as culture and public sentiment, systems of government, public policy, and geography. There are also various methods to disposition LLRW including but not limited to: - Long term statutes and unconditional or conditional release of material; - Direct Burial; - Treatment (Processing); - Burial; - Treatment; - Unconditional Release; - Recycle for Unconditional Release or Reuse Within Any Industry; - Controlled Recycle within Nuclear Industry. This paper examines the options of controlled recycle of material within the nuclear industry and cites several successful examples. Controlled recycling of LLRW materials within the nuclear industry has been demonstrated to be practical and economical. The reuse of materials within the nuclear industry properly addressed stakeholder concerns for material being used for what they believe to be improper purposes. There are a number of environmental benefits including: - Preservation of resources; - Energy Conservation (in cases where less energy is required to recycle/reuse as compared to mainstream new fuel storages. - Preservation of burial space at disposal sites. In many cases recycling is cost beneficial as compared to other options to disposition the LLRW. In some cases burial costs are comparatively higher. To further the advancement of controlled recycle countries must continue to embrace the concept and create large enough feedstocks of like type material to achieve economies of scale. Additionally, a mechanism to uniformly track material to show where material has been moved and ultimately dispositioned would also contribute to enhancing the endorsement of controlled recycling. There is a large amount of LLRW material that could potentially be recycled. To date, 100 mines, 90 commercial power reactors, over 250 research reactors and a number of fuel cycle facilities, have been retired from operation. Some of these have been fully dismantled. Proven techniques and equipment are available to dismantle nuclear facilities safely. Most parts of a nuclear power plants do not become radioactive or are contaminated at very low levels and most metal can be recycled. There are obvious environmental benefits to the decontamination, recycle and reuse of materials. The benefits come primarily from the reduction of waste and eliminating the need to obtain fresh materials for the new product. The benefits of recycling in other industries are well recognized. Not having a waste management option can sometimes delay decommissioning of nuclear facilities. Therefore, the availability of a recycling route for the waste may accelerate decommissioning progress. With improving prospects for building new nuclear power plants, the industry would likely use the option if significant amounts of waste materials could be recycled economically. There is little consistency in national approaches to recycling radioactive waste. Many options for recycling allow for the release of materials into the public domain (after decontamination to allowable levels). There is not uniform endorsement of this practice from country to country and some stakeholders do not agree with this type of material release (often reduced to as unconditional release). There is a large amount of material that can have conditional release within the industry that assures consistent endorsement by stakeholders. This material includes: concrete, lead, carbon and stainless steel, and graphite. More work needs to be done to ensure consistency in regulation from country to country. The IAEA is working to this end.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Melting of the metallic wastes generated by dismantling retired nuclear research facilities

The decommissioning of nuclear installations results in considerably large amounts of radioactive metallic wastes such as stainless steel, carbon steel, aluminum, copper etc. It is known that the reference 1,000 MWe PWR and 881 MWe PHWR will generate metal wastes of 24,800 ton and 26,500 ton, respectively. In Korea, the D and D of KRR-2 and a UCP at KAERI have been performed. The amount of metallic wastes from the KRR-1 and UCP was about 160 ton and 45 ton, respectively, up to now. These radioactive metallic wastes will induce problems of handling and storing these materials from environmental and economical aspects. For this reason, prompt countermeasures should be taken to deal with the metal wastes generated by dismantling retired nuclear facilities. The most interesting materials among the radioactive metal wastes are stainless steel (SUS), carbon steel (CS) and aluminum wastes because they are the largest portions of the metallic wastes generated by dismantling retired nuclear research facilities. As most of these steels are slightly contaminated, if they are properly treated they are able to be recycled and reused in the nuclear field. In general, the technology of a metal melting is regarded as one of the most effective methods to treat metallic wastes from nuclear facilities. In conclusion: The melting of metal wastes (Al, SUS, carbon steel) from a decommissioning of research reactor facilities was carried out with the use of a radioisotope such as cobalt and cesium in an electric arc furnace. In the aluminum melting tests, the cobalt was captured at up to 75% into the slag phase. Most of the cesium was completely eliminated from the aluminum ingot phase and moved into the slag and dust phases. In the melting of the stainless steel wastes, the {sup 60}Co could almost be retained uniformly in the ingot phase. However, we found that significant amounts of {sup 60}Co remained in the slag at up to 15%. However the removal of the cobalt from the ingot phase was improved by the addition of a CaF{sub 2} slag former at up to 20%. The {sup 137}Cs was partitioned between the slag and the dust phases in the offgas. In the pilot scale melting test, the cobalt mostly remained in the ingot phase and the cesium was mainly found in the quenching water and slag.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Detroit Edison's Fermi 1 - Preparation for Reactor Removal

This paper is intended to provide information about the ongoing decommissioning tasks at Detroit Edison's Fermi 1 plant, and in particular, the work being performed to prepare the reactor for removal and disposal. In 1972 Fermi 1 was shutdown and the fuel returned to the Atomic Energy Commission. By the end of 1975, a retirement plan was prepared, the bulk sodium removed, and the plant placed in a safe store condition. The plant systems were left isolated with the sodium containing systems inert with carbon dioxide in an attempt to form a carbonate layer, thus passivating the underlying reactive sodium. In 1996, Detroit Edison determined to evaluate the condition of the plant and to make recommendations in relation to the Fermi 1 future plans. At the end of 1997 approval was obtained to remove the bulk asbestos and residual alkali-metals (i.e., sodium and sodium potassium (NaK)). In 2000, full nuclear decommissioning of the plant was approved. To date, the bulk asbestos insulation has been removed, and the only NaK remaining is located in six capillary instrument tubes. The remaining sodium is contained within the reactor, two of the three primary loops, and miscellaneous removed pipes and equipment to be processed. The preferred method for removing or reacting sodium at Fermi 1 is by injecting superheated steam into a heated, nitrogen inert system. The byproducts of this reaction are caustic sodium hydroxide, hydrogen gas, and heat. The decision was made to separate the three primary loops from the reactor for better control prior to processing each loop and the reactor separately. The first loop has already been processed. The main focus is now to process the reactor to allow removal and disposal of the Class C waste prior to the anticipated June 2008 closure of the Barnwell radioactive waste disposal facility located in South Carolina. Lessons learnt are summarized and concern: the realistic schedule and adherence to the schedule, time estimates, personnel accountability, back up or fill in work, work packages, condensation control, radiological contamination control, and organization of the waste stream.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗