Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Build System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Wastewater to Plant Nutrient System

Vision and Mission Statement During human space exploration missions longer than 30 days (500 days to indefinite; as defined by NASA strategic plan), a spacefaring crew will generate liquid waste that can be recovered and processed to create nutrients for a plant food production system. In addition, the sodium in urine has a potential to build-up in the system and is not useful as a plant fertilizer since it can stress plants at high concentrations. Finding a way to separate these products and retrieve them for other use is critical for long duration missions. This is useful since it can greatly reduce the amount of overall mission mass.

Robert Gitten↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Using NASA's Space Launch System to Enable Game Changing Science Mission Designs

NASA's Marshall Space Flight Center is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will help restore U.S. leadership in space by carrying the Orion Multi-Purpose Crew Vehicle and other important payloads far beyond Earth orbit. Its evolvable architecture will allow NASA to begin with Moon fly-bys and then go on to transport humans or robots to distant places such as asteroids, Mars, and the outer solar system. Designed to simplify spacecraft complexity, the SLS rocket will provide improved mass margins and radiation mitigation, and reduced mission durations. These capabilities offer attractive advantages for ambitious missions such as a Mars sample return, by reducing infrastructure requirements, cost, and schedule. For example, if an evolved expendable launch vehicle (EELV) were used for a proposed mission to investigate the Saturn system, a complicated trajectory would be required with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip times and cost. As this paper will report, the SLS rocket will launch payloads of unprecedented mass and volume, such as monolithic telescopes and in-space infrastructure. Thanks to its ability to co-manifest large payloads, it also can accomplish complex missions in fewer launches. Future analyses will include reviews of alternate mission concepts and detailed evaluations of SLS figures of merit, helping the new rocket revolutionize science mission planning and design for years to come.

Creech, Stephen D.↗

Compatibility Between Exploration EVA System and Exploration Spacecraft

Over the life of the Extravehicular Mobility Unit (EMU), numerous products detailing “how to build Extravehicular Activity (EVA) System hardware”, “how to interface with EVA System hardware” and “how to design hardware EVA will access and utilize” were generated to provide interoperability between a suited crewmember and the specified vehicle’s EVA task. Since the inception of these products, some have continued to receive updates due to the necessity of an on-going program while others remained unchanged for years and have led to discrepancies between the current accepted values and those considered outdated. For EVA-suited crewmember tasks beyond Low Earth Orbit (LEO), new vehicles need a single consolidated location for the best practices and lessons learned from the EVA Community. This paper outlines what common EVA compatibility design requirements are expected of an Exploration spacecraft that has interactions between the vehicle and an EVA suited crewmember for and an approach for standardizing EVA compatibility across various vehicles at various destinations. The approach of standardization allows for flexibility by tailoring the applicability to meet the EVA tasks required for that vehicle’s operation beyond Low Earth Orbit. This paper will also describe the broad difference between microgravity and partial gravity EVA compatibility and how those requirements were identified and will be informed.

Compatibility↗

NASA's Space Launch System: A New Capability for Science and Exploration

NASA's Marshall Space Flight Center (MSFC) is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will launch the Orion Multi-Purpose Crew Vehicle (MPCV) and other high-priority payloads into deep space. Its evolvable architecture will allow NASA to begin with human missions beyond the Moon and then go on to transport astronauts or robots to distant places such as asteroids and Mars. Developed with the goals of safety, affordability, and sustainability in mind, SLS will start with 10 percent more thrust than the Saturn V rocket that launched astronauts to the Moon 40 years ago. From there it will evolve into the most powerful launch vehicle ever flown, via an upgrade approach that will provide building blocks for future space exploration. This paper will explain how NASA will execute this development within flat budgetary guidelines by using existing engines assets and heritage technology, from the initial 70 metric ton (t) lift capability through a block upgrade approach to an evolved 130-t capability, and will detail the progress that has already been made toward a first launch in 2017. This paper will also explore the requirements needed for human missions to deep-space destinations and for game-changing robotic science missions, and the capability of SLS to meet those requirements and enable those missions, along with the evolution strategy that will increase that capability. The International Space Exploration Coordination Group, representing 12 of the world's space agencies, has worked together to create the Global Exploration Roadmap, which outlines paths towards a human landing on Mars, beginning with capability-demonstrating missions to the Moon or an asteroid. The Roadmap and corresponding NASA research outline the requirements for reference missions for all three destinations. The SLS will offer a robust way to transport international crews and the air, water, food, and equipment they would need for extended trips to asteroids, the Moon, and Mars. SLS also offers substantial capability to support robotic science missions, offering benefits such as improved mass margins and radiation mitigation, and reduced mission durations. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip time and cost. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by providing the robust space launch capability to deliver sustainable solutions for advanced exploration.

Robinson, Kimberly F.↗

Technology Innovations from NASA's Next Generation Launch Technology Program

NASA's Next Generation Launch Technology Program has been on the cutting edge of technology, improving the safety, affordability, and reliability of future space-launch-transportation systems. The array of projects focused on propulsion, airframe, and other vehicle systems. Achievements range from building miniature fuel/oxygen sensors to hot-firings of major rocket-engine systems as well as extreme thermo-mechanical testing of large-scale structures. Results to date have significantly advanced technology readiness for future space-launch systems using either airbreathing or rocket propulsion.

Cook, Stephen A.↗

The Application of Hardware in the Loop Testing for Distributed Engine Control

The essence of a distributed control system is the modular partitioning of control function across a hardware implementation. This type of control architecture requires embedding electronics in a multitude of control element nodes for the execution of those functions, and their integration as a unified system. As the field of distributed aeropropulsion control moves toward reality, questions about building and validating these systems remain. This paper focuses on the development of hardware-in-the-loop (HIL) test techniques for distributed aero engine control, and the application of HIL testing as it pertains to potential advanced engine control applications that may now be possible due to the intelligent capability embedded in the nodes.

Distributed Engine Control↗

The Application of Hardware in the Loop Testing for Distributed Engine Control

The essence of a distributed control system is the modular partitioning of control function across a hardware implementation. This type of control architecture requires embedding electronics in a multitude of control element nodes for the execution of those functions, and their integration as a unified system. As the field of distributed aeropropulsion control moves toward reality, questions about building and validating these systems remain. This paper focuses on the development of hardware-in-the-loop (HIL) test techniques for distributed aero engine control, and the application of HIL testing as it pertains to potential advanced engine control applications that may now be possible due to the intelligent capability embedded in the nodes.

Control↗

Assessing Ceres’ Past and Current Habitability

Dwarf planet Ceres is a compelling target as an evolved ocean world with, at least, regional brine reservoirs and potentially ongoing geological activity. Situated in the Main Belt of asteroids, Ceres is the most water-rich body in the inner solar system (in relative abundance) and is accessible enough for a sample return with the resources of a typical medium-class (New Frontiers) NASA mission. NASA’s Dawn mission at Ceres revealed the presence of liquid, brine-driven activity, organic matter, and a rich salt chemistry. With this evidence, the overarching goals of the mission concept presented herein are to quantify Ceres’ current habitability potential and origin. A sample return from young evaporite deposits in Occator crater offers greater science return than an in situ exploration mission by enabling high-resolution analysis of (1) organic matter expected from terrestrial and chondritic analogs that are trapped in salt minerals and (2) isotopes of refractory elements for a similar cost and less science risk. The sample return concept would be executed with a single flight system due to Ceres’ relative proximity to Earth and low gravity. Solar electric propulsion was identified as the most cost-effective approach for getting to Ceres and back. De-orbiting, landing, and takeoff are performed with a throttleable monopropellant hydrazine system. The solar arrays are stowed prior to landing and takeoff. Sample acquisition builds on the pneumatic system designed by Honeybee Robotics. The sample return mission concept relies on the availability of key technologies: an enhanced landing vision system leveraging investments from Mars 2020; retractable/redeployable solar arrays, which have been demonstrated on the International Space Station but not at Ceres’ gravity; and an emerging design from upcoming missions for sample transfer from the pneumatic sampling system to the sample return capsule. Return of a sample of mass ~100 g from Ceres, maintained at ≤ -20°C, is without precedent for any currently advocated Ocean World mission, enabling a vast range of experimental techniques back on Earth with sensitivities and accuracies far beyond those feasible with in situ instruments. A sample of this size also enables analyses to benefit from techniques that will become available in the future.

Casillas, Raul Polit↗

Experimental Study of Turbine Fuel Thermal Stability in an Aircraft Fuel System Simulator

The thermal stability of aircraft gas turbines fuels was investigated. The objectives were: (1) to design and build an aircraft fuel system simulator; (2) to establish criteria for quantitative assessment of fuel thermal degradation; and (3) to measure the thermal degradation of Jet A and an alternative fuel. Accordingly, an aircraft fuel system simulator was built and the coking tendencies of Jet A and a model alternative fuel (No. 2 heating oil) were measured over a range of temperatures, pressures, flows, and fuel inlet conditions.

Vranos, A.↗

Virtual Build: Low-Tech Simulations Can Be High on IPPD Content

After two years of design, component testing, and parts fabrication, the project team was within months of starting assembly on the first major elements of a new product assembly. Schedules were extremely tight and there was no room for error in the first unit build-up for test. The first draft of the assembly drawing was nearing completion and needed to be approved by key members of the Integrated Product Team (IPT) before release. Only then could the manufacturing planning be finalized and released for assembly to begin. What could we do to improve the quality of our first build effort? How could we minimize all the changes inherent in the first-time build of a complex mechanical system? Why not a dress rehearsal of the build process with all the participating players, hardware, and build documentation? A "virtual build simulation". In an organization employing integrated product teams there is no substitute for clear communication between the various cross-functional members. Despite team collocation, integrated solid modeling, and frequent coordination meetings. elements of the product-process design can still slip through the cracks and show up on the assembly floor. The virtual build exercise was designed to provide one intensive hands-on experience for all members of the design and assembly team in time to make corrections without schedule impact.

Hilscher, Rick↗

Closed End Launch Tube (CELT)

As an alternative to magnetic propulsion for launch assist, the authors propose a pneumatic launch assist system. Using off the shelf components, coupled with familiar steel and concrete construction, a launch assist system can be brought from the initial feasibility stage, through a flight capable 5000 kg. demonstrator to a deployed full size launch assist system in 10 years. The final system would be capable of accelerating a 450,000 kg. vehicle to 270 meters per second. The CELT system uses commercially available compressors and valves to build a fail-safe system in less than half the time of a full Mag-Lev (magnetic levitation) system, and at a small fraction of the development cost. The resulting system could be ready in time to support some Gen 2 (generation 2) vehicles, as well as the proposed Gen 3 vehicle.

Lueck, Dale E.↗

Search for Presolar Materials and Isotopically Anomalous Diffuse Insoluble Organic Matter in Samples From Asteroid 101955 Bennu

Carbonaceous asteroids allow us to study the original materials that formed the planets in the protoplanetary disk. They contain organic matter and (sub-)micrometer-size dust grains, called presolar grains, that condensed in the circumstellar envelopes of evolved stars and the ejecta of stellar explosions, such as novae and supernovae, before the formation of our Solar System. The isotopically anomalous organics are thought to have formed in the interstellar medium and the early Solar System. Whereas presolar grains provide insight into the building blocks of our Solar System, studying organics can help us understand the origin of life on Earth. These organics might have contributed to ingredients that helped life emerge. The return of samples from asteroid 101955 Bennu by NASA’s Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx) mission gives us a new opportunity to elucidate the formation mechanism(s) and evolution of organics, as well as the abundance and distribution presolar grains in carbonaceous asteroids. Here, we report on our ongoing work to characterize the isotopic and chemical compositions, microstructure, distribution, and abundance of insoluble organic matter (IOM) and presolar grains in Bennu samples. This work supports hypotheses 2 and 3 of the OSIRIS-REx Sample Analysis Plan.

P. Haenecour↗

The Next Landsat Satellite: The Landsat Data Continuity Mission

The Landsat program is one of the longest running satellite programs for Earth observations from space. The program was initiated by the launch of Landsat 1 in 1972. Since then a series of six more Landsat satellites were launched and at least one of those satellites has been in operations at all times to continuously collect images of the global land surface. The Department of Interior (DOI) U.S. Geological Survey (USGS) preserves data collected by all of the Landsat satellites at their Earth Resources Observation and Science (EROS) Center in Sioux Falls, South Dakota. This 40-year data archive provides an unmatched record of the Earth's land surface that has undergone dramatic changes in recent decades due to the increasing pressure of a growing population and advancing technologies. EROS provides the ability for anyone to search the archive and order digital Landsat images over the internet for free. The Landsat data are a public resource for observing, characterizing, monitoring, trending, and predicting land use change over time providing an invaluable tool for those addressing the profound consequences of those changes to society. The most recent launch of a Landsat satellite occurred in 1999 when Landsat 7 was placed in orbit. While Landsat 7 remains in operation, the National Aeronautics and Space Administration (NASA) and the DOI/ USGS are building its successor satellite system currently called the Landsat Data Continuity Mission (LDCM). NASA has the lead for building and launching the satellite that will carry two Earth-viewing instruments, the Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS). The OLI will take images that measure the amount of sunlight reflected by the land surface at nine wavelengths of light with three of those wavelengths beyond the range of human vision. T1RS will collect coincident images that measure light emitted by the land surface as a function of surface temperature at two longer wavelengths well beyond the range of human vision. The DOI/USGS is developing the ground system that will command and control the LDCM satellite in orbit and manage the OLI and TIRS data transmitted by the satellite. DOI/USGS will thus operate the satellite and collect, archive, and distribute the image data as part of the EROS archive. DOI/USGS has committed to renaming LDCM as Landsat 8 following launch. By either name the satellite and its sensors will extend the 40-year archive with images sufficiently consistent with data from earlier Landsat satellites to allow multi-decadal, broad-area studies of our dynamic landscapes. The next Landsat satellite and ground system are on schedule for a January, 2013 launch.

Rons, James R.↗

Faults Discovery By Using Mined Data

Fault discovery in the complex systems consist of model based reasoning, fault tree analysis, rule based inference methods, and other approaches. Model based reasoning builds models for the systems either by mathematic formulations or by experiment model. Fault Tree Analysis shows the possible causes of a system malfunction by enumerating the suspect components and their respective failure modes that may have induced the problem. The rule based inference build the model based on the expert knowledge. Those models and methods have one thing in common; they have presumed some prior-conditions. Complex systems often use fault trees to analyze the faults. Fault diagnosis, when error occurs, is performed by engineers and analysts performing extensive examination of all data gathered during the mission. International Space Station (ISS) control center operates on the data feedback from the system and decisions are made based on threshold values by using fault trees. Since those decision-making tasks are safety critical and must be done promptly, the engineers who manually analyze the data are facing time challenge. To automate this process, this paper present an approach that uses decision trees to discover fault from data in real-time and capture the contents of fault trees as the initial state of the trees.

Lee, Charles↗

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 4: Detailed data. Part 2: Program plans and common support needs (a study of the commonality of space vehicle applications to future national needs

The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.

Bekey, I.↗