Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Deciphering Degradation: Machine Learning on Real-World Performance Data (Final Report)

This project addresses a fundamental flaw in solar PV research and solar project financing; the assumed rate of degradation for solar plants. The solar industry currently relies on an out-dated report that observed a 0.5% degradation rate based on a small sample size of systems (~100). While the research conducted at the time was new and innovative, the solar community has not updated this research and universally applies this 0.5% degradation assumption in financial models. Our project updates this assumption by analyzing observed degradation from the industry’s largest dataset of operating solar assets (>10,000 systems) and creating the first machine-learning model based on these observed results to quantify and identify features that drive degradation. There are two strategic goals for this award: reduce the cost of capital (enable solar to attract more capital) and improve the reliability of solar itself. These dual goals are achieved by leveraging an industry dataset to observe system degradation on a large scale, deploying advanced data analysis and machine learning methods to quantify and predict system reliability, and engaging with industry stakeholders to help them accurately price degradation in financial models.

14 SOLAR ENERGY↗

Integrated Operations for Nuclear Business Operation Model Analysis and Industry Validation

The purpose of this report is to refine and analyze five work reduction opportunities first presented in INL/EXT-21-64134, Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts. This report seeks to further refine and analyze five work reduction opportunities first presented in the original report. Researchers selected five work reduction opportunities from the full Integrated Operations for Nuclear (ION) suite. A selected group of utilities then verified details and inputs from the original report. Categories for verification included capital cost, technology requirements, and savings. Researchers then modeled the data points and data ranges using probabilistic analysis which predicts the likelihood of positive or negative net present value. Research results show four out of the five work reduction opportunities have a greater than fifty percent chance of a positive net present value outcome when analyzed independently. When the five work reduction opportunities are grouped and analyzed together the model indicates a sixty percent chance that the outcome of all five taken together will be positive. The nuclear industry should interpret these results as encouraging. In line with the ION model, positive financial analysis supports the investment of capital dollars into existing nuclear power plants along the ION model. Implementation of the five work reduction opportunities in this report is likely to result in substantive long-term savings for the owners and operators of domestic nuclear power plants.

99 GENERAL AND MISCELLANEOUS↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

Process-based cost estimation framework for assessing economic viability of environmentally and socially sustainable rare earth element feedstocks

Rare Earth Elements (REEs) are critical raw material inputs that are required to enable the energy transition. Constraints on the U.S. supply of conventional REE feedstocks and the desire to diversify U.S. reliance on foreign supply chains have motivated the pursuit of REE recovery from unconventional feedstocks including waste products. Recovery of REEs from unconventional sources is also motivated by environmental and social considerations, including the potential to offset new mining activity and subsidize the remediation of REE-containing wastes from coal, natural gas, and other mineral extraction activities. Sourcing REEs from unconventional feedstocks would reduce supply chain constraints and minimize the environmental impacts of REE extraction, but current processes to exploit these feedstocks have uncertain technical and economic performance and the processes have not been demonstrated at scale. This work aims to reduce uncertainty in evaluating the performance of new REE production pathways. A database of operating and capital expenses for REE recovery and establish consistent process unit costs for common stages in the conventional supply chain are developed. Market prices are used to develop well-defined methods for determining product values for a diverse set of products that can be generated (e.g. oxalates, alloys, end-use products such as magnets) but are not typically considered in technoeconomic analyses. Finally, to provide insight on the effects of economies of scale and feedstock purity on capital and operating costs, process unit level cost functions relating total costs per kilogram of REE produced are reported. These tools can be applied to assess and facilitate scale-up of REE production from diverse sources of REEs.

Fritz, Alison↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating the Value of Nuclear Integrated Hydrogen Production and the Dependency of Electricity and Hydrogen Markets on Natural Gas

Producing low carbon Hydrogen at a competitive price is one of the challenges to hydrogen being part of the solution to reach net-zero emission targets set by the U.S. DOE by 2050. With projected near-term improvements in technology, hydrogen production via solid oxide electrolysis cell (SOEC) / high-temperature steam electrolysis (HTSE) integrated with existing light water reactor (LWR) Nuclear Power Plants (NPP-HTSE) can produce carbon-free hydrogen competitively. In the near term, a 10-year production tax credit (PTC) found in the Inflation Reduction Act (IRA) has been passed, which will catalyze the development and improvement of hydrogen production technology to be competitive. The “1-1-1” target set by the U.S. DOE is to reduce the cost of carbon-free hydrogen by 80% to $1 per kilogram in 1 decade. Several models are available to analyze the profitability, opportunity, and technical capability of NPP-HTSE systems. In order of complexity from most complex to least complex some of these models include: RAVEN/HERON, process models using Aspen HYSYS and capital expense estimations using Aspen Process Economic Analyzer (APEA) and levelized cost of hydrogen (LCOH) calculation using the H2A model (Hydrogen Analysis Model), and custom spread sheets built by the interested party. Though some of the more advanced existing models provide detailed analysis to complex grid integrated problems, they also can take considerable time to setup and run. These advanced models are well suited to complex grid integrated analysis and the consideration of flexibility and variability of regulated and de-regulated electricity price and advanced estimation of capital and operating expenses and heat and material balances.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Techno-Economic Analysis of Geologically Connected Seawater Air Conditioning (GeoSWAC) Concept for District Cooling at the University of Puerto Rico at Rio Piedras: Preprint

At the University of Puerto Rico at Rio Piedras, a central chilled water plant supplies cooling to several campus buildings, contributing significantly to electricity demand during daytime peak hours, particularly in the summer months. These operational challenges are exacerbated by Puerto Rico's tropical rainforest climate and a power grid vulnerable to frequent disruptions caused by hurricanes and tropical storms. This study presents a techno-economic analysis of the existing chilled water plant serving four representative campus buildings and introduces a conceptual alternative: the Geologically connected Seawater Air Conditioning (GeoSWAC) system. GeoSWAC leverages stable low temperatures of deep ocean water (~1 km depth), hydraulically connected to an inland well, to deliver cooling without the use of vapor-compression refrigeration. Using modeled annual cooling loads and chiller performance data, capital costs, energy consumption, and levelized cost of cooling (LCOC) were evaluated for both systems. While GeoSWAC showed higher capital costs than the chiller-based scenario, operational costs were significantly lower at $26k-$53k annually, resulting in a lower LCOC between $2.3/MWh and $8.2/MWh compared to $30.2/MWh-$33.6/MWh for the chiller scenario. These results suggest that the GeoSWAC system offers a promising, low-energy, and climate-resilient alternative for large-scale cooling in tropical coastal environments, with significant potential to reduce peak electricity demand and improve long-term system reliability.

15 GEOTHERMAL ENERGY↗

Oversizing and Part-Load Problems

Oversizing, the common engineering practice of specifying devices with capacity exceeding the actual load requirement, is a widespread practice across virtually all building technologies end-use categories, including HVAC, electrical systems, lighting, appliances, and plug loads. This practice, driven by factors like design uncertainty, institutional pressures, and risk aversion, results in wasted capital investment, control difficulties, and excessive energy consumption due to inefficient part-load operation. Part-load operation, where devices run below maximum capacity, is the dominant operating mode in most energy systems and presents a complex design challenge. Solutions to match output to load fall into three broad categories: constraining the output, adjusting the device’s internal behavior, and linking output to energy storage or other waste-heat reuse applications. The energy implications of part-load are critical, as efficiency often drops sharply as load decreases across a wide diversity of devices. To quantify the extent of this problem, we derive a dimensionless Part-Load Metric (PLM) based on device efficiency and its frequency distribution of operating hours at various output levels. The PLM quantifies the deviation of a device's actual efficiency from its maximum design efficiency. This metric also serves as a measure of "capital inefficiency," enabling engineers to compare the impact of different part-load solutions and providing a unified framework for evaluating performance across various devices and systems.

Meier, Alan↗

Technical Qualifications for Treating Photovoltaic Assets as Real Property by Real Estate Investment Trusts (REITs)

It has been proposed that Real Estate Investment Trusts (REITs) have the potential to lower the cost and increase the adoption of photovoltaic systems (PV) by offering a more attractive source of capital. The purpose of this paper is to explain the fundamental physical characteristics of PV and compare them to the characteristics of 'real' property, to help determine whether REITs can own PVsystems.

14 SOLAR ENERGY↗

Updated U.S. Geothermal Supply Characterization and Representation for Market Penetration Model Input

The U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) tasked the National Renewable Energy Laboratory (NREL) with conducting the annual geothermal supply curve update. This report documents the approach taken to identify geothermal resources, determine the electrical producing potential of these resources, and estimate the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs from these geothermal resources at present and future timeframes under various GTP funding levels. Finally, this report discusses the resulting supply curve representation and how improvements can be made to future supply curve updates.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2022↗

U.S. Solar Photovoltaic BESS System Cost Benchmark Q1 2020 Report

NREL has been modeling U.S. solar photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. PV for residential, commercial, and utility-scale systems, with and without storage, built in the first quarter of 2020 (Q1 2020). The methodology includes bottom-up accounting for all system and project-development costs incurred when installing residential, commercial, and utility-scale systems and it models the capital costs and levelized cost of energy for such systems.

14 SOLAR ENERGY↗

Climate adaptation planning in practice: an evaluation of adaptation plans from three developed nations

Formal planning for climate change adaptation is emerging rapidly at a range of geo-political scales. This first generation of adaptation plans provides useful information regarding how institutions are framing the issue of adaptation and the range of processes that are recognized as being part of an adaptation response. To better understand adaptation planning among developed nations, a set of 57 adaptation plans from Australia, the United Kingdom and the United States was evaluated against a suite of 19 planning processes identified from existing guidance instruments for adaptation planning. Total scores among evaluated plans ranged from 16% of the maximum possible score to 61%, with an average of 37%. These results suggest adaptation plans are largely under-developed. Critical weaknesses in adaptation planning are related to limited consideration for non-climatic factors as well as neglect for issues of adaptive capacity including entitlements to various forms of capital needed for effective adaptation. Such gaps in planning suggest there are opportunities for institutions to make better use of existing guidance for adaptation planning and the need to consider the broader governance context in which adaptation will occur. In addition, the adaptation options prescribed by adaptation plans reflect a preferential bias toward low-risk capacity-building (72% of identified options) over the delivery of specific actions to reduce vulnerability. To the extent these findings are representative of the state of developed nation adaptation planning, there appear to be significant deficiencies in climate change preparedness, even among those nations often assumed to have the greatest adaptive capacity.

54 ENVIRONMENTAL SCIENCES↗

Estimates of the Global Indirect Energy-Use Emission Impacts of USA Biofuel Policy

This paper evaluates the indirect energy-use emission implications of increases in the use of biofuels in the USA between 2001 and 2010 as mandates within a dynamic global computable general equilibrium model. The study incorporates explicit markets for biofuels, petroleum and other fossil fuels, and accounts for interactions among all sectors of an 18-region global economy. It considers bilateral trade, as well as the dynamics of capital allocation and investment. Simulation results show that the biofuel mandates in the USA generate an overall reduction in global energy use and emissions over the simulation period from 2001 to 2030. Consequently, the indirect energy-use emission change or emission leakage under the mandate is negative. That is, global emission reductions are larger than the direct emission savings from replacing petroleum with biofuels under the USA RFS2 over the last decade. Under our principal scenario this enhanced the direct emission reduction from biofuels by about 66%. The global change in lifecycle energy-use emissions for this scenario was estimated to be about 93 million tons of CO2e in 2010, 45 million tons of CO2e in 2020, and an increase of 5 million tons of CO2e in 2030, relative to the baseline scenario. Sensitivity results of six alternative scenarios provided additional insights into the pattern of the regional and global effects of biofuel mandates on energy-use emissions.

02 PETROLEUM↗

Levelized Cost of CO 2 Captured Using Five Physical Solvents in Pre-combustion Applications

Aspen Plus v8.8 was used to perform techno-economic analysis (TEA) of a CO 2 capture process from a typical fuel gas stream in a 543-MW pre-combustion power plant using five different physical solvents (Selexol, PEGPDMS-1, NMP, [aPy][Tf 2 N] and [hmim][Tf 2 N]). The process included a countercurrent packed-bed absorber operating under high-pressure over a wide range of temperatures and three pressure-swing flash drums for solvent regeneration. Furthermore, two packings, Mellapak 250Y and IMTP50, were used and the Levelized costs of CO 2 captured (LCOC) were calculated. The simulation results indicated that using Mellapak 250Y exhibited lower LCOC values than those when using IMTP50 for the five solvents under all conditions used as it offered better mass transfer. The CO 2 capture process carried out at low temperatures showed lower LCOC values than those at higher temperatures due to the increased CO 2 solubility in the solvents at lower temperatures, requiring smaller absorber diameter and lower solvent circulation rates, which offset the cooling requirements. Comparing the lowest LCOC values for the five solvents, the hydrophobic PEGPDMS-1 solvent was the most promising one compared to the other four solvents, due to its lowest capital and operating costs and noncorrosive, which enabled using less expensive materials for the process equipment.

42 ENGINEERING↗