Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Dworshak Kokanee Population and Engrainment Assessment : 2006 Annual Report, March 1, 2006 - February 28, 2007.

During this contract, we continued testing underwater strobe lights to determine their effectiveness at repelling kokanee Oncorhynchus nerka away from Dworshak Dam. Strobe light tests were conducted on four nights from April 24-27, 2006, in front of the middle reservoir outlet (RO) 2. The density and distribution of fish, (thought to be mostly kokanee), were monitored with a split-beam echo sounder. We then compared fish counts and densities during nights when the lights were flashing to counts and densities during adjacent nights without the lights on. On two nights, April 25 and 27, 2006, when no lights were present, fish counts near RO 2 averaged 12.4 fish and densities averaged 31.0 fish/ha. When strobe lights were turned on during the nights of April 24 and 26, mean counts dropped to 4.7 fish and densities dropped to 0.5 fish/ha. The decline in counts (62%) and densities (99%) was statistically significant (p = 0.009 and 0.002, respectively). Test results indicated that strobe lights were able to reduce fish densities by at least 50% in front of a discharging reservoir outlet, which would be sufficient to improve sport fish harvest. We also used split-beam hydroacoustics to monitor the kokanee population in Dworshak Reservoir during 2006. Estimated abundance of kokanee increased from the 2005 population estimate. Based on hydroacoustic surveys, we estimated approximately 5,815,000 kokanee (90% CI {+-} 27.6%) in Dworshak Reservoir in August 2006. This included 2,183,000 age-0 (90% CI {+-} 24.2%), 1,509,000 age-1 (90% CI {+-} 29.0%), and 2,124,000 age-2 (90% CI {+-} 27.6%) kokanee. This resulted in a density of age-2 kokanee above the management goal of 30-50 adults/ha. Entrainment sampling was conducted with fixed-site, split-beam hydroacoustics from May through September for a continuous 24 h period when dam operations permitted. The highest fish detection rates from entrainment assessments were found during dawn periods, unlike previous year's results, which were highest during nighttime. The lowest detection rate was found during the day period, which was consistent with previous findings. Fish detection rates were generally low during high discharges throughout the summer and highest during low discharges in May and June. Low detection rates were found during high discharge periods during drawdowns for anadromous fish flows in July and August, which resulted in low susceptibility to entrainment. Counts of spawning kokanee in four tributary streams totaled 29,743 fish. These data fit the previously developed relationship between spawner counts and adult kokanee abundance in the reservoir.

13 HYDRO ENERGY↗

The 2005 Project Progress Report for 1987-099-00 Dworshak Kokanee Population and Entrainment Assessment (contract # 16791) is attached to project 1987-099-00, contract # 26850. [POINTER]

During this contract, we continued testing underwater strobe lights to determine their effectiveness at repelling kokanee Oncorhynchus nerka away from Dworshak Dam. We tested one set of nine strobe lights flashing at a rate of 360 flashes/min in front of turbine 3 while operating at higher discharges than previously tested. The density and distribution of fish, (thought to be mostly kokanee), were monitored with a split-beam echo sounder. We then compared fish counts and densities during nights when the lights were flashing to counts and densities during adjacent nights without the lights on. On five nights between January 31 and February 28, 2006, when no lights were present, fish counts near turbine 3 averaged eight fish and densities averaged 91 fish/ha. When strobe lights were turned on during five adjacent nights during the same period, mean counts dropped to four fish and densities dropped to 35 fish/ha. The decline in counts (49%) was not statistically significant (p = 0.182), but decline in densities (62%) was significant (p = 0.049). There appeared to be no tendency for fish to habituate to the lights during the night. Test results indicated that strobe lights were able to reduce fish densities by at least 50% in front of turbines operating at higher discharges, which would be sufficient to improve sportfish harvest. We also used split-beam hydroacoustics to monitor the kokanee population in Dworshak Reservoir during 2005. Estimated abundance of kokanee decreased from the 2004 population estimate. Based on hydroacoustic surveys, we estimated 3,011,626 kokanee (90% CI {+-} 15.2%) in Dworshak Reservoir, July 2005. This included 2,135,986 age-0 (90% CI {+-} 15.9%), 769,175 age-1 (90% CI {+-} 16.0%), and 107,465 age-2 (90% CI {+-} 15.2%). Poor survival of kokanee from age-1 to age-2 continued to keep age-2 densities below the management goal of 30-50 adults/ha. Entrainment sampling was conducted with fixed-site split-beam hydroacoustics a minimum of two days per month for a continuous 24 h period when dam operations permitted. The highest fish detection rates from entrainment assessments were again found during nighttime periods and lowest during the day. Fish detection rates were low during high discharges throughout the spring and summer and highest during low discharges in September and November. High discharge during drawdowns for anadromous fish flows in July and August again resulted in low detection rates and susceptibility to entrainment. Index counts of spawning kokanee in four tributary streams totaled 12,742 fish. This data fits the previously developed relationship between spawner counts and adult kokanee abundance in the reservoir.

13 HYDRO ENERGY↗

Evaluate Status of Pacific Lamprey in the Clearwater River and Salmon River Drainages, Idaho, 2009 Technical Report.

Pacific lamprey Lampetra tridentata have received little attention in fishery science until recently, even though abundance has declined significantly along with other anadromous fish species in Idaho. Pacific lamprey in Idaho have to navigate over eight lower Snake River and Columbia River hydroelectric facilities for migration downstream as juveniles to the Pacific Ocean and again as adults migrating upstream to their freshwater spawning grounds in Idaho. The number of adult Pacific lamprey annually entering the Snake River basin at Ice Harbor Dam has declined from an average of over 18,000 during 1962-1969 to fewer than 600 during 1998-2006. Based on potential accessible streams and adult escapement over Lower Granite Dam on the lower Snake River, we estimate that no more than 200 Pacific lamprey adult spawners annually utilize the Clearwater River drainage in Idaho for spawning. We utilized electrofishing in 2000-2006 to capture, enumerate, and obtain biological information regarding rearing Pacific lamprey ammocoetes and macropthalmia to determine the distribution and status of the species in the Clearwater River drainage, Idaho. Present distribution in the Clearwater River drainage is limited to the lower sections of the Lochsa and Selway rivers, the Middle Fork Clearwater River, the mainstem Clearwater River, the South Fork Clearwater River, and the lower 7.5 km of the Red River. In 2006, younger age classes were absent from the Red River.

13 HYDRO ENERGY↗

Pair-Trawl Detection of PIT-Tagged Juvenile Salmonids Migrating in the Columbia River Estuary, 2008 Report of Research.

In 2008, we sampled migrating juvenile Pacific salmonids Oncorhynchus spp. tagged with passive integrated transponder (PIT) tags using a surface pair trawl in the upper Columbia River estuary (rkm 61-83). The cod-end of the trawl was replaced with a cylindrical PIT-tag detection antenna with an 86-cm-diameter fish-passage opening and two detection coils connected in series. The pair trawl was 105 m long with a 91.5-m opening between the wings and a sample depth of 4.9 m. Also during 2008, we finalized the development of a prototype 'matrix' antenna, which was larger than previous antennas by a considerable magnitude. The matrix antenna consisted of 6 coils: a 3-coil front component and a 3-coil rear component, which were separated by 1.5-m of net mesh. The fish-passage opening was 2.5 m wide by 3.0 m tall and was attached to a standard-size pair trawl net. Intermittent sampling with a single crew began on 7 March and targeted yearling Chinook salmon O. tshawytscha and steelhead O. mykiss. Daily sampling using two crews began on 30 April and continued through 14 June; during this period we detected 2.7% of all juvenile salmonids previously detected at Bonneville Dam--a measure of sample efficiency. Sampling with a single crew continued through 20 August and targeted subyearling Chinook salmon. We detected 7,397 yearling Chinook salmon, 2,735 subyearling Chinook salmon, 291 coho salmon O. kisutch, 5,950 steelhead, and 122 sockeye salmon O. nerka in the upper estuary. We deployed the matrix antenna system and the older, cylindrical antenna system (86-cm-diameter fish-passage opening) simultaneously in mid-May 2008 to test matrix detection efficiency. The cylindrical antenna system had been used successfully in 2007 and early 2008. Because distribution of migrating salmonids in the estuary changes rapidly, we felt that a tandem sampling effort between the two systems was the only way to truly evaluate comparative detection efficiency. We deployed both systems within 1 km of each other during a period of high fish densities on 13, 14, and 15 May. Detections of the matrix system surpassed those of the cylindrical system by 53% in 14 h of simultaneous sampling (total detections 716 and 339, respectively). We believe that the higher detection rate observed with the matrix system was due to fewer smolts escaping the trawl entrance and to more smolts readily passing through the larger fish-passage opening. After tandem sampling, we continued exclusive use of the matrix system for the remainder of the 2008 juvenile migration season. Mean survival rates from Lower Granite to Bonneville Dam for yearling Chinook salmon and steelhead were 42% (SE = 3.7%) and 46% (SE = 1.5%), respectively. Over 358,000 PIT-tagged salmonids were transported, and we detected 4,619 of these fish.

13 HYDRO ENERGY↗

The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

13 HYDRO ENERGY↗

Dworshak Kokanee Population and Entrainment Assessment 2005-2006 Annual Report.

During this contract, we continued testing underwater strobe lights to determine their effectiveness at repelling kokanee Oncorhynchus nerka away from Dworshak Dam. We tested one set of nine strobe lights flashing at a rate of 360 flashes/min in front of turbine 3 while operating at higher discharges than previously tested. The density and distribution of fish, (thought to be mostly kokanee), were monitored with a split-beam echo sounder. We then compared fish counts and densities during nights when the lights were flashing to counts and densities during adjacent nights without the lights on. On five nights between January 31 and February 28, 2006, when no lights were present, fish counts near turbine 3 averaged eight fish and densities averaged 91 fish/ha. When strobe lights were turned on during five adjacent nights during the same period, mean counts dropped to four fish and densities dropped to 35 fish/ha. The decline in counts (49%) was not statistically significant (p = 0.182), but decline in densities (62%) was significant (p = 0.049). There appeared to be no tendency for fish to habituate to the lights during the night. Test results indicated that strobe lights were able to reduce fish densities by at least 50% in front of turbines operating at higher discharges, which would be sufficient to improve sportfish harvest. We also used split-beam hydroacoustics to monitor the kokanee population in Dworshak Reservoir during 2005. Estimated abundance of kokanee decreased from the 2004 population estimate. Based on hydroacoustic surveys, we estimated 3,011,626 kokanee (90% CI {+-} 15.2%) in Dworshak Reservoir, July 2005. This included 2,135,986 age-0 (90% CI {+-} 15.9%), 769,175 age-1 (90% CI {+-} 16.0%), and 107,465 age-2 (90% CI {+-} 15.2%). Poor survival of kokanee from age-1 to age-2 continued to keep age-2 densities below the management goal of 30-50 adults/ha. Entrainment sampling was conducted with fixed-site split-beam hydroacoustics a minimum of two days per month for a continuous 24 h period when dam operations permitted. The highest fish detection rates from entrainment assessments were again found during nighttime periods and lowest during the day. Fish detection rates were low during high discharges throughout the spring and summer and highest during low discharges in September and November. High discharge during drawdowns for anadromous fish flows in July and August again resulted in low detection rates and susceptibility to entrainment. Index counts of spawning kokanee in four tributary streams totaled 12,742 fish. This data fits the previously developed relationship between spawner counts and adult kokanee abundance in the reservoir.

13 HYDRO ENERGY↗

Sandy River Delta Habitat Restoration : Annual Report, January 2008 - March 2009.

During the period 2008-2009, there were 2 contracts with BPA. One (38539) was dealing with the restoration work for 2007 and the other (26198) was an extension on the 2006 contract including the NEPA for Dam removal on the old channel of the Sandy River. For contract 38539, the Sandy River Delta Habitat Restoration project continued its focus on riparian hardwood reforestation with less emphasis on wetlands restoration. Emphasis was placed on Sundial Island again due to the potential removal of the dike and the loss of access in the near future. AshCreek Forest Management was able to leverage additional funding from grants to help finance the restoration effort; this required a mid year revision of work funded by BPA. The revised work not only continued the maintenance of restored hardwood forests, but was aimed to commence the restoration of the Columbia River Banks, an area all along the Columbia River. This would be the final restoration for Sundial Island. The grant funding would help achieve this. Thus by 2011, all major work will have been completed on Sundial Island and the need for access with vehicles would no longer be required. The restored forests continued to show excellent growth and development towards true riparian gallery forests. Final inter-planting was commenced, and will continue through 2010 before the area is considered fully restored. No new wetland work was completed. The wetlands were filled by pumping in early summer to augment the water levels but due to better rainfall, no new fuel was required to augment existing. Monitoring results continued to show very good growth of the trees and the restoration at large was performing beyond expectations. Weed problems continue to be the most difficult issue. The $100,000 from BPA planned for forest restoration in 2008, was augmented by $25,000 from USFS, $120,000 from OR150 grant, $18,000 from LCREP, and the COE continued to add $250,000 for their portion. Summary of the use of these funds are displayed in Table 1 (page 5). Work on the restoration of the original Sandy River channel (dam removal, contract 26198) continued slowly. The draft EA was completed and sent out for review. The COE has decided to finish the NEPA with the intent to complete the project.

13 HYDRO ENERGY↗

Hood River and Pelton Ladder Evaluation Studies, 2008 Annual Report : October 2007 - September 2008.

This report summarizes the life history and production data collected in the Hood River subbasin during FY 2008. Included is a summary of jack and adult life history data collected at the Powerdale Dam trap on seventeen complete run years of winter steelhead, spring and fall chinook salmon, and coho salmon, and on fifteen complete run years of summer steelhead. Also included are summaries of (1) the hatchery winter steelhead broodstock collection program; (2) hatchery production releases in the Hood River subbasin; (3) subbasin wild summer and winter steelhead smolt production, (4) numbers of hatchery summer and winter steelhead smolts leaving the subbasin; (5) smolt migration timing past Bonneville Dam, (6) wild and hatchery steelhead smolt-to-adult survival rates; (7) wild summer and winter steelhead egg to smolt survival rates; and (8) streamflow at selected locations in the Hood River subbasin. Data will be used in part to (1) evaluate the HRPP relative to its impact on indigenous populations of resident and anadromous salmonids (see Ardren Draft), (2) evaluate the HRPP's progress towards achieving the biological fish objectives defined in the Hood River Subbasin Plan (Coccoli 2004) and the Revised Master Plan for the Hood River Production Program (HDR|FishPro, ODFW, and CTWSRO 2008), (3) refine spawner escapement objectives to more accurately reflect subbasin carrying capacity, and (4) refine estimates of subbasin smolt production capacity to more accurately reflect current and potential subbasin carrying capacity.

13 HYDRO ENERGY↗

Energy-Flow-Environment Linkage Map

Understanding how flexibility in environmental requirements can facilitate co-optimization of hydropower production outcomes and environmental outcomes is critical for future grid decision-making and operations as renewable energy resources increase. The environmental and power system outcomes connectivity linkage maps presented here provide a framework for conceptually and quantitatively linking power system outcomes to environmental outcomes through hydropower flow decisions. The Executive Summary Map serves as a starting for exploring the links between hydropower system performance outcomes and environmental outcomes. The centralized topic is “Flow from Hydropower System,” and connects the hydropower operations through “Flow through turbines” and “Non-turbine flows”, and to environmental outcomes through Reservoir elevation” and “Flow downstream of the hydropower system”. To the left of these central topics, “Hydro-mechanical operations” are linked through “Hydro-electrical operations” to “Hydropower performance outcomes” (“Reliability”, “Resilience”, “Revenue”, “Emissions”). On the right, environmental outcomes are grouped together by their physical location: “Upstream Outcomes” (“Upstream geomorphology”, “Upstream recreation”, “Upstream habitat”, “Upstream biota and biodiversity”, “Upstream water quality and greenhouse gas”), Outcomes relevant to both “Upstream/downstream or dam interface” (“Navigation”, “Dam safety and maintenance", “Human health”, “Water supply”, “Flood control”, ”Fish passage”), and “Downstream outcomes“ (e.g., “Downstream geomorphology”, “Downstream recreations”, “Downstream habitat”, “Downstream biota and biodiversity”, “Downstream water quality and greenhouse gas”). Each of these subtopics (e.g., “Hydro-mechanical operations”, “Hydro-electrical operations”, “Upstream geomorphology”, “Upstream recreation”) is further explored through their corresponding submaps. The “Read Me” file provides more detail information on map navigation. The “Models and tools database” file provides detailed information of models and tools presented in the maps.

13 HYDRO ENERGY↗

U.S. Hydropower Development Pipeline Data, 2026

The U.S. Hydropower Development Pipeline dataset provides a comprehensive, regularly updated view of proposed and potential hydropower projects across the United States. This resource compiles information from federal agencies and other public sources to track non-powered dams considered for electrification, proposed hydropower facilities at stream reaches with no existing dams, conduit exemptions, and emerging pumped storage hydropower proposals. The dataset includes project characteristics such as location, development status, technology type, ownership category, and other attributes that support analysis of future hydropower trends. It is designed to help researchers, planners, policymakers, and stakeholders assess national‑scale development patterns, understand the evolving hydropower landscape, and explore opportunities and challenges associated with new hydropower deployment. The dataset is updated annually to reflect changes in project status, new proposals entering the pipeline, and projects that are cancelled, completed, or otherwise removed from active consideration. Note: Capacity additions to existing hydropower plants are not included in this database due to reliance on a proprietary data source.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Environmental Flow Requirements from FERC Licenses Across the US

Environmental flow requirements included in Federal Energy Regulatory Commission (FERC) hydropower licenses are important for balancing natural properties and benefits of river ecosystems (e.g., healthy species, recreation, water supply, flood control) supporting hydropower production. In some cases, environmental flow requirements may limit operational flexibility given current operational schemes and make a hydropower plant less able to provide power to the electric grid on demand. Hydropower plants may gain some flexibility as hydropower scheduling time periods are made to be more responsive to the short-term needs of an energy grid increasingly reliant on intermittent renewables. However, many flow requirements focus on the daily, monthly, or seasonal flow fluctuations which matches the time scale of most paradigms linking flow alterations to the health of river ecosystems. This dataset seeks to provide a greater understanding of how flexibility in environmental requirements can be leveraged to create positive outcomes for both the power system and the environment. It contains information on environmental flow requirements from the Protection, Mitigation, and Enhancement section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The information on environmental flow requirements was extracted from the PM&E section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The flow requirements were then categorized into flow augmentation categories based on whether the license stated a specific water management purpose for the given requirement called augmentation categories (i.e., fisheries or habitat, recreation or boating, industry, and general or unspecified; Table B). Requirements were also grouped into flow type categories (e.g., minimum flow rate, maximum flow rate, ramping rate). Additional information related to flow requirements such as the augmentation time-period and whether the flow rate was continuous (i.e., condition must be present at all-times) or instantaneous (i.e., condition present at a point in time) was also extracted from the licenses. Some licenses had specific flow requirements based on whether the project was in a wet, dry, or normal water year. If that information was presented in the license, it was also included in the data set. The location within the project was noted, hereafter, zone, in the dataset for flow requirements relating to specific areas of hydropower projects (Dam, Powerhouse, Bypass Reach). Maximum discharge capacities of hydropower facilities were also extracted from both the Existing Hydropower Assets (EHA) data set and the National Inventory of Dams (NID) databases. Each facility was coded with project identification codes from the EHA dataset to facilitate cross-referencing between datasets.

13 HYDRO ENERGY↗

Longitudinal, Lateral, Vertical, and Temporal Thermal Heterogeneity in a Large Impounded River: Implications for Cold-Water Refuges

Dam operations can affect mixing of the water column, thereby influencing thermal heterogeneity spatially and temporally. This occurs by restricting or eliminating connectivity in longitudinal, lateral, vertical, and temporal dimensions. We examined thermal heterogeneity across space and time and identified potential cold-water refuges for salmonids in a large impounded river in inland northwestern USA. To describe these patterns, we used thermal infrared (TIR) imagery, in situ thermographs, and high-resolution, 3-D hydraulic mapping. We explained the median water temperature and probability of occurrence of cool-water areas using generalized additive models (GAMs) at reach and subcatchment scales, and we evaluated potential cold-water refuge occurrence in relation to these patterns. We demonstrated that (1) lateral contributions from tributaries dominated thermal heterogeneity, (2) thermal variability at confluences was approximately an order of magnitude greater than of the main stem, (3) potential cold-water refuges were mostly found at confluences, and (4) the probability of occurrence of cool areas and median water temperature were associated with channel geomorphology and distance from dam. These findings highlight the importance of using multiple approaches to describe thermal heterogeneity in large, impounded rivers and the need to incorporate these types of rivers in the understanding of thermal riverscapes because of their limited representation in the literature.

Mejia, Francine H.↗

Integrated Water-Power System Resilience Analysis in a Southeastern Idaho Irrigation District: Minidoka Case Study

This study investigates the joint water–power system resilience of an irrigation district in southeastern Idaho. Irrigation districts face difficulties in the delivery of water to farmers under drought conditions, during equipment failures, or unplanned infrastructure disruptions. The resilience of interconnected water and power systems can be better analyzed and understood through an integrated approach, using a model that connects the dependencies between the two halves of the system. Using a multi-agent system model capturing both water and power system components, as well as their linkages, we capture the interdependencies of these systems and highlight opportunities for improvement when faced with disruptions. Through simulation scenarios, we examine the system resilience using system performance, quantified as the percentage of met demand of the power and water system, when subjected to drought water year, an unforeseen water demand increase, power outage and dam failure. Scenario results indicate that the effects of low flow years are mostly felt in the power system; unexpected increases in water demand marginally impact irrigation system performance; dams and pumps present vulnerabilities of the system, causing substantial unmet demand during disruptions. Noting the interdependencies between the water–power system halves while leveraging an integrated simulation allows for an insightful analysis of the system impacts during disruptions.

13 HYDRO ENERGY↗

A New Approach to Quantify Shallow Water Hydrologic Exchanges in a Large Regulated River Reach

Hyporheic exchange is a crucial component in the water cycle. The strength of the exchange directly affects the biogeochemical and ecological processes occurred in the hyporheic zone from micro to reach scale. Hyporheic fluxes can be quantified using many direct and indirect measurements as well as analytical and numerical modeling tools. However, in a relatively large river, these methods are limited by accessibility, the difficulty of performing representative sampling, and complexity of geomorphologic features and subsurface properties. In rivers regulated by hydroelectric dams, quantifying hyporheic fluxes becomes more challenging due to frequent hydropeaking events, featured by hourly to daily variations in flow and river stages created by dam operations(Hancock 2002). In this study, we developed and validated methods that based on field measurements to estimate shallow water hyporheic fluxes across the river bed at five locations along the shoreline of the Columbia River. Vertical thermal profiles measured by self-recording thermistors were combined with time series of hydraulic gradients derived from river stage and water level at in-land wells to estimate the hyporheic flux rate. The results suggested that the hyporheic exchange rate had high spatial and temporal heterogeneities over the riverbed, with predicted flux rate varies from +1×10 -6 m s-1 to -1.5×10 -6 m s -1 under various flow conditions at the some locations, and with a magnitude of fluxes 6-9 times higher in the primary channel than that in the secondary channel. Furthermore, the variations on shallow water hyporheic flow dynamics may further lead to different biogeochemical and ecological consequences at different river segments.

54 ENVIRONMENTAL SCIENCES↗

Assessing the Impacts of Hydrologic and Land Use Alterations on Water Temperature in the Farmington River Basin in Connecticut

Aquatic ecosystems can be significantly altered by the construction of dams and modification of riparian buffers and the effects are often reflected in spatial and temporal changes to water temperature. To investigate the implications for water temperature of spatially and temporally varying riparian buffers and dam-induced hydrologic alterations, we have implemented a modeling system (DHSVM-RBM) that couples a spatially distributed land surface hydrologic model, DHSVM, with the distributed stream temperature model, RBM. The basic modeling system has been applied previously to several similar-sized watersheds. However, we have made enhancements to DHSVM-RBM that simulate spatial heterogeneity and temporal variation (i.e. seasonal changes in canopy cover) in riparian vegetation, and we included additional features in DHSVM-RBM that provide the capability for simulating the impacts of reservoirs that may develop thermal stratification. We have tested the modeling system in the Farmington River basin in the Connecticut River system that includes varying types of watershed development (e.g. deforestation and reservoirs) that can alter the streams’ hydrologic regime and thermal energy budget. We evaluated streamflow and stream temperature simulations against all available observations distributed along the Farmington River basin. Results based on metrics recommended for model evaluation compare well to those obtained in similar studies. We demonstrate the way in which the model system can provide decision support for watershed planning by simulating a limited number of scenarios associated with hydrologic and land use alterations.

Freshwater Ecosystem, Water Temperature, Riparian ↗

Theory of decametric radio emissions from Jupiter.

It is suggested that the Jovian decametric emissions (DAM) originate in a cyclotron instability of weakly relativistic electrons trapped in the Jovian magnetic field. The resulting radiation has a group velocity in the magnetospheric plasma which may be of order 100 km/sec, and thus takes much more time to escape the magnetosphere than if the group velocity were at or near the speed of light. Therefore, the asymmetry of the Io phase with respect to sources east and west of the Earth-Jupiter line does not imply an asymmetric beaming of DAM; it is caused by the delay the waves experience in traversing the magnetosphere. The frequency drifts of milli- and decasecond bursts are also explained.

Wu, C. S.↗

Satellite geological and geophysical remote sensing of Iceland

The author has identified the following significant results. Most of the research emphasis was directed at the analysis of Icelandic icecaps on ERTS imagery. A number of new findings were made, including: (1) on low sun angle imagery of Hofsjokull, the outline of a probable central volcano can be seen delineated on the northwest part of the icecap; (2) on low sun angle imagery of Langjokull, two parallel hyaloclastite ridges can be seen to continue for more than 10 km in from the margin of the icecap; (3) measurements of contorted medial moraines on images of Skeioararjokull, acquired about 11 months apart show an approximate 600 m of annual glacier movement; (4) measurements on images of the surging glacier, Eyjabakkajokull, taken about 11 months apart show an approximate 1.8 km of movement during that time; and (5) successive ERTS images of the glacier-dammed lake, Graenalon, show an increase in area of the lake until the ice dam was partially breached, causing a jokulhlaup across the Skeioararsandur. Because of the shape of the lake basin the elevation of the post-jokulhlaup lake can be determined from ERTS imagery to + or - 2 m.

Williams, R. S., Jr.↗