Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Spacelab ground operations

The Spacelab modular design and its operational relationship with the Shuttle, the Spacelab payload, and the ground facilities dictate a particular approach to the ground turnaround in order to achieve the projected mission model. A certain portion of the Spacelab ground operational cycle will be almost totally dependent on the Shuttle turnaround functions. The remainder of the Spacelab ground operational cycle will be spent in the Operations and Checkout Building where the Spacelab-unique facilities and GSE are located. KSC, as the Spacelab operations center, will be responsible for continuing assessment of Spacelab hardware utilization, based on mission requirements and program hardware.

Dickinson, J. N.↗

Update of KSC activities for the space transportation system

The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.

Gray, R. H.↗

Pioneer Venus spacecraft design and operation

The Pioneer Venus Orbiter and Multiprobe spacecraft design and operation enabled both remote and in-situ measurements of the Venusian environment from the outermost fringes of the atmosphere all the way to the surface. Both spacecraft were spin-stabilized and solar-cell powered from launch to Venus. Since orbit insertion, the Orbiter has been transmitting measurements from a highly elliptical 24-h orbit with periapsis altitudes down to about 150 km. Data rates up to 2048 bits/s have been utilized through a despun high-gain antenna transmitting at S-band frequency. Spacecraft attitudes, orbit periods, and periapsis altitudes are being maintained as required with a hydrazine propulsion system. The Multiprobe spacecraft (Bus with all four Probes attached) performed the necessary Probe checkouts and deployed the Probes to achieve the desired Probe and Bus targeting. Silver-zinc batteries provided the necessary power on each of the four Probes from separation from the Bus through the entry/descent sequence. Data rates of 256 and 128 bits/s on the Large Probe were maintained with 40-W radiated power, and 64 and 16 bits/s on the Small Probes were maintained with 10-W radiated power, through omni antennas directly to Earth-based stations. Each Probe's entry/descent sequence was controlled with a hardwired entry sequence programmer to achieve the desired scientific and spacecraft operations.

Nothwang, G. J.↗

Status of the Space Shuttle Solid Rocket Booster

The first Space Shuttle Solid Rocket Boosters have been stacked on the Mobile Launch Platform at the Kennedy Space Center and are ready to be mated with the External Tank and Orbiter in preparation for the first Shuttle flight. This readiness is built upon a design within the state of the art and, to the maximum extent practicable, within the state of experience. Component qualification, subsystem verification, system checkout, and recovery tests are essentially complete and provide the basis for certifying the boosters for manned flight.

Horton, W. P.↗

Space Shuttle cargo processing at the Kennedy Space Center

This paper discusses the various activities involved in processing the two basic types of cargo being prepared for launch by the Space Transportation System. An overview will be presented describing the independent processing systems used to ready the Spacelabs and other horizontal cargo as well as upper stages and other vertical cargo. The interrelationship of these two types of preparations with the main line Space Shuttle test and checkout operations will be shown. In the explanation of each process, the ground support equipment and facilities of the Kennedy Space Center are described.

Rock, W. H.↗

Road map to adaptive optimal control

A building block control structure leading toward adaptive, optimal control for jet engines is developed. This approach simplifies the addition of new features and allows for easier checkout of the control by providing a baseline system for comparison. Also, it is possible to eliminate certain features that do not have payoff by being selective in the addition of new building blocks to be added to the baseline system. The minimum risk approach specifically addresses the need for active identification of the plant to be controlled in real time and real time optimization of the control for the identified plant.

Boyer, R.↗

YF-12 cooperative airframe/propulsion control system program, volume 1

Several YF-12C airplane analog control systems were converted to a digital system. Included were the air data computer, autopilot, inlet control system, and autothrottle systems. This conversion was performed to allow assessment of digital technology applications to supersonic cruise aircraft. The digital system was composed of a digital computer and specialized interface unit. A large scale mathematical simulation of the airplane was used for integration testing and software checkout.

Anderson, D. L.↗

Cell module and fuel conditioner

Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.

Hoover, D. Q., Jr.↗

Common data buffer system

A high speed common data buffer system is described for providing an interface and communications medium between a plurality of computers utilized in a distributed computer complex forming part of a checkout, command and control system for space vehicles and associated ground support equipment. The system includes the capability for temporarily storing data to be transferred between computers, for transferring a plurality of interrupts between computers, for monitoring and recording these transfers, and for correcting errors incurred in these transfers. Validity checks are made on each transfer and appropriate error notification is given to the computer associated with that transfer.

Byrne, F.↗

Automated Plasma Spray (APS) process feasibility study

An automated plasma spray (APS) process was developed to apply two layer (NiCrAlY and ZrO2-12Y2O3) thermal barrier coatings to aircraft and stationary gas turbine engine blade airfoils. The APS process hardware consists of four subsystems: a mechanical positioning subsystem incorporating two interlaced six degree of freedom assemblies (one for coating deposition and one for coating thickness monitoring); a noncoherent optical metrology subsystem (for in process gaging of the coating thickness buildup at specified points on the specimen); a microprocessor based adaptive system controller (to achieve the desired overall thickness profile on the specimen); and commerical plasma spray equipment. Over fifty JT9D first stage aircraft turbine blade specimens, ten W501B utility turbine blade specimens and dozens of cylindrical specimens were coated with the APS process in preliminary checkout and evaluation studies. The best of the preliminary turbine blade specimens achieved an overall coating thickness uniformity of 53 micrometers (2.1 mils), much better than is achievable manually. Comparative evaluations of coating thickness uniformity for manually sprayed and APS coated specimens were performed. One of the preliminary turbine blade evaluation specimens was subjected to a torch test and metallographic evaluation. Some cylindrical specimens coated with the APS process survived up to 2000 cycles in subsequent burner rig testing.

Fetheroff, C. W.↗

NASA electronic message experiment and study: Detailed test plans

A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.

Source record↗

Space Operations Center - A concept analysis

The Space Operations Center (SOC) which is a concept for a Shuttle serviced, permanent, manned facility in low earth orbit is viewed as a major candidate for the manned space flight following the completion of an operational Shuttle. The primary objectives of SOC are: (1) the construction, checkout, and transfer to operational orbit of large, complex space systems, (2) on-orbit assembly, launch, recovery, and servicing of manned and unmanned spacecraft, (3) managing operations of co-orbiting free-flying satellites, and (4) the development of reduced dependence on earth for control and resupply. The structure of SOC, a self-contained orbital facility containing several Shuttle launched modules, includes the service, habitation, and logistics modules as well as construction, and flight support facilities. A schedule is proposed for the development of SOC over ten years and costs for the yearly programs are estimated.

Source record↗

Space Shuttle cargo processing.

The spacecraft processing techniques to be used at the Kennedy Space Center for the assembly and check-out of Space Shuttle cargoes are discussed. The processing flow for vertically handled spacecraft, which are inserted into the Shuttle orbiter cargo bay while the orbiter is in the vertical position and often are attached to a separate solid booster stage, includes assembly into unified payloads in the Vertical Processing Facility, followed by Cargo Integration Test Equipment tests to ensure cargo bay compatibility, and transportation to the launch pad. Horizontally handled spacecraft such as Spacelab, which are inserted into the Orbiter cargo bay while it is in the Orbiter Processing Facility in the horizontal position, are assembled and checked out within the Operations and Checkout Building, where the CITE tests are performed and the Spacelab will be disassembled, and then transported to the Orbiter Processing Facility. It is pointed out that during the Space Shuttle era, when the number of spacecraft to be processed simultaneously at Kennedy will double or triple, all spacecraft processing facilities will be required to handle the workload.

Neilon, J. J.↗

The potential evolution of the space transportation system

An evolutionary plan satisfying the requirements of permanent manned space stations in low orbit by 1990 along with geostationary orbit sortie capabilities by 2000 is proposed. The program, to be gradually implemented with near-term technology, comprises: (1) unmanned platforms in low and geostationary orbits; (2) growth and development of these platforms into manned systems; (3) satellite checkout, handling, repair and maneuvering by means of special techniques, such as teleoperated docking, berthing and component exchange; and (4) transportation, by means of unmanned, cargo-carrying derivatives of the Space Shuttle and reuseable, space-based orbit transfer vehicles. Attention is given the envisioned configurations of both manned and unmanned orbital platforms, through a series of progress diagrams.

Bekey, I.↗

Space shuttle main engine controller

A technical description of the space shuttle main engine controller, which provides engine checkout prior to launch, engine control and monitoring during launch, and engine safety and monitoring in orbit, is presented. Each of the major controller subassemblies, the central processing unit, the computer interface electronics, the input electronics, the output electronics, and the power supplies are described and discussed in detail along with engine and orbiter interfaces and operational requirements. The controller represents a unique application of digital concepts, techniques, and technology in monitoring, managing, and controlling a high performance rocket engine propulsion system. The operational requirements placed on the controller, the extremely harsh operating environment to which it is exposed, and the reliability demanded, result in the most complex and rugged digital system ever designed, fabricated, and flown.

Mattox, R. M.↗

Shuttle considerations for the design of large space structures

Shuttle related considerations (constraints and guidelines) are compiled for use by designers of a potential class of large space structures which are transported to orbit and, deployed, fabricated or assembled in space using the Space Shuttle Orbiter. Considerations of all phases of shuttle operations from launch to ground turnaround operations are presented. Design of large space structures includes design of special construction fixtures and support equipment, special stowage cradles or pallets, special checkout maintenance, and monitoring equipment, and planning for packaging into the orbiter of all additional provisions and supplies chargeable to payload. Checklists of design issues, Shuttle capabilities constraints and guidelines, as well as general explanatory material and references to source documents are included.

Roebuck, J. A., Jr.↗

ROLM computers in the flight testing of the Fokker F29 aircraft

The design, development, installation, and operation of the test equipment (MRVS) is discussed. The main feature of the MRVS is continuous recording on an instrumentation recorder data of up to 1500 parameters with a total sample rate of up to 10,000 samples per second. In order to compress the evaluation and calibration time period, the following additional requirements were set for two test systems: (1) recording of selected parameters, time tagged on computer compatible tape (CCT); (2) recording of selected high bandwidth signals and ad hoc parameters on analog tape; (3) onboard presentation of calibrated parameter data, in engineering units, in numerical as well as graphical form for: system checkout during pre-, in- and post-flight, and quick look analysis during in-flight; (4) real time presentation on the ground by telemetry for: flight monitoring, takeoff and landing measurements, and noise measurements; and (5) data processing on the ground on the Fokker-NLR computer network.

Manders, P. J.↗